Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Earth Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

NEPTranS: a shuttle-tended NEP interplanetary transporation system

This paper discusses the preliminary design developed for the NEP Interplanetary Transfer Vehicle, including its configuration and design features, and outlines the concept for mission design, including discussion of unique requirements for launch, deployment and operations with the Space Shuttle, and rendezvous and servicing by the Shuttle in Earth orbit following a return from each target destination.

NEP↗

Design and Technology Maturation of the Stratospheric Projectile Experiment of Entry Dynamics

The supersonic and transonic dynamic stability of blunt-body reentry vehicles currently poses large risks in all of NASA’s ongoing entry missions (MSR SRL, MSR EES, and Dragonfly). These projects have allocated millions of dollars to testing and modeling efforts to buy down risk by using the current state-of-the-art (SoA) facilities at NASA’s disposal. While these facilities have heritage in supplying dynamics data to reentry missions, their availability is severely limited – particularly with the high number of concur-rent projects requesting simultaneous testing– and are costly when considering the science density per dollar. None of the current SoA facility methodologies allow the test model to have the dynamics fully develop through a flight relevant free-stream profile and as such require extrapolations with resultant high uncertainties in order to relate the test dynamics to flight expectations. SPEED is a NASA Ames Center Innovation Fund (CIF) project that is developing a highly tailorable and cost-effective test methodology to better assess the dynamic stability of blunt-body reentry vehicles via a stratospheric balloon flight. This is accomplished by dropping a suite of instrumented capsules from a stratospheric balloon to gain a statistically relevant dataset of scaled reentry vehicles in mission relevant free-flight conditions. This presentation will walk through how the test methodology is being implemented specifically for the Mars Sample Return (MSR) Earth Entry System (EES) geometry in an awarded Flight Opportunities Program (FOP) test flight in early CY24. SPEED Application to MSR: SPEED consists of three main mechanical systems: the Drop Platform, the Projectile, and the test Capsule. SPEED is being developed as a set of guidelines and recommendations for how to test with the proposed Concept of Operations (Conops) since the specific design parameters will vary depending on the specific project’s reference trajectory and entry vehicle design. As such, this presentation will walk through the development time-line as shown in Fig. 2. This is meant to serve as a blueprint for further missions as desired. Mechanical and Avionics Design. The SPEED test platform designed for the MSR-EES capsule geometry with nominal entry parameters has the ability to carry 10 Capsules to altitude instrumented with: 1. 3-Axis Accelerometer 2. IMU 3. Gyroscope 4. Magnetometer 5. Pressure Transducer cruciform 6. Uplook and Horizon Cameras To package the avionics/instrumentation suite, the capsule is approximately 1’ in diameter with the Outer Mold Line (OML) centroid-scaled from the full EES design. The internal volume is gutted and custom-shaped to fit the desired instrumentation suite, as well as to allow for the positioning of ballast mass such that the Center of Gravity is analogous to the flight vehicle. All structural components in the Capsule and Projectile are 3D printed, which significantly reduces the cost of each flight unit to around $1500 including all instrumentation, avionics, and structural components. Flight Conops. The test Capsule is accelerated to the desired altitude and Mach number while stowed in the Projectile, a missile-like vehicle consisting of steel ballast in the nose, a low-drag OML, and an Ejection Mechanism to reliably release the Capsule into the free-flow supersonic conditions. For the MSR-EES design, the capsule employs ~3kg of ballast mass at the nose to accelerate the 1.25kg test Capsule to ~Mach 1.7 at 23km altitude. This requires an initial release altitude of 40km, the quoted limit of a 80kg payload by the FOP-contracted balloon provider. Once the Ejection Mechanism avionics detect the proper conditions, the spring-loaded Ejection Mechanism will release and – guided by the sabot – expose the test Capsule to the desired test conditions for ~5 seconds of free-flight in the supersonic/transonic regimes. Dynamics in the subsonic regime will also be captured with the instrumentation suite with post-flight recovery operations aimed at recovering the high-G-load capable SD cards after the planned hard impact landings. Testing and Development: In the few months the SPEED project has worked the development of MSR-EES flight test, the team has performed lab and drone based testing which this presentation will overview. After the first design phase, the team fabricated Engineering Demonstration Units (EDUs) of all subsystems to perform validation testing shown in Fig. 5. After validation was completed on the subsystem level, a drone-drop test was performed at the recreational flight ceiling of 400ft altitude to assess the SPEED systems in a flight environment. Parameters such as in-flight stability, hard impact landing performance, and avionics performance were quantified and qualified. The FY23 CIF will culminate in a helicopter drop test aboard an Air National Guard Blackhawk. This will prepare the team for the CY24 FOP stratospheric balloon flight that should provide the final verification to begin offering the test platform for mission support. Focus of Presentation: This presentation will outline the technology maturation path of the SPEED implementation to the MSR-EES capsule baseline as well as the details regarding the mechanical system, avionics and instrumentation, and flight operations. Note that a complementary presentation is being submitted for a methodology overview of the SPEED test platform, introducing the testing technique and benefits as well as the full application space of the technology.

pitch damping coefficient↗

Fast Calculation of Abort Return Trajectories for Manned Missions to the Moon

In order to support the anytime abort requirements of a manned mission to the Moon, the vehicle abort capabilities for the translunar and circumlunar phases of the mission must be studied. Depending on the location of the abort maneuver, the maximum return time to Earth and the available propellant, two different kinds of return trajectories can be calculated: direct and fly-by. This paper presents a new method to compute these return trajectories in a deterministic and fast way without using numerical optimizers. Since no simplifications of the gravity model are required, the resulting trajectories are very accurate and can be used for both mission design and operations. This technique has been extensively used to evaluate the abort capabilities of the Orion/Altair vehicles in the Constellation program for the translunar phase of the mission.

Senent, Juan S.↗

Development and Test Plans for the MSR EEV

The goal of the proposed Mars Sample Return mission is to bring samples from the surface of Mars back to Earth for thorough examination and analysis. The Earth Entry Vehicle is the passive entry body designed to protect the sample container from entry heating and deceleration loads during descent through the Earth s atmosphere to a recoverable location on the surface. This paper summarizes the entry vehicle design and outlines the subsystem development and testing currently planned in preparation for an entry vehicle flight test in 2010 and mission launch in 2013. Planned efforts are discussed for the areas of the thermal protection system, vehicle trajectory, aerodynamics and aerothermodynamics, impact energy absorption, structure and mechanisms, and the entry vehicle flight test.

Dillman, Robert↗

Preliminary Analysis of ISS Maintenance History and Implications for Supportability of Future Missions

The International Space Station (ISS) enables the study of supportability issues associated with long-duration human spaceflight. The ISS is a large, complex spacecraft that must be maintained by its crew. In contrast to the Space Shuttle Orbiter vehicle, but similar to spacecraft that will be component elements of future missions beyond low-Earth orbit, ISS does not return to the ground for servicing and provisioning of spares is severely constrained by transportation limits. Although significant technical support is provided by ground personnel, all hands-on maintenance tasks are performed by the crew. It is expected that future missions to distant destinations will be further limited by lack of resupply opportunities and will, eventually, become largely independent of ground support. ISS provides an opportunity to begin learning lessons that will enable future missions to be successful. Data accumulated over the first several years of ISS operations have been analyzed to gain a better understanding of maintenance-related workload. This analysis addresses both preventive and corrective maintenance and includes all U.S segment core systems. Systems and tasks that are major contributors to workload are identified. As further experience accrues, lessons will be learned that will influence future system designs so that they require less maintenance and, when maintenance is required, it can be performed more efficiently. By heeding the lessons of ISS it will be possible to identify system designs that should be more robust and point towards advances in both technology and design that will offer the greatest return on investment.

Watson, Kevin J.↗

Progress and Status of the 2nd Generation Reusable Launch Vehicle Program

Safe, low-cost space transportation is the key enabler of the commercial development and civil exploration of space. Human space flight remains a hazardous endeavor in spite of advances in aerospace technology. NASA intends to reduce the resources devoted to routine space operations, thus enabling additional science research, technology development, and exploration activities. NASA developed the Integrated Space Transportation Plan (ISTP) to address the needs for space access. ISTP is a balanced and comprehensive plan that embodies strategies for achieving goals for earth-to-orbit and in-space transportation operations. ISTP calls for near-term safety related upgrades to the Space Shuttle, development of a Crew Return Vehicle, a new Space Launch Initiative (SLI), and development of an Aero-Space Base to provide foundation technology for future space systems. NASA formed the SLI to coordinate the development of the 2nd Generation Reusable Launch Vehicle (RLV) architecture, The SLI is implemented by the 2nd Generation RLV Program Office.

Dumbacher, Daniel L.↗

Mars transfer vehicle studies

Earth-to-Mars distances vary from 60 to 400 million kilometers over a 14-year cycle. This complicates Mars mission design as a function of calendar time. Stay times at Mars are also strongly driven by opportunities for a return flight path which are within the limits of delta-V associated with practical space vehicles. The biggest difference between Mars and lunar transfer missions is mission time, which grows from a few days for the moon, to as much as a few hundred days for Mars missions. As a result, modules for similarly sized crews must be much larger for Mars missions that for transfer to lunar orbit. Technology challenges for one Mars mission scenario analyzed by Boeing include aerobrakes, propulsion, and life support systems. Mission performance is very sensitive to aerobrake weight fraction and, as a result, there is an incentive to use high performance materials such as advanced composites and thermal protection systems. Lander aerobrake would be used twice (for both planetary capture and descent to the Mars surface), and it would need to survive temperatures up to 3500 degrees.

Woodcock, Gordon↗

An ISRU Propellant Production System to Fully Fuel a Mars Ascent Vehicle

In-Situ Resource Utilization (ISRU) will enable the long term presence of humans beyond low earth orbit. Since 2009, oxygen production from the Mars atmosphere has been baselined as an enabling technology for Mars human exploration by NASA. However, using water from the Martian regolith in addition to the atmospheric CO2 would enable the production of both liquid Methane and liquid Oxygen, thus fully fueling a Mars return vehicle. A case study was performed to show how ISRU can support NASA's Evolvable Mars Campaign (EMC) using methane and oxygen production from Mars resources. A model was built and used to generate mass and power estimates of an end-to-end ISRU system including excavation and extraction water from Mars regolith, processing the Mars atmosphere, and liquefying the propellants. Even using the lowest yield regolith, a full ISRU system would weigh 1.7 mT while eliminating the need to transport 30 mT of ascent propellants from earth.

Mars Surface↗

The New Jettison Policy for the International Space Station

During more than seven years of operations by the International Space Station (ISS), approximately three dozen pieces of debris were released and subsequently cataloged by the U.S. Space Surveillance Network (SSN). The individual mass of these objects ranged from less than 1 kg to 70 kg. Although some of these debris were separated from the ISS accidentally, some were intentionally cast-off, especially the larger items. In addition, small operational satellites are candidates for launch from the ISS, such as the TNS-O satellite deployed from ISS in March 2005. Recently an official ISS Jettison Policy was developed to ensure that decisions to deliberately release objects in the future were based upon a complete evaluation of the benefits and risks to the ISS, other resident space objects, and people on the Earth. The policy identifies four categories of items which might be considered for release: (1) items that pose a safety issue for return on-board a visiting vehicle, (2) items that negatively impact ISS utilization, return, or on-orbit stowage manifests, (3) items that represent an EVA timeline savings, and (4) items that are designed for jettison. Some of the principal issues to be addressed during this evaluation process are the potential for the object to recontact the ISS within the first two days after jettison, the potential of the object to breakup prior to reentry, the ability of the SSN to track the object, and the risk to people on Earth from components which might survive reentry. This paper summarizes the history of objects released from ISS, examines the specifics of the ISS jettison policy, and addresses the overall impact of ISS debris on the space environment.

Johnson, Nicholas L.↗

NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present Missions

The United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.

Dumbacher, Daniel L.↗

Nuclear Thermal Propulsion (NTP): A Proven, Growth Technology for Fast Transit Human Missions to Mars

The "fast conjunction" long surface stay mission option was selected for NASA's recent Mars Design Reference Architecture (DRA) 5.0 study because it provided adequate time at Mars (approx. 540 days) for the crew to explore the planet's geological diversity while also reducing the "1-way" transit times to and from Mars to approx. 6 months. Short transit times are desirable in order to reduce the debilitating physiological effects on the human body that can result from prolonged exposure to the zero-gravity (0-gE) and radiation environments of space. Recent measurements from the RAD detector attached to the Curiosity rover indicate that astronauts would receive a radiation dose of approx. 0.66 Sv (approx. 66 rem)-the limiting value established by NASA-during their 1-year journey in deep space. Proven nuclear thermal rocket (NTR) technology, with its high thrust and high specific impulse (Isp approx. 900 s), can cut 1-way transit times by as much as 50 percent by increasing the propellant capacity of the Mars transfer vehicle (MTV). No large technology scale-ups in engine size are required for these short transit missions either since the smallest engine tested during the Rover program-the 25 klbf "Pewee" engine is sufficient when used in a clustered arrangement of three to four engines. The "Copernicus" crewed MTV developed for DRA 5.0 is a 0-gE design consisting of three basic components: (1) the NTP stage (NTPS); (2) the crewed payload element; and (3) an integrated "saddle truss" and LH2 propellant drop tank assembly that connects the two elements. With a propellant capacity of approx. 190 t, Copernicus can support 1-way transit times ranging from approx. 150 to 220 days over the 15-year synodic cycle. The paper examines the impact on vehicle design of decreasing transit times for the 2033 mission opportunity. With a fourth "upgraded" SLS/HLV launch, an "in-line" LH2 tank element can be added to Copernicus allowing 1-way transit times of 130 days. To achieve 100 to 120 day transit times, Copernicus' saddle truss/drop tank assembly is replaced by a "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. The HLV launch count increases (from approx. 5 to 7) and a fourth engine is needed to reduce total mission burn time and gravity losses. Using a "split mission" approach, the NTPS, in-line tank and the saddle truss/LH2 drop tank elements can be configured as a pre-deployed Earth Return Vehicle/propellant tanker supporting 90-day crewed mission transits. The split mission approach also eliminates the need for on-orbit assembly. Mission scenario descriptions, key features and operational characteristics for five different vehicle configurations are presented.

Borowski, Stanley K.↗

Crew Exploration Vehicle Service Module Ascent Abort Coverage

The Crew Exploration Vehicle (CEV) is required to maintain continuous abort capability from lift off through destination arrival. This requirement is driven by the desire to provide the capability to safely return the crew to Earth after failure scenarios during the various phases of the mission. This paper addresses abort trajectory design considerations, concept of operations and guidance algorithm prototypes for the portion of the ascent trajectory following nominal jettison of the Launch Abort System (LAS) until safe orbit insertion. Factors such as abort system performance, crew load limits, natural environments, crew recovery, and vehicle element disposal were investigated to determine how to achieve continuous vehicle abort capability.

Tedesco, Mark B.↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Human Lunar Destiny: Past, Present, and Future

This paper offers conceptual strategy and rationale for returning astronauts to the moon. NASA's historic Apollo program enabled humans to make the first expeditionary voyages to the moon and to gather and return samples back to the earth for further study. To continue exploration of the moon within the next ten to fifteen years, one possible mission concept for returning astronauts using existing launch vehicle infrastructure is presented. During these early lunar missions, expeditionary trips are made to geographical destinations and permanent outposts are established at the lunar south pole. As these missions continue, mining operations begin in an effort to learn how to live off the land. Over time, a burgeoning economy based on mining and scientific activity emerges with the formation of more accommodating settlements and surface infrastructure assets. As lunar activity advances, surface infrastructure assets grow and become more complex, lunar settlements and outposts are established across the globe, travel to and from the moon becomes common place, and commerce between earth and the moon develops and flourishes. Colonization and development of the moon is completed with the construction of underground cities and the establishment of a full range of political, religious, educational, and recreational institutions with a diverse population from all nations of the world. Finally, rationale for diversifying concentrations of humanity throughout earth's neighborhood and the greater solar system is presented.

Fletcher, David↗

Regenerative Life Support Systems for Exploration Habitats: Unique Capabilities and Challenges to Enable Long-Duration-Mission Habitats Beyond Low Earth Orbit

The Artemis I launch of NASA’s Space Launch System and Orion crew vehicle will mark a major milestone in the agency’s efforts to return humans to the Moon. Work is underway on the Human Landing System that will carry the next astronauts to the lunar surface, and the lunar orbiting Gateway that will host science and serve as a platform to support sustained human presence on the Moon and ultimately crewed missions to Mars. Two decades of continuous human presence on the International Space Station has provided a wealth of experience operating, upgrading, and demonstrating advanced Regenerative Environmental Control and Life Support Systems (Regen ECLSS). However, habitats that enable sustained lunar surface presence and transit to Mars will encounter many unique conditions and challenges. System characteristics including reliability, maintainability, mass, and power become significantly more critical. Operating environments associated with lower total pressure, low gravity, contingency protocols, and extensive un-crewed and dormant periods impose additional functionality requirements and alter the performance of certain critical systems. Integration and combined operations with other elements such as orbiting outposts, logistics suppliers, and mobility platforms impact capability and interface requirements. Limits on allocated water and oxygen consumable mass influence the need for higher levels of water and oxygen recovery from waste products. Impacts and challenges these unique exploration circumstances impose on the suite of Regen ECLSS systems are explored and discussed herein.

David F Howard↗

Apollo experience report: Development of guidance targeting techniques for the command module and launch vehicle

The development of the guidance targeting techniques for the Apollo command module and launch vehicle is discussed for four types of maneuvers: (1) translunar injection, (2) translunar midcourse, (3) lunar orbit insertion, and (4) return to earth. The development of real-time targeting programs for these maneuvers and the targeting procedures represented are discussed. The material is intended to convey historically the development of the targeting techniques required to meet the defined target objectives and to illustrate the solutions to problems encountered during that development.

Yencharis, J. D.↗

Aerobraked orbital transfer vehicle definition

A new technique has been developed to enhance the use of upper atmosphere aerobraking for increased performance from orbital transfer vehicles. This technique utilizes a pressure supported drag brake and the orbital transfer vehicle main engine to modulate aerodynamic drag and also to alleviate the aerodynamic heating during a grazing pass through the atmosphere. Performance analyses of vehicles utilizing all-propulsive or aerobraking during round trip missions from low earth orbit (LEO) to geo-synchronous earth orbit (GEO) and back shows that aerobraking allows a given vehicle to deliver approximately twice as much payload to GEO and return. Aerobraking also provides more than twice the round trip payload.

Andrews, D. G.↗

Wind-tunnel preflight test program for aeroassist flight experiment

A proposed Aeroassist Flight Experiment (AFE) will simulate return from geosynchronous orbit to low-earth orbit to provide fundamental information about the hypersonic flow conditions surrounding aeroassisted orbital transfer vehicles (AOTV's). Future AOTV design must rely heavily on computational fluid dynamic (CFD) computer codes now under development, since the entry conditions are beyond the simulation capabilities of ground-based test facilities. However, existing codes and best available ground-based test facilities must provide for design of the AFE. The AFE ground-based test program provides data for calibration of existing and developing pertinent CFD codes. Confidence in code prediction capability increases with ability to predict forces and moments, pressure and heat-transfer distributions, shock shapes, and surface streamline directions. The ground-based test program provides these data over a wide range of hypersonic test parameters. This paper describes the test program, models, facilities, and some representative results.

Wells, William L.↗