Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Pipeline Decommissioning Trial AWE Berkshire UK - 13619

This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes; - Hot tapping - a method of breaching the pipe while maintaining containment to remove residual liquids, - Crimp and shear - remote crimping, cutting and handling of pipe using the excavator - Pipe jacking - a way of removing pipes avoiding excavations and causing minimal disturbance and disruption. The details of the decommissioning trial design, the techniques employed, their application and effectiveness are discussed and evaluated here in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise the PRACLAY gallery equipped to simulate a disposal gallery for heat-generating high-level waste evaluating fibre-optic based sensing techniques, including distributed sensing for thermal distribution and long-term reliability in harsh conditions. It also includes the potential to improve the treatment of signals from micro-seismic monitoring to enable enhanced understanding of the evolution around the gallery following its excavation due to ventilation, saturation and heating, and to image a water-bearing concretion layer. HADES URL will also be used to test wireless techniques to transmit monitoring data from the underground to the surface. The main focus of this contribution is to evaluate magneto-inductive data transmission; and to optimise energy usage. At the Bure underground facility in France, monitoring systems have been developed and will be embedded into the steel liner for the mock-up high-level waste disposal tunnel. The aim of this programme is to establish the capacity to conduct integrated monitoring activities inside the disposal cell, on the cell liner and in the near-field and to assess the capability of the monitoring to withstand construction and liner emplacement procedures. These projects, which are supported by focused development and testing of the monitoring systems, will allow the testing of both the effectiveness of these techniques applied to disposal situations and to understand the limits of these monitoring technologies. This approach should also enhance the confidence of key stakeholders in the ability to understand/confirm the changes occurring within a disposal cell. In addition, remote or 'non-intrusive' monitoring technologies are evaluated to provide a means of enhancing understanding of what is occurring in an isolated disposal cell. The projects also test solutions for embedded monitoring systems in challenging (risk of damage) situations. The outputs from this work will lead to improved understanding of these state-of-the-art techniques and allow focused development of those techniques beneficial to future monitoring programmes. It is also planned, as part of the MoDeRn programme of stakeholder engagement to show some of these monitoring demonstrations to lay stakeholders in order to receive their feed-back on the approach taken and their views on the value of this work. This feedback will help improve our understanding of how this work and future work on monitoring can be more effectively communicated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Method for Implementing Subsurface Solid Derived Concentration Guideline Levels (DCGL) - 12331

The U.S. Nuclear Regulatory Commission (NRC) and other federal agencies currently approve the Multi-Agency Radiation Site Survey and Investigation Manual (MARSSIM) as guidance for licensees who are conducting final radiological status surveys in support of decommissioning. MARSSIM provides a method to demonstrate compliance with the applicable regulation by comparing residual radioactivity in surface soils with derived concentration guideline levels (DCGLs), but specifically discounts its applicability to subsurface soils. Many sites and facilities undergoing decommissioning contain subsurface soils that are potentially impacted by radiological constituents. In the absence of specific guidance designed to address the derivation of subsurface soil DCGLs and compliance demonstration, decommissioning facilities have attempted to apply DCGLs and final status survey techniques designed specifically for surface soils to subsurface soils. The decision to apply surface soil limits and surface soil compliance metrics to subsurface soils typically results in significant over-excavation with associated cost escalation. MACTEC, Inc. has developed the overarching concepts and principles found in recent NRC decommissioning guidance in NUREG 1757 to establish a functional method to derive dose-based subsurface soil DCGLs. The subsurface soil method developed by MACTEC also establishes a rigorous set of criterion-based data evaluation metrics (with analogs to the MARSSIM methodology) that can be used to demonstrate compliance with the developed subsurface soil DCGLs. The method establishes a continuum of volume factors that relate the size and depth of a volume of subsurface soil having elevated concentrations of residual radioactivity with its ability to produce dose. The method integrates the subsurface soil sampling regime with the derivation of the subsurface soil DCGL such that a self-regulating optimization is naturally sought by both the responsible party and regulator. This paper describes the concepts and basis used by MACTEC to develop the dose-based subsurface soil DCGL method. The paper will show how MACTEC's method can be used to demonstrate that higher concentrations of residual radioactivity in subsurface soils (as compared with surface soils) can meet the NRC's dose-based regulations. MACTEC's method has been used successfully to obtain the NRC's radiological release at a site with known radiological impacts to subsurface soils exceeding the surface soil DCGL, saving both time and cost. Having considered the current NRC guidance for consideration of residual radioactivity in subsurface soils during decommissioning, MACTEC has developed a technically based approach to the derivation of and demonstration of compliance with subsurface soil DCGLs for radionuclides. In fact, the process uses the already accepted concepts and metrics approved for surface soils as the foundation for deriving scaling factors used to calculate subsurface soil DCGLs that are at least equally protective of the decommissioning annual dose standard. Each of the elements identified for consideration in the current NRC guidance is addressed in this proposed method. Additionally, there is considerable conservatism built into the assumptions and techniques used to arrive at subsurface soil scaling factors and DCGLs. The degree of conservatism embodied in the approach used is such that risk managers and decision makers approving and using subsurface soil DCGLs derived in accordance with this method can be confident that the future exposures will be well below permissible and safe levels. The technical basis for the method can be applied to a broad variety of sites with residual radioactivity in subsurface soils. Given the costly nature of soil surveys, excavation, and disposal of soils as low-level radioactive waste, MACTEC's method for deriving and demonstrating compliance with subsurface soil DCGLs offers the possibility of significant cost savings over the traditional approach of applying surface soil DCGLs to subsurface soils. Furthermore, while yet untested, MACTEC believes that the concepts and methods embodied in this approach could readily be applied to other types of contamination found in subsurface soils. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering for Operation of a Future Belgian Deep Geological Repository for ILW and HLW - 12379

In Belgium, an advanced conceptual design is being elaborated for deep geologic disposal of high level waste (HLW) and for low and intermediate level waste (LILW) not amenable for surface disposal. The concept is based on a shielded steel and concrete container for disposal of HLW, i.e., the Super-container. LILW will be disposed of in separately designed concrete caissons. The reference host rock is the Boom Clay, a poorly indurated clay formation in northeastern Belgium. Investigations into the potential host rock are conducted at the HADES underground research laboratory in Mol, Belgium. In 2009 the Belgian Agency for Management of Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS) initiated a four year research project aimed at confirming the fundamental feasibility of building and operating a repository. The goal of the program is to demonstrate at a detailed conceptual level that the proposed geologic disposal system can be safely constructed, operated, and progressively closed. Part of the broader research efforts being conducted includes evaluations optimization of the waste transportation shaft, subsurface transportation system, ventilation system, and evaluation of backfilling and sealing concepts for the repository design. The potential for implementation of a waste retrieval strategy encompassing the first 100 years after emplacement is also considered. In the framework of a four year research program aimed at confirming the fundamental feasibility of building and operating a repository in poorly indurated clay design studies have been underway to optimize the waste transportation shaft, subsurface transportation system, and ventilation system. Additionally backfilling and sealing concepts proposed for the potential repository have been reviewed in conjunction with impacts related to the potential future inclusion of a retrievability requirement in governing regulations. The main engineering challenges in the Belgian repository concept are size limitations on the underground facilities imposed by the mechanical behavior of the candidate host rock type (i.e., poorly indurated clay) and the resulting ground support requirements. Underground excavations in the Boom Clay require a significant level of ground support to ensure the openings remain stable. A concrete lining system has been developed to address this engineering requirement. As a result strict size limits are imposed on both the diameter of the tunnels and the dimensions of the shaft stations resulting in unique design challenges requiring maximal optimization of the available space. Ongoing studies indicate that a significant (20%) reduction in shaft diameter can be achieved by diagonally orienting the hoist guide rails with respect to the cage, optimizing the counter weight dimensions, and reconfiguring the auxiliary hoisting system as a single rope system. Reliable subsurface transportation of waste packages can be achieved through a hybrid rail/wheel system powered by a battery operated electric locomotive. Key components of the system, including the battery-powered locomotive and a turntable used for transitioning waste shipments from the access gallery into disposal galleries without the need for constructing turnouts, have been successfully demonstrated at the Gorleben exploratory facility and the Konrad repository in Germany, respectively. By optimizing the available space in the disposal galleries and limiting the introduction of hazardous gases by using electric powered systems combined with the relatively small number of workers envisioned in the Belgian repository concept adequate ventilation can be achieved to ensure safe operational conditions. The proposed sealing and backfill systems in the Belgian repository concept should provide adequate safeguards as currently planned. Should a future retrievability requirement be imposed on the design it appears likely that a partial backfilling strategy could be employed. The key component in ensuring retrievability in the design would be the selection of a backfill that combines the safety functions required in the current design concept with a material strength amenable to removal by hydro-jet excavation techniques. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Humboldt Bay Power Plant Decommissioning Progress Update - 16358

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility achieved several significant milestones in the summer and fall of 2015 when the RPV Segmentation Project completed, the Caisson Removal project began and the Unit 3 Refueling building (RFB) and Main Plant Ventilation system were released for Open Air Demolition (OAD). At the end of 2014 the Civil Works prime contractor Chicago Bridge and Iron (CB and I) was also awarded the contract to complete the RPV Segmentation. This work scope continued to use the First of a Kind (FOAK) segmentation equipment that was designed and fabricated for the HBPP Reactor Project. The preparation for RFB OAD was part of the original Civil Works contract scope. It was important that this work and the segmentation of the reactor shell be finished to allow a portion of the Refueling building to be demolished to continue the installation of the perimeter water cutoff wall and the caisson Support of Excavation (SOE) shoring system. The CB and I Civil Works contract endorsed the October 2012 HBPP Caisson Removal Feasibility Study approach to install a perimeter cutoff wall intended to stop movement of groundwater by installation of cement-bentonite (CB) backfill in a slurry wall trench excavated to a depth of 53 meters and tied into the Unit F clay layer. The CB and I on-site project manager and principal engineer from their home office re-evaluated the design approach outlined in their proposal and awarded contract. As CB and I further developed design plans, an option to complete the perimeter wall with Cutter Soil Mixing (CSM) technology was developed. CB and I described the CSM process as a modified trench cutter technique, to be used for both perimeter groundwater cutoff, and for caisson demolition SOE. CSM technology blends slurry while mixing soil on the down stroke, and injects cement into the blended soil cuttings on the upstroke to create a cemented 'cutoff wall'. CB and I proposed several variations for three key support elements: the perimeter cutoff wall; the dewatering well system; and the caisson SOE shoring system. The proposed alternatives brought many enhancements in the design and integration of the work to be executed. CB and I personnel were persistent in seeing their vision through that resulted in a significant benefit in worker safety and schedule enhancement (early finish by 5 months). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing and Deployment of Remote Systems to Remove Highly Radioactive Soil at Hanford's 324 Building - 18043

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is in the process of procuring, testing and deploying remotely operated tools to safely remove highly contaminated soil from beneath the 324 Building on the Hanford Site in southeastern Washington State. The 324 Building operated for more than 40 years, completing a variety of high-dose engineering development and demonstration activities inside six hot cells that shielded the workers from the highly radioactive materials. Activities to decommission, decontaminate and demolish the facility began in 2008. In 2010, soil contamination was found in the soil under one of the hot cells, and building deactivation was paused to evaluate the soil contamination. Sampling efforts, using borehole technology, revealed significant under-building contamination with dose rates measuring has high as 130 Sv/hr (13,000 R/hr). The highly-contaminated soil has to be removed before traditional open air deactivation activities can continue. CHPRC completed proof of concept testing and built a full-scale test facility to demonstrate the effectiveness of three primary tools that will accomplish the floor and soil removal. The tools include a commercially available concrete saw, and a commercially available excavator arm that have been modified to operate remotely in the high-radiation environment within the hot-cell. In order to reduce the wear on the hot-cell overhead cranes, a remote operated rail and cart system has been designed to transport soil and debris out of the hot-cell to an airlock area where the waste will be separated, according to its level of radioactivity. A camera and light system has been designed to provide visual and audio coverage of the hot-cell area that will allow the operations to proceed from remote control stations. This paper will describe the primary remote operated equipment designed for the project and the challenges and processes for developing, testing and deploying the equipment necessary to excavate the soil from below the 324 Building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful In Situ Remediation of Cr(VI)-Impacted Deeper Vadose Zone Soils for Groundwater Protection - 18603

Shallow soil at a former industrial wood treating facility was impacted with chromium, arsenic, and copper above cleanup goals and shallow soil has been excavated for protection of direct contact exposure pathways. Deeper vadose zone soil was predominantly impacted with chromium and was undergoing remediation for long-term groundwater protection. The 920-meter (m) long Cr(VI) groundwater plume has undergone full-scale remediation with groundwater recirculation and in situ bioremediation. Following approximately 4 years of operation, the Cr(VI) groundwater plume, with former source area groundwater concentrations over 10,000 micrograms per liter (μg/L), has been reduced to below the laboratory method reporting limit (0.50 μg/L). Approximately 23,000 cubic meters (m{sup 3}) of deeper (4.5 m - 11 m below ground surface, bgs) vadose zone soil required Cr(VI) remediation. The remediation strategy relied on reduction of Cr(VI) and geochemical fixation as trivalent chromium (Cr(III)) and iron hydroxide precipitates. Chromium reduction was facilitated by a carbon source (corn syrup and methanol) to establish and maintain biogeochemical reducing conditions and ferrous iron to support direct Cr(VI) chemical reduction. Combined, the injected soil moisture, carbon source and ferrous iron supported fast and sustained ferrous/ferric iron cycling and Cr(VI) reduction. Remedy performance monitoring included time-series water quality data from a network of vacuum lysimeters and confirmation soil borings. Reagent was applied either through liquid injection wells and direct-push injection points, or by deep soil mixing methodology in areas with difficult geology (i.e., fine-grained soils and discontinuous iron-silica hardpan layer). Following both phases of deep soil remediation, soils met long-term protection of groundwater remediation action objectives. In situ treatment of soils provides a cost-effective remedial solution compared to excavation, specifically when impacts are deep and long-term protection of groundwater is a primary remediation goal. The delivery methods employed in this case study can be applied to sites impacted with a broad range of contaminants amendable to geochemical fixation (e.g., chromium, uranium, strontium, nitrate, etc.). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning, Decontamination, and Disposal of LLW-LL, and ILW-LL at a Former Rare Earths Processing Facility in Malaysia - 19087

Geosyntec Consultants, Inc. (Geosyntec) was the design-build Contractor for a project involving the remediation and disposal of low level (LLW-LL and ILW-LL) NORM and TENORM wastes at a former rare earth processing facility in Malaysia. These sites were associated with a plant that extracted rare earth elements from local tin ores. Because of the naturally occurring radioactivity contained in the raw materials, these productions resulted in by-products and residues containing LLW-LL and ILW-LL thorium hydroxide and uranium hydroxide. The total mass of uranium (∼120 tons) and thorium (∼1,200 tons) managed in a single repository required the project design incorporate requirements related to inventory, security and safeguards around nuclear precursor materials. The requirement to consider a performance over a period of more than 10,000 years led to significant challenges in design and modeling of the disposal facility as this disposal facility was purposely designed and permitted as a final disposal for the LLW-LL and ILW-LL. The first phase of the project was the decommissioning, decontamination, and demolition of the 14- acre former rare earth processing plant and excavation of contaminated soils, construction of an engineered cell at the repository for waste disposal, and transportation and disposal of the waste materials into the cell. Final status surveys were carried out to allow the site to be successfully released by the Malaysian regulatory authorities as a clean site for re-development as common industrial use. Over 11,000 loads of material, including approximately 75,000 cubic meters of excavated soils and plant debris, were transported in specially designed steel transport boxes on public roads for disposal in the engineered cell. The second phase of the project included the design and construction of a second engineered cell, enhanced with protective barrier systems and a final cover system constructed of natural materials. Ancillary facilities such as substations, offices, processing buildings, and wastewater treatment plants were constructed to support retrieval and processing of the materials from more than 87,000 individual drums using a semi-automated process. The drums, waste packages, and other materials in the storage facility were systematically extracted, sorted, inventoried, solidified using Portland cement, transported, and disposed in the cell. All temporary facilities were decontaminated, demolished, and disposed in the cell. Radiological inventory and radiation safety programs were implemented to quantify the waste activity and to control exposure to workers and the public during the project. The total mass of radioactive contaminated waste disposed in the two projects is nearly 200,000 tons. The projects were carried out under a high level of scrutiny from Malaysian and international regulatory bodies. Between 2014 and 2017, performance monitoring and modeling activities were carried out to demonstrate that the disposal facility was performing in accordance with design requirements established by regulatory agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing the FUSRAP Colonie Interim Storage Site for Transfer Back to the US Department of Energy Office of Legacy Management - 19215

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Colonie Interim Storage Site was transferred from the US Department of Energy (US DOE) to the US Army Corps of Engineers (USACE) in 1997. The USACE initiated remediation efforts at the Site under FUSRAP. The Site was separated into three distinct operable units (OU) to more efficiently manage the remedial process: 1) Groundwater OU, 2) Main Site Soils OU, and 3) Vicinity Property OU. The USACE has completed remedial actions at each of these three OUs and has advanced the OU remedies at the Site to the long-term stewardship stage to be executed by the US DOE Office of Legacy Management (LM). The US DOE LM is the current real property owner of record of the Colonie Main Site. A summary of each OU and the activities needed to prepare for site transfer follows: OU 1 - USACE issued the Colonie Groundwater OU Record of Decision (ROD) (USACE 2010a) on April 9, 2010. The Groundwater ROD remedy is monitored natural attenuation (MNA) and long-term monitoring (LTM) of groundwater after source removal completion. Results of groundwater monitoring indicate reductions in concentrations of contaminants of concern (COC). Based on the marked progress to date, USACE has optimized the groundwater LTM program (USACE, 2014) by reducing the well network, sampling frequency, and analytical parameters, and by abandoning wells that are no longer needed. A Groundwater ROD Five-Year Review report was submitted to the New York State Department of Environmental Conservation (NYSDEC) for review in 2018. NYSDEC agreed that MNA is still an appropriate remedial method although it is progressing at a slower rate than predicted. OU 2 - From 1999 to 2007, USACE completed the large-scale removal of soil at the Main Site, which included the adjacent Town of Colonie Vicinity Property. Radioactively contaminated soil along with accessible metals-contaminated soil and soil containing volatile organic compounds (VOC) were removed during this effort. A total of 103,402 cubic meters (m{sup 3}) of soil was excavated and disposed offsite. On March 26, 2015, USACE signed the Main Site Soils OU ROD (USACE, 2015a). The ROD remedy included provisions for Land Use Controls (LUC) consisting of institutional controls (IC) through an Environmental Easement for management of three small and discrete inaccessible locations within three of the 27 Final Status Survey units of the Main Site. The Environmental Easement provides a means of protection based on both current and future land use by placing restrictions on soil excavation and reuse. The easement and a supporting Site Management Plan (SMP) will be finalized by LM in coordination with NYSDEC. OU 3 - the Vicinity Property OU ROD was signed on 20 September 2017. This ROD declared No Action (NA) for dust and No Further Action (NFA) for soil and other media for the Vicinity Properties. Prior to the ROD, USACE performed dust sampling and other characterization activities at representative commercial and residential Vicinity Property locations. These efforts were reported in the Colonie FUSRAP Site Vicinity Property Operable Unit Remedial Investigation Summary Report (USACE, 2016). A Site Closeout Report (SCOR) was issued to NYSDEC and approved in 2018. The approval of this report starts the transfer process back to the LM. Ongoing and future transfer activities include records retention and management, preparation and filing of real estate records, physical site management (fencing, landscape maintenance, well abandonment) and coordination with state regulators and LM staff. This presentation is intended to make all stakeholders aware of the necessary steps for site transfer from the USACE back to the LM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho-Developed Technologies, Processes Offer Unique Solutions to Waste Management Challenges - 19281

INL Site cleanup contractor Fluor Idaho, LLC (Fluor Idaho) and its predecessors have developed a host of state-of-the-art technologies and specialized processes for nuclear waste handling, treatment, storage, and shipping. The cleanup program has also repurposed and upgraded previously idled Cold War-era buildings to treat and repackage both on- and off-site generated radioactive and hazardous wastes. And lastly, Fluor Idaho is using one-of-a-kind equipment to protect waste management personnel as they undertake their work to meet cleanup commitments that the Department of Energy (DOE) made to the state of Idaho. Such applications, although developed for Idaho's wastes, have the potential to benefit other facilities within the DOE Complex. Engineers and fabricators have teamed up to develop truly unique devices made of specialized metals, like stainless steel alloys, and more readily available materials such as Lexan. All waste types that Fluor Idaho manages daily - spent nuclear fuel, both high- and low-level wastes, and both remote-handled (RH) and CH-TRU - benefit from these innovations. Without question, the greatest number of specialized equipment, processes, and worker-protection technologies developed are for the retrieving, characterizing, repackaging, and shipping of TRU wastes, which makes sense considering the INL Site stores the most TRU waste in the DOE Complex. On the CH-TRU retrieval front, crews are using specially modified Gradall excavators to protect workers while they exhume Rocky Flats Plant wastes that were sent to Idaho in the 1950's and 1960's and buried in a shallow landfill. The excavators are supplied with extra Lexan windows to protect operators from the potential for flying debris during exhumation. On-board supplied air, pumped into the cab, and individual air supplies protect workers from inhalation hazards. Also on-board infrared cameras allow operators to detect heat generating from reactive metals at the dig face. At the Advanced Mixed Waste Treatment Facility (AMWTP), Brokk robotic arm operators use a 'super clam' claw, designed and built at the INL Site, on the remotely operated heavy equipment to size-reduce waste boxes, drums, concrete, and metal containing TRU constituents. The super clam is so powerful and dexterous that operators can crush a 55-gallon drum into the size of a basketball, but also delicately turn the pages of a magazine. Boxes too large to be sized at the AMWTP's box-lines are sent to the Accelerated Retrieval Project VII facility to be sized by Waste Management personnel. Such waste boxes, which sometimes contain 'flighty' plutonium-238 material, have forced the project to employ a heavily ventilated and filtered interior tent. Not all technologies developed for the Waste Management program are high-technology; in fact, one piece of equipment is so simple it's literally ingenious. Operators who inspect and repackage RH-TRU inside a hot cell at the Idaho Nuclear Technology and Engineering Center (INTEC) needed a backup plan in case the hot cell port couldn't be closed in the event of a power outage. Engineers and fabricators collaborated to develop a port cover actuator mechanism, which allows operators to open and close the cell's hatch cover with nothing more than a cordless drill. Also at INTEC, Maintenance Shop fabricators developed a Lexan container or 'pig' suitable for shielding neutron-emitting TRU waste sources. Lexan was chosen as the preferred shielded container material for this special type of waste because neutrons are best shielded with materials containing lots of hydrogen, such as plastics, which are composed of carbon and hydrogen molecules. Once approved for shipment, the high-activity waste will be loaded into specialty casks and shipped to WIPP for permanent disposal. Although all these technologies and processes were initially developed for resolving challenges at the INL Site, their applications could be far-reaching. Like the INL Site, many other facilities in the DOE Complex manage, treat, store, and ship TRU, low-and high-level wastes, and spent nuclear fuel. The technologies and processes developed in Idaho protect Waste Management personnel as they undertake their work, but these benefits could be utilized by other facilities and personnel doing similar work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Posiva's Onkalo{sup R} FST (Full-Scale In Situ System Test) - 20051

The FST - Full-scale In Situ System Test - is a unique full-scale demonstration of disposal system in crystalline host rock. The FST was constructed in ONKALO{sup R} demonstration area at the disposal depth of 420 metres, in Posiva's actual final disposal facility at Olkiluoto, Finland. The demonstration has included design, manufacture, installation and comprehensive instrumentation for monitoring the evolution of the disposal system and its components. The demonstration tunnel and experimental deposition holes were excavated in 2010 in ONKALO to address that they can be excavated to meet the requirements set for them. Two experimental deposition holes, bored in the floor of the tunnel, host each a canister surrounded by bentonite clay buffer rings/segments in the holes. Inside the canisters are heating elements to simulate decay heat emitted by spent fuel. The tunnel part used for the test is about 50 m long and it was filled with bentonite clay backfill after the installation of the canisters and buffer components. The tunnel is closed with a steel-reinforced concrete plug. The test is equipped with 500 sensors to monitor early evolution of the system. To forecast the evolution of the system, a mathematical model has been created. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Teleoperation of Construction Robots Using Human Interaction: Case Study Examples: Preprint

The integration of advanced teleoperation methods in construction robotics has the potential to enhance productivity and safety in demanding environments. Among different methods, hand gestures have emerged as an intuitive approach, enabling seamless communication between human operators and robotic systems. This study demonstrates the use of hand gestures for controlling a model robotic excavator and a virtual robotic arm in construction applications. Two case study examples are presented. In the first case study, a series of hand gestures are performed to control a model robotic excavator's bucket and arm movements. The second case study focuses on using hand gestures to control a virtual robotic arm to perform a material handling task in a simulated environment. In both cases, the performed hand gestures are all successfully captured and interpreted by the gesture-based teleoperation method to conduct the corresponding tasks, which demonstrates the application of the gesture-based control method for various types of construction robots. Also, the limitations of the gesture-based teleoperation method (e.g., recognition delay, sensitivity to motion outliers) are discussed. Future work will focus on developing a digital twin system to support gesture-based teleoperation for a wider range of construction robots.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Multiple-code simulation study of the long-term EDZ evolution of geological nuclear waste repositories

This simulation study shows how widely different model approaches can be adapted to model the evolution of the excavation disturbed zone (EDZ) around a heated nuclear waste emplacement drift in fractured rock. The study includes modeling of coupled thermal-hydrological-mechanical (THM) processes, with simplified consideration of chemical coupling in terms of time-dependent strength degradation or subcritical crack growth. The different model approaches applied in this study include boundary element, finite element, finite difference, particle mechanics, and elastoplastic cellular automata methods. The simulation results indicate that thermally induced differential stresses near the top of the emplacement drift may cause progressive failure and permeability changes during the first 100 years (i.e., after emplacement and drift closure). Moreover, the results indicate that time-dependent mechanical changes may play only a small role during the first 100 years of increasing temperature and thermal stress, whereas such time-dependency is insignificant after peak temperature, because decreasing thermal stress.

54 ENVIRONMENTAL SCIENCES↗

Coupled Thermo-Hydrological-Mechanical-Chemical Behavior of Anisotropic Granite for Geologic Disposal of High-Level Radioactive Waste: A Core-Scale Laboratory Investigation

The coupled thermo-hydrological-mechanical-chemical (THMC) behavior of rock within an Excavation Damaged Zone (EDZ) is critical for the safety and long-term performance of a geological repository for high-level radioactive wastes. While many laboratory experiments have been conducted to investigate EDZ rocks, the flow and deformation characteristics resulting from anisotropic rock textures and microcrack distribution under triaxial loading and elevated temperatures remain poorly understood. Particularly, cracks at various scales serve as fast paths for fluid flow and solute transport and present as focal points of mechanical weakness, which complicate the coupled THMC processes in anisotropic EDZ rocks and challenge modeling predictions. Here, in this study, a series of core-scale experiments was conducted on three granite samples under repository-relevant conditions. These rock samples were obtained from the Grimsel Underground Research Laboratory (URL), featured by anisotropic minerals (represented by bedding layers) and microcrack distributions and coarse cm-scale grain sizes. During the experiments, samples were subjected to an elevated temperature at 90 °C and different triaxial loading conditions either by radial (normal to bedding layers) or axial (parallel to bedding layers) compaction. Water was injected into the samples, and the rock permeability evolutions and effluent water chemistry were monitored closely. For intact samples, thermal expansion of minerals at 90 °C resulted in a large, 75% irreversible permeability reduction and rock strengthening under radial compaction, while thermal impact was limited to a 15% permeability reduction under axial compaction. In contrast, for a sample containing open cracks, the growth of fractures during the experiment resulted in an abrupt permeability increase and fast failure at 90 °C. The effluent water chemistry indicates much more considerable mineral dissolution from large shear sliding than that in rocks dominated by mechanical compaction. These results helped better understand the coupled THMC processes in anisotropic rocks containing cracks, evaluate the behaviors of EDZ rocks, and predict the long-term evolution of EDZ for the performance of the repositories.

Coupled THMC processes↗

Synchrotron radiation-based x-ray analysis of bronze artifacts from an Iron Age site in the Judean hills.

Seven bronze bangles from Tell en-Nasbeh, northern Judah, were investigated to understand the phase composition and manufacturing process of the artifacts, and possibly suggest a provenance for their origin. Synchrotron x-ray radiation diffraction (XRD) and fluorescence (XRF) were used in the analysis to avoid any destructive sampling and at the same time penetrate through the surface into the core metal. These techniques enabled us to determine that the bangles were not just tin bronze, but leaded tin bronze. Based on excavation reports, it is unlikely that the metal objects were manufactured locally at Tell en-Nasbeh; rather, preliminary XRD and XRF data point towards the neighboring region of Edom as their origin. Despite their political enmity during the Iron Age II, the data suggest that Judahite social demands for bronze may have fostered a strong economic relationship between these two polities.

43 PARTICLE ACCELERATORS↗

A cost-benefit analysis of landfill mining and material recycling in China

Highlights: • Assessing the economic feasibility of landfill mining. • We applied a cost-benefit analysis model for landfill mining. • Four material cycling and energy recovery scenarios were designed. • We used net present value to evaluate the cost-benefit efficiency. - Abstract: Landfill mining is an environmentally-friendly technology that combines the concepts of material recycling and sustainable waste management, and it has received a great deal of worldwide attention because of its significant environmental and economic potential in material recycling, energy recovery, land reclamation and pollution prevention. This work applied a cost-benefit analysis model for assessing the economic feasibility, which is important for promoting landfill mining. The model includes eight indicators of costs and nine indicators of benefits. Four landfill mining scenarios were designed and analyzed based on field data. The economic feasibility of landfill mining was then evaluated by the indicator of net present value (NPV). According to our case study of a typical old landfill mining project in China (Yingchun landfill), rental of excavation and hauling equipment, waste processing and material transportation were the top three costs of landfill mining, accounting for 88.2% of the total cost, and the average cost per unit of stored waste was 12.7 USD ton{sup −1}. The top three benefits of landfill mining were electricity generation by incineration, land reclamation and recycling soil-like materials. The NPV analysis of the four different scenarios indicated that the Yingchun landfill mining project could obtain a net positive benefit varying from 1.92 million USD to 16.63 million USD. However, the NPV was sensitive to the mode of land reuse, the availability of energy recovery facilities and the possibility of obtaining financial support by avoiding post-closure care.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evidence for the incorporation of lead into barite from waste rock pile materials

Because Pb is one of the most toxic elements and is found as a major contaminant in mining environments, this study aims to identify the distribution of this element in host phases issued from the alteration of mine wastes. The sampling location was a former mine near Oakland, California (USA). This mine was once a source of sulfide minerals from which sulfuric acid was made. The material discussed in this paper was collected in iron hardpans that were formed within the waste rock pile resulting from the excavation work. In most contaminated environments (soils, mine waste), secondary metal-bearing phases arising from alteration processes are usually fine-grained (from 10 {micro}m to less than 1 {micro}m) and highly heterogeneous, requiring the use of micron-scale techniques. We performed micro-Raman spectroscopy, microscanning X-ray diffraction (SXRD), and microextended X-ray near edge spectroscopy (XANES) to determine the relationships between Pb and a Ba/Fe-rich host phase. Micro-Raman spectroscopy suggests that Pb is preferentially incorporated into barite rather than goethite. Results from micro-Raman experiments show the high sensitivity of this analytical tool to the incorporation of Pb into barite by being especially sensitive to the variations of the S-O bond and showing the characteristic bands due to the contribution of Pb. This association is confirmed and is well-illustrated by micro-SXRD mineral species maps showing the correlation between Pb and barite. Microfocused XANES indicates that Pb is present as Pb{sup 2+}, agreeing with the in situ physicochemical parameters.

54 ENVIRONMENTAL SCIENCES↗