Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Data Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Imaging Sensor Flight and Test Equipment Software

The Lightning Imaging Sensor (LIS) is one of the components onboard the Tropical Rainfall Measuring Mission (TRMM) satellite, and was designed to detect and locate lightning over the tropics. The LIS flight code was developed to run on a single onboard digital signal processor, and has operated the LIS instrument since 1997 when the TRMM satellite was launched. The software provides controller functions to the LIS Real-Time Event Processor (RTEP) and onboard heaters, collects the lightning event data from the RTEP, compresses and formats the data for downlink to the satellite, collects housekeeping data and formats the data for downlink to the satellite, provides command processing and interface to the spacecraft communications and data bus, and provides watchdog functions for error detection. The Special Test Equipment (STE) software was designed to operate specific test equipment used to support the LIS hardware through development, calibration, qualification, and integration with the TRMM spacecraft. The STE software provides the capability to control instrument activation, commanding (including both data formatting and user interfacing), data collection, decompression, and display and image simulation. The LIS STE code was developed for the DOS operating system in the C programming language. Because of the many unique data formats implemented by the flight instrument, the STE software was required to comprehend the same formats, and translate them for the test operator. The hardware interfaces to the LIS instrument using both commercial and custom computer boards, requiring that the STE code integrate this variety into a working system. In addition, the requirement to provide RTEP test capability dictated the need to provide simulations of background image data with short-duration lightning transients superimposed. This led to the development of unique code used to control the location, intensity, and variation above background for simulated lightning strikes at user-selected locations.

Freestone, Kathleen↗

Lightweight Broadcloth Recovery Parachute Testing and Reconstruction

Early in the Orion CPAS (Capsule Parachute Assembly System) project a main parachute was fabricated with lighter weight broadcloth in the lower part of the parachute skirt in order to look into different options for reducing the mass of the CPAS. At the end of Orion CPAS airdrop testing this parachute was used as a test equipment recovery parachute in order to gather data on the performance of this parachute. The parachute was the single recovery parachute in order to achieve the proper load under the parachute. It was flown on the final CPAS qualification test CQT 4-8 in September 2018.This paper will include imagery analysis, performance analysis based on all the gathered data, a full description of the configuration of the recovery parachute, as well as a comparison between this parachute and other CPAS recovery parachutes and other CPAS Main parachutes.

Ray, Eric S.↗

FY 2025 Multidimensional Data Correlation Platform: Unified Software Architecture for Advanced Materials and Manufacturing Technologies Data Management and Processing

The Advanced Materials and Manufacturing Technologies (AMMT) program continues to advance a data-driven approach to demonstrate the utility of additive manufacturing for fabricating components for nuclear applications. A key scientific goal is to leverage data to better understand manufacturing outcomes and thereby improve the performance, reliability, and lifespan of nuclear components. Ultimately, this effort supports the development of standards for certification and qualification of additively manufactured components, enabling broader industry adoption. In support of this objective, the AMMT program is building and deploying a data management platform to record, index, analyze, and make available the manufacturing data generated across the AMMT program. In FY 2023, the team conceptualized the architecture of the platform and, in FY 2024, deployed the first functional version at the Oak Ridge National Laboratory (ORNL) Manufacturing Demonstration Facility (MDF). In FY 2025, the platform was officially opened to all AMMT members. To enable this expansion, core modifications and enhancements were developed, including improvements to the user interface and workflows for data entry and retrieval. Most notably, robust security and access control mechanisms were implemented to protect data and manage information sharing. This effort featured a logging system, protected views, and controlled access mechanisms. This report documents these enhancements and the transition of the platform into program-wide use.

36 MATERIALS SCIENCE↗

Retractable Sensors for In-Core Use in Material Test Reactors - conf paper

Material Test Reactors (MTRs) such as the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) are used to irradiate nuclear fuels and materials to evaluate their performance after high levels of exposure to a reactor in-core environment. The most critical tests are equipped with instrumentation leads, which allow real-time data collection. However, because of the very harsh environment inside high-power MTR experiments, there are very few sensors that can survive and maintain their calibrated readings for the time periods required to obtain the high neutron doses needed for new fuels and materials qualification. As a result, sometimes sponsoring programs are forced to accept low reliability of sensors, collecting useful data for only part of the experiment duration. The work described herein is based on the observation that MTRs normally run at constant power and the corresponding conditions within reactor experiments typically evolve relatively slowly. Therefore, even one or two measurements per day would provide a complete and representative data set. With this in mind, INL has embarked on a program to develop a mechanism capable of pushing a very small-diameter sensor (typically a thermocouple or optical fiber) into the location to be measured, leave the sensor for roughly 60 seconds to allow it to reach equilibrium and transmit the signal, then pull it up and away from the high neutron flux and high-temperature region. Small-diameter capillary tubes, up to 8 m long, are used to guide the sensors to the appropriate locations. These capillary tubes serve as essentially very deep, thin-walled thermowells. The distance a thermocouple or optical fiber would need to traverse is on the order of 40 - 80 cm. By adopting this infrequent cycling strategy, the thermocouple or optical fiber would spend only a few hours in the high-neutron flux/high-temperature environment over the duration of even the longest irradiation experiment. To date, INL has developed two styles of drive mechanisms. The first is based on friction drive wheels which drive the sensors in a manner similar to a small MIG welder. This has the advantage of being able to accommodate a very long insertion length. The second is based on a ball screw drive and has the advantages of positive attachment and being able to move more than one sensor at a time. Both drive mechanisms have been fabricated and tested in a laboratory setting. Both systems can handle hard mineral insulated cable (such as thermocouples) or optical fibers encased in small diameter tube. The sizes tested to date are 1 - 1.6 mm diameter. Work in this area is ongoing with an eye toward demonstration in the Massachusetts Institute of Technology's MITR reactor, followed by deployment in an ATR irradiation experiment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Retractable Sensors for In-Core Service in Material Test Reactors

Material Test Reactors (MTRs) such as the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) are used to irradiate nuclear fuels and materials to evaluate their performance after high levels of exposure to a reactor in-core environment. The most critical tests are equipped with instrumentation leads, which allow real-time data collection. However, because of the very harsh environment inside high-power MTR experiments, there are very few sensors that can survive and maintain their calibrated readings for the time periods required to obtain the high neutron doses needed for new fuels and materials qualification. As a result, sometimes sponsoring programs are forced to accept low reliability of sensors, collecting useful data for only part of the experiment duration. The work described herein is based on the observation that MTRs normally run at constant power and the corresponding conditions within reactor experiments typically evolve relatively slowly. Therefore, even one or two measurements per day would provide a complete and representative data set. With this in mind, INL has embarked on a program to develop a mechanism capable of pushing a very small-diameter sensor (typically a thermocouple or optical fiber) into the location to be measured, leave the sensor for roughly 60 seconds to allow it to reach equilibrium and transmit the signal, then pull it up and away from the high neutron flux and high-temperature region. Small-diameter capillary tubes, up to 8 m long, are used to guide the sensors to the appropriate locations. These capillary tubes serve as essentially very deep, thin-walled thermowells. The distance a thermocouple or optical fiber would need to traverse is on the order of 40 - 80 cm. By adopting this infrequent cycling strategy, the thermocouple or optical fiber would spend only a few hours in the high-neutron flux/high-temperature environment over the duration of even the longest irradiation experiment. To date, INL has developed two styles of drive mechanisms. The first is based on counter-rotating wheels which drive the sensors in a manner similar to a small MIG welder. This has the advantage of being able to accommodate a very long insertion length. The second is based on a ball screw drive and has the advantages of positive attachment and being able to move more than one sensor at a time. Both drive mechanisms have been fabricated and tested in a laboratory setting. Both systems can handle hard mineral insulated cable (such as thermocouples) or optical fibers encased in small diameter tube. The sizes tested to date are 1 - 1.6 mm diameter. Work in this area is ongoing with an eye toward demonstration in the Massachusetts Institute of Technology's MITR reactor, followed by deployment in an ATR irradiation experiment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Retractable Sensors for In-Core Service in Material Test Reactors

Material Test Reactors (MTRs) such as the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) are used to irradiate nuclear fuels and materials to evaluate their performance after high levels of exposure to a reactor in-core environment. The most critical tests are equipped with instrumentation leads, which allow real-time data collection. However, because of the very harsh environment inside high-power MTR experiments, there are very few sensors that can survive and maintain their calibrated readings for the time periods required to obtain the high neutron doses needed for new fuels and materials qualification. As a result, sometimes sponsoring programs are forced to accept low reliability of sensors, collecting useful data for only part of the experiment duration. The work described herein is based on the observation that MTRs normally run at constant power and the corresponding conditions within reactor experiments typically evolve relatively slowly. Therefore, even one or two measurements per day would provide a complete and representative data set. With this in mind, INL has embarked on a program to develop a mechanism capable of pushing a very small-diameter sensor (typically a thermocouple or optical fiber) into the location to be measured, leave the sensor for roughly 60 seconds to allow it to reach equilibrium and transmit the signal, then pull it up and away from the high neutron flux and high-temperature region. Small-diameter capillary tubes, up to 8 m long, are used to guide the sensors to the appropriate locations. These capillary tubes serve as essentially very deep, thin-walled thermowells. The distance a thermocouple or optical fiber would need to traverse is on the order of 40 – 80 cm. By adopting this infrequent cycling strategy, the thermocouple or optical fiber would spend only a few hours in the high-neutron flux/high-temperature environment over the duration of even the longest irradiation experiment. To date, INL has developed two styles of drive mechanisms. The first is based on counter-rotating wheels which drive the sensors in a manner similar to a small MIG welder. This has the advantage of being able to accommodate a very long insertion length. The second is based on a ball screw drive and has the advantages of positive attachment and being able to move more than one sensor at a time. Both drive mechanisms have been fabricated and tested in a laboratory setting. Both systems can handle hard mineral insulated cable (such as thermocouples) or optical fibers encased in small diameter tube. The sizes tested to date are 1 – 1.6 mm diameter. Work in this area is ongoing with an eye toward demonstration in the Massachusetts Institute of Technology’s MITR reactor, followed by deployment in an ATR irradiation experiment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The CLAS12 Silicon Vertex Tracker

Silicon Vertex Tracker (SVT) has been designed for the CLAS12 spectrometer using single-sided microstrip sensors fabricated by Hamamatsu Photonics. The sensors have a graded angle design to minimize dead areas and a readout pitch of 156 um, with intermediate strips. Each double-sided SVT module hosts three daisy-chained sensors on each side with a full strip length of 33 cm. There are 512 channels per module, read out by four Fermilab Silicon Strip Readout (FSSR2) chips, featuring data-driven architecture, mounted on a rigid–flex hybrid board. The modules are assembled in a barrel configuration using a unique cantilevered geometry to minimize the amount of material in the tracking volume. This paper is focused on the design, qualification of the performance, and experience in operating and commissioning the tracker during the first year of the data taking.

47 OTHER INSTRUMENTATION↗

Qualification of the First ICS-3000 ION Chromatograph for use at the Defense Waste Processing Facility

The ICS-3000 Ion Chromatography (IC) system installed in 221-S M-13 has been qualified for use. The qualification was a head to head comparison of the ICS-3000 with the currently used DX-500 IC system. The crosscheck work included standards for instrument calibration and calibration verifications and standards for individual anion analysis, where the standards were traceable back to the National Institute of Standards and Technology (NIST). In addition the crosscheck work included the analysis of simulated Sludge Receipt Adjustment Tank (SRAT) Receipt, SRAT Product, and Slurry Mix Evaporator (SME) samples, along with radioactive Sludge Batch 5 material from the SRAT and SME tanks. Based upon the successful qualification of the ICS-3000 in M-13, it is recommended that this task proceed in developing the data to qualify, by a head to head comparison of the two ICS-3000 instruments, a second ICS-3000 to be installed in M-14. The Defense Waste Processing Facility (DWPF) requires the analysis of specific anions at various stages of its processing of high level waste (HLW). The anions of interest to the DWPF are fluoride, formate, chloride, nitrite, nitrate, sulfate, oxalate, and phosphate. The anion analysis is used to evaluate process chemistry including formic acid/nitric acid additions to establish optimum conditions for mercury stripping, reduction-oxidation (REDOX) chemistry for the melter, nitrite destruction, organic acid constituents, etc. The DWPF Laboratory (Lab) has been using Dionex DX-500 ion chromatography (IC) systems since 1998. The vendor informed DWPF in 2006 that the instruments would no longer be supported by service contracts after 2008. DWPF purchased three new ICS-3000 systems in September of 2006. The ICS-3000 instruments are (a) designed to be more stable using an eluent generator to make eluent, (b) require virtually no daily chemical handling by the analysts, (c) require less line breaks in the hood, and (d) generally require less maintenance due to the pump configuration only using water versus the current system where the pump uses various hydroxide concentrations. The ICS-3000 instruments also allow the DWPF to maintain current service contracts, which support routine preventive maintenance and emergency support for larger problems such as component failure. One of the three new systems was set up in the DWPF Lab trailers in January of 2007 to be used for the development of methods and procedures. This system will continue to be used for training, new method development and potential improvements to current methods. The qualification of the other two ICS-3000 instruments is to be a phased effort. This effort is to be supported by the Applied Computational Engineering and Statistical (ACES) group of the Savannah River National Laboratory (SRNL) as authorized by the Technical Task Request (TTR) and as directed by the corresponding Task Technical and Quality Assurance (TT&QA) plan. The installation of the first 'rad' system into the M-13 Lab module required modifications to both the Lab module and to the radiohood. The installation was completed in July 2008. The testing of this system was conducted as directed by the TT&QA plan. The purpose of this technical report is to provide a review of the data generated by these tests that will lead to the recommendation for the qualification of the M-13 ICS-3000 instrument. With the successful qualification of this first ICS-3000, plans will be developed for the installation of the second 'rad' system in the M-14 Lab module later in fiscal year 2009. When the second 'rad' ICS-3000 system is installed, the DX-500 systems will be removed and retired from service.

47 OTHER INSTRUMENTATION↗

Equipment Qualification Report Environmental Qualification of GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah100G33 Battery Rack Assembly (24590-QL-POA-EDB0-00001-11-00002_00A)

Greenberry Environmental Qualification Report 550001.001-35.0.5 provides basis for assignment of qualified life for: GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah 100G33 Battery Rack Assembly in accordance with the requirements specified 24590-WTP-3PS-G000-T0015 (Rev 2) and Environmental Qualification Plan 550001.001-35.0.1 (Rev. 3). The equipment qualification basis represents the most conservative capability of the equipment. The analysis performed for the qualification is not less conservative than the bounding environmental conditions detailed in contract documents issued to Greenberry in contract 24509-QL-POA-EDB0-00001 Rev.0. The qualified life of 10 years has been established based upon an end-condition objective of the equipment condition indicators that correlate to the ability of equipment to perform its safety function. The VRLA Battery Cell Assembly was aged by 10 years (minimum) in accordance with conditions specified by Bechtel Equipment Qualification Datasheet 24590-LAW-EUQ-UPE 00003 Rev. 3 and the process conditions specified by the Instrument Data Sheet 24590-LAW EUD-UPE-00009 Rev. 2. Greenberry Industrial has contracted with GNB Industrial Battery Co located at 4115 S Zero St, Fort Smith, AR 72908 to perform age conditioning, monitoring, and capacity testing in accordance with Environmental Qualification Plan 550001.001-35.0.1 Rev. 1. The required process at the stated conditions set by the parameters established by the plan were completed satisfactorily. The details of the of the test process observed by Greenberry is detailed in the attached Seismic Test Log 550001.001-7.0.3, including examples of the objective evidence collected during the qualification process.

54 ENVIRONMENTAL SCIENCES↗

Characterization of Urbix Resources Natural Flake Graphite Material for Nuclear Applications (CRADA NFE-18-07340 Final Report)

Urbix Resources is a company specializing in graphite powder processing and purification. Urbix is looking to become the first domestic supplier of nuclear-grade graphite in the United States. This has led to a Cooperative Research and Development Agreement (CRADA) being established between the Oak Ridge National Laboratory (ORNL) and Urbix Resources, with the goal of characterizing a purified graphite feedstock supplied by Urbix Resources. The resulting data will then be used to determine the viability of a large-scale nuclear graphite production and qualification campaign. These characterization methods have been performed on the as-received graphite feedstock, a heat-treated batch of the feedstock, a milled batch of the feedstock, and a nuclear-grade graphite powder historically used in fuel production. The data from the heat-treated and milled feedstock will determine how different processing methods affect the powder’s physical properties, whereas the data from the nuclear grade graphite will provide information about the characteristics of a graphite previously accepted for nuclear applications. All of these powders have been characterized individually and as part of a resin-graphite blend (herein referred to as matrix) that has been used in past fuel experiments. The results of these experiments show that the Urbix powder and nuclear-grade graphite powder display notably different properties from one another in many cases, but this discrepancy may have been the result of the typical particle size of each powder. This hypothesis is supported by tests conducted on the milled powder, which showed a closer resemblance in properties to the nuclear-grade graphite than the as-received powder. The method for pressing the graphite matrix also had a noticeable effect on the measured properties.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Microelectronics Instrument Products Shock and Vibration Electro-optics: C-Qualification Test Report

In this test report all measurements made during testing are recorded in ATP 20049 DS data sheets and are included in the log. The motor/encoder (henceforth referred to as the UUT) test sequence began with a baseline functional evaluation, which demonstrated that the motor satisfied the operating torque, cogging torque, winding resistance, and mechanical requirements of SOW. In addition, the encoder electrical requirements were verified, as well as the alignment of the encoder outputs relative tc, the motor shaft position. There were no discrepancies observed in this portion of the test. The UUT was then exposed to a number of environments, including thermal vacuum, thermal cycling, random and sine vibration, and mechanical shock. During the thermal environments, the performance of the UUT under load was verified at specified points in the cycles, as described in ATP 20049. In addition, the UUT was bench tested between the two thermal environments. No anomalies were observed during the thermal tests. The load attachment method was subsequently corrected, and vibration of S/N 0002 began while 0003 was being repaired.

Source record↗

Process Improvement For Pu-238 Production at Idaho National Laboratory

Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets

07 ISOTOPE AND RADIATION SOURCES↗

Process Improvements For Pu-238 Production at Idaho National Laboratory

Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets.

07 ISOTOPE AND RADIATION SOURCES↗

Uncertainty Quantification Enabled by Automatic Differentiation for Hydrodynamic Simulation of Shock‐to‐Detonation Transition in High Explosives

Quantifying the effects of uncertainty in a reactive burn model on the run-to-detonation time in high explosives (HEs) provides a robust methodology for assessing the probability of an HE failing the IHE qualification standard. Moreover, uncertainty quantification helps evaluate whether the model calibration accurately represents data outside the calibration set. This study uses a specialized hydrodynamic simulation code for modeling detonation to determine the run-to-detonation time of the HE PBX 9502 for various impact velocities. To quickly approximate uncertainties in the model, a surrogate was constructed using a Taylor series expansion centered at the mean of the input parameters. To obtain the sensitivities required for constructing the Taylor series, HYP-percomplex Automatic Differentiation (HYPAD) was implemented. HYPAD is a methodology for infusing existing codes with automatic differentiation capabilities by augmenting variables with one or more imaginary units to compute step-size independent partial derivatives. These derivatives are accurate to machine precision with respect to the implemented numerical algorithm, meaning their accuracy reflects that of the underlying method (e.g., integration or discretization schemes). Using reduced order modeling techniques, the mean and standard deviation of the run-to-detonation time of a shock within PBX 9502 were computed for a number of initial impact velocities. A weighted least squares regression was then performed to obtain a best fit curve and prediction interval for the computed statistics. Historical data points from explosively driven wedge tests were utilized to validate the prediction interval, ensuring its reliability in predicting future outcomes. With this prediction interval and a known safety constraint curve, the most probable point of failure and the probability of failure for the HE PBX 9502 were determined.

97 MATHEMATICS AND COMPUTING↗

RCT Module 2.09: Environmental Monitoring [Slides]

Environmental monitoring plays a large role in the field of radiological control. It is used to estimate human population doses, determine the impact a site has on the environment, monitor for unplanned releases as well as quantifying planned releases, and gives us useful data in determining pathway data. This course will prepare the student with the skills necessary for RCT qualification.

54 ENVIRONMENTAL SCIENCES↗

Information management system study results. Volume 2: IMS study results appendixes

Computer systems program specifications are presented for the modular space station information management system. These are the computer program contract end item, data bus system, data bus breadboard, and display interface adapter specifications. The performance, design, tests, and qualification requirements are established for the implementation of the information management system. For Vol. 1, see N72-19972.

Source record↗

Evaluation of flawed composite structure under static and cyclic loading

This paper presents the results of a program investigating the effects of initial defects on the fatigue and fracture response of composite laminates. The structural laminates investigated were a typical angle-ply laminate, a polar/hoop-wound pressure vessel laminate, and a typical engine fan blade laminate. Defects investigated were full- and half-penetration circular holes, full- and half-penetration slits, and countersink holes. Results are presented showing the effects of the defect size and type on the static fracture strength, fatigue performance, and residual static strength. The results of inspection procedures are shown, describing the effect of cyclic and static loadings on damage propagation in composite laminates. The data in this study were used to define proof test levels as a qualification procedure in composite structure subjected to cyclic loading.

Porter, T. R.↗

Test results of Spacelab 2 infrared telescope focal plane

The small helium cooled infrared telescope for Spacelab 2 is designed for sensitive mapping of extended, low-surface-brightness celestial sources as well as highly sensitive investigations of the shuttle contamination environment (FPA) for this mission is described as well as the design for a thermally isolated, self-heated J-FET transimpedance amplifier. This amplifier is Johnson noise limited for feedback resistances from less than 10 to the 8th power Omega to greater than 2 x 10 to the 10th power Omega at T = 4.2K. Work on the focal plane array is complete. Performance testing for qualification of the flight hardware is discussed, and results are presented. All infrared data channels are measured to be background limited by the expected level of zodiacal emission.

Young, E. T.↗