Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DIRECTIONAL DRILLING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

ITER CS Intermodule Support Structure

With five independently driven, bi-polarity power supplies, the modules of the ITER central solenoid (CS) can be energized in aligned or opposing field directions. This sets up the possibility for repelling modules, which indeed occurs, particularly between CS2L and CS3L around the End of Burn (EOB) time point. Light interface compression between these two modules at EOB and wide variations in these coil currents throughout the pulse produce a tendency for relative motion or slip. Ideally, the slip is purely radial as the modules breathe without any accumulative translational motion. In reality, however, asymmetries such as nonuniformity in intermodule friction, lateral loads from a plasma Vertical Disruption Event (VDE), magnetic forces from manufacturing and assembly tolerances, and earthquakes can all contribute to a combination of radial and lateral module motion. This paper presents 2D and 3D, nonlinear, ANSYS models which simulate these various asymmetries and determine the lateral forces which must be carried by the intermodule structure. Summing all of these asymmetric force contributions leads to a design-basis lateral load which is used in the design of various support concepts: the CS-CDR centering rings and a variation, the 2001 FDR baseline radial keys, and interlocking castles structures. Radial key-type intermodule structure interface slip and stresses are tracked through multiple 15 MA scenario current pulses to demonstrate stable motion following the first few cycles. Detractions and benefits of each candidate intermodule structure are discussed, leading to the simplest and most robust configuration which meets the design requirements: match-drilled radial holes and pin-shaped keys.

42 ENGINEERING↗

Decommissioning Experience at Rokkasho; Standing Type Manipulator: A1000S for Dismantling Tasks - 16434

Decommissioning is a technical process which includes various steps and processes from the clean-up of radioactive materials to the progressive demolition of the plant. One of these steps is the cutting of subassemblies, like tanks, pipes or walls in small pieces suitable for the sorting and disposal. Different solutions are offered for this cutting work and can be grouped as following: - Chip forming - sawing, drilling, milling, turning etc. - Shearing - punching, stamping, scissoring. - Abrading - Grinding, lapping, polishing; water-jet. - Heat - flame cutting, plasma cutting, laser cutting. - Electro-Chemical - Etching, Electrical discharge machining (EDM). Each method has its limitations in accuracy, cost, and effect on the material. In 2013, Waelischmiller Engineering won a contract for two remote handling systems dedicated to the dismantling cell at Rokkasho Nuclear Fuel Reprocessing Facility in Japan. For this project, Inconel and other metals needed to be cut. One of the main cutting methods was decided to use of an angle grinder handled by a robotic arm. Because the use of the overhead systems (bridges and cranes) was difficult for this installation, it was determined, that the best alternative was a power manipulator A1000 installed on the floor with a pre-positioning system. The project proceeded to go forward with the adaptation of the standard A1000 with integration of a control system in a Cartesian coordinate frame; resulting in a heavy duty arm; A1000S with 6 degrees of freedom. The heavy duty power arm A1000S was developed and designed for mechanical cutting with an angle grinder, especially for thick and hard material for example stainless steel and Inconel. Cutting a thick material with an angle grinder requires repeatable precise linear motion, in order not to damage the disc. The angle grinder should be handled with a manipulator which can cut in all directions in a linear motion, since the objects which should be cut are usually very large and fixed in any direction For these requirements, the Cartesian control function was added to our standard power manipulator type A1000. In some cases, the decommissioning work includes repeated access routes or fixed access points that the manipulator arm has to pass repeatedly. For example a fixed point where the waste materials are collected, or repeated transport route that the arm has to go along for each step. For this requirement, the A1000S has been equipped with the 'Go To-Mode'. It is a 'teach and playback mode' which has been developed especially for remote operating manipulators. Quick direct teach, quick play function and an intuitive touch-panel layout are some of the features. With the Go To-Mode high working efficiency was achieved. After rigorous testing at Waelischmiller premises; the manipulator was delivered to JNFL in Rokkasho. It was found that the obtained functionality and precision can be applicable not only for the cutting with a disc grinder, but also the laser cutting method, which requires precise trajectory control. This paper will provide: - A project description, - Presentation of solution process, - Technical description of the A1000S, - Future Applications of the robotic Arm A1000S. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Time-Series Data for the Agra Interim Measure, Fall 2013

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at Agra, Kansas, from the 1950s to the early 1970s. No structures remain on the property, and the land is used for agricultural purposes, specifically wheat production. The property is currently owned by the Kyle Railroad Co. and is leased to Mr. Herb VanEaton. The Pro-Ag Marketing grain storage facility is directly south of the former CCC/USDA facility. In 1985, carbon tetrachloride was detected in groundwater samples collected from Agra public water supply wells PWS-3 and PWS-4, located approximately 2,000 ft south of the former CCC/USDA facility and approximately 1,800 ft south of the Pro-Ag Marketing Facility, at levels below the maximum contaminant level of 5.0 μg/L. In 1986, in response to an increase in carbon tetrachloride to 12 μg/L in well PWS-3, the city was required to remove both PWS-3 and PWS-4 from service. The Agra public water supply system is served by three other wells (PWS-1, PWS-2, and PWS-5) that are outside the area of contamination. In 2005, the Environmental Science Division of Argonne National Laboratory conducted a comprehensive investigation of potential contaminant source areas at Agra, on behalf of the CCC/USDA. Data collected during the 2005 investigation identified three primary source areas for the carbon tetrachloride contamination (Argonne 2006). One source is located on the former CCC/USDA property, and the other two sources are on property owned by Pro-Ag Marketing. In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA initiated source area cleanup as an interim measure (IM) in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup employs five large-diameter boreholes (LDBs) that were excavated by auger drilling. The purposes of these borings were to (1) physically remove soils impacted by carbon tetrachloride from the most contaminated area for treatment by onsite land farming and (2) provide locations for the installation of coupled soil vapor extraction (SVE) and air sparging (AS) wells to facilitate in situ treatment of the remaining carbon tetrachloride in the soils and groundwater. Construction data for the SVE wells, the AS wells, and groundwater and soil gas observation points installed to monitor the progress of the cleanup (as reported on the Kansas Review of Time-Series Data for the Agra Interim Measure 1-2 Version 01, 10/24/13 WWC-5 forms for these installations) are summarized in Table 1.1. The locations of the wells are shown in Figure 1.1. The IMWP/D was approved by the Kansas Department of Health and Environment in November 2008 (KDHE 2008), and operation of the SVE/AS systems began in May 2009. With the approval of the KDHE (2009), landfarming operations to treat the contaminated soils excavated from the LDBs were completed on October 12, 2010. Since start-up, the IM activities have been documented periodically (Argonne 2009a,b,c; Argonne 2010a,b,c,d, 2011a,b,c, 2012, 2013a,b), in accord with the requirements of the KDHEapproved IMWP/D (Argonne 2008). Each of the reports primarily summarizes the operations and maintenance of the SVE and AS equipment and the results of sampling of the groundwater, soil gas, and system effluents for analyses for volatile organic compounds (VOCs) over a specific 3- to 6-month period. Hence, the focus is the incremental performance of the IM. To complement these documents, this report provides a broader perspective by examining the collective data acquired since start-up on May 29, 2009, and through June 2013. The objectives of this approach are to evaluate possible longer-term trends in (1) the operational characteristics of the remedial systems and (2) the corresponding responses in the subsurface environment and their potential relationships to the progress of the cleanup. To facilitate this investigation, time-series diagrams have been developed to illustrate key parameter data for the SVE and AS systems, as well as sampling and additional supporting data obtained from the monitoring program. An overview of the information compiled is in Section 2. In Section 3, observations drawn from these data are discussed. The principal findings of the evaluation and recommendations for consideration are summarized in Sections 4 and 5, respectively.

54 ENVIRONMENTAL SCIENCES↗

Geochemical and Mineralogical Investigation of Uranium in Multi–element Contaminated, Organic–rich Subsurface Sediment

Alluvial sediments characterized by an abundance of refractory or lignitic organic carbon compounds and reduced Fe and S bearing mineral phases have been identified through drilling activities at the U.S. Department of Energy’s (DOE) Integrated Field Research Challenge (IFRC) site at Rifle, CO. Regions of the subsurface from which such sediments are derived are referred to as Naturally Reduced Zones (NRZ). We conducted a study with NRZ sediments with the objective to: i.) Characterize solid phase contamination of U and other co-contaminants; ii.) Document the occurrence of potential U host minerals; iii.) Determine U valence state and micron scale spatial association with co-contaminants. Macroscopic (wet chemical batch extractions and a column experiment), microscopic (SEM-EDS), and spectroscopic (Mössbauer, µ-XRF and XANES) techniques were employed. Results showed that sediments’ solid phase had significant concentrations of U, S, As, Zn, V, Cr, Cu and Se, and a remarkable assortment of potential U hosts (sorbents and/or electron donors), such as Fe oxides (hematite, magnetite, Al-substituted goethite), siderite, reduced Fe(II) bearing clays, sulfides of different types, Zn sulfide framboids and multi – element sulfides. Multi-contaminants, micron size (ca. 5 to 30 µm) areas of mainly U(IV) and some U(VI), and/or other electron scavengers or donors such as Se, As, Cr, and V were discovered in the sediments, suggesting complex micron-scale system responses to transient redox conditions, and different extent and rates of competing U redox reactions than those of single contaminant systems. Collectively, the results improve our understanding and ability to predict U and NRZ’s complex behavior and will delineate future research directions to further study both the natural attenuation and persistence of contaminant plumes and their contribution to groundwater contamination.

bioavailability↗

Internal and near nozzle measurements of Engine Combustion Network “Spray G” gasoline direct injectors

Gasoline direct injection (GDI) sprays are complex multiphase flows. When compared to multi-hole diesel sprays, the plumes are closely spaced, and the sprays are more likely to interact. The effects of multi-jet interaction on entrainment and spray targeting can be influenced by small variations in the mass fluxes from the holes, which in turn depend on transients in the needle movement and small-scale details of the internal geometry. In this paper, we present a comprehensive overview of a multi-institutional effort to experimentally characterize the internal geometry and near-nozzle flow of the Engine Combustion Network (ECN) Spray G gasoline injector. In order to develop a complete picture of the near-nozzle flow, a standardized setup was shared between facilities. A wide range of techniques were employed, including both X-ray and visible-light diagnostics. The novel aspects of this work include both new experimental measurements, and a comparison of the results across different techniques and facilities. The breadth and depth of the data reveal phenomena which were not apparent from analysis of the individual data sets. We show that plume-to-plume variations in the mass fluxes from the holes can cause large-scale asymmetries in the entrainment field and spray structure. Both internal flow transients and small-scale geometric features can have an effect on the external flow. The sharp turning angle of the flow into the holes also causes an inward vectoring of the plumes relative to the hole drill angle, which increases with time due to entrainment of gas into a low-pressure region between the plumes. In conclusion, these factors increase the likelihood of spray collapse with longer injection durations.

33 ADVANCED PROPULSION SYSTEMS↗

Merging high resolution geophysical and geochemical surveys to reduce exploration risk at glass buttes, Oregon

The engineering and studies phase of the Glass Buttes project was aimed at reducing risk during the early stages of geothermal project development. The project’s inclusion of high resolution geophysical and geochemical surveys allowed Ormat to evaluate the value of these surveys both independently and in combination to quantify the most valuable course of action for exploration in an area where structure, permeability, and temperature are the most pressing questions. The sizes of the thermal anomalies at Glass Buttes are unusually large. Over the course of Phase I Ormat acquired high resolution LIDAR data to accurately map fault manifestations at the surface and collected detailed gravity and aeromagnetic surveys to map subsurface structural features. In addition, Ormat collected airborne hyperspectral data to assist with mapping the rock petrology and mineral alteration assemblages along Glass Buttes faults and magnetotelluric (MT) survey to try to better constrain the structures at depth. Direct and indirect identification of alteration assemblages reveal not only the geochemical character and temperature of the causative hydrothermal fluids but can also constrain areas of upflow along specific fault segments. All five datasets were merged along with subsurface lithologies and temperatures to predict the most likely locations for high permeability and hot fluids. The Glass Buttes temperature anomalies include 2 areas, totaling 60 km2 (23 mi2) of measured temperature gradients over 165° C/km (10° F/100ft). The Midnight Point temperature anomaly includes the Strat-1 well with 90°C (194 °F) at 603 m (1981 ft) with a 164 °C/km (10°F/100ft) temperature gradient at bottom hole and the GB-18 well with 71°C (160 °F) at 396 m (1300 ft) with a 182°C/km (11°F/100ft) gradient. The primary area of alteration and elevated temperature occurs near major fault intersections associated with Brothers Fault Zone and Basin and Range systems. Evidence for faulting is observed in each data set as follows. Field observations include fault plane orientations, complicated fault intersections, and hydrothermal alteration apparently pre-dating basalt flows. Geophysical anomalies include large, linear gradients in gravity and aeromagnetic data with magnetic lows possibly associated with alteration. Resistivity low anomalies also appear to have offsets associated with faulting. Hyperspectral and XRF identified alteration and individual volcanic flow units, respectively. When incorporated into a 3D geologic model, the fault intersections near the highest proven temperature and geophysical anomalies provide the first priority targets at Midnight Point. Ormat geologists selected the Midnight Point 52-33 drilling target based on a combination of pre-existing drilling data, geologic field work, geophysical interpretation, and geochemical analysis. Deep temperatures of well 52-33 was lower than anticipated. Temperature gradients in the well mirrored those found in historical drilling, but they decreased below 1500 ft and were isothermal below 2000 ft.

15 GEOTHERMAL ENERGY↗

Topics and Considerations for Developing State Geothermal Regulations

The intent of this document is to provide guidance to states for developing geothermal regulations that would be inclusive of all geothermal technologies (e.g., conventional and non-conventional power production and direct-use applications) with applicability in all states. As part of this project, the NREL project team reviewed and catalogued existing state and federal geothermal regulations, compiled best practices from geothermal and other extractive industries, and established a Geothermal Regulatory Stakeholder Working Group (SWG) to advise and review the geothermal regulatory guidance. The SWG met approximately monthly over the course of one year to review and discuss specific topics as relevant to this geothermal regulatory guidance. This report is broken into five main sections, which were identified in coordination with the SWG as the main topics for inclusion. Within these sections, a list of considerations within each category were identified and, in some cases, relevant examples from existing state and federal geothermal regulations are included to further illustrate the proposed considerations. This report includes the following topics: geothermal resource definition; leasing process; exploration approval process; drilling/wellfield development approval process; and underground injection control process.

15 GEOTHERMAL ENERGY↗

Methods for Finding Legacy Wells in Residential and Commercial Areas

In 1919, the enthusiasm surrounding a short-lived gas play in Versailles Borough, Pennsylvania resulted in the drilling of many needless wells. The legacy of this activity exists today in the form of abandoned, unplugged gas wells that are a continuing source of fugitive methane in the midst of a residential and commercial area. Flammable concentrations of methane have been detected near building foundations, which have forced people from their homes and businesses until methane concentrations decreased. Despite mitigation efforts, methane problems persist and have caused some buildings to be permanently abandoned and demolished. This paper describes the use of magnetic and methane sensing methods by the National Energy Technology Laboratory (NETL) to locate abandoned gas wells in Versailles Borough where site access is limited and existing infrastructure can interfere. Here, wells are located between closely spaced houses and beneath buildings and parking lots. Wells are seldom visible, often because wellheads and internal casing strings have been removed, and external casing has been cut off below ground level. The magnetic survey of Versailles Borough identified 53 strong, monopole magnetic anomalies that are presumed to indicate the locations of steel-cased wells. This hypothesis was tested by excavating the location of one strong, monopole magnetic anomaly that was within an area of anomalous methane concentrations. The excavation uncovered an unplugged gas well that was within 0.2 m of the location of the maximum magnetic signal. Truck-mounted methane surveys of Versailles Borough detected numerous methane anomalies that were useful for narrowing search areas. Methane sources identified during truck-mounted surveys included strong methane sources such as sewers and methane mitigation vents. However, inconsistent wind direction and speed, especially between buildings, made locating weaker methane sources (such as leaking wells) difficult. Walking surveys with the methane detector mounted on a cart or wagon were more effective for detecting leaking wells because the instrument’s air inlet was near the ground where: 1) the methane concentration from subsurface sources (including wells) was a maximum, and 2) there was less displacement of methane anomalies from methane sources by air currents. The Versailles Borough survey found 15 methane anomalies that coincided with the location of well-type magnetic anomalies; the methane sources for these anomalies were assumed to be leaking wells. For abandoned well locations where the wellhead and all casing strings have been removed and there is no magnetic anomaly, leaking wellbores can sometimes be detected by methane surveys. Unlike magnetic anomalies, methane anomalies can be: 1) ephemeral, 2) significantly displaced from the well location, and 3) from non-well sources that cannot be discriminated without isotopic analysis. If methane surveys are used for well location, the air inlet to the instrument should be kept as close to the ground as possible to minimize the likelihood of detecting methane from distant, wind-blown sources.

54 ENVIRONMENTAL SCIENCES↗

Federal Response Assets for a Radioactive Dispersal Device Incident

If a large scale RDD event where to occur in New York City, the magnitude of the problem would likely exceed the capabilities of City and State to effectively respond to the event. New York State could request Federal Assistance if the United States President has not already made the decision to provide it. The United States Federal Government has a well developed protocol to respond to emergencies. The National Response Framework (NRF) describes the process for responding to all types of emergencies including RDD incidents. Depending on the location and type of event, the NRF involves appropriate Federal Agencies, e.g., Department of Homeland Security (DHS), the Department of Energy (DOE), Environmental Protection Agency (EPA), United States Coast Guard (USCG), Department of Defense (DOD), Department of Justice (DOJ), Department of Agriculture (USDA), and Nuclear Regulatory Commission (NRC). The Federal response to emergencies has been refined and improved over the last thirty years and has been tested on natural disasters (e.g. hurricanes and floods), man-made disasters (oil spills), and terrorist events (9/11). However, the system has never been tested under an actual RDD event. Drills have been conducted with Federal, State, and local agencies to examine the initial (early) phases of such an event (TopOff 2 and TopOff 4). The Planning Guidance for Protection and Recovery Following Radiological Dispersal Device (RDD) and Improvised Nuclear Device (IND) incidents issued by the Department of Homeland Security (DHS) in August 2008 has never been fully tested in an interagency exercise. Recently, another exercise called Empire 09 that was situated in Albany, New York was conducted. Empire 09 consists of 3 different exercises be held in May and June, 2009. The first exercise, May 2009, involved a table top exercise for phase 1 (0-48 hours) of the response to an RDD incident. In early June, a full-scale 3- day exercise was conducted for the mid-phase response (48 hours +). A few weeks later, a one day full-scale exercise was conducted for the late phase (recovery) response to an RDD event. The lessons learned from this study are not available as of June 30, 2009. The objective of this report is to review and summarize anticipated Federal and State response actions and the roles and responsibilities of various agencies (DHS, EPA, DOE, NY-DEP, NY-DEC) with respect to decontamination issues that would arise from a radiological dispersion device (RDD), e.g., dirty bomb attack. These issues arise in the late phase of the response (48 hours and beyond) after the area has been stabilized and forensic information has been obtained. Much of the information provided in this report is taken directly from published guidance that is readily available.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

The Multi-Stage History of Mt. Sharp

The Curiosity rover is exploring Gale crater and Mt. Sharp, Gale's 5‐km high central mound. We are investigating the history of alteration and erosion of Mt. Sharp using orbital imagery, spectroscopy and rover observations. Our results suggest a significant time gap between emplacement of the upper and lower sections of the mound. Crater counts show that the lower mound was formed soon after Gale itself, and that it contains distinct units ranging in altitude from approximately ‐4,500 to ‐1,800 m. Spectral data suggest that many units contain phyllosilicates. We found that these clay‐bearing rocks occur in distinct layers concentrated below ‐2,900 m. Parts of the lower mound exhibit a transition from clays to sulfates with increasing altitude. The lower mound shows evidence of flowing water, including canyons and inverted channels. Wind erosion produced km‐scale yardangs and scalloped cliffs. Our mapping shows that many yardangs in the lower mound are clay‐bearing, with a predominant orientation of around N‐S. Curiosity's ground‐level images show myriad fine‐scale, mainly horizontal layers in the lower mound. The rover has found stream beds and conglomerates, indicating that water once flowed on the crater floor. Drilling near the deepest point in Gale produced abundant clay, providing additional evidence of aqueous alteration. Upper mound units range in altitude from ‐2,100 m to +500 m, and mantle the lower mound above an angular unconformity. Most upper mound units are composed of layers. The formation age of the upper mound is unknown, since few craters are preserved. Clay‐bearing layers are detectable in several locations, mainly at altitudes near ‐2,000 m. There is no evidence of water flow, but wind erosion has scalloped the surfaces and edges of layers, and fine‐scale yardangs are common. Correlations between yardangs and clay spectra are apparent only in the lowermost units of the upper mound. Yardang orientations vary, and include N‐S, NW‐SE, and NE‐SW. Upper mound units resemble the planet‐wide Medusae Fossae formation, dated as Hesperian and argued to be composed of ignimbrites. Medusae Fossae layers are easily eroded by wind, and our mapping demonstrates their resemblance to upper mound fine‐scale yardangs. The history of Mt. Sharp started with deposition and lithification of sediments shortly after crater formation. Some lower mound layers were partially altered to clays and sulfates, and water formed streams and canyons. Wind erosion of the lower mound produced large‐scale yardangs, particularly in clay‐rich layers, oriented generally N‐S. Upper mound units were emplaced following a considerable period of wind erosion. The absence of water flow on the upper mound suggests that these units were emplaced after atmospheric loss rendered water unstable at the surface. The shift in dominant wind direction, as indicated by yardang orientations, also argues for a time gap between erosion of the lower and upper mound. These observations are consistent with upper mound units being related to the Hesperian Medusae Fossae formation. During 2014 Curiosity is expected to reach the foot of Mt. Sharp and ascend through the clay‐rich layers, into the sulfate‐rich layers, and possibly past the interface with the upper mound. This will be a unique opportunity to field check geologic models on the surface of Mars.

Allen, C.↗

Apollo 6, Anomaly Report No. 6: Abnormal Structural Performance During Launch Phase

Approximately 2 minutes 13 seconds after lift-off of the Apollo 6 mission, abrupt changes of strain, vibration, and acceleration measurements were indicated in the S-IVB, instrument unit, adapter, lunar module, and command and service modules; photographs showed objects coming from the area of the adapter. The adapter, however, continued to sustain the required loads with no impairment of the mission. The investigation was first focused upon the understanding of the coupled vibration modes and characteristics of the launch vehicle and spacecraft.' Extensive test programs were conducted. It was eventually concluded that the adapter failure was not caused by vibration. Extensive study of the airborne photography and other evidence indicated that a large area of the adapter had lost inner facesheet from the honeycomb sandwich panels. Loads and stresses resulting from vibration were determined to be insufficient to initiate such a failure. The investigation was then directed toward determining the range of pressures that could have been trapped in the Apollo 6 adapter sandwich panels, and toward determining the tolerance of the panels to withstand pressure with various degrees of flaws such as adhesive voids and facesheet dents. The degradation effects of moisture and heat exposure on the adhesive strength were also studied and tested. These tests and analyses led to the conclusion that pressure internal to the sandwich panels could have caused the failure, if a large flaw existed. The pressure buildup would have been caused by aerodynamic heating effects on air and moisture trapped in the panel. The probable cause of the failure was found in the original ultrasonic inspection scan record of the affected adapter panel. In the center of the region where the adapter failed, horizontally along the station 709 panel splice, the record contained two thick anomalous lines extending several feet. Without an X-ray record of this region, the significance of this particular scan record cannot be fully understood. However, since all other evidence had indicated that the adhesive had to be weakened in a rather large area to initiate the failure, the investigation was focused intently upon the station 709 splices of other adapters. Sufficient information was developed to verify that deficient assembly techniques have consistently resulted in abnormalities in the structure at this station. These abnormalities were identified in adapters 12, 13, 14, 15, and 16. Before the splice abnormalities were pinpointed, corrective action was taken to reduce pressure "buildup in the honeycomb panels and to reduce heat degrading effects on the adhesive. This was done by drilling vent holes in the inner facesheet and covering the outer facesheet with cork. The adapters having identified abnormalities in the station 709 splice are being repaired, and the contractor is investigating ways of avoiding these -abnormalities in panels yet to be bonded.

Source record↗

Historic Context, Character-Defining Elements, And Photographic Record For A 26.45-Mile Segment Of The 138-Kilovolt Power Transmission System, Areas 3, 5, 6, And 23, Nevada National Security Site, Nye County, Nevada

The subject of this report is the 138-kilovolt (kV) power transmission line on the Nevada National Security Site (NNSS) (see Figure 1). The NNSS, formerly the Nevada Test Site (NTS), was the main continental nuclear test site for the United States between 1951 and 1992. Known as the battleground of the Cold War, the NNSS hosted a total of 928 nuclear tests during that period. It also served as the location of numerous scientific advancements in the fields of rocketry, big-hole drilling, nuclear waste management, and defense. From its construction in the 1960s through the present day, the 138 kV line has provided electrical power to the numerous buildings, facilities, experiments, and tests on the NNSS. The Department of Energy (DOE), in consultation with the Nevada State Historic Preservation Officer (SHPO), has determined that it may contribute to the character and significance of the Mercury Historic District (MHD) on the NNSS, as well as other historic districts that have not been recorded or evaluated yet. The purpose of this report is to fulfill two of the stipulations in the Memorandum of Agreement DEGM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site (MOA). The MOA was executed as part of the DOE’s obligations under Section 106 of the National Historic Preservation Act (NHPA) to mitigate the adverse effects of two undertakings on historic properties. In particular, this report fulfills MOA Stipulations III.C.1-3, which state that the Department of Energy (DOE) will prepare the following: A historic context for the 138 kV transmission line and identification of the line’s characterdefining elements; High-quality digital images of the 26.45-mile segment of the 138 kV transmission line that is subject to the two undertakings for which the MOA was executed; and Photograph catalogs and map keys showing photograph viewpoints and directions.

54 ENVIRONMENTAL SCIENCES↗

Small Scale Field Test Demonstrating CO 2 Sequestration In Arbuckle Saline Aquifer And By CO 2 -Eor At Wellington Field, Sumner County, Kansas

The objectives of this project are to understand the processes that occur when a maximum of 70,000 metric tonnes of CO 2 are injected into two different formations to evaluate the response in different lithofacies and depositional environments. The evaluation will be accomplished through the use of both in situ and indirect MVA (monitoring, verification, and accounting) technologies. The project will optimize for carbon storage accounting for 99% of the CO 2 using lab and field testing and comprehensive characterization and modeling techniques. Site characterization and CO 2 injection should demonstrate state-of-the-art MVA tools and techniques to monitor and visualize the injected CO 2 plume and to refine geomodels developed using nearly continuous core, exhaustive wireline logs, and well tests and a multi-component 3-D seismic survey. Reservoir simulation studies will map the injected CO 2 plume and estimate tonnage of CO 2 stored in solution, as residual gas, and by mineralization and integrate MVA results and reservoir models shall be used to evaluate CO 2 leakage. A rapid-response mitigation plan was developed to minimize CO 2 leakage and provide a comprehensive risk management strategy. The CO 2 was intended to be supplied from a reliable facility and have an adequate delivery and quality of CO 2 . However, several unforeseen circumstances complicated this plan: (1) the initially negotiated CO 2 supply facility went offline and contracts associated with CO 2 supply had to be renegotiated, (2) a UIC Class VI permit proved to be difficult to obtain due to the experimental nature of the project. Both subjects are detailed in separate deliverables attached to this report. The CO 2 enhanced oil recovery (EOR) and geologic storage in Mississippian carbonate reservoir was sucessully deployed. Approximately 20,000 metric tons of CO 2 was injected in the upper part of the Mississippian reservoir to verify CO 2 EOR viability in carbonate reservoirs and evaluate a potential of transitioning to geologic CO 2 storage through EOR. A total of 1,101 truckloads, 19,803 metric tons—an average of 120 tonnes per day—were delivered over the course of injection that lasted from January 9 to June 21, 2016. After cessation of CO 2 injection, the KGS 2-32 well was converted to water injector and continues to operate. CO 2 EOR progression in the field was monitored weekly with fluid level, temperature, and production recording and formation fluid composition sampling. It is important to note that normally, CO 2 EOR pilots are less efficient than commercial operations due to lack of directional and precise well control, lack of surface facilities for CO 2 recycling, and other factors. As a result of this pilot CO 2 injection, the observed incremental average oil production increase was ~68% with only ~18% of injected CO 2 produced back. Decline curve analysis forecasts of additional cumulative oil produced were 32.44M STB to the end of 2027. Wellington Mississippian pilot efficiency by the end of forecast calculations is 11 MCF per barrel of produced oil. Using 32M STB oil production and $1,964,063 cost of CO 2 , CO 2 EOR cost per barrel of oil production is ~$60. Simple but robust monitoring technologies proved to be very efficient in detecting and locating CO 2 . High CO 2 reservoir retentions with low yields within an actively producing field could help to estimate real-world risks of CO 2 geological storage for future projects. The Wellington Field CO 2 EOR was executed in a controlled environment with high efficiency. This case study proves that CO 2 EOR could be successfully applied in Kansas carbonate reservoirs if CO 2 sources and associated infrastructure are available. Recent developments in unconventional resources development in Mid-Continent USA and associated large volume disposal of backflow water and the resulting seismic activity have brought more focus and attention to the Arbuckle Group in southern Kansas. Despite the commercial interest, limited essential information about reservoir properties and structural elements has impeded the management and regulation of disposal, an issue brought to the forefront by recent seismicity in and near areas of large volumes and rates of brine disposal. The Kansas Geological Survey (KGS) collected, compiled, and analyzed available data, including well logs, core data, step rate tests, drill stem tests, 2-D and 3-D seismic data, water level measurements, and others types of data. Several exploratory wells were drilled and core was collected and modern suites of logs were analyzed. Reservoir properties were populated into several site-specific geological models. The geological models illustrate the highly heterogeneous nature of the Arbuckle Group. Vertical and horizontal variability results in several distinct hydro-stratigraphic units that are the result of both depositional and diagenetic processes. During the course of this project, it has been demonstrated that advanced seismic interpretation methods can be used successfully for characterization of the Mississippian reservoir and Arbuckle saline aquifer. Analysis of post-stack 3-D seismic data at the Mississippian reservoir showed the response of a gradational velocity transition. Pre-stack gather analysis showed that porosity zones of the Mississippian and Arbuckle reservoirs exhibit characteristic amplitude versus offset (AVO) response. Simultaneous AVO inversion estimated P- and S-impedances. The 3-D survey gather azimuthal anisotropy analysis (AVAZ) provided information about the fault and fracture network and showed good agreement to the regional stress field and well data. Mississippian reservoir porosity and fracture predictions agreed well with the observed mobility of injected CO 2 in KGS well 2-32. Fluid substitution modeling predicted acoustic impedance reduction in the Mississippian carbonate reservoir introduced by the presence of CO 2 . Seismicity in the United States midcontinent has increased by orders of magnitude over the past decade. Spatiotemporal correlations of seismicity to wastewater injection operations have suggested that injection-related pore fluid pressure increases are inducing the earthquakes. In this investigation, we examine earthquake occurrence in southern Kansas and northern Oklahoma and its relation to the change in pore pressure. The main source of data comes from the Wellington Array in the Wellington oil field, in Sumner County, Kansas, which has monitored for earthquakes in central Sumner County, Kansas, since early 2015. The seismometer array was established to monitor CO 2 injection operations at Wellington Field. Although no seismicity was detected in association with the spring 2016 Mississippian CO 2 injection, the array has recorded more than 2,500 earthquakes in the region and is providing valuable understanding to induced seismicity. A catalog of earthquakes was built from this data and was analyzed for spatial and temporal changes, stress information, and anisotropy information. The region of seismic concern has been shown to be expanding through use of the Wellington earthquake catalog, which has revealed a northward progression of earthquake activity reaching the metropolitan area of Wichita. The stress orientation was also calculated from this earthquake catalog through focal mechanism inversion. The calculated stress orientation was confirmed through comparison to other stress measurements from well data and previous earthquake studies in the region. With this knowledge of the stress orientation, the anisotropy in the basement could be understood. This allowed for the anisotropy measurements to be correlated to pore pressure increases. The increase in pore pressure was monitored through time-lapse shear-wave anisotropy analysis. Since the onset of the observation period in 2010, the orientation of the fast shear wave has rotated 90°, indicating a change associated with critical pore pressure build up. The time delay between fast and slow shear wave arrivals has increased, indicating a corresponding increase in anisotropy induced by pore pressure rise. In-situ near-basement fluid pressure measurements corroborate the continuous pore pressure increase revealed by the shear-wave anisotropy analysis over the earthquake monitoring period. This research is the first to identify a change in pore fluid pressure in the basement using seismological data and it was recently published in the AAAS journal Science Advances (Nolte et al., 2017). The shear-wave splitting analysis is a novel application of the technique, which can be used in other regions to identify an increase in pore pressure. This increasing pore fluid pressure has become more regionally extensive as earthquakes are occurring in southern Kansas, where they previously were absent. These monitoring techniques and analyses provide new insight into mitigating induced seismicity’s impact on society.

02 PETROLEUM↗

Slopes To Prevent Trapping of Bubbles in Microfluidic Channels

The idea of designing a microfluidic channel to slope upward along the direction of flow of the liquid in the channel has been conceived to help prevent trapping of gas bubbles in the channel. In the original application that gave rise to this idea, the microfluidic channels are parts of micro-capillary electrophoresis (microCE) devices undergoing development for use on Mars in detecting compounds indicative of life. It is necessary to prevent trapping of gas bubbles in these devices because uninterrupted liquid pathways are essential for sustaining the electrical conduction and flows that are essential for CE. The idea is also applicable to microfluidic devices that may be developed for similar terrestrial microCE biotechnological applications or other terrestrial applications in which trapping of bubbles in microfluidic channels cannot be tolerated. A typical microCE device in the original application includes, among other things, multiple layers of borosilicate float glass wafers. Microfluidic channels are formed in the wafers, typically by use of wet chemical etching. The figure presents a simplified cross section of part of such a device in which the CE channel is formed in the lowermost wafer (denoted the channel wafer) and, according to the present innovation, slopes upward into a via hole in another wafer (denoted the manifold wafer) lying immediately above the channel wafer. Another feature of the present innovation is that the via hole in the manifold wafer is made to taper to a wider opening at the top to further reduce the tendency to trap bubbles. At the time of reporting the information for this article, an effort to identify an optimum technique for forming the slope and the taper was in progress. Of the techniques considered thus far, the one considered to be most promising is precision milling by use of femtosecond laser pulses. Other similar techniques that may work equally well are precision milling using a focused ion beam, or a small diamond-tipped drill bit.

Greer, Harold E.↗

Topics and Considerations for Developing State Geothermal Regulations

The intent of this document is to provide guidance to states for developing geothermal regulations that would be inclusive of all geothermal technologies (e.g., conventional and non-conventional power production and direct-use applications) with applicability in all states. As part of this project, the NREL project team reviewed and catalogued existing state and federal geothermal regulations, compiled best practices from geothermal and other extractive industries, and established a Geothermal Regulatory Stakeholder Working Group (SWG) to advise and review the geothermal regulatory guidance. The SWG met approximately monthly over the course of one year to review and discuss specific topics as relevant to this geothermal regulatory guidance. This report is broken into five main sections, which were identified in coordination with the SWG as the main topics for inclusion. Within these sections, a list of considerations within each category were identified and, in some cases, relevant examples from existing state and federal geothermal regulations are included to further illustrate the proposed considerations. This report includes the following topics: 1) Geothermal Resource Definition; 2) Leasing process; 3) Exploration approval process; 4) Drilling/wellfield development approval process; 5) Underground injection control process In addition, a list of 'key considerations' summarized from this report are included below. This list is not meant to be exhaustive as each state's regulatory landscape is unique, rather these are meant to be concepts that can be considered when developing and/or updating existing geothermal regulations.

drilling↗

A techno-economic framework for comparing conventionally and additively manufactured parts for geothermal applications

Geothermal reservoir characterization, construction, and operations are technology-intensive activities that contribute significantly to the cost of delivering renewable electricity. The technologies involved, such as downhole tools and drilling equipment, are similar to those used in oil and gas exploration and production must often be adapted for use in the corrosive, high-temperature geothermal reservoir environment. Low production volume of geothermal tools presents a major challenge in meeting the industry's technology needs. Production of specialized tools for geothermal subsurface applications is often cost-prohibitive. Reduced inventory of subsurface well construction, characterization, and production tools causes geothermal reservoir development efficiency and sophistication to lag behind that of the oil and gas industry. Advances in additive manufacturing provide opportunities to advance geothermal technology while reducing lead time and costs associated with production of low-volume, complex parts. Additionally, this paper performs an initial techno-economic analysis comparing the cost of conventional production techniques and additive manufacturing for geothermal downhole applications. An analysis of representative downhole tools is used to create a framework for estimating fabrication costs of subtractive and additive techniques, including post-print machining required to meet final tolerances. The framework is used to explore several manufacturing scenarios and identify the dominant factors driving manufacturing time and cost. The current feasibility of additive manufacturing for geothermal downhole tool applications is assessed and issues for future development to better meet the needs of the geothermal industry are identified.

36 MATERIALS SCIENCE↗

The Athena Mars Rover Science Payload

The Mars Surveyor missions that will be launched in April of 2001 will include a highly capable rover that is a successor to the Mars Pathfinder mission's Sojourner rover. The design goals for this rover are a total traverse distance of at least 10 km and a total lifetime of at least one Earth year. The rover's job will be to explore a site in Mars' ancient terrain, searching for materials likely to preserve a record of ancient martian water, climate, and possibly biology. The rover will collect rock and soil samples, and will store them for return to Earth by a subsequent Mars Surveyor mission in 2005. The Athena Mars rover science payload is the suite of scientific instruments and sample collection tools that will be used to perform this job. The specific science objectives that NASA has identified for the '01 rover payload are to: (1) Provide color stereo imaging of martian surface environments, and remotely-sensed point discrimination of mineralogical composition. (2) Determine the elemental and mineralogical composition of martian surface materials. (3) Determine the fine-scale textural properties of these materials. (4) Collect and store samples. The Athena payload has been designed to meet these objectives. The focus of the design is on field operations: making sure the rover can locate, characterize, and collect scientifically important samples in a dusty, dirty, real-world environment. The topography, morphology, and mineralogy of the scene around the rover will be revealed by Pancam/Mini-TES, an integrated imager and IR spectrometer. Pancam views the surface around the rover in stereo and color. It uses two high-resolution cameras that are identical in most respects to the rover's navigation cameras. The detectors are low-power, low-mass active pixel sensors with on-chip 12-bit analog-to-digital conversion. Filters provide 8-12 color spectral bandpasses over the spectral region from 0.4 to 1.1 micron Narrow-angle optics provide an angular resolution of 0.28 mrad/pixel, nearly a factor of four higher than that of the Mars Pathfinder and Mars Surveyor '98 cameras. Image compression will be performed using a wavelet compression algorithm. The Mini-Thermal Emission Spectrometer (Mini-TES) is a point spectrometer operating in -the thermal IR. It produces high spectral resolution (5 /cm) image cubes with a wavelength range of 5-40 gm, a nominal signal/noise ratio of 500:1, and a maximum angular resolution of 7 mrad (7 cm at a distance of 10 in). The wavelength region over which it operates samples the diagnostic fundamental absorption features of rockforming minerals, and also provides some capability to see through dust coatings that could tend to obscure spectral features. The mineralogical information that Mini-TES provides will be used to select from a distance the rocks and soils that will be investigated in more detail and ultimately sampled. Mini-TES is derived from the MO/MGS TES instrument, but is significantly smaller and simpler. The instrument uses an 8-cm Cassegrain telescope, a Michelson interferometer, and uncooled pyroelectric detectors. Along with its mineralogical capabilities, Mini-TES can provide information on the thermophysical properties of rocks and soils. Viewing upward, it can also provide temperature profiles through the martian atmospheric boundary layer. Elemental and Mineralogical Composition: Once promising samples have been identified from a distance using Pancam/Mini-TES, they will be studied in detail using up to three compositional sensors that can be placed directly against them by an Instrument Arm. The two compositional sensors, presently on the payload are an Alpha-Proton-X-Ray Spectrometer (APXS), and a Mossbauer Spectrometer. The APXS is derived closely from the instrument that flew on Mars Pathfinder. Radioactive alpha sources and three detection modes (alpha, proton, and x-ray) provide elemental abundances of rocks and soils to complement and constrain mineralogical data. The Athena APXS will have a revised mechanical design that will cut down significantly on backscattering of alpha particles from martian atmospheric carbon. It will also include a target of known elemental composition that will be used for calibration purposes. The Athena Mossbauer Spectrometer is a diagnostic instrument for the mineralogy and oxidation state of Fe-bearing phases, which are particularly important on Mars. The instrument measures the resonant absorption of gamma rays produced by a Co-57 source to determine splitting of nuclear energy levels in Fe atoms that is related to the electronic environment surrounding them. It has been under development for space flight for many years at the Technical University of Darmstadt. The Mossbauer Spectrometer (and the other arm instruments) will be able to view a small permanent magnet array that will attract magnetic particles in the martian soil. The payload may also include a Raman Spectrometer. If included, the Raman Spectrometer will provide precise identification of major and minor mineral phases. It requires no sample preparation, and is also sensitive to organics. Fine-Scale Texture: The Instrument Arm a also carries a Microscopic Imager that will obtain high-resolution monochromatic images of the same materials for which compositional data will be obtained. Its spatial resolution is 20 micron/pixel over a 1 cm depth of field, and 40 micron/pixel over a 1-cm depth of field. Like Pancam, it uses the same active pixel sensor detectors and electronics as the rover's navigation cameras. The Instrument Arm is a three degree-of-freedom arm that uses designs and components from the Mars Pathfinder and Mars Surveyor '98 projects. Its primary function is instrument positioning. Along with the instruments noted above, it also carries a brush that can be used to remove dust and other loose coatings from rocks. Sample Collection and Storage: Martian rock and soil samples will be collected using a low-power rotary coring drill called the Mini-Corer. An important characteristic of this device is that it can obtain intact samples of rock from up to 5 cm within strong boulders and bedrock, Nominal core dimensions are 8xl7 mm. The Mini-Corer drills a core to the commanded depth in a rock, shears it off, retains it, and extracts it. It can also acquire samples of loose soil, using soil sample cups that are pressed downward into loose material. The Mini-Corer can drill at angles from vertical to 45' off vertical. It has six interchangeable bits for long life. Mechanical damage to the sample during drilling is minimal, and heating is negligible. After acquisition, the sample may be viewed by the arm instruments, and/or placed in one of 104 compartments in the Sample Container. A subset of the acquired samples may be replaced with other samples obtained later if desired. The Sample Container has no moving parts, and is mounted external to the rover for easy removal by the Mars Surveyor 2005 flight system. Operation of the rover will make extensive use of automated onboard navigation and hazard avoidance capabilities. Otherwise, use of onboard autonomy is minimal. Data downlink capability is about 40 Mbit/sol, and the use of the Mars Surveyor '01 orbiter for data relay imposes a limit of at most two command cycles per sol. Because of the significant amount of time available between command cycles, all payload elements will be operated sequentially, rather than in parallel.; this approach also significantly simplifies operations and minimizes peak power usage. The landing site for the '01 rover has not been selected yet. Site selection will make as full use as possible of Mars Global Surveyor data, and will involve substantial input from the broad Mars science community. Summary: The following table describes the mass, power, providers, and key scientific objectives of all the major elements of the Athena payload. Additional Athena payload information may be found at: http://astrosun.tn.cornell.edu/athena/index.html. Additional information contained in the original.

Squyes, S. W.↗

The Potosi Reservoir Model 2013

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium in Macon County, Illinois. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the VW1 and the CCS1 wells, structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. Intention was for two million tons per annum (MTPA) of CO2 to be injected for 20 years. In the preceding, the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010" in this topical report) was re-run using a new injection scenario; 3.2 MTPA for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. It was not sufficiently large enough to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 miles x 30 miles (48.3km x48.3km), while preserving all property modeling workflows and layering. This model was retained as the base case of Potosi Dynamic Model 2013a. The Potosi reservoir model was updated to take into account the new data from the verification well VW2 which was drilled in 2012. The new porosity and permeability modeling was performed to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.2 MTPA for 30 years. This new dynamic model was named Potosi Dynamic Model 2013b. Due to the major uncertainties on the vugs permeability, two models were built; the Pessimistic and Optimistic Cases. The Optimistic Case assumes vugs permeability of 9,000 mD, which is analog to the vugs permeability identified in the pressure fall off test of a waste water injector in the Tuscola site, approx. 40 miles (64.4km) away from the IBDP area. The Pessimistic Case assumes that the vugs permeability is equal to the log data, which does not take into account the permeability from secondary porosity. The probability of such case is deemed low and could be treated as the worst case scenario, since the contribution of secondary porosity to the permeability is neglected and the loss circulation events might correspond to a much higher permeability. It is considered important, however, to identify the range of possible reservoir performance since there are no rigorous data available for the vugs permeability. The Optimistic Case gives an average CO2 injection rate of 0.8 MTPA and cumulative injection of 26 MT in 30 years, which corresponds to 27% of the injection target. The injection rate is approx. 3.2 MTPA in the first year as the well is injecting into the surrounding vugs, and declines rapidly to 0.8 MTPA in year 4 once the surrounding vugs are full and the CO2 start to reach the matrix. This implies that according to this preliminary model, a minimum of four (4) wells could be required to achieve the injection target. This result is lower than the injectivity estimated in the Potosi Dynamic Model 2013a (43 MT in 30 years), since the permeability model applied in the Potosi Dynamic Model 2013b is more conservative. This revision was deemed necessary to treat the uncertainty in a more appropriate manner. As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. For the Optimistic Case, the plume extends 17 miles (27.4km) in E-W and 14 miles (22.5km) in N-S directions after 30 years. After injection is completed, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 100 years post injection, the plume extends 20 miles (32.2km) in E-W and 15.5 miles (24.9km) in N-S directions. Should the targeted cumulative injection of 96 MT be achieved; a much larger plume extent could be expected. For the Optimistic Case, the increase of reservoir pressure at the end of injection is approximately 1200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 30 psia (206.8 kPa) beyond 14 miles (22.5km) away from injector. Should the targeted cumulative injection of 96 MT be achieved; a much larger areal pressure increase could be expected. The initial reservoir pressure is nearly restored after approximately 100 years post injection. The presence of matrix slows down the pressure dissipations. The Pessimistic Case gives an average CO2 injection rate of 0.2 MTPA and cumulative injection of 7 MT in 30 years, which corresponds to 7% of the injection target. This implies that in the worst case scenario, a minimum of sixteen (16) wells could be required to achieve the injection target. The present evaluation is mainly associated with uncertainty on the vugs permeability, distribution, and interconnectivity. The different results indicated by the Optimistic and Pessimistic Cases signify the importance of vugs permeability characterization. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Porosity mapping derived from the seismic inversion could also be used in the succeeding task to characterize the lateral porosity distribution within the reservoir. With or without seismic inversion porosity mapping, it is worth exploring whether increased lateral heterogeneity plays a significant role in Potosi injectivity. Investigations on vugular, dolomitic outcrops suggest that there may be significantly greater lateral heterogeneity than what has been modeled here. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗