CERESMIP: a climate modeling protocol to investigate recent trends in the Earth's Energy Imbalance

The Clouds and the Earth's Radiant Energy System (CERES) project has now produced over two decades of observed data on the Earth's Energy Imbalance (EEI) and has revealed substantive trends in both the reflected shortwave and outgoing longwave top-of-atmosphere radiation components. Available climate model simulations suggest that these trends are incompatible with purely internal variability, but that the full magnitude and breakdown of the trends are outside of the model ranges. Unfortunately, the Coupled Model Intercomparison Project (Phase 6) (CMIP6) protocol only uses observed forcings to 2014 (and Shared Socioeconomic Pathways (SSP) projections thereafter), and furthermore, many of the ‘observed' drivers have been updated substantially since the CMIP6 inputs were defined. Most notably, the sea surface temperature (SST) estimates have been revised and now show up to 50% greater trends since 1979, particularly in the southern hemisphere. Additionally, estimates of short-lived aerosol and gas-phase emissions have been substantially updated. These revisions will likely have material impacts on the model-simulated EEI. We therefore propose a new, relatively low-cost, model intercomparison, CERESMIP, that would target the CERES period (2000-present), with updated forcings to at least the end of 2021. The focus will be on atmosphere-only simulations, using updated SST, forcings and emissions from 1990 to 2021. The key metrics of interest will be the EEI and atmospheric feedbacks, and so the analysis will benefit from output from satellite cloud observation simulators. The Tier 1 request would consist only of an ensemble of AMIP-style simulations, while the Tier 2 request would encompass uncertainties in the applied forcing, atmospheric composition, single and all-but-one forcing responses. We present some preliminary results and invite participation from a wide group of models.

54 ENVIRONMENTAL SCIENCES↗

CERESMIP: A Climate Modeling Protocol to Investigate Recent Trends in the Earth's Energy Imbalance

The Clouds and the Earth's Radiant Energy System (CERES) project has now produced over two decades of observed data on the Earth's Energy Imbalance (EEI) and has revealed substantive trends in both the reflected shortwave and outgoing longwave top-of-atmosphere radiation components. Available climate model simulations suggest that these trends are incompatible with purely internal variability, but that the full magnitude and breakdown of the trends are outside of the model ranges. Unfortunately, the Coupled Model Intercomparison Project (Phase 6) (CMIP6) protocol only uses observed forcings to 2014 (and Shared Socioeconomic Pathways (SSP) projections thereafter), and furthermore, many of the ‘observed' drivers have been updated substantially since the CMIP6 inputs were defined. Most notably, the sea surface temperature (SST) estimates have been revised and now show up to 50% greater trends since 1979, particularly in the southern hemisphere. Additionally, estimates of short-lived aerosol and gas-phase emissions have been substantially updated. These revisions will likely have material impacts on the model-simulated EEI. We therefore propose a new, relatively low-cost, model intercomparison, CERESMIP, that would target the CERES period (2000-present), with updated forcings to at least the end of 2021. The focus will be on atmosphere-only simulations, using updated SST, forcings and emissions from 1990 to 2021. The key metrics of interest will be the EEI and atmospheric feedbacks, and so the analysis will benefit from output from satellite cloud observation simulators. The Tier 1 request would consist only of an ensemble of AMIP-style simulations, while the Tier 2 request would encompass uncertainties in the applied forcing, atmospheric composition, single and all-but-one forcing responses. We present some preliminary results and invite participation from a wide group of models.

CMIP6↗

Software cost/resource modeling

The Putnam method for planning the time/work effort component of software development is evaluated. This software costing model, based on Norden-Rayleigh product life cycle concepts, was applied to four development projects. The time/effort tradeoff leading to savings attainable when development time on a project is extended by a few months is demonstrated. The software equation which relates the principal parameters of development time, total effort, system size, and the development environment is presented.

Golden, J. R.↗

Commonality analysis for the NASA Space Station Common Module

The concept of commonality to enhance cost savings, as applied to NASA's Space Station Common Module (CM), is explored. The equipment to be included in the CM is organized by subsystems of structure, power, thermal, command and data handling, environmental control and life support, and crew station. The weight, volume, and quantity of each instrument item will be subsequently added to support a cost model. The CM concept, its reference configuration, power distribution and management, and cost sensitivity options are discussed in detail. Some computer programs are outlined, stressing the importance of the existing capabilities of the STS and the optimum commonality case.

Powell, L. E.↗

Isotherm modeling and techno-economic analysis of a TSA moving bed process using a tetraamine-appended MOF for NGCC applications

Tetraamine-appended metal-organic frameworks (MOF) are a new family of amine-functionalized MOF materials that show potential for CO 2 capture from flue gas conditions relevant to natural gas combined cycle (NGCC) power plants. This work presents isotherm modeling of the tetraamine-appended MOF Mg 2 (dobpdc)(3-4-3)(dobpdc 4- =4,4'-dioxidobiphenyl-3,3'dicarboxylate;3-4-3=N,N'bis(3-aminopropyl)-1,4-diaminobutane), process modeling, scale up, and a techno-economic optimization of a moving bed Temperature Swing Adsorption (TSA) process for carbon capture using this sorbent. This MOF exhibits a unique two-step CO 2 adsorption profile in three different pressure ranges. Thus, arctangent-based logistic functions and, quadratic and Langmuir models were employed to represent such isotherm behavior. The results of the isotherm model show good fitting vs the experimental data with an RMSE of 0.41. Here, to model the carbon capture process, the isotherm model was embedded into a moving bed contactor model, and this was used to simulate a TSA CO 2 capture cycle and evaluate cost-optimal designs considering flue gas from a -650 MWe NGCC power plant. The capital cost model consists of CAPEX correlations for reactors, compressors, ducting, etc., while the operating costs include steam, water, chemicals, and electricity (following NETL's quality guidelines for energy systems studies). A techno-economic optimization of the capture system was performed by using NETL's Framework for the Optimization and Quantification of Uncertainty and Surrogates tool (FOQUS). Results suggest that a moving bed carbon capture system with tetraamine-appended MOF can be competitive compared to conventional MEA solvent-based capture processes for NGCC plants, when a heat recovery efficiency of at least 40% is achieved, and MOF materials can be produced at a cost below -$9/kg.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Techno-Economic Evaluation of Electrified Vehicle Options in Drayage Fleets

The electrification of drayage fleets offers potential economic and operational benefits, but the financial viability of electrified vehicles remains sensitive to battery cost, energy price, and fleet usage patterns. While total cost of ownership (TCO) is a useful benchmark, fleet operators and investors are equally concerned with investment performance metrics such as payback period (PB) and Internal Rate of Return (IRR), which better reflect financial risks and investment return timelines. This study develops a unified techno-economic framework that jointly evaluates TCO, PB, and IRR to determine when electrified trucks become cost-effective alternatives to diesel trucks. Building on a previously developed cost modeling tool and using real-world telematics data from a Class 8 drayage fleet at the Port of Savannah, the analysis incorporates projected battery cost trajectories, electricity and diesel price trends, vehicle efficiency improvements, and multiple battery capacities. Parameter ranges reflect widely cited projections and observed drayage-duty-cycle variability. A surrogate-modeling method approximates economic performance across thousands of battery cost–electricity price combinations, enabling high-resolution identification of conditions that achieve TCO parity, acceptable PB thresholds, and target IRR levels. Additionally, the study estimates the evolving share of the fleet that can feasibly electrify over time under multiple economic metrics. This integrated framework offers a novel, data-driven approach to inform risk-aware decision-making for fleet electrification and supports investment planning under evolving cost and operational conditions.

Sun, Ruixiao [ORNL] (ORCID:0000000341768676)↗

HybridBOSSE (Hybrid Balance-of-System (BOS) Systems Engineering Model)

Hybrid Power Plants (HPPs) have the potential to increase the value of renewable energy systems and decrease their costs through shared development (e.g., permitting) and infrastructure (e.g., collection system). Prior work has identified potential cost savings and technical and economic performance improvements for solar plus storage plants. However, additional research is needed to understand cost drivers that are specific to hybrid wind plants. Here we analyze the potential for shared infrastructure cost savings at one type of hybrid plant: wind plus solar photovoltaic (PV). To perform this analysis, we developed a new open-source, Python-based cost modeling tool: the Hybrid Balance-of-System (BOS) Systems Engineering model (HybridBOSSE). HybridBOSSE is an extension of NREL's LandBOSSE tool.

Barker, Aaron↗

Electric-vehicle battery second-life and recycling pathways: How economics depend on chemistry, processing, and application

We assess the economics of repurposing and recycling electric vehicle (EV) batteries by estimating the maximum acquisition price repurposers and recyclers could pay for used EV packs across cathode chemistries, first-life conditions, second-life applications, and recycling processes. We develop a novel open-source process-based cost model of a UL-1974-certified repurposing facility and leverage battery degradation models to estimate the maximum acquisition price repurposers could pay for used EV batteries while producing second-life battery energy storage systems with life-adjusted costs equivalent to new systems. We compare these maximum price estimates to maximum prices for recyclers based on cost and revenue estimates from the EverBatt model. We find that repurposing is more economical than recycling for lithium iron phosphate (LFP) batteries, due to their relatively long life and low value materials; recycling is generally more economical than repurposing for lithium nickel cobalt aluminum oxide (NCA) batteries, due to their shorter life and higher value materials; and the economics for lithium nickel manganese cobalt oxide (NMC) batteries depend more heavily on first life retirement conditions and second life application intensity. These results suggest an overall strategy: reuse LFP, recycle NCA, and sort NMC into recycling or repurposing pathways based on state of health and second-life application.

25 ENERGY STORAGE↗

Optimal hybrid power plants for electric vehicle charging demand

Transmission constraints, increasing motivations to decarbonize, and concerns over peak electric vehicle (EV) load impacts on local grids have driven electric customers to consider behind-the-meter, hybrid power plant generation and storage at the distributed-grid level for EV charging. In this study, we develop capabilities to optimize hybrid power plant component capacities for EV charging. We then demonstrate these capabilities in a case study for Boulder, Colorado, using public EV charging data as well as wind and solar resource data. Our results show system designs that balance the cost of energy with load-meeting and peak shaving performance. Within the case study, systems designed for wind, solar photovoltaic (PV), and storage resulted in lower cost of energy than those optimized for PV and storage only. This indicates that in areas where wind resource exists, hybrid power plants that include wind, PV, and battery assets can better meet EV charging loads (including peak loads that are prone to overloading local grids) than PV and battery assets alone. Future work to address limitations in this paper include extending cost modeling to include performance losses (e.g., based on operations or weather) and charging station costs to estimate levelized cost of charging, and quantifying uncertainty and error in our aggregation methods for estimating EV charging loads at the hourly timescale.

14 SOLAR ENERGY↗

Offshore Wind Farm Turbine and Energy Storage Optimization

Abstract This paper evaluates the technical and economic feasibility of repurposing decommissioned offshore oil and gas platforms as electrical substations for offshore wind projects in the U.S. Gulf of America, a region characterized by relatively low and highly variable wind speeds, extensive legacy offshore infrastructure, and exposure to merchant electricity markets. A unified techno-economic framework is developed using the Repurposing Offshore Infrastructure for Continued Energy (ROICE) Economic Model (REM) to integrate Gulfspecific wind resource assessment, commercial wind turbine performance, offshore infrastructure cost modeling, and wholesale electricity market exposure. Gulf wind speed data are vertically extrapolated to turbine hub height and combined with manufacturer power curves to compute annual energy production and capacity factors across a broad portfolio of commercial turbines, enabling identification of turbine designs best suited for low-wind offshore environments. Hourly electricity price data from the Midcontinent Independent System Operator (MISO) day-ahead market are incorporated to characterize revenue potential, price volatility, and the temporal alignment between wind generation and market conditions. In addition, a conceptual framework for offshore battery energy storage system (BESS) integration is developed to support future investigation of market-responsive energy shifting at repurposed platforms. Results from the turbine evaluation demonstrate that machines with lower cut-in wind speeds and earlier ‘rated-power’ characteristics significantly outperform larger, industry-standard offshore turbines for the same net power under Gulf wind conditions, underscoring the need for region-specific technology selection. Market analysis further reveals substantial price variability and limited intrinsic alignment between wind production and high-price periods, motivating consideration of operational flexibility mechanisms. While storage optimization is not implemented in this study, the REM framework establishes a transparent and replicable foundation for co-evaluating turbine selection, infrastructure constraints, and market exposure, providing a practical pathway for assessing the potential role of repurposed offshore platforms in enabling economically viable offshore wind development in the Gulf of America.

02 PETROLEUM↗

Local design optimization for composite transport fuselage crown panels

Composite transport fuselage crown panel design and manufacturing plans were optimized to have projected cost and weight savings of 18 and 45 percent, respectively. These savings are close to those quoted as overall NASA Advanced Composite Technology (ACT) program goals. Three local optimization tasks were found to influence the cost and weight of fuselage crown panels. The effects are summarized of each task and the task associated with a design cost model is described in detail. Studies were performed to evaluate the relationship between manufacturing cost and design details. A design tool was developed to aid in these studies. The development of the design tool included combining cost and performance constraints with a random search optimization algorithm. The resulting software was used in a series of optimization studies that evaluated the sensitivity of design variables, guidelines, criteria, and material selection on cost. The effect of blending adjacent design points in a full scale panel subjected to changing load distributions and local variations was shown to be important. Technical issues and directions for future work were identified.

Swanson, G. D.↗

Sampling Size Optimization for Bioburden Density Estimation in Planetary Protection

Planetary protection (PP) is a discipline that focuses on minimizing the biological contamination of spacecraft to ensure compliance with international policy. Precise estimation of bioburden - the total number of microbes in or on spacecraft hardware – and the bioburden density are of utmost importance for PP. Such estimation is the way concordance with requirements is demonstrated, and it is critical for quantifying the potential risk of inadvertently contaminating other planetary bodies. Although a suite of molecular techniques have been used to thoroughly characterize and profile the microbiome of various cleanroom environments and spacecraft, the gold standard remains the physical enumeration of microbes via culturing of samples directly taken from spacecraft and associated surfaces. However, due to technical, budgetary, and programmatic constraints, only a manageable portion (around 10%) of the entire spacecraft surface is directly sampled with cotton swabs or wipes. To generate the bioburden current best estimate (CBE) for components not directly verifiable, the accepted approach is to apply a NASA-defined bioburden estimate based on the components’ manufacturing or assembly environment. This approach utilizes a prespecified bioburden density estimation that applies a maximum value across the total surface area of the specified component. For hardware components that underwent similar assembly processes, an implied bioburden is adopted for all components, based on a direct verification of a representative component within the same lot. Once all components have a CBE, the bioburden estimates are generated. In previous publication [ 1], we have shown that statistical risks quantifying the accuracy of the estimates for sampled, prespecified, and implied components can be derived and ranked. For mean squared error (MSE) function, the risks are available analytically and hence a cost function can be obtained to optimize the risks with respect to the sampling area and sampling cost. Since the sampling area and sampling cost are two complimentary variables, their sum will have a well-defined minimum. This paper presents the multivariate optimization of the integrated risk of an empirical Bayes estimator to determine the optimal sampling schedule for a given number of components. It is assumed that given a number of components, N, the bioburden density for each component can either be sampled, implied, or prespecified. The multivariate optimization searches through different options to sample, imply or prespecify the bioburden density for a component, and account for the component’s surface area and cost of sampling. The idea of the optimization is based on the observation that the statistical risk of using an estimator is a monotonically decreasing function of the sampled area. The larger the sampled area, the lower the risk of using the estimator as the estimator becomes more and more accurate as the sampling area increases. On the other hand, the cost of sampling is monotonically increasing as the sampled surface grows. This makes the risk and total cost of sampling complimentary variables which can be counterbalanced to achieve an optimal overall value with respect to the sampled surface. In this paper, the integrated risk has been used to quantify the accuracy of the estimator. This risk has been selected because it depends on neither the true value of the parameter nor on the collected data. The cost of each sample was also available to obtain the total cost of sampling of N components. The paper will present the results based on computer-simulated data as well as the data collected during the InSight mission. The computer-simulated data have N components with randomly generated total areas and each component assigned to one of the three categories according to the method of estimating of bioburden density: sampled, implied, or prespecified. The cost of sampling is also available. The cost of sampling is estimated based on a cost model provided by the planetary protection group at JPL. For this paper, the overall cost was assumed to be a linear function of exposure. The optimization process finds the allocation of the components to the three categories that minimizes the tradeoff between integrated risk and total cost. For the InSight data, a set of components is selected representing all three categories, and optimization is performed to determine if the performed allocation was optimal or if a better allocation could have been obtained. To the best of our knowledge, this work is the first attempt not only perform an accurate estimation of bioburden density but also do it in an optimal way.

97 - MATHEMATICS AND COMPUTING↗

Assurance Equations: A Cost and Criticality Model for Optimizing Quality Assurance Surveillance

The cost of quality vs cost of failure correction has been a long-running topic of discussion within the Aerospace community. It leads directly to concepts of “risk tolerance”, and risk-based decision-making. It would be valuable if there was a way to compute the optimal investment in customer-executed quality assurance activities using defect significance with respect to performance objectives, the activities’ defect detection effectiveness, and the cost-penalty for late discovery of impactful defects. This optimization is particularly of interest to projects whose budget constraints significantly limit their risk management options.The cost to fix defects (i.e., failure correction) escalates as the project matures. There have been studies attempting to determine the relative cost of fixing defects discovered during various phases of a project life cycle with important implications, all of which suggest growth factors are large. The commonly referred to 1:10:100 rule represents a cost multiplier for repair/rework across the Design to Fab to Test hardware development phases. Cost premiums for QA activities also accumulate when they are treated as mandatory (due to schedule drag) or are performed later than their assigned phase.This paper describes the modeling of development phase -dependencies in the conduct of typical customer-executed quality assurance activities. Our initial modeling encompasses:• Distinct phases of the production lifecycle• Multiple kinds of Defects, each with some a-priori likelihood of being present• Each defect’s impact on performance Objectives for a type of hardware• The cost and efficacy of assurance techniques at detecting such Defects• The costs of fixing those Defects detected in a given phase of the production lifecycleThe model captures assurance activities’ abilities to Detect defects. Upon detection it is assumed that the Defect is immediately fixed. Defects that “escape” detection by some activity may thereafter be detected by a later activity, but by then the cost of fixing the Defect may have escalated. Defects are related to the performance Objectives they would detract from, were those Defects to remain present in the operating system.We have constructed and are exploring, a model that relates the importance of hardware system elements to mission objectives, the impact of types of Defects on those hardware types, the cost of customer-executed assurance activities (i.e., supplier controls) and their effectiveness towards reducing an impactful quality escape, and the cost of Defect correction across production phase. We describe the approach taken to select the key model aspects, why they are relevant to our NASA mission, and our efforts to populate it with relevant and contemporary data. We use a notional example to illustrate model design and function.

Plante, Jeannette↗

Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

Butts, Glenn↗

PART 1- techno-economic analysis of a grid scale Ground-Level Integrated Diverse Energy Storage (GLIDES) technology

In this paper, a techno-economic model / cost reduction analysis of a low-cost, dispatchable / scalable, efficient Ground-Level Integrated Diverse Energy Storage (GLIDES) system is analyzed, along with a review of existing state-of-the-art energy storage technologies. The introduced technology, GLIDES, which was invented at the Oak Ridge National Laboratory (ORNL), stores energy by compression and expansion of air using water as a liquid piston inside high-pressure reservoirs. GLIDES is introduced by combining Pumped Hydroelectric Storage (PHS) and Compressed Air Energy Storage (CAES) technologies. Here, by replacing inefficient gas compressor and turbine with higher efficiency liquid turbomachines for liquid-piston compression/expansion, GLIDES achieves higher roundtrip efficiency than other gas compression-based energy storage technologies and is a scalable energy storage system. For cost reduction purposes, various pressure reservoirs including steel vessels, carbon fiber vessels, pipe segments, and underground pressure reservoirs are analyzed in this paper. Based on the analyzed data using the models discussed in this paper, energy storage costs as low as ~$14/kWh and ~346/kWh (roundtrip efficiency (RTE) ~80%) can be achieved for a grid-scale GLIDES using depleted oil/gas reservoirs and high-pressure pipe segments respectively.

25 ENERGY STORAGE↗

Sandia Contributions to WaterTAP

SAND2023-06591O Through National Alliance for Water Innovation funding, Sandia will be contributing to the Water treatment Technoeconomic Assessment Platform (WaterTAP) project. WaterTAP is an open-source, Python-based software package that supports the technoeconomic assessment of full water treatment trains. WaterTAP includes a modular water treatment model library spanning a broad set of water treatment processes composed of unit, property, and costing models.

Rawlings, EdnaSoraya↗

Cost Efficient and Highly Weather-Resistant Solar Panel Backsheet Produced through Continuous Co-Extrusion Processing

The efficient generation and delivery of ‘clean energy” through photovoltaic (PV) technology relies heavily on the cost, performance and reliability of solar panels, along with the individual components used in assembly of those panels. In order to continue towards the Department of Energy’s (DOE) goals of driving costs down, the lifetime of high-output power generation equipment (i.e. solar modules) must be extended to reduce costs associated with power output degradation and replacement of failed or degraded panels. One of the major sources of module failures in the past 30 years has been the failure of the solar panel backsheet. Failure of this component causes severe output losses due to oxidation and yellowing of the module while creating safety concerns as the major electrical insulation of the module is compromised. Tomark-Worthen LLC was formed in 2012 with the goal of designing and manufacturing novel PV backsheets and encapsulants that would be produced in the United States of America and exceed expectations of domestic and international module producers. These backsheets would improve upon known backsheet design failures (i.e. Isovoltaic’s AAA backsheet) and create domestic manufacturing jobs in the PV sector. This goal became a reality with a first-generation product in 2018 and now, with the support of the DOE, Tomark-Worthen has launched a second-generation product known as PhotoMark® Reflections™ 205-3 and 360-3. This 2+ year effort began in late 2017 with a screening of potential polymeric materials and backsheet structural designs. Performance evaluations of each material provided the necessary data needed to select the proper material combinations and move forward into the design of the manufacturing process. These decisions were made by teaming with a local university, well-respected government laboratories, and private research organizations who provided the tools necessary to predict long-term performance of these materials in much shorter periods of time. Once the go/no-go criteria were met at the mid-point of the project, the effort transitioned to predicting 30+ year performance, achieving certifications, and improving manufacturing efficiencies designed to lower costs in order to be competitive in a cost-driven market. Major project accomplishments include recognition of the new backsheet by Underwriters Laboratories (UL) and international certification for 1000V and 1500V modules by TUV Sud. Both 1000V and 1500V products have been proven on several module manufacturing lines and initial customer orders have been received by both domestic and international module producers. Accelerated exposure testing has shown that the performance of this backsheet exceeds the prior polyamide-based backsheet known to fail in the field. Cost-models and initial customer orders have shown the ability to produce this backsheet at a cost acceptable to many domestic manufacturers, while International costs for standard backsheet remains extremely low. Tomark-Worthen remains one of the only U.S. companies manufacturing backsheet domestically and this has drawn interest from many domestic module manufacturers looking to improve their material supply logistics by avoiding long lead times and custom’s headaches while avoiding current tariffs on Chinese-made components. Along with the launch of a new PV backsheet, this project has provided a critical deliverable to the PV R&D community. This deliverable is the knowledge that not all polyamide-containing backsheets are doomed to failure as the earlier versions did. There has been a fear amongst the PV community to consider these materials due to the failure of one design. This effort has brought a new level of interest to the scientific community as it has been shown that polyamides can be used successfully in a well-designed backsheet. As we move forward from this project, we are excited to see how backsheet technology and manufacturing in the U.S. will continue to progress and grow.

14 SOLAR ENERGY↗