Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

The aircraft energy efficiency active controls technology program

Broad outlines of the NASA Aircraft Energy Efficiency Program for expediting the application of active controls technology to civil transport aircraft are presented. Advances in propulsion and airframe technology to cut down on fuel consumption and fuel costs, a program for an energy-efficient transport, and integrated analysis and design technology in aerodynamics, structures, and active controls are envisaged. Fault-tolerant computer systems and fault-tolerant flight control system architectures are under study. Contracts with leading manufacturers for research and development work on wing-tip extensions and winglets for the B-747, a wing load alleviation system, elastic mode suppression, maneuver-load control, and gust alleviation are mentioned.

Hood, R. V., Jr.↗

Data from: Initial nitrous oxide, carbon dioxide, and methane costs of converting conservation reserve program grassland to row crops under no-till vs. conventional tillage

Around 4.4 million ha of land in USDA Conservation Reserve Program (CRP) contracts will expire between 2013 and 2018 and some will likely return to crop production. No-till (NT) management offers the potential to reduce the global warming costs of CO2 , CH4 , and N2 O emissions during CRP conversion, but to date there have been no CRP conversion tillage comparisons. In 2009, we converted portions of three 9-21 ha CRP fields in Michigan to conventional tillage (CT) or NT soybean production and reserved a fourth field for reference. Both CO2 and N2 O fluxes increased following herbicide application in all converted fields, but in the CT treatment substantial and immediate N2 O and CO2 fluxes occurred after tillage. For the initial 201-day conversion period, average daily N2 O fluxes (g N2 O-N ha-1 d-1 ) were significantly different in the order: CT (47.5 ± 6.31, n = 6) ≫ NT (16.7 ± 2.45, n = 6) ≫ reference (2.51 ± 0.73, n = 4). Similarly, soil CO2 fluxes in CT were 1.2 times those in NT and 3.1 times those in the unconverted CRP reference field. All treatments were minor sinks for CH4 (-0.69 ± 0.42 to -1.86 ± 0.37 g CH4 -C ha-1 d-1 ) with no significant differences among treatments. The positive global warming impact (GWI) of converted soybean fields under both CT (11.5 Mg CO2 e ha-1 ) and NT (2.87 Mg CO2 e ha-1 ) was in contrast to the negative GWI of the unconverted reference field (-3.5 Mg CO2 e ha-1 ) with on-going greenhouse gas (GHG) mitigation. N2 O contributed 39.3% and 55.0% of the GWI under CT and NT systems with the remainder contributed by CO2 (60.7% and 45.0%, respectively). Including foregone mitigation, we conclude that NT management can reduce GHG costs by ~60% compared to CT during initial CRP conversion.

54 ENVIRONMENTAL SCIENCES↗

GEMPAK: An arbitrary aircraft geometry generator

A computer program, GEMPAK, has been developed to aid in the generation of detailed configuration geometry. The program was written to allow the user as much flexibility as possible in his choices of configurations and the detail of description desired and at the same time keep input requirements and program turnaround and cost to a minimum. The program consists of routines that generate fuselage and planar-surface (winglike) geometry and a routine that will determine the true intersection of all components with the fuselage. This paper describes the methods by which the various geometries are generated and provides input description with sample input and output. Also included are descriptions of the primary program variables and functions performed by the various routines. The FORTRAN program GEMPAK has been used extensively in conjunction with interfaces to several aerodynamic and plotting computer programs and has proven to be an effective aid in the preliminary design phase of aircraft configurations.

Stack, S. H.↗

Novel Molten Salts Thermal Energy Storage for Concentrating Solar Power Generation

The explicit UA program objective is to develop low melting point (LMP) molten salt thermal energy storage media with high thermal energy storage density for sensible heat storage systems. The novel Low Melting Point (LMP) molten salts are targeted to have the following characteristics: 1. Lower melting point (MP) compared to current salts (<222ºC) 2. Higher energy density compared to current salts (>300 MJ/m3) 3. Lower power generation cost compared to current salt In terms of lower power costs, the program target the DOE's Solar Energy Technologies Program year 2020 goal to create systems that have the potential to reduce the cost of Thermal Energy Storage (TES) to less than $15/kWh-th and achieve round trip efficiencies greater than 93%. The project has completed the experimental investigations to determine the thermo-physical, long term thermal stability properties of the LMP molten salts and also corrosion studies of stainless steel in the candidate LMP molten salts. Heat transfer and fluid dynamics modeling have been conducted to identify heat transfer geometry and relative costs for TES systems that would utilize the primary LMP molten salt candidates. The project also proposes heat transfer geometry with relevant modifications to suit the usage of our molten salts as thermal energy storage and heat transfer fluids. The essential properties of the down-selected novel LMP molten salts to be considered for thermal storage in solar energy applications were experimentally determined, including melting point, heat capacity, thermal stability, density, viscosity, thermal conductivity, vapor pressure, and corrosion resistance of SS 316. The thermodynamic modeling was conducted to determine potential high temperature stable molten salt mixtures that have thermal stability up to 1000 °C. The thermo-physical properties of select potential high temperature stable (HMP) molten salt mixtures were also experimentally determined. All the salt mixtures align with the go/no-go goals stipulated by the DOE for this project. Energy densities of all salt mixtures were higher than that of the current solar salt. The salt mixtures costs have been estimated and TES system costs for a 2 tank, direct approach have been estimated for each of these materials. All estimated costs are significantly below the baseline system that used solar salt. These lower melt point salts offer significantly higher energy density per volume than solar salt – and therefore attractively smaller inventory and equipment costs. Moreover, a new TES system geometry has been recommended A variety of approaches were evaluated to use the low melting point molten salt. Two novel changes are recommended that 1) use the salt as a HTF through the solar trough field, and 2) use the salt to not only create steam but also to preheat the condensed feedwater for Rankine cycle. The two changes enable the powerblock to operate at 500°C, rather than the current 400°C obtainable using oil as the HTF. Secondly, the use of salt to preheat the feedwater eliminates the need to extract steam from the low pressure turbine for that purpose. Together, these changes result in a dramatic 63% reduction required for 6 hour salt inventory, a 72% reduction in storage volume, and a 24% reduction in steam flow rate in the power block. Round trip efficiency for the Case 5 - 2 tank “direct” system is estimated at >97%, with only small losses from time under storage and heat exchange, and meeting RFP goals. This attractive efficiency is available because the major heat loss experienced in a 2 tank “indirect” system - losses by transferring the thermal energy from oil HTF to the salt storage material and back to oil to run the steam generator at night - is not present for the 2 tank direct system. The higher heat capacity values for both LMP and HMP systems enable larger storage capacities for concentrating solar power.

25 ENERGY STORAGE↗

Solid rocket motor cost model

A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.

Harney, A. G.↗

Apollo/Skylab suit program management systems study. Volume 2: Cost analysis

The business management methods employed in the performance of the Apollo-Skylab Suit Program are studied. The data accumulated over the span of the contract as well as the methods used to accumulate the data are examined. Management methods associated with the monitoring and control of resources applied towards the performance of the contract are also studied and recommended upon. The primary objective is the compilation, analysis, and presentation of historical cost performance criteria. Cost data are depicted for all phases of the Apollo-Skylab program in common, meaningful terms, whereby the data may be applicable to future suit program planning efforts.

Source record↗

Municipal Pay-As-You-Throw (PAYT) Programs: Economic Benefits, Limitations, and Best Practices

Pay-as-you-throw (PAYT), also known as unit pricing or variable rate pricing, is a solid waste management system where customers pay for waste collection based on the volume or weight of waste they discard. By linking costs directly to waste generation, PAYT encourages customers to reduce waste through recycling, composting, and source reduction. This approach could support key waste management goals such as waste reduction, increased recycling, and controlling disposal costs. PAYT programs are flexible and can be customized to community needs. When implemented effectively, PAYT may also generate dedicated funding for waste services, enhancing program sustainability and stability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

When Do Efficiency and Demand Flexibility Go Hand-in-hand?

Utilities have been experimenting with integrated demand side management (IDSM) programs since the 2000s. The potential benefits of improved program cost-effectiveness and customer engagement from combining energy efficiency (EE), demand flexibility (DF), and other distributed energy resources into an integrated customer offering have been recognized although there are several known regulatory and program administrative challenges. In addition, as buildings adopt EE measures, the baseline load profile change generally reduces the potential load that can be shed or shifted. This has been a significant technical barrier for customers and program implementers. However, it is a myth that EE always reduces DF. Load change from EE can be time-varying. Therefore, whether EE improves or reduces DF should be evaluated on an individual measure basis accounting for weather dependencies and interactions. For IDSM program design purpose, it is useful to understand how common EE features influence DF and the underlying building physics. In this paper, we use parametric simulations of a prototype medium office building to evaluate how various EE features influence DF, measured by a “demand decrease intensity” (W/ft2) metric. These EE features cover envelope characteristics, internal loads, and airside HVAC system. The parametric analysis shows that some efficient HVAC control measures will increase DF but not the traditional building envelope, lighting, and ventilation-related efficiency measures. These findings contribute to the technical basis for achieving enhanced energy benefits by packaging appropriate HVAC control measures in IDSM program design. Program developers should further validate these results in targeted pilot projects.

Yu, Lili↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2012

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 142 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

Slattery, Bob S.↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2013

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 152 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2014

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $\$$210.6 million, total reported cost savings were $\$$215.1 million, and total guaranteed cost savings were $\$$$204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2015

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 151 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Funding Mechanisms for Federal Geothermal Permitting

The Department of Energy's (DOE) Geothermal Technologies Office (GTO) initiated a Geothermal Regulatory Roadmap (GRR) in March 2012 to facilitate the development of utility-scale geothermal power. The GRR team conducted a series of workshops during the summer of 2012, which included key representatives from federal and state agencies, as well as industry and other stakeholders involved in the permitting and development of utility-scale geothermal projects. In many of the GRR meetings held with agencies, industry, and other stakeholders, a recurring issue was competing priorities for agency staff's time, which result in permit processing delays. Some agency personnel explained how only a percentage of their weekly or monthly time is allocated to geothermal due to geothermal budget allocations. Others described how their time allocation was determined by agency priorities, and not by specific geothermal budget allocations. In these cases, geothermal may not be a priority at all. One suggestion that was to increase geothermal permit fees or to develop some other mechanisms of cost recovery to fund additional geothermal positions or contractors to process permits more quickly. Because much of the geothermal resource available in the western U.S. is on federal lands, analysis of cost recovery programs could identify opportunities for additional funding mechanisms to support federal agency personnel and processing permits for geothermal projects. This paper discusses: federal agency revenues received for geothermal projects, including: (1) lease revenues, (2) fixed fees, and (3) cost recovery fees; and potential federal agency budget sources for processing geothermal applications, including: (1) cost-recovery fees for services rendered, (2) set-aside funds (such as those employed by EPAct2005), and (3) the appropriations process. This paper then analyzes the three budget sources as mechanisms for increasing funds available to federal agencies for processing geothermal permits and approvals. This paper concludes that both set-asides and cost-recovery fees for services rendered were effective ways of ensuring sufficient funding for processing geothermal authorizations on federally-managed public lands in a timely manner.

15 GEOTHERMAL ENERGY↗

Satellite solar power - Will it pay off

A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.

Hazelrigg, G. A., Jr.↗

Commercial Buildings Partnerships - Overview of Higher education projects

The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits are designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗