Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONCRETES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Effect of High Temperature on the Tensile Behavior of CFRP and Cementitious Composites

Concrete and other composite manufacturing processes are continuing to evolve and become more and more suited for use in non-Earth settings such as the Moon and Mars. The fact that structures built in lunar environments would experience a range of effects from temperature extremes to bombardment by micrometeorites and that all the materials for concrete production exist on the Moon means that concrete appears to be the most feasible building material. it can provide adequate shelter from the harshness of the lunar environment and at the same time be a cost effective building material. With a return to the Moon planned by NASA to occur after the turn of the century, it will be necessary to include concrete manufacturing as one of the experiments to be conducted in one of the coming missions. Concrete's many possible uses and possibilities for manufacturing make it ideal for lunar construction. The objectives of this research are summarized as follows: i) study the possibility of concrete production on the Moon or other planets, ii) study the effect of high temperature on the tensile behavior of concrete, and iii) study the effect of high temperature on the tensile behavior of carbon fiber reinforced with inorganic polymer composites. Literature review indicates that production of concrete on the Moon or other planets is feasible using the indigenous materials. Results of this study has shown that both the tensile strength and static elastic modulus of concrete decreased with a rise in temperature from 200 to 500 C. The addition of silica fume to concrete showed higher resistance to high temperatures. Carbon fiber reinforced inorganic polymer (CFRIP) composites seemed to perform well up to 300 C. However, a significant reduction in strength was observed of about 40% at 400 C and up to 80% when the specimens were exposed to 700 C.

Toutanji, Houssam A.↗

Poromechanical cohesive interface element with combined Mode I-II cohesive zone elastoplasticity for simulating fracture in fluid-saturated porous media

A combined Mode I-II cohesive zone (CZ) elasto-plastic constitutive model, and a two-dimensional (2D) cohesive interface element (CIE) are formulated and implemented at small strain within an ABAQUS User Element (UEL) for simulating 2D crack nucleation and propagation in fluid-saturated porous media. Here, the CZ model mitigates problems of convergence for the global Newton-Raphson solver within ABAQUS, which when combined with a viscous stabilization procedure allows for simulation of post-peak response under load control for coupled poromechanical finite element analysis, such as concrete gravity dam stability analysis. Verification examples are presented, along with a more complex ambient limestone-concrete wedge fracture experiment, water-pressurized concrete wedge experiment, and concrete gravity dam stability analyses. A calibration procedure for estimating the CZ parameters is demonstrated with the limestone-concrete wedge fracture process. For the water-pressurized concrete wedge fracture experiment it is shown that the inherent time-dependence of the poromechanical CIE analysis provides a good match with experimental force versus displacement results at various crack mouth opening rates, yet misses the pore water pressure evolution ahead of the crack tip propagation. This is likely a result of the concrete being partially-saturated in the experiment, whereas the finite element analysis assumes fully water saturated concrete. For the concrete gravity dam analysis, it is shown that base crack opening and associated water uplift pressure leads to a reduced Factor of Safety, which is confirmed by separate analytical calculations.

97 MATHEMATICS AND COMPUTING↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗

PORFLOW modeling of Vadose zone flow and transport for the E-area intermediate level vault

In support of the E-Area Performance Assessment, a two-dimensional model of water flow and radionuclide transport through the E-Area Intermediate Level Vault (ILV) and local vadose zone has been developed using the PORFLOWTM software. The purpose of the model is to calculate flux to the water table for radionuclides eluted from the ILV during its operational life, the period of institutional control, and times following site closure. Results of model calculations will be used by a three-dimensional PORFLOW model of transport through the aquifer to determine radionuclide concentrations at a hypothetical 100 meter well and at the site boundary where contaminated groundwater could be assessed by members of the public following site closure. While newly developed, the model structure closely follows that used in the 2008 PA while incorporating a refined computational mesh, updated material properties for the vadose zone soil and vault concrete, revised infiltration rates, and new solid-liquid distribution coefficients. The model also addresses degradation of concrete hydraulic properties by blending soil and concrete water retention curves over a 500 year period. That is, the hydraulic properties of ILV concrete start out as fresh concrete at the time of site closure and degrade to soil properties over a 500 year time period. This approach has not been used previously in E-Area PA’s. The model has been used to calculate water flow through the ILV vadose zone and, on a trial basis, transport of a limited number of radionuclides from the waste region inside the ILV to the water table. Figure ES-1 provides a view of the model and an example of water flow after the concrete has substantially degraded. Figure dimensions are in centimeters. The red area in the left hand side figure is the waste disposal region within the ILV. Colored bands in the figures indicate different soil and concrete regions. Figure ES-2 shows a calculation of flux to the water table (mol/yr) for U-234 and its one-year half-life decay chain (U-234 → Th-230 → Ra-226 → Pb-210). Pb-210 flux is too small to show on the same scale used for Th-230 and Ra-226 in Figure ES-2. The model has also been used to make a preliminary evaluation of the release of tritium from TPBAR disposal containers that will be place in the ILV. A separately calculated tritium release rate as a function of time was used as a source in the PORFLOW model. The TPBAR disposal schedule and tritium release rate differ from the values used in the 2008 PA. Results from these initial trial runs are compared to calculations made for the 2008 PA ILV analysis. In brief, a new PORFLOW model of flow and transport through the ILV vadose zone has been developed and tested. The model is ready to be used for PA calculations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cathodic Protection Modeling for Hanford Underground Double-Shell Tank Farms

Hanford stores millions of gallons of radioactive and chemically hazardous waste from the production of weapon materials in tank farms consisting of underground carbon-steel storage tanks surrounded by reinforced concrete. Six of these Hanford tank farms use double-shell storage tanks (DSTs). The DST farms were constructed from 1968 to 1986 with a planned 40–50 year design life, so some are already operating beyond their initial life expectancy. Ultrasonic testing (UT) has indicated significant thinning on the bottom of the secondary (outer) liner of these tanks, believed to arise from groundwater intrusion driving concrete side corrosion. There is no direct access to the steel/concrete interface between the tank and the concrete pad, making it difficult to apply a chemical-based mitigation strategy or to conduct repairs, but cathodic protection (CP) is a possible method to inhibit further concrete-side corrosion. Hanford already uses CP to protect below grade steel piping within the tank farms and connected to the tanks, but this system was not designed to protect the tank bottoms. CP design must account for the structures surrounding the DSTs, including the steel reinforcing bars (rebar) within the concrete pad and vault, various process lines, and the existing CP system. In this study, finite element analysis (FEA) modeling was carried out to simulate CP protection of 1) a single tank and CP anode to develop options for modeling the rebar and to compare to a simpler circuit model and 2) the entire Hanford AN tank farm as a representative example consisting of seven tanks, associated piping, and both existing and new CP anodes. Both circuit and FEA models predict that significant protective current could be delivered to the bottoms of the tanks with the addition of tank-protection anodes below the depth of the tanks. Simulations with only the existing pipe-protection anodes active confirmed that only a very small current to the tank bottoms is predicted under present conditions. Multiple simplified representations of the dome and wall rebar were tested to reduce the computational complexity of the tank-farm simulations, resulting in modeling the rebar as edge elements with a prescribed effective circumference that matches the real rebar surface area. The geometry of the rebar is also simplified into horizontal hoops around the tank walls and radial rebar over the dome with increased effective circumference to retain the target surface area. This simplification was found to greatly reduce the complexity and solution time of the models without large changes in current distributions, especially to the tank bottom. A range of values were tested for model parameters such as soil and concrete resistivities and polarization resistance to investigate their impact on the current and electric potential distributions. Depending on the parameters used, FEA simulations predict some risk of overprotection, particularly on the piping system; since overprotection can also lead to surface damage associated with hydrogen gas generation at the interface (e.g. hydrogen embrittlement or damage to coatings), this needs to be considered when refining the design of the new CP system. Comparison between the FEA models and the circuit model representation demonstrated that the circuit model could not match the predicted FEA current distribution, even when using the exact same surface areas. This discrepancy appeared to be at least partly attributable to the impact of the relative positions of the tank components and anodes to each other and to the ground surface. The FEA model accounts for the relative positions since it solves the governing equations in three dimensions, but the circuit model cannot account for the positioning. In particular, the circuit model underpredicts the current to the tank bottom and overpredicts the current to the dome compared to FEA for the baseline geometry. The FEA models omitted the electrically isolated rebar in the bottom concrete slab. However, a circuit based stray current model estimated that only 2.1% of the total current through the slab would stray into the rebar, corresponding to ~0.21 A for a target current density of 2 mA/ft2 to the tank bottom. The estimated corrosion driven by this amount of stray current is predicted to yield a lifetime of >400 years for the minimum rebar diameter, assuming an acceptable cross-section area loss of 10%.

d'Entremont, Anna [Savannah River National Laborat↗

Modeling Interfaces to Support Low-Level Waste Disposal System Performance Assessments - 20366

In low-level waste (LLW) disposal sites, interfaces between cementitious materials, used as waste forms and/or engineered barriers, and the surrounding soil or backfill material are often encountered. Reactions across these interfaces may lead to chemical and structural alteration of the cementitious and backfill materials that may ultimately affect long-term performance. For example, the ingress of carbon dioxide from soil gas into a waste tank concrete shell at the Hanford Site or Savannah River Site (SRS) or a low-level waste disposal vault at SRS leads to carbonation of cement hydration products (e.g. portlandite, calcium-silicate hydrate or C-S-H, and ettringite). The result of carbonation is a decrease in pH in the cement paste portion of the tank wall or vault concrete structure that could ultimately lead to de-passivation of the embedded structural steel and, eventually, to cracking. Cracking can lead to increased ingress of water into the structure, corresponding increased release of constituents of concern, and to subsequent increased transport of these constituents to the surrounding environment. The mobility of trace constituents (e.g., radionuclides of concern) in waste forms may increase in response to changes in pH, pore structure, and mineralogical gradients. Depletion of portlandite results in subsequent decalcification of C-S-H that leads to changes in the cement strength and may lead to structural failure. At the boundary between waste forms and concrete vaults, the migration of sulfate ions from the salt waste form (e.g., the saltstone waste form used for LLW disposal at the Savannah River Site in Saltstone Disposal Units, or SDUs) into the barrier or vault concrete has been predicted to result in expansive mineral phase formation (or 'sulfate attack'). Expansive mineral formation could result in cracking and potential loss of structural integrity in the vault concrete. In the performance assessment (PA) for the SRS SDUs, prediction of both the carbonation and sulfate attack fronts are critical to assessing the long-term performance of these LLW disposal vaults. A general purpose geochemical reactive transport model has been developed in LeachXS/ORCHESTRA to evaluate typical interfaces for LLW disposal environments, including SDUs at SRS. The model may be used to predict the long-term performance of interfaces between cementitious materials and saltstone or backfill materials with respect to primary phases by considering mass transport, cement chemistry, geochemical speciation, and multi-ionic diffusion over interfaces between different materials. The present study compares the performance and interactions between vault concrete and saltstone waste form for a representative SDU scenario. The materials were characterized using pH-dependence leaching test (EPA 1313) and semi-dynamic transport tests (EPA 1315) with test results used to parameterize the interface model. The development of a credible inter model provides an important basis for supporting future PAs where carbonation and sulfate attack are important aging and degradation mechanisms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wash Penalty Factors: Insight into the Effects of Water Wash Down of Building Materials for Radionuclide/Nuclear (Rn) Decontamination - 20153

The release of radiological material to the urban environment can have a devastating socio-economic impact. In an urban release scenario, areas around the dispersal epicenter and any areas contaminated via atmospheric deposition may require extensive decontamination. Most recently, our group reported the decontamination efficacy of pressurized water washing of common porous building materials, and compared the penetration depth of the contaminations before and after exposure to pressurized tap water. Here, we continue evaluation of the decontamination efficacy of wash solutions based on potassium (K{sup +}) salt for cesium (Cs), strontium (Sr), and europium (Eu) contaminations on common building surfaces. The surfaces included: the cement used in concrete, the aggregate used in concrete, intact concrete, roadway asphalt, asphalt shingles, and latex paint. We deposited solutions of {sup 137}Cs, {sup 85}Sr, and {sup 152}Eu onto numerous common building materials and exposed these materials to a static bath or low-pressure flow of tap water, 0.1 M potassium chloride (KCl), and 0.5 M KCl. The decontamination efficacy and the depth profile for residual contamination were measured to determine the conditions under which applying a wash solution has benefit compared to physically removing the surface material. To aid in these analyses, we introduced a 'wash penalty factor' to quantify the degree to which contamination migrated into the bulk material by the action of the wash method. On asphalt, 70-80% of the radionuclides were found to be within 0.02 mm of the surface. Cs{sup +} bonded to negative charge sites on the surface of the mineral aggregate (used in concrete) so decontamination was improved by ion exchange with K{sup +}. Sr{sup 2+} is soluble and removed by water, while not bonding to aggregate or demonstrating solubility in the liquid asphalt. Eu{sup 3+} is precipitated and not removed in gentle wash but displays mobility within the pore space that suggests its presence as a colloid. Concrete is more porous than asphalt, and 80% of the radionuclides were within 0.2 mm of the surface for {sup 137}Cs and {sup 152}Eu and 50- 80% for {sup 85}Sr. On concrete, Cs{sup +} bonds similarly to asphalt. Sr{sup 2+} bonds to the cement or precipitates from the alkaline pore water. Eu{sup 3+} sorbs to the cement and then precipitates. In brick, the results for Cs{sup +} and Sr{sup 2+} suggested that diffusion of ions from deeper in the coupon was important. Eu{sup 3+} is removed poorly due to precipitation. We will explain and report example wash penalty factors that vary from 0 to > 1 for the various methods and the implications for deciding when to implement wash down methods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life cycle assessment of railway ties fabricated with ductile cementitious composites and carbonation curing

This paper evaluates the lifecycle economic and environmental benefits of implementing CO 2 utilization and storage within advanced engineered cementitious composite (ECC) railway ties. Using CO 2 -treated ECC ties can yield lifecycle benefits primarily due to enhanced material properties – increased lifespan in this case – instead of due to the stored CO 2 that would otherwise enter the atmosphere. Sequestration-based policies such as 45Q in the United States would therefore not incentivize deployment of ECC railway ties, despite their considerable CO 2 avoidance opportunities. To reach these conclusions, cradle-to-grave lifecycle models were developed for ECC ties and conventional concrete ties and evaluated under 1000 possible use-phase scenarios. The models incorporated premature tie failures – consistent with real-world observations – that were used to study a wide range of non-linear impacts arising from the random nature of tie failures and replacements. The results show that past studies that neglected premature failure of ties may have underestimated lifecycle greenhouse gas (GHG) emissions of concrete rail ties by nearly three times. Overall, servicing a track with ECC ties instead of concrete ties can reduce the lifecycle costs and GHG emissions by 12% and 21% respectively, based on median values of 1000 model run results. The expected benefits would be larger for entities like Amtrak that plan to expand concrete tie infrastructure despite significant challenges with premature concrete tie failures. Furthermore, the results of this study suggest that the lifespan of ECC ties needs to be at least 25% longer than concrete ties to achieve net lifecycle benefits. The possibility of this should be tested and confirmed under real-world conditions.

42 ENGINEERING↗

Multi-faceted framework for extrapolating early age flexural strength to facilitate rapid lifting/handling of high-volume fly ash precast members

Maintaining adequate early-age structural performance for precast concrete components has grown in importance as more sustainable mix designs become more widespread. Achieving high-early flexural strength is particularly crucial to facilitate rapid removal of hardened concrete components from formwork, often within 24 h after fresh concrete placement. Limited research has assessed the effectiveness of traditional design methods in correlating flexural strength with compressive strength for next-generation mix designs, or demonstrated extrapolation of such material performance to larger-scale structural tests. This paper presents a multi-faceted framework to reassess early-age flexural strength for concretes made with relatively high proportions of fly ash from both fresh and harvested sources. Here, the framework provides several pathways, from which the user can select based upon available resources and the specific application, to improve accuracy of early-age cracking moment calculations. Furthermore, the scope includes evaluation of strength performance under curing conditions emulative of those in a precast facility, recommending modulus of rupture equations which are more performance-driven than current design provisions, and experimental tests on prefabricated concrete beams to validate the proposed methodologies. Correlations of early-age strength with both concrete age and maturity measurements compare the effectiveness of utilizing in-situ data to further enhance the prediction methods. Ultimately, the proposed framework helped reduce errors when calculating cracking moment capacity at early ages by tailoring calculations to reflect mix-dependent behavior. Furthermore, most estimates of cracking moment were within 25 % of their corresponding experimental test results, thus promoting confidence for using these strategies with high-volume fly ash precast structures.

42 ENGINEERING↗

Qualification of 3-D Printed Mortar With Electrical Conductivity Measurements

Additive manufacturing (AM) or 3D printing of concrete allows for construction of arbitrary shape structures without a mold. Since reproducibility of 3D printed concrete is lower than that of conventional fabrication, each 3D printed structure should be monitored for proper curing. Conventional qualification of concrete is based on several tests, including destructive compressive strength measurements. Because a structure is 3-D printed layer-by-layer, the surfaces of AM concrete structures have significant surface roughness. This limits the applicability of conventional nondestructive testing methods. We investigated qualification of 3D printed mortar by monitoring curing with nondestructive electrical conductivity measurements. Bulk resistance of concrete was extracted from electrochemical impedance spectroscopy (EIS measurements made using custom flexible self-adhesive electrodes, which contour to rough surfaces. We show that bulk resistivity of concrete increases linearly with time. This allows for developing a calibration curve for compressive strength lookup from nondestructive electrical conductivity measurements. Conductivity measurements also allow for estimation of formation factor, which is an indicator of mortar permeability.

36 MATERIALS SCIENCE↗

Removable, Sequestration Coatings for Mitigating Hazardous Contaminants Related to Deactivation and Decommissioning Activities

This project is a collaborative effort between InnoSense LLC (ISL) and Oak Ridge National Laboratory (ORNL) aimed at mitigating the mercury (Hg) contamination problem at the Y-12 National Security Complex (NSC). The report summarizes the research and technology development work of the Phase IIB Project, led by Dr. Uma Sampathkumaran at ISL for the period of July 31, 2017–October 31, 2021. The Y-12 site cleanup includes technologies for safe and cost-effective facility demolition, soil remediation, and on-site treatment and disposal of mercury bearing wastes. One of the technology demonstration goals was a reactive strippable coating for targeted pre-demolition and de-contamination to limit Hg mobilization and the volume of debris requiring treatment for disposal. Toward this, ISL has developed a water-based reactive strippable coating (Trap & See-Hg™) to sequester elemental Hg(0) and mercuric Hg(II) species in the coating. The coating provides multiple benefits including (1) Hg vapor suppression, (2) sealing in the hazardous contaminants, (3) visually locating the contaminant through color changes, and (4) remediating the contaminated surfaces upon coating removal. Through collaboration between ORNL and ISL in Phase II work, the team successfully demonstrated the Trap & See-Hg technology to (1) visually locate the presence of Hg on concrete, soil and drywall surfaces, (2) effectively sequester all mercury species (elemental, soluble and insoluble Hg) from lab-generated and ex-situ soil and brick/rubble samples collected from the Y 12 site with 80 to 95% efficiency to capture/reduce Hg vapor concentration, (3) be applied by manual and robotic spray applicators and cure at room ambient, (4) remain a cohesive and peelable coating upon drying, and (5) sequester Hg0 from walls in the alpha-2 building basement at Y-12 during a small scale in-situ field trial. In Phase IIB, ISL’s effort was focused on refining the coating formulations with additives containing passive and reactive sorbents, colorimetric indicator, and thixotropic agents to achieve the desired performance. The paints were then evaluated at ORNL for applicability to metal and concrete surfaces of different sizes and shapes, and soil rubble, Hg-sorption capacity and achieving sag-free coating on surfaces when applied by a manual spray applicator. Ambient cure of the coating resulted in a dry thickness of 16–20 mil. The coatings were removed from smooth or rough surfaces with low to moderate force. Both lab-generated Hg-contaminated samples and soil and brick/rubble samples containing a range of Hg concentrations (collected from the Y-12 site by UCOR) were used in this project. Optimized formulations were applied to these samples and evaluated for ability to suppress Hg vapors, sequester Hg 0 and Hg(II) species and color mapping of mercury species on the test surface. The ORNL team initially identified three to four potential sites at Y-12 and ORNL for potential demonstration. However, the pandemic closed any possible avenues for on-site demonstration of the robotic spray applicator. The metal and concrete samples with low to high Hg content provided by UCOR from an ongoing demolition were subsequently used for ex-situ sample characterization and analysis at ORNL over a period of 25 days. The coatings suppressed Hg vapors with an efficiency of 95–99% from heavily contaminated metal and 60% from concrete substrate. Analysis of total Hg in the peeled paints indicates sorption capacities ranging from 12 µg Hg/g of paint from concrete to 1.2 mg Hg/g of paint from the metal substrates while peeled paints from soil samples could capture a total Hg from 2.3 mg Hg/g to 66 mg/g paint. Toxicity characteristic leaching procedure (TCLP) tests recovered total mercury leached at 0.15±0.0008 µg/L for concrete to 126.81±0.67 µg/L and 377.25±5.67 µg/L for the two metal substrates, to allow for informed decisions on downstream disposal considerations. Together, this Phase IIB demonstrated the potential value of the Trap & See-Hg for Hg uptake, vapor suppression, and color mapping, and may thus be used to enhance worker safety during site cleanup, facility demolition, and downstream waste disposal at Y-12 NSC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Printable Fiber Reinforced Cement Composites – Feasibility Study

Additive manufacturing is enabling the manufacturability of structures with previously unattainable complexity or functionality, and there is growing interest in additive manufacturing of “printed” concrete structures. The focus of this Phase 1 Technical Collaboration (TC) project was to evaluate feasibility of printing hybrid cement composite structures reinforced with textile carbon fibers (tCF). This project leverages other (non-IACMI) projects on cement formulation and printing process development, as well as on the production process for tCF. This project’s primary focus was to explore cement composite mix design with textile carbon fibers to be manufactured by MonteFibre (TC partner) and evaluate suitable fiber-matrix interface or sizing for cement composites working with Michelman (TC Partner). This project supports IACMI’s goal of reducing the cost and embodied energy of carbon fiber composites. Cost is one of the fundamental challenges to carbon fiber reinforced cement composites. Cement is an extremely inexpensive material (approximately $\$$0.05/lb). Adding 1 wt% of conventional carbon fiber to cement quadruples its cost. Therefore, the need to use low-cost carbon fiber and ensure that the additional cost of the carbon fiber has a greater cost benefit to the final product. This was the first preliminary evaluation to integrate tCF reinforcement in cement composites, and such potential tCF utilization should significantly reduce materials cost. Cement composite production is energy and emissions intensive, thus by strengthening it less material will be required. Hence, the embodied energy and production time of the resulting structures will be reduced. Additionally, integrating these new materials into additive processes can enable selective use of the material in high load or stress areas. It is noteworthy that past work in this field of fiber reinforced cement composites did not consider the optimization of fiber-matrix interface using suitable sizing. Carbon fiber reinforcement offers potential added benefits of thermal conductivity (which affects cure rate) and flow behavior that could provide opportunities for site specific utilization of carbon fiber on hybrid cement structures (e.g. use the fiber reinforcement on outer surfaces to enhance strength and modulus and then infiltrating the internal structures with conventional concrete). MonteFibre was the industry lead and planned on supplying the tCF for this project. However, during the short Phase-1 duration of this project, MonteFibre was unable to produce tCF for this project due to manufacturing plant being off-line throughout the course of the project. The project team decided to pursue an alternate option which involved demonstrating printable concrete with steel fibers by the ORNL lead, Dr. Brian Post. The University of Tennessee collaboration team focused on evaluating the suitable chemical sizing for carbon fibers working with Michelman and also developed methods for material characterization of cement-based composites to evaluate the material response for compression, shear, flexure, and tension. The two milestones for University of Tennessee, Knoxville were realized related to identification of one sizing suitable for carbon fiber reinforced cement composite and developing data associated with mechanical behavior of unreinforced (neat) and carbon fiber reinforced cement composites. ORNL could not complete the task of carbon fiber reinforced printed cement composites due to the reasons mentioned earlier, but was able to replace tCF with steel fibers to demonstrate the feasibility of printing with fiber reinforced cement composites. The Project team reviewed possible sizing chemistry available in collaboration with Michelman for use on carbon fiber reinforcement in cement composites and concrete applications. Our initial goal was to identify a sizing most promising for formulation with textile carbon fibers (tCF) to deliver excellent mechanical properties in composite material state. Since tCF was not available for this project as originally envisioned, the team continued this task to identify a suitable sizing for carbon fiber applications by applying such sizing to lower cost carbon fibers currently available commercially from Zoltek called Panex fibers. At a future time this can be optimized for textile carbon fibers from Montefibre. The bulk of previous work on carbon fiber reinforced cement has neglected the importance of fiber-matrix adhesion on mechanical properties of the cement composite and identifying this missing link was an important accomplishment for future research. Tensile behavior of fiber reinforced concrete is important to evaluate in order to realize the dream of concrete products that do not need reinforcing steel. Important sample preparation and testing procedures were addressed in this study and it was concluded that substantial improvements in tensile behavior, without compromising compressive strength, and improved ductility can result from the use of carbon fiber reinforcement.

36 MATERIALS SCIENCE↗

In Situ Electrosynthesis of Polymethyl Methacrylate Within Ceramic Launch Pad Materials

Electrokinetic deposition of methylmethacrylate is used to mitigate corrosion in reinforced concrete. The methylmethacrylate (MMA) monomer deposits in the pores in the concrete where it is converted into its polymer, polymethylmethacrylate, thus creating a barrier that also enhances the mechanical properties of the concrete. Previous to the MMA treatment an Electrokinetic deposition is used to transport calcium, sodium and potassium hydroxide particles through the capillary pores of concrete directly to the concrete reinforcement. The intent is to use these compounds as a sacrificial electrode layer during the electrokinetic deposition of methylmethacrylate monomer. Cylindrical reinforced concrete specimens were subjected to electrokinetic treatment and the specimens were tested to characterize porosity reduction and tensile splitting strength showing an increase in the tensile strength. In addition, nine specimens treated electro-kinetically and in long-term atmospheric exposure testing at NASA's Kennedy Space Center, seaside atmospheric exposure test site were tested to determine their corrosion rate.

Acevedo, Raul↗

Using SWMM for emergency response planning: A case study evaluating biological agent transport under various rainfall scenarios and urban surfaces

To assist in emergency preparedness for a biological agent terrorist attack or accidental pathogen release, potential contaminant levels and migration pathways of spores spread by urban stormwater were evaluated using a Storm Water Management Model (SWMM) of U.S. Coast Guard Base Elizabeth City, North Carolina. The high temporal-spatial resolution SWMM model was built using spore concentrations in stormwater runoff from asphalt, grass, and concrete collected from a point-scale field study. The subsequent modeled contamination scenarios included a notional plume release and point releases mimicking the field study under three rainfall conditions. The rainfall scenarios included a 6-hour natural rainfall event on Dec. 8, 2021 and two design storms (2-year and 100-year events). The observed spore concentrations from asphalt and concrete from the actual field experiment were applied to calibrate the washoff parameters in the SWMM model, using an exponential washoff function. The calibrated washoff coefficient (c 1 ) and exponent (c 2 ) were 0.01 and 1.00 for asphalt, 0.05 and 1.45 for grass, and 2.45 and 1.00 for concrete, respectively. The calibrated SWMM model simulated spore concentrations in runoff at times and magnitudes similar to the field study data. In the point release modeled scenario, the concrete surface generated 55.6% higher average spore concentrations than asphalt. Similarly, in the field experiment, a 175% (p < 0.05) higher average spore concentration in surface runoff was observed from concrete than from asphalt. Here, this study demonstrates how SWMM may be used to evaluate spore washoff from urban surfaces under different precipitation amounts, intensities, and durations, and how visualized spatial migration pathways in stormwater runoff may be used for emergency planning and remediation.

54 ENVIRONMENTAL SCIENCES↗

FEED Study of Carbon Capture Inc. DAC and CarbonCure Utilization Using United States Steel's Gary Works Waste Plant

The University of Illinois Urbana-Champaign (UIUC) is spearheading a front-end engineering design (FEED) study of a Direct Air Capture and Utilization System (DACUS) that can remove 5,000 tonnes/yr net CO2 from ambient air, utilizing it in the production of concrete. The designed system, if built, would be larger than any currently existing DAC collector. Such carbon negative technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. DAC is a promising new technology for reducing the greenhouse gas in the atmosphere but is expensive, partly due to the energy required to capture and then release CO2 during the process. By integrating CarbonCapture Technologies Inc. DAC collector at United States Steel's Gary Works and utilizing steel plant's waste heat, energy, and location so energy & transportation costs can be minimized. CarbonCapture has developed an innovative DAC system using novel adsorbents to cost- effectively capture CO2. The captured, liquified CO2 will be trucked to ready-mix concrete plants across Illinois, Indiana, & Wisconsin, where CarbonCure will inject it into concrete during the mixing process. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO3), sequestering the CO2 into the concrete, and reducing the amount of cement, the manufacturing of which is among the major sources of CO2 emissions. This FEED study demonstrates a full CO2 value chain for DACUS from industrial facilities. It also provided an opportunity to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice.

Carbon management, ccus, carbon capture, utilizati↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Robotic Assisted Non-Destructive Testing (NDT)

Mission Statement: Concrete wall characterization for structural integrity evaluation of H-Canyon exhaust tunnel using a remote controlled robotic arm with a NDT Concrete Instrument. Challenges: Rough and Curved Surfaces, Remote location. The UR5 is a collaborative robotic arm capable of: Payload: 11 lbs (5 kg), Reach: 33.5 in (850 mm), Footprint: 5.87 in (149 mm) diameter, Weight: 45.4 Ibs (20.6 kg). The force torque sensor reacts to a set value inputted by the user that can be utilized for sensitive products. This allows the UR5 to react to surfaces using the built-in function to search for a wall and orient itself normal to that plane. The Proceq Pundit 250 array is a nondestructive device that the user applies against a concrete wall and scans using ultrasonic transducers. The back wall and other defects can be show through the touchscreen. A fixture to hold the Proceq Pundit 250 array onto the UR5 robotic arm was designed and 3D printed. It includes openings for easy access to the buttons from the Pundit array as well as a reinforced structural design. The scan from the Pundit array can show the back-wall, rebars, and other defects to assist in determining the structural integrity. In order to scan, a program was made to search for the wall first. 1. The UR5 robotic arm will go to the desired location away from the wall. 2. It will then search for the wall by moving towards it slowly. 3. After contact, the force applied will slowly but steadily increase to a preset value inputted by the user. 4. The force torque sensor will use those values and communicate with the UR5 by adjusting the arm to become normal to the wall. 5. The arm will then apply force to push back the transducers on the Pundit array to avoid gaps. 6. It will then prompt the user to collect data and wait until finished. The UR5 teach pendant allows the user to program the robot to perform automated and repeatable tasks. It includes a free drive mode which allows the user to move the arm to a desired position by hand. The user can also apply restricted planes which include either stopped or slower motion to ensure safety. The concrete sample being tested includes rebars and different grades of surface roughness to understand the readings from the Proceq Pundit 250 array. Desired concrete samples are currently being fabricated that will simulate the terrain being tested.

3D PRINTING↗

Designing a repository in domal salt: The influence of design variants in different modelling environments

To understand the long-term environmental impact of disposing radioactive waste of in a deep geological repository and to optimise its design, performance assessments are used. In this study, four teams (COVRA, GRS, Quintessa, and DOE) modified the previously developed generic repository of DECOVALEX task F2 to identify commonalities and differences between the teams for specific changes in repository design. The teams tested six design modifications: (1) Replacing concrete abutments with run-of-mine salt; (2) Replacing the salt seal with a concrete abutment and using run-of-mine salt instead for the two concrete abutments in each drift seal; (3) Halving the size of the infrastructure area; (4) Using run-of-mine salt instead of gravel for backfilling the infrastructure area; (5) Disposal of spent nuclear fuel without the POLLUX-10 containers (6); Lower initial saturation of the spent nuclear fuel and vitrified waste disposal drifts. Despite different modelling strategies used, models agreed that a smaller infrastructure area has a limited effect on radionuclide transport. Responses to the absence of the two concrete abutments in each seal, the use of single large concrete abutments (200 m each), or the use of run-of-mine salt in the infrastructure area differ between teams due to differing modelling assumptions. Based on these results, the estimated efficacy of containment depends strongly on the model assumptions of each team. More specifically, it appears to depend on the compaction model used and therefore on the backfill material used in different areas of the repository. However, the drift seal appears to be a critical design element in all models, effectively limiting radionuclide transport by hydrologically disconnecting sections of the repository. Additional beneficial design choices include the use of dry salt in disposal drifts to limit radionuclide transport and reducing the infrastructure area costs and minimizing host rock damage.

DECOVALEX↗