Legacy Emittance Continuity Tester Block Diagram [Poster]
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.
The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.
Abstract not provided.
This framework is developed to progress the digital implementation of digital tools applied to the DOE authorization process, with future applications to NRC SAR development/review, to accelerate the design and review processes of advanced nuclear reactors. The engineering design and licensing process for nuclear reactors is currently burdened by a document-based approach that leads to duplications and errors due to a lack of traceability among numerous static documents. Changes to design information require labor-intensive manual tracing through these documents, creating a high potential for human error. The adoption of a digital ecosystem, utilizing a digital thread to link various aspects of project design and analysis, promises dynamic documentation generation, automatic updates, and error reduction. Model Based Definition (MBD) and Product Lifecycle Management (PLM) tools are central to this digital transformation.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Several upgrades are being considered for the proton storage ring (PSR) at the Los Alamos Neutron Science Center (LANSCE) to reduce beam loss and thereby reduce the cooldown period of the PSR following a beam run. First, we have considered an increased beam pipe diameter would reduce beam loss due to beam scraping caused by misalignments and tuning errors. However, this would require increased pole-to-pole gap height within the dipoles and quadrupoles, which would change their effective length and alter their fringe fields. The effect of different magnet gaps on the beam optical parameters and on beam loss was studied using the simulation codes MAD-X and PyORBIT. Second, we are developing a detailed particle tracking model within the framework of the simulation package General Particle Tracer (GPT) for the PSR H - stripping system. This model will be used to study the effect of the stripper foil parameters (position, composition, areal density, depth, etc.) on first-turn losses, where most of the observed beam loss and emittance growth occurs due to foil scattering, foil stripping, and Lorentz stripping. The model implements C++ custom elements created to model foil scattering, foil stripping, and Lorentz stripping, as these are not built-in features of GPT. The preliminary results of the MAD-X and PyORBIT simulations, as well as the GPT simulation model, is described in this tech note.
A charged particle, such as an electron or a proton, is accelerated through its interaction with either a static (DC) or time-varying (RF) electric field. The magnitude of the accelerating field, or gradient, is typically given in units of volts per meter; in charged-particle accelerators, fields are usually expressed as kV/m or MV/m. The energy of the accelerated particle is usually expressed in terms of electron volts, or eV. An electron starting at rest at ground potential, and accelerated to an electrode with a potential of 1 kV, will have an energy of 1 keV.
Explore the source record for details and available documents.
The widely used transverse parameters characterizing particle beams are the Twiss parameters. These parameters can be measured experimentally but they do not fully characterize the beam since they do not account for possible correlations in particle distribution between two transverse coordinates. These correlations may occur due to uncompensated magnetic field at the cathode or misalignment of focusing quadrupoles in the transport beamline. We test a novel diagnostic for diagnosing full 4D beam matrix which may be used to identify such imperfections. The diagnostic is based on transporting the beam through the beamline which includes a quadrupole and a skew quadrupole magnets and measuring the resulting 2D beam distribution at the screen downstream. Such a measurement can be viewed as measuring a 2D projection of the 4D distribution. Different settings of the quads provide measurements of different slices of the phase space. The reconstruction of the original beam matrix from a number of measurements is done using machine learning algorithm, which provides a fast and reliable way of reconstruction for an arbitrary configuration of the scanning beamline. In August 2024, we set up the diagnostic beamline to perform a quadrupole scan of the beam. The setup includes a skew quadrupole, a regular quadrupole, and a screen. The images on the screen were post-processed to remove experimental artifacts and enhance contrast by eliminating background noise outside the core of the distribution=. The rms parameters of the distribution were then calculated and used as inputs for the reconstruction algorithm. This algorithm attempts to determine the initial beam matrix that produces expected images on the screen closely matching the observed images across all quadrupole settings. The algorithm found a solution in which the expected rms parameters closely align with the observations. Validation of the results is planned for FY25.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.
Ensuring that the beam delivered from the upgraded Front-End (FE) meets the Key Performance Parameters (KPPs) at each user facility is critical to the success of the LANSCE Accelerator Modernization Project (LAMP). For a high-intensity, multi-user facility like LANSCE, compliance with beam loss and radiation thresholds is as important as the charge delivered to each target. While early LAMPF/LANSCE operations relied on iterative tuning to minimize losses from beam halo and tail particles, the new FE may introduce different beam distributions and loss modes—making predictive modeling essential. To manage this, the F2E (Front-End to End) effort is developing detailed particle-tracking models that reflect realistic beamline conditions, including halo formation and expected diagnostic readings. These "snapshot" simulations aim to benchmark live machine performance at a given moment. This will help quantify how beam quality from the new FE will propagate downstream through the facility. Only by validating these models can we confidently assess and mitigate the potential impacts of the LAMP FE on beam delivery. Post-DTL, the beam splits to serve five major user facilities. Historically, low-energy beam transport has been modeled using TRACE, and higher-energy sections with TRANSPORT. These have now been unified into MAD-X format and validated with codes such as Elegant, pyOrbit, XSuite, Impact-Z, and HPSim. The primary focus now is on accurate modeling of full particle distributions (including beam halo) as they traverse the accelerator and beamlines to each experimental station. All models are at various stages of validation with empirical data.