Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “vector control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Ares I-X Ground Diagnostic Prototype

The automation of pre-launch diagnostics for launch vehicles offers three potential benefits: improving safety, reducing cost, and reducing launch delays. The Ares I-X Ground Diagnostic Prototype demonstrated anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage Thrust Vector Control and for the associated ground hydraulics while the vehicle was in the Vehicle Assembly Building at Kennedy Space Center (KSC) and while it was on the launch pad. The prototype combines three existing tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool from Qualtech Systems Inc. for fault isolation and diagnostics. The second tool, SHINE (Spacecraft Health Inference Engine), is a rule-based expert system that was developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification, and used the outputs of SHINE as inputs to TEAMS. The third tool, IMS (Inductive Monitoring System), is an anomaly detection tool that was developed at NASA Ames Research Center. The three tools were integrated and deployed to KSC, where they were interfaced with live data. This paper describes how the prototype performed during the period of time before the launch, including accuracy and computer resource usage. The paper concludes with some of the lessons that we learned from the experience of developing and deploying the prototype.

Schwabacher, Mark A.↗

General Pressurization Model in Simscape

System integration is an essential part of the engineering design process. The Ares I Upper Stage (US) is a complex system which is made up of thousands of components assembled into subsystems including a J2-X engine, liquid hydrogen (LH2) and liquid oxygen (LO2) tanks, avionics, thrust vector control, motors, etc. System integration is the task of connecting together all of the subsystems into one large system. To ensure that all the components will "fit together" as well as safety and, quality, integration analysis is required. Integration analysis verifies that, as an integrated system, the system will behave as designed. Models that represent the actual subsystems are built for more comprehensive analysis. Matlab has been an instrument widely use by engineers to construct mathematical models of systems. Simulink, one of the tools offered by Matlab, provides multi-domain graphical environment to simulate and design time-varying systems. Simulink is a powerful tool to analyze the dynamic behavior of systems over time. Furthermore, Simscape, a tool provided by Simulink, allows users to model physical (such as mechanical, thermal and hydraulic) systems using physical networks. Using Simscape, a model representing an inflow of gas to a pressurized tank was created where the temperature and pressure of the tank are measured over time to show the behavior of the gas. By further incorporation of Simscape into model building, the full potential of this software can be discovered and it hopefully can become a more utilized tool.

Servin, Mario↗

Evaluation of Separation Mechanism Design for the Orion/Ares Launch Vehicle

As a part of the preliminary design work being performed for the Orion vehicle, the Orion to Spacecraft Adaptor (SA) separation mechanism was analyzed and sized, with findings presented here. Sizing is based on worst case abort condition as a result of an anomaly driving the launch vehicle engine thrust vector control hard-over causing a severe vehicle pitch over. This worst case scenario occurs just before Upper Stage Main Engine Cut-Off (MECO) when the vehicle is the lightest and the damping effect due to propellant slosh has been reduced to a minimum. To address this scenario and others, two modeling approaches were invoked. The first approach was a detailed 2-D (Simulink) model to quickly assess the Service Module Engine nozzle to SA clearance for a given separation mechanism. The second approach involved the generation of an Automatic Dynamic Analysis of Mechanical Systems (ADAMS) model to assess secondary effects due to mass centers of gravity that were slightly off the vehicle centerline. It also captured any interference between the Solar Arrays and the Spacecraft Adapter. A comparison of modeling results and accuracy are discussed. Most notably, incorporating a larger SA flange diameter allowed for a natural separation of the Orion and its engine nozzle even at relatively large pitch rates minimizing the kickoff force. Advantages and disadvantages of the 2-D model vs. a full 3-D (ADAMS) model are discussed as well.

Konno, Kevin E.↗

Data-Driven Anomaly Detection Performance for the Ares I-X Ground Diagnostic Prototype

In this paper, we will assess the performance of a data-driven anomaly detection algorithm, the Inductive Monitoring System (IMS), which can be used to detect simulated Thrust Vector Control (TVC) system failures. However, the ability of IMS to detect these failures in a true operational setting may be related to the realistic nature of how they are simulated. As such, we will investigate both a low fidelity and high fidelity approach to simulating such failures, with the latter based upon the underlying physics. Furthermore, the ability of IMS to detect anomalies that were previously unknown and not previously simulated will be studied in earnest, as well as apparent deficiencies or misapplications that result from using the data-driven paradigm. Our conclusions indicate that robust detection performance of simulated failures using IMS is not appreciably affected by the use of a high fidelity simulation. However, we have found that the inclusion of a data-driven algorithm such as IMS into a suite of deployable health management technologies does add significant value.

Martin, Rodney A.↗

ARES I Upper Stage Subsystems Design and Development

From 2005 through early 2011, NASA conducted concept definition, design, and development of the Ares I launch vehicle. The Ares I was conceived to serve as a crew launch vehicle for beyond-low-Earth-orbit human space exploration missions as part of the Constellation Program Architecture. The vehicle was configured with a single shuttle-derived solid rocket booster first stage and a new liquid oxygen/liquid hydrogen upper stage, propelled by a single, newly developed J-2X engine. The Orion Crew Exploration Vehicle was to be mated to the forward end of the Ares I upper stage through an interface with fairings and a payload adapter. The vehicle design passed a Preliminary Design Review in August 2008, and was nearing the Critical Design Review when efforts were concluded as a result of the Constellation Program s cancellation. At NASA Glenn Research Center, four subsystems were developed for the Ares I upper stage. These were thrust vector control (TVC) for the J-2X, electrical power system (EPS), purge and hazardous gas (P&HG), and development flight instrumentation (DFI). The teams working each of these subsystems achieved 80 percent or greater design completion and extensive development testing. These efforts were extremely successful representing state-of-the-art technology and hardware advances necessary to achieve Ares I reliability, safety, availability, and performance requirements. This paper documents the designs, development test activity, and results.

Frate, David T.↗

High Voltage EEE Parts for EMA/EHA Applications on Manned Launch Vehicles

The objective of this paper is an assessment of high voltage electronic components required for high horsepower electric thrust vector control (TVC) systems for human spaceflight launch critical application. The scope consists of creating of a database of available Grade 1 electrical, electronic and electromechanical (EEE) parts suited to this application, a qualification path for potential non-Grade 1 EEE parts that could be used in these designs, and pathfinder testing to validate aspects of the proposed qualification plan. Advances in the state of the art in high power electric power systems enable high horsepower electric actuators, such as the electromechnical actuator (EMA) and the electro-hydrostatic actuator (EHA), to be used in launch vehicle TVC systems, dramaticly reducing weight, complexity and operating costs. Designs typically use high voltage insulated gate bipolar transistors (HV-IGBT). However, no Grade 1 HV-IGBT exists and it is unlikely that market factors alone will produce such high quality parts. Furthermore, the perception of risk, the lack of qualification methodoloy, the absence of manned space flight heritage and other barriers impede the adoption of commercial grade parts onto the critical path. The method of approach is to identify high voltage electronic component types and key parameters for parts currently used in high horsepower EMA/EHA applications, to search for higher quality substitutes and custom manufacturers, to create a database for these parts, and then to explore ways to qualify these parts for use in human spaceflight launch critical application, including grossly derating and possibly treating hybrid parts as modules. This effort is ongoing, but results thus far include identification of over 60 HV-IGBT from four manufacturers, including some with a high reliability process flow. Voltage ranges for HV-IGBT have been identified, as has screening tests used to characterize HV-IGBT. BSI BS ISO 21350 Space systems Off-the-shelf item utilization, developed from Marshall Work Instruction MWI8060.1 OFF-THE-SHELF HARDWARE UTILIZATION IN FLIGHT HARDWARE DEVELOPMENTwas found to provide guidance for including commercial off-the-shelf (COTS) hardware for use in critical applications.

Griffin, Trent↗

Towards the Handing of Cloud-Affected Infrared Radiances in the GSI

In the gridpoint statistical interpolation (GSI) data assimilation algorithm, only thermal infrared measurements determined to be uncontaminated by clouds are assimilated. Using this approach, typically only 19-29% of footprints are deemed to have no cloud affects through the measured spectra. This study will discuss the efforts underway at the Global Modeling and Assimilation Office (GMAO) at NASA Goddard Space Flight Center, in conjunction with the Joint Center for Satellite Data Assimilation (JCSDA), to actively assimilate these morecomplicated observations by using a graybody assumption. In the GSI, cloud top pressure and effective cloud amount are retrieved concurrently using a minimum residual method. This study will address the limitations and advantages of the technique and the modifications underway to the assimilation system to incorporate those two parameters into the radiative transfer forward operators and TL/AD calculations. Furthermore, it will explain the efforts underway to incorporate these parameters into the control vector so that they can be altered variationally as part of the minimization.

McCarty, William↗

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. The full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes.

Schwabacher, Mark↗

America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing

The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.

Birkenstock, Benjamin↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Environmental and Socio-Demographic Determinants of Dengue Fever in Colombo City, Sri Lanka

Dengue fever has increased exponentially in Sri Lanka, from 24.4 cases per 100,000 in 2003 to 165.3 per 100,000 population in 2013. Although early warning systems using predictor models have been previously developed in other settings, it is important to develop such models in each local setting. Further, the ability of these models to be applicable at smaller geographic units will enhance current vector control and disease surveillance measures. The aim of this paper was to identify environmental and socio-economic status (SES) risk factors that may predict dengue fever at the Gram Niladhari Divisions (GND) level (smallest administrative unit) in Colombo city, Sri Lanka. These factors included landcover classes, amount of vegetation, population density, water access and neighborhood SES as determined by roof type. A geographically weighted regression (GWR) was used to develop the prediction model. A total 55 GND units covering an area of 37 sq km were investigated. We found that GND units with decreased vegetation, higher built-up area, higher population density and poor access to tap-water supply were associated with high risk of dengue; the pertinent GND units were concentrated in the center of the city. This is the first study in Sri Lanka to include both environmental and socio-demographic factors in prediction models for dengue fever. The methodology may be useful in enhancing ongoing dengue fever control measures in the country, and to be extended to other countries in the region that have an increasing incidence of dengue fever.

Tipre, Meghan↗

Technology Development and Design of a Hybrid Mars Ascent Vehicle Concept

Hybrid propulsion has been investigated as an enhancing technology for a Mars Ascent Vehicle (MAV) concept as part of potential Mars Sample Return (MSR) because of its high specific impulse, restartability, and the ability to operate and survive at extremely low temperatures. A new wax-based hybrid fuel formulation has been developed that could withstand the harsh and variable Mars environment protected solely by a minimal layer of passive insulation. This formulation could provide substantial energy savings for a notional lander and is critical for rover mobility. Preliminary thermal cycle testing has determined that the formulation can survive the expected temperature extremes and lifetime thermal testing is currently underway. A complete preliminary design using this new fuel formulation combined with a low temperature oxidizer such as Mixed Oxides of Nitrogen (MON30) is presented. Several key features associated with a complete hybrid MAV concept are investigated to determine their mission suitability (e.g. Thrust Vector Control and restartable ignition options). Potential challenges along a path towards developing such a system are outlined and future work is suggested as a means of technology maturation. The hybrid design presented here was the lowest Gross Lift Off Mass (GLOM) result of a 2015 Jet Propulsion Laboratory (JPL) led MAV concept study.

MSR↗

Automation of POST Cases via External Optimizer and "Artificial p2" Calculation

During conceptual design speed and accuracy are often at odds. Specifically in the realm of launch vehicles, optimizing the ascent trajectory requires a larger pool of analytical power and expertise. Experienced analysts working on familiar vehicles can produce optimal trajectories in a short time frame, however whenever either "experienced" or "familiar " is not applicable the optimization process can become quite lengthy. In order to construct a vehicle agnostic method an established global optimization algorithm is needed. In this work the authors develop an "artificial" error term to map arbitrary control vectors to non-zero error by which a global method can operate. Two global methods are compared alongside Design of Experiments and random sampling and are shown to produce comparable results to analysis done by a human expert.

Dees, Patrick D.↗

Development of the European Service Module Propulsion Subsystem for the Multi-Purpose Crew Vehicle

2013, NASA and the European Space Agency (ESA) entered into an international partnership to develop the European Service Module (ESM) for use on NASA's Multi-Purpose Crew Vehicle (MPCV), also known as Orion. The MPCV will be used as the principal spacecraft for future human space exploration missions beyond low earth orbit. The ESM Propulsion Subsystem (PSS) is a pressure-fed, bi-propellant propulsion system, being developed by Airbus Defense and Space under contract to ESA. For this effort, NASA is responsible for the traditional role of insight/oversight to ensure that the PSS delivered by Airbus meets all MPCV Program requirements. In addition, the NASA Propulsion team also has some unique responsibilities that are a result of the Implementing Agreement (IA) between NASA and ESA for development of the ESM. These responsibilities include: (1) providing the main engine and Thrust Vector Control (TVC) assembly for the PSS. This is being accomplished through the delta qualification and re-use the Space Shuttle Orbital Maneuvering System (OMS) engine and TVC assembly; (2) procurement and delivery of the Auxiliary engines (R-4Ds) for the PSS. These engines are being procured by NASA from Aerojet-Rocketdyne via Lockheed Martin, the prime contractor for the MPCV, per an Airbus-provided specification; and (3) conducting the integrated systems hot-fire test which will qualify the end-to-end PSS for flight on MPCV. This test is being conducted at the NASA White Sands Test Facility (WSTF) using an Airbus-provided test article known as the Propulsion Qualification Model (PQM).

Multi-Purpose Crew Vehicle↗

Use of the NLPQLP Sequential Quadratic Programming Algorithm to Solve Rotorcraft Aeromechanical Constrained Optimisation Problems

Optimization of the control vector, configuration and aerodynamic surface design potentially offers significant performance enhancement to rotorcraft systems. These analyses indicated that non-linear programming methods that solve a sequence of related quadratic-programming sub-problems could be used successfully to solve these problems. Accordingly, a license for one of the latest versions of Professor Schittkowski's very successful Sequential Quadratic Programming NLPQLP software was obtained and used to experiment and analyze typical optimization problems of the type encountered in various rotorcraft wind tunnel and flight tests. Emphasis was directed toward obtaining efficiency, robustness and speed in computation.

Use of the NLPQLP↗

Mars Ascent Vehicle (MAV) Solid Motor Technology Plans

Recent trades have taken place on solid propulsion options to support a potential Mars Sample Retrieval Campaign. Mass and dimensional requirements for a Mars Ascent Vehicle (MAV) are being assessed. One MAV vehicle concept would utilize a solid propulsion system. Key challenges to designing a solid propulsion system for MAV include low temperatures beyond common tactical and space requirements, performance, planetary protection, mass limits, and thrust vector control system. Two solutions are addressed, a modified commercial commercially available system, and an optimum new concept.

Prince, Andrew↗

A Hybrid Mars Ascent Vehicle Design and FY 2016 Technology Development

Hybrid propulsion is currently favored for a Mars Ascent Vehicle (MAV) concept from a thermal performance and Gross Lift Off Mass standpoint. However, it is at a relatively low level of maturity compared to conventional propulsion options. Technology development efforts are currently underway to bring hybrid propulsion to a technology readiness level that would enable its infusion into potential Mars Sample Return. A new propellant combination is being considered for this design that has excellent low temperature behavior. Preliminary results of two ground test campaigns are currently underway to characterize this propellant combination. Hotfire testing is being carried out in parallel at Parabilis Space Technologies and Space Propulsion Group. In addition to the new propellant combination, several other technologies are being pursued for a potential hybrid MAV: hypergolic ignition and Liquid Injection Thrust Vector Control. Both of these technologies have been applied in other rocket applications, e.g. liquid propulsion commonly uses hypergolic propellants and missiles, such as the Minuteman II, have used LITVC in the past. Hypergolic ignition, when oxidizer and fuel combust upon contact, is highly desirable for multiple starts required by the MAV concept. Therefore, testing at Penn State and Purdue is being completed in this area. An updated hybrid propulsion system design for a Mars Ascent Vehicle concept based on JPL’s current understanding of potential Mars Sample Return requirements will be presented, leveraging the advances in technology development as well as updated understanding of how requirements may evolve.

Karp, Ashley C.↗