Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Performance of an Electro-Hydrostatic Actuator on the F-18 Systems Research Aircraft

An electro-hydrostatic actuator was evaluated at NASA Dryden Flight Research Center, Edwards, California. The primary goal of testing this actuator system was the flight demonstration of power-by-wire technology on a primary flight control surface. The electro-hydrostatic actuator uses an electric motor to drive a hydraulic pump and relies on local hydraulics for force transmission. This actuator replaced the F-18 standard left aileron actuator on the F-18 Systems Research Aircraft and was evaluated throughout the Systems Research Aircraft flight envelope. As of July 24, 1997 the electro-hydrostatic actuator had accumulated 23.5 hours of flight time. This paper presents the electro-hydrostatic actuator system configuration and component description, ground and flight test plans, ground and flight test results, and lessons learned. This actuator performs as well as the standard actuator and has more load capability than required by aileron actuator specifications of McDonnell- Douglas Aircraft, St. Louis, Missouri. The electro-hydrostatic actuator system passed all of its ground tests with the exception of one power-off test during unloaded dynamic cycling.

Robert Navarro↗

Degradation Factor Approach for Impacted Composite Structural Assessment: MSFC Center Director's Discretionary Fund Final Report, Project No. 96-17

This technical memorandum documents the results of the research to develop a concept for assessing the structural integrity of impacted composite structures using the strength degradation factor in conjunction with available finite element tools. For this purpose, a literature search was conducted, a plan for conducting impact testing on two laminates was developed, and a finite element model of the impact process was created. Specimens for the impact testing were fabricated to support the impact testing plan.

Ortega, R.↗

Thermal-Mechanical Cyclic Test of a Composite Cryogenic Tank for Reusable Launch Vehicles

This viewgraph presentation provides an overview of thermal-mechanical cyclic tests conducted on a composite cryogenic tank designed for reusable launch vehicles. Topics covered include: a structural analysis of the composite cryogenic tank, a description of Marshall Space Flight Center's Cryogenic Structure Test Facility, cyclic test plans and accomplishments, burst test and analysis and post-testing evaluation.

Messinger, Ross↗

Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) A void duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and Air Force Space Command (AFSPC) installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Joint Test Protocol (JTP) contains the critical requirements and tests necessary to qualify alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel Applications. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of NASA and Air Force Space Command (AFSPC) participants. The Field Test Plan (FTP), entitled Joint Test Protocol for Validation of Alternative Low Emission Surface Preparation/Depainting Technologies for Structural Steel, prepared by ITB, defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP.

Lewis, Pattie↗

SWI 1.10 Testing Process

This procedure establishes a system for performing testing in the Six-Degree-Of-Freedom Dynamic Test System (SDTS). Testing includes development and verification testing of customer supplied Test Articles (TAs) and other testing requirements, as requested. This procedure applies to all SDTS testing operations and equipment. The procedure provides an overview of testing performed in the SDTS including test identification requirements, test planning and procedure development, test and performance inspection, test data analysis, and test report generation.

Stokes, LeBarian↗

Highlights from a Mach 4 Experimental Demonstration of Inlet Mode Transition for Turbine-Based Combined Cycle Hypersonic Propulsion

NASA is focused on technologies for combined cycle, air-breathing propulsion systems to enable reusable launch systems for access to space. Turbine Based Combined Cycle (TBCC) propulsion systems offer specific impulse (Isp) improvements over rocket-based propulsion systems in the subsonic takeoff and return mission segments along with improved safety. Among the most critical TBCC enabling technologies are: 1) mode transition from the low speed propulsion system to the high speed propulsion system, 2) high Mach turbine engine development and 3) innovative turbine based combined cycle integration. To address these challenges, NASA initiated an experimental mode transition task including analytical methods to assess the state-of-the-art of propulsion system performance and design codes. One effort has been the Combined-Cycle Engine Large Scale Inlet Mode Transition Experiment (CCE-LIMX) which is a fully integrated TBCC propulsion system with flowpath sizing consistent with previous NASA and DoD proposed Hypersonic experimental flight test plans. This experiment was tested in the NASA GRC 10 by 10-Foot Supersonic Wind Tunnel (SWT) Facility. The goal of this activity is to address key hypersonic combined-cycle engine issues including: (1) dual integrated inlet operability and performance issues-unstart constraints, distortion constraints, bleed requirements, and controls, (2) mode-transition sequence elements caused by switching between the turbine and the ramjet/scramjet flowpaths (imposed variable geometry requirements), and (3) turbine engine transients (and associated time scales) during transition. Testing of the initial inlet and dynamic characterization phases were completed and smooth mode transition was demonstrated. A database focused on a Mach 4 transition speed with limited off-design elements was developed and will serve to guide future TBCC system studies and to validate higher level analyses.

Foster, Lancert E.↗

Advanced Manufacturing Technologies (AMT): Additive Manufactured Hot Fire Planning and Testing in GRC Cell 32 Project

The objective of this project is to hot fire test an additively manufactured thrust chamber assembly TCA (injector and thrust chamber). GRC will install the additively manufactured Inconel 625 injector, two additively manufactured (SLM) water cooled Cu-Cr thrust chamber barrels and one additively manufactured (SLM) water cooled Cu-Cr thrust chamber nozzle on the test stand in Cell 32 and perform hot fire testing of the integrated TCA.

Fikes, John C.↗

Flow Characterization of the NASA Langley Unitary Plan WindTunnel, Test Section 2: Computational Results

Flow in the empty Unitary Planform Wind Tunnel at the NASA Langley Research Center issimulated with computational fluid dynamics methods. The objectives are to assess CFD’s truepredictive capability and to generate flow-field maps upstream of the tunnel’s test section foruse in associated vehicle tests. Multiple CFD solvers, grid adaption methods, and turbulencemodels are used by five teams doing the simulations. The simulation domain is as large aspractical: from the start of the settling chamber, just downstream of the last set of turningvanes, to well downstream of the test section. Simulations are done at three Mach numbers andseveral Reynolds numbers that cover most of the tunnel’s operating range. The sensitivity ofthe CFD solutions to simulation process details, including turbulence model, spatial resolutionand settling-chamber inflow velocity profile, is characterized. Significant sensitivities in somedetails of the predicted test section flow are described. CFD predicts that details of flow inthe settling chamber can affect the flow in the test section. Turning of the flow through thetunnel contraction and past nozzle-block hardware generates streamwise vortices, some ofwhich survive into the core of the test section, principally at low Mach number. Preliminarycomparisons to experimental measurements are given. The major flow characteristics andthe dynamical vortices predicted by CFD exist in the experiment. Several details in CFD andexperiment are observed to differ, including the effects of the vortices and features that appearto be Mach waves in the test section. Sensitivity to grid resolution and turbulence modelingis noted in the vortices; no potential cause for the differences in Mach waves has yet beenidentified in the CFD sensitivity studies.

wind tunnel↗

Europa Clipper Payload Verification and Validation: Avionics-Instrument Interface Test Campaign

NASA's Europa Clipper mission will investigate Jupiter's icy moon Europa using a payload suite consisting of nine instruments to address a range of scientific objectives concerning Europa's habitability. As the project proceeds past its Critical Design Review, confidence is being built in the system's ability to achieve mission objectives through the implementation of a rigorous payload verification and validation (V&V) program. As part of this payload V&V program, instrument box-level testing was performed by the payload team to verify select instrument-avionics interface requirements. This testing was performed at JPL using the avionics testbed's Bulk Data Storage Emulator (BDSEM) with visiting instrument Test Models. This paper summarizes the Data Link test campaign involving roughly four days of functional testing per instrument, including planning, testing methods, types of issues found, and the requirement closure process. Detail is also provided on the development, deployment, and validation of a standardized analysis tool used in data reviews. This testing verified requirements related to commanding rates, loss of link, packet format, clock counters, loopback test capability, and SpaceWire jitter and skew margins. Additional risk reduction testing of basic commanding, counter behavior, science data collection and transfer, and interface swapping was also performed. Because the BDSEM venue was not originally designed to be a run for record venue, the process of characterizing venue fidelity and establishing suitability for requirement closure using data collected in this venue will also be addressed.In order to close requirements, an extensible tool was developed to post-process instrument command and telemetry data from their original binary to a human-readable format and give visibility to errors detected within the data, such as packets with Cyclic Redundancy Check errors. This tool, called payload-packet-parser, is a Python 3.9 command line tool built using a variety of open-source Python libraries. Payload-packet-parser was designed to support parsing command and telemetry packets for all Europa Clipper instruments and additional analysis tools were developed for verification of specific information interface requirements. This test campaign, including post-processing using a single parsing and verification toolset, allowed for early interface testing, alleviating testing burdens on instrument teams and buying down risk on the instrument-avionics interface by finding hardware and software issues and idiosyncrasies prior to integration with system test venues. Over twenty issues were discovered across the payload, resulting in software updates and instrument rework well in advance of any system impacts. This paper concludes with an assessment of benefits and costs of this type of testing and lessons learned.

Montanez, Leticia↗

Summary of Alloy 617 and Alloy 709 Elevated Temperature Crack Growth Test Results from the Planned FY24 Crack Growth Test Activities

This report covers the results from crack growth rate testing performed at Idaho National Laboratory in the fiscal year 2024. It includes two creep crack growth rate tests and two creep-fatigue crack growth rate tests. Results are shown for each of these tests, included crack growth measured during the test using direct current potential drop, and measurements based off of the fracture surface. Load line displacement, as well as load, were also collected during the tests. Detailed analysis of the results will continue into the next fiscal year, however, a number of potential improvements to the equipment and testing procedures were identified that will increase testing reliability and throughput, as well as decrease complications with the analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Environmental degradation testing of Alloy 709

Alloy 709 is an advanced austenitic stainless steel developed to meet the demanding conditions of sodium fast reactors (SFRs) but may also be of use for lead fast reactors, high temperature gas reactors, and molten salt reactors. Understanding environmental degradation modes and quantifying degradation rates are crucial to ensure the long-term, reliable operation of these reactors. This paper discusses recent neutron irradiation results, future neutron irradiation test plans, and sodium corrosion testing to communicate current best understanding of the performance of Alloy 709 in SFR environments.

A709↗

Preliminary results of the mission profile life test of a 30 cm Hg bombardment thruster

The paper deals with some preliminary results of the Mission Profile Life Test planned to conduct a program of long-term test segments of 30-cm diameter thrusters and power processing units under computer control. Thruster performance data and other operational characteristics taken at various times during a test segment are compared and the results are evaluated in light of the life-timing mechanisms. Thruster control algorithms are also presented. The first test segment completed 2700 hr of a planned 4000 hr test with a J-series 30-cm thruster. The last 1600 hr used a functional model power processing unit (PPU) operated in vacuum. The thruster-PPU was controlled by a computer with software developed to control start-ups, throttling, and variety of off-normal conditions.

Bechtel, R. T.↗

Preliminary Test Design and Plan for a Canister Deposition Field Demonstration

This report provides a high-level test plan for deploying three commercial 32PTH2 spent nuclear fuel (SNF) canisters inside NUHOMS Advanced Horizontal Storage Modules (AHSM) from Orano (formerly Transnuclear Inc.). The details contained in this report represent the best designs and approaches explored for testing as of this publication. Given the rapidly developing nature of this test program, some of these plans may change to accommodate new objectives or adapt in response to conflicting requirements. The goal of the testing is to collect highly defensible and detailed surface deposition measurements from the surface of dry storage systems in a marine coastal environment to guide chloride-induced stress corrosion crack (CISCC) research. To facilitate surface sampling, the otherwise highly prototypic dry storage systems will not contain SNF but rather will be electrically heated to mimic the thermal-hydraulic environment. Instrumentation throughout the canister, storage module, and environment will provide an extensive amount of information for the use of model validation. Manual sampling over a comprehensive portion of the canister surface at regular time intervals will offer a high-fidelity quantification of the conditions experienced in a harsh yet realistic environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Lost in Translation: the Case for Integrated Testing

The building of a spacecraft is complex and often involves multiple suppliers and companies that have their own designs and processes. Standards have been developed across the industries to reduce the chances for critical flight errors at the system level, but the spacecraft is still vulnerable to the introduction of critical errors during integration of these systems. Critical errors can occur at any time during the process and in many cases, human reliability analysis (HRA) identifies human error as a risk driver. Most programs have a test plan in place that is intended to catch these errors, but it is not uncommon for schedule and cost stress to result in less testing than initially planned. Therefore, integrated testing, or "testing as you fly," is essential as a final check on the design and assembly to catch any errors prior to the mission. This presentation will outline the unique benefits of integrated testing by catching critical flight errors that can otherwise go undetected, discuss HRA methods that are used to identify opportunities for human error, lessons learned and challenges over ownership of testing will be discussed.

Young, Aaron↗