Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling and coordination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Comparison of Airborne and Ground-Based Function Allocation Concepts for NextGen Using Human-In-The-Loop Simulations

This paper presents an air/ground functional allocation experiment conducted by the National Aeronautics and Space Administration (NASA) using two human-in-the-Loop simulations to compare airborne and ground-based approaches to NextGen separation assurance. The approaches under investigation are two trajectory-based four-dimensional (4D) concepts; one referred to as "airborne trajectory management with self-separation" (airborne) the other as "ground-based automated separation assurance" (ground-based). In coordinated simulations at NASA's Ames and Langley Research Centers, the primary operational participants -controllers for the ground-based concept and pilots for the airborne concept - manage the same traffic scenario using the two different 4D concepts. The common scenarios are anchored in traffic problems that require a significant increase in airspace capacity - on average, double, and in some local areas, close to 250% over current day levels - in order to enable aircraft to safely and efficiently traverse the test airspace. The simulations vary common independent variables such as traffic density, sequencing and scheduling constraints, and timing of trajectory change events. A set of common metrics is collected to enable a direct comparison of relevant results. The simulations will be conducted in spring 2010. If accepted, this paper will be the first publication of the experimental approach and early results. An initial comparison of safety and efficiency as well as operator acceptability under the two concepts is expected.

Wing, David J.↗

The Berkeley Serendip Project

An automated system was designed to perform a real time search for narrow band radio signals in the spectra of sources in a regularly scheduled, non-SETI astronomical observing program. The system will compute the power spectrum using a 65,536 channel fast Fourier transform processor with a real time bandwidth of 128 KHz and 2 Hz per channel resolution. After search for peaks in a 100 KHz portion of the IF band of the radio telescope, the system will move to the next 100 KHz portion using a programmable frequency synthesizer. When the whole IF band is scanned, the process will start again. Unidentified peaks in the power spectra are candidates for further study and their celestial coordinates will be recorded along with the time and power, IF and RF frequency, and bandwidth of the peak. Most of the hardware was developed and the machine software is in the process of being finalized. A number of means for identifying and rejecting power spectra peaks which have a high likelihood of being nonuseful are being investigated.

Bowyer, S.↗

Safety Demonstrator Series for an In-Time Aviation Safety Management System

NASA's Advanced Air Mobility Integration Office has coordinated a meeting with the National Research Council Canada (NRC) to have an interchange of technical area activities to evaluate merit for international partnership. Both NASA and NRC will provide a brief overview of their Advanced Air Mobility activities. Additional aeronautics projects will have an opportunity to present a few slides on current activities and plans. Topics include wildfire, vehicle automation technologies and detect and avoid, and national campaign flight initiatives. NASA's System-Wide Safety (SWS) Project will provide a high-level overview of the the safety demonstrator series. The project has scheduled operational demonstrations of an in-time aviation safety management system across a series of disaster-oriented operations. First up is a wildland fire demonstration scheduled for 2025. Opportunities for synergy will be discussed.

system-wide safety↗

Coordinating Council. First Meeting: NASA/RECON database

A Council of NASA Headquarters, American Institute of Aeronautics and Astronautics (AIAA), and the NASA Scientific and Technical Information (STI) Facility management met (1) to review and discuss issues of NASA concern, and (2) to promote new and better ways to collect and disseminate scientific and technical information. Topics mentioned for study and discussion at subsequent meetings included the pros and cons of transferring the NASA/RECON database to the commercial sector, the quality of the database, and developing ways to increase foreign acquisitions. The input systems at AIAA and the STI Facility were described. Also discussed were the proposed RECON II retrieval system, the transmittal of document orders received by the Facility and sent to AIAA, and the handling of multimedia input by the Departments of Defense and Commerce. A second meeting was scheduled for six weeks later to discuss database quality and international foreign input.

Source record↗

Solid Inflammability Boundary at Low Speed (SIBAL)

This research program is concerned with the effect of low-speed, concurrent flow on the spreading and extinction processes of flames over solid fuels. The primary objective is to verify the theoretically predicted extinction boundary, using oxygen percentage and flow velocity as coordinates. In particular, we are interested in the low-speed quenching limits and the existence of the critical oxygen flammability limit. Detailed flame spread characteristics, including flame spread rate, flame size, and flame structure are sought. Since the predicted flame behavior depends on the inclusion of flame and surface radiation, the measured results will also be used to assess the importance of radiative heat transfer by direct comparison to a comprehensive numerical model. This project passed the Science Concept Review (SCR) in 1996. As a result, the experiment continues on the flight definition path, and is currently scheduled to be performed in the Space Station Combustion Integrated Rack (CIR). We present an overview of recent and ongoing work, including selected experimental and theoretical topics.

T'ien, James S.↗

Summer Student Research Presentations

In 2005, over 150 undergraduate students and first-year graduate students participated in a variety of research programs coordinated by the Jet Propulsion Laboratory Education Office in conjunction with the Caltech Student- Faculty Programs Office. The programs give students the opportunity to conduct research under the guidance of an experienced mentor for a 10-week period. Students gain valuable experience while contributing to the ongoing goals of JPL. Students are required to submit progress reports and an abstract, and to give an oral presentation of their projects to an audience of JPL staff and other students. This set of abstracts provides brief descriptions of the projects that were conducted by these students and their mentors. A schedule of student talks is also included.

Casey, Carol↗

Model Deformation Measurements at NASA Langley Research Center

Only recently have large amounts of model deformation data been acquired in NASA wind tunnels. This acquisition of model deformation data was made possible by the development of an automated video photogrammetric system to measure the changes in wing twist and bending under aerodynamic load. The measurement technique is based upon a single view photogrammetric determination of two dimensional coordinates of wing targets with a fixed third dimensional coordinate, namely the spanwise location. A major consideration in the development of the measurement system was that use of the technique must not appreciably reduce wind tunnel productivity. The measurement technique has been used successfully for a number of tests at four large production wind tunnels at NASA and a dedicated system is nearing completion for a fifth facility. These facilities are the National Transonic Facility, the Transonic Dynamics Tunnel, and the Unitary Plan Wind Tunnel at NASA Langley, and the 12-FT Pressure Tunnel at NASA Ames. A dedicated system for the Langley 16-Foot Transonic Tunnel is scheduled to be used for the first time for a test in September. The advantages, limitations, and strategy of the technique as currently used in NASA wind tunnels are presented. Model deformation data are presented which illustrate the value of these measurements. Plans for further enhancements to the technique are presented.

Burner, A. W.↗

Summer student research presentations

In 2005, over 150 undergraduate students and first-year graduate students participated in a variety of research programs coordinated by the Jet Propulsion Laboratory Education Office in conjunction with the Caltech Student-Faculty Programs Office. The programs give students the opportunity to conduct research under the guidance of an experienced mentor for a 10-week period. Students gain valuable experience while contributing to the ongoing goals of JPL. Students are required to submit progress reports and an abstract, and to give an oral presentation of their projects to an audience of JPL staff and other students. This set of abstracts provides brief descriptions of the projects that were conducted by these students and their mentors. A schedule of student talks is also included. Students presenting their work have come to JPL through one of the following programs: SURF - Summer Undergraduate Research Fellowships, MURF - MURF Undergraduate Research Fellowships, NASA USRP - Undergraduate Student Research Program, NASA Space Grant Work Force Development Program, and NASA PGGURP - Planetary Geology and Geophysics Undergraduate Research Program

Casey, Carol↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

Biotechnology Facility: An ISS Microgravity Research Facility

The International Space Station (ISS) will support several facilities dedicated to scientific research. One such facility, the Biotechnology Facility (BTF), is sponsored by the Microgravity Sciences and Applications Division (MSAD) and developed at NASA's Johnson Space Center. The BTF is scheduled for delivery to the ISS via Space Shuttle in April 2005. The purpose of the BTF is to provide: (1) the support structure and integration capabilities for the individual modules in which biotechnology experiments will be performed, (2) the capability for human-tended, repetitive, long-duration biotechnology experiments, and (3) opportunities to perform repetitive experiments in a short period by allowing continuous access to microgravity. The MSAD has identified cell culture and tissue engineering, protein crystal growth, and fundamentals of biotechnology as areas that contain promising opportunities for significant advancements through low-gravity experiments. The focus of this coordinated ground- and space-based research program is the use of the low-gravity environment of space to conduct fundamental investigations leading to major advances in the understanding of basic and applied biotechnology. Results from planned investigations can be used in applications ranging from rational drug design and testing, cancer diagnosis and treatments and tissue engineering leading to replacement tissues.

Gonda, Steve R.↗

The Search for Chiral Asymmetry as a Potential Biosignature in Samples from Mars

The search for evidence of extraterrestrial life in our solar system has been guided by our under-standing of terrestrial biology and its associated biosignatures. The observed homochirality in all life on Earth, that is, the predominance of “left-handed” or L-amino acids and “right-handed” or D-sugars, is a unique property of life that is crucial for molecular recognition, enzymatic function, information storage and structure, and is thought to be a prerequisite for the origin or early evolution of life. Therefore, the detection of L- or D-excesses of chiral amino acids or sugars could be a powerful indicator of extant or extinct life on Mars or other habitable environments in our solar system. However, studies of primitive meteorites have revealed that they contain extraterrestrial amino acids and sugar acids with large enantiomeric excesses (60% and higher) that resulted from non-biological processes [1], complicating the use of chiral asymmetry by itself as a definitive biosignature. The exploration of habitable environments on Mars, including an assessment of the preservation potential for complex organics of either abiotic or biological origin, is an objective of both current and future Mars missions. Now with the unambiguous detection of indigenous organic matter in sedimentary rocks by the Sample Analysis at Mars (SAM) instrument suite on Mars [2-5], NASA’s Curiosity rover has found evidence of the preservation of potential chemical biosignatures in the martian near surface. Although amino acids have not yet been identified by in situ measurements on Mars [5], indigenous achiral amino acids have been identified in one martian meteorite [6]. It is expected that amino acid racemization would be very slow and any chiral or isotopic signatures from an extinct martian biota could be preserved for billions of years, given the extremely cold and dry surface conditions [7]. The ESA/Roscosmos ExoMars mission scheduled for launch next year includes the Rosalind Franklin rover designed to acquire samples from a depth of ~2 m and deliver them to a suite of instruments, including the Mars Organic Molecule Analyzer (MOMA). The MOMA instrument contains a wet chemistry experiment designed specifically for the detection of amino acids and measurement of their enantiomeric compositions [8]. The complexity and limited duration of spaceflight operations, and the known analytical challenges associated with in situ extraction and characterization of trace reduced organic com-pounds in ancient rocks, make it challenging to determine the origins of martian organic matter found to date. Coordinated state-of-the-art laboratory measurements of returned samples from Mars that include spatially resolved chemical, mineralogical, bulk and molecule-specific isotopic, and enantiomeric measurements will be required to firmly establish whether the complex organic matter detected on Mars derives from bio-tic or abiotic processes. Ultimately, Mars Sample Return of rock cores collected by NASA’s Perseverance rover may be our best chance of identifying chemical biosignatures, including any chiral amino acid asymmetry resulting from a past or present martian biota, if one ever existed on Mars. Here we review our current knowledge of the distributions, and enantiomeric and isotopic com-positions of amino acids found in meteorites compared to terrestrial biochemistry. We also propose a set of measurement criteria that should be used to help establish the sources of any amino acids detected in samples returned from Mars using state-of-the-art gas and liquid chromatography mass spectrometry techniques [1].

D P Glavin↗

Estimation of Cometary Rotation Parameters Based on Camera Images

The purpose of the Rosetta mission is the in situ analysis of a cometary nucleus using both remote sensing equipment and scientific instruments delivered to the comet surface by a lander and transmitting measurement data to the comet-orbiting probe. Following a tour of planets including one Mars swing-by and three Earth swing-bys, the Rosetta probe is scheduled to rendezvous with comet 67P/Churyumov-Gerasimenko in May 2014. The mission poses various flight dynamics challenges, both in terms of parameter estimation and maneuver planning. Along with spacecraft parameters, the comet's position, velocity, attitude, angular velocity, inertia tensor and gravitatonal field need to be estimated. The measurements on which the estimation process is based are ground-based measurements (range and Doppler) yielding information on the heliocentric spacecraft state and images taken by an on-board camera yielding informaton on the comet state relative to the spacecraft. The image-based navigation depends on te identification of cometary landmarks (whose body coordinates also need to be estimated in the process). The paper will describe the estimation process involved, focusing on the phase when, after orbit insertion, the task arises to estimate the cometary rotational motion from camera images on which individual landmarks begin to become identifiable.

Spindler, Karlheinz↗

Feedback on the Electric Emergency Incident and Disturbance Report, OE-417

The US Department of Energy (DOE) Office of Electricity (OE) mandates requirements for reporting electric emergencies and disruptions in the United States. Specific electric power industry organizations (such as balancing authorities, reliability coordinators, some generating entities, and electric utilities) report this information through the OE-417 Electric Emergency Incident and Disturbance Report via Form OE-417. Entities are required to submit Form OE-417 when at least one of the qualifying 26 criteria is met pursuant to Section 13(b) of the Federal Energy Administration Act of 1974 (Public Law 93-275). Entities are required to report, within 6 hours of the incident, loss of electric service to 50,000 customers or more for 1 hour or longer. The deadline for submitting Form OE-417 depends on the nature of the incident. An updated Form OE-417 Schedule 1 and all of Schedule 2 are both due within 72 hours of the incident to provide complete disruption information. Additionally, a Final Report must be filed within 72 hours of the incident, unless an interim update has been provided. If the incident meets specific criteria, the form must be filed within one hour, six hours, or by the later of 24 hours after the recognition of the incident or by the end of the next business day.1 The ability of DOE to respond quickly to energy emergencies that could affect the nation’s infrastructure and help alleviate or prevent further disruptions depends on the industry’s prompt and complete submission of information. This report summarizes current issues with Form OE-417 and the reporting process and presents recommendations for improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interaction Between Strategic and Local Traffic Flow Controls

The loosely coordinated sets of traffic flow management initiatives that are operationally implemented at the national- and local-levels have the potential to under, over, and inconsistently control flights. This study is designed to explore these interactions through fast-time simulations with an emphasis on identifying inequitable situations in which flights receive multiple uncoordinated delays. Two operationally derived scenarios were considered in which flights arriving into the Dallas/Fort Worth International Airport were first controlled at the national-level, either with a Ground Delay Program or a playbook reroute. These flights were subsequently controlled at the local level. The Traffic Management Advisor assigned them arrival scheduling delays. For the Ground Delay Program scenarios, between 51% and 53% of all arrivals experience both pre-departure delays from the Ground Delay Program and arrival scheduling delays from the Traffic Management Advisor. Of the subset of flights that received multiple delays, between 5.7% and 6.4% of the internal departures were first assigned a pre-departure delay by the Ground Delay Program, followed by a second pre-departure delay as a result of the arrival scheduling. For the playbook reroute scenario, Dallas/Fort Worth International Airport arrivals were first assigned pre-departure reroutes based on the MW_2_DALLAS playbook plan, and were subsequently assigned arrival scheduling delays by the Traffic Management Advisor. Since the airport was operating well below capacity when the playbook reroute was in effect, only 7% of the arrivals were observed to receive both rerouting and arrival scheduling delays. Findings from these initial experiments confirm field observations that Ground Delay Programs operated in conjunction with arrival scheduling can result in inequitable situations in which flights receive multiple uncoordinated delays.

Grabbe, Son↗

The Use of Astronomy VLBA Campaign MOJAVE for Geodesy

We investigated the suitability of the astronomical 15 GHz VLBA observing program MOJAVE-5 for estimation of geodetic parameters, such as station coordinates and Earth orientation parameters. We processed contemporary geodetic dual-band RV and CN experiments observed at 2.3 GHz and 8.6 GHz starting on September 2016 through July 2020 as reference dataset. We showed that the baseline length repeatability from MOJAVE-5 experiments is only a factor of 1.5 greater than from the dedicated geodetic dataset and still below 1 ppb. The wrms of the difference of estimated EOP with respect to the reference IERS C04 time series are a factor of 1.3 to 1.8 worse. We isolated three major differences between the datasets in terms their possible impact on the geodetic results, i.e. the scheduling approach, treatment of the ionospheric delay, and selection of target radio sources. We showed that the major factor causing discrepancies in the estimated geodetic parameters is the different scheduling approach of the datasets. We conclude that systematic errors in MOJAVE-5 dataset are low enough for these data to be used as an excellent testbed for further investigations on the radio source structure effects in geodesy and astrometry.

Hana Krasna↗

Repair of major system elements on Skylab

In-flight maintenance, as conceived and preplanned for the Skylab mission was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Tools and spares were provided accordingly. However, failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs included the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment, and tapping into and recharging a cooling system. The repairs were conducted both inside the spacecraft and during extravehicular activities. Some of the repair tasks required team effort on the part of the crewmen including close procedural coordination between internal and extravehicular crewmen. The Skylab experience indicates that crewmen can, with adequate training, make major system repairs in space using standard or special tools. Design of future spacecraft systems should acknowledge this capability and provide for more extensive in-flight repair and maintenance.

Pace, R. E., Jr.↗

Project Management Using Modern Guidance, Navigation and Control Theory

Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

Hill, Terry R.↗

Overview of the Third Convection and Moisture EXperiment (CAMEX-3)

The Convection And Moisture EXperiment (CAMEX) is a series of field research investigations sponsored by the National Aeronautics and Space Administration (NASA). The third field campaign in the CAMEX series (CAMEX-3) is scheduled for 6 August - 23 September, 1998 to study tropical cyclone development, tracking, intensification, and landfalling impacts using NASA-funded aircraft remote sensing instrumentation. This study will yield high spatial and temporal information of hurricane structure, dynamics, and motion. These data, when analyzed within the context of more traditional aircraft, satellite, and ground-based radar observations, should provide additional insight to hurricane modelers and forecasters who continually strive to improve hurricane predictions. During CAMEX-3, NASA will deploy a high attitude ER-2 and medium altitude DC-8 aircraft from Patrick Air Force Base, Florida. Ground-based instrumentation will also be stationed on Andros Island, Bahamas. Opportunities for coordinated aircraft missions with the National Oceanic and Atmospheric Administration (NOAA) Hurricane Research Division are also being planned. This presentation will provide an overview of the CAMEX-3 missions and key case studies sampled. Data availability and access will also be discussed.

Hood, Robbie↗