Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plutonium”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

A Preponderance of Elastic Properties of Alpha Plutonium Measured Via Resonant Ultrasound Spectroscopy

Samples of {alpha} plutonium were fabricated at the Los Alamos National Laboratory's Plutonium Facility. Cylindrical samples were machined from cast pucks. Precision immersion density and resonant ultrasound spectroscopy (RUS) measurements were completed on 27 new samples, yielding elastic moduli measurements. Mechanical tests were performed in compression yielding stress-strain curves as a function of rate, temperature and phase.

36 MATERIALS SCIENCE↗

An Evaluation of Monte Carlo Simulations of Neutron Multiplicity Measurements of Plutonium Metal

In January 2009, Sandia National Laboratories conducted neutron multiplicity measurements of a polyethylene-reflected plutonium metal sphere. Over the past 3 years, those experiments have been collaboratively analyzed using Monte Carlo simulations conducted by University of Michigan (UM), Los Alamos National Laboratory (LANL), Sandia National Laboratories (SNL), and North Carolina State University (NCSU). Monte Carlo simulations of the experiments consistently overpredict the mean and variance of the measured neutron multiplicity distribution. This paper presents a sensitivity study conducted to evaluate the potential sources of the observed errors. MCNPX-PoliMi simulations of plutonium neutron multiplicity measurements exhibited systematic over-prediction of the neutron multiplicity distribution. The over-prediction tended to increase with increasing multiplication. MCNPX-PoliMi had previously been validated against only very low multiplication benchmarks. We conducted sensitivity studies to try to identify the cause(s) of the simulation errors; we eliminated the potential causes we identified, except for Pu-239 {bar {nu}}. A very small change (-1.1%) in the Pu-239 {bar {nu}} dramatically improved the accuracy of the MCNPX-PoliMi simulation for all 6 measurements. This observation is consistent with the trend observed in the bias exhibited by the MCNPX-PoliMi simulations: a very small error in {bar {nu}} is 'magnified' by increasing multiplication. We applied a scalar adjustment to Pu-239 {bar {nu}} (independent of neutron energy); an adjustment that depends on energy is probably more appropriate.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Use of MCNP + GADRAS in Generating More Realistic Gamma-Ray Spectra for Plutonium and HEU Objects

The ability to accurately simulate high-resolution gamma spectra from materials that emit both neutrons and gammas is very important to the analysis of special nuclear materials (SNM), e.g., uranium and plutonium. One approach under consideration has been to combine MCNP and GADRAS. This approach is expected to generate more accurate gamma ray spectra for complex three-dimensional geometries than can be obtained from one-dimensional deterministic transport simulations (e.g., ONEDANT). This presentation describes application of combining MCNP and GADRAS in simulating plutonium and uranium spectra.

07 ISOTOPE AND RADIATION SOURCES↗

Co-Design: Fabrication of Unalloyed Plutonium

The successful induction casting of plutonium is a challenge which requires technical expertise in areas including physical metallurgy, surface and corrosion chemistry, materials science, electromagnetic engineering and a host of other technologies all which must be applied in concert. Here at LANL, we are employing a combined experimental and computational approach to design molds and develop process parameters needed to produce desired temperature profiles and improved castings. Computer simulations are performed using the commercial code FLOW-3D and the LANL ASC computer code TRUCHAS to reproduce the entire casting process starting with electromagnetic or radiative heating of the mold and metal and continuing through pouring with coupled fluid flow, heat transfer and non-isothermal solidification. This approach greatly reduces the time required to develop a new casting designs and also increases our understanding of the casting process, leading to a more homogeneous, consistent product and better process control. We will discuss recent casting development results in support of unalloyed plutonium rods for mechanical testing.

CASTING↗

Using NDA Techniques to Improve Safeguards Metrics on Burnup Quantification and Plutonium Content in LWR SNF

Globally, there exists a long history in reprocessing in evaluation of the shipper/receiver difference (SRD) on spent nuclear fuel (SNF) received and processed. Typically, the declared shipper s values for uranium and plutonium in SNF (based on calculations involving the initial manufacturer s data and reactor operating history) are used as the input quantities to the head-end process of the facility. Problems have been encountered when comparing these values with measured results of the input accountability tank contents. A typical comparison yields a systematic bias indicated as a loss of 5 7 percent of the plutonium (Pu) and approximately 1 percent for the uranium (U). Studies suggest that such deviation can be attributed to the non-linear nature of the axial burnup values of the SNF. Oak Ridge National Laboratory and Texas A&M University are co-investigating the development of a new method, via Nondestructive Assay (NDA) techniques, to improve the accuracy in burnup and Pu content quantification. Two major components have been identified to achieve this objective. The first component calculates a measurement-based burnup profile along the axis of a fuel rod. Gamma-ray data is collected at numerous locations along the axis of the fuel rod using a High Purity Germanium (HPGe) detector designed for a wide range of gamma-ray energies. Using two fission products, 137Cs and 134Cs, the burnup is calculated at each measurement location and a profile created along the axis of the rod based on the individual measurement locations. The second component measures the U/Pu ratio using an HPGe detector configured for relatively low-energy gamma-rays including x-rays. Fluorescence x-rays from U and Pu are measured and compared to the U/Pu ratio determined from a destructive analysis of the sample. This will be used to establish a relationship between the measured and actual values. This relationship will be combined with the burnup analysis results to establish a relationship between fission product activity and Pu content. It is anticipated that this new method will allow receiving facilities to make a limited number of NDA, gamma-ray, measurements to confirm the shipper declared values for burnup and Pu content thereby improving the SRD.

Burnup↗

Plutonium Detection with Straw Neutron Detectors

A kilogram of weapons grade plutonium gives off about 56,000 neutrons per second of which 55,000 neutrons come from spontaneous fission of 240Pu (~6% by weight of the total plutonium). Actually, all even numbered isotopes (238Pu, 240Pu, and 242Pu) produce copious spontaneous fission neutrons. These neutrons induce fission in the surrounding fissile 239Pu with an approximate multiplication of a factor of ~1.9. This multiplication depends on the shape of the fissile materials and the surrounding material. These neutrons (typically of energy 2 MeV and air scattering mean free path >100 meters) can be detected 100 meters away from the source by vehicle-portable neutron detectors. [1] In our current studies on neutron detection techniques, without using 3He gas proportional counters, we designed and developed a portable high-efficiency neutron multiplicity counter using 10B-coated thin tubes called straws. The detector was designed to perform like commercially available fission meters (manufactured by Ortec Corp.) except instead of using 3He gas as a neutron conversion material, we used a thin coating of 10B.

plutonium, neutron, straw↗

Technology for Treatment of Liquid Radioactive Waste Generated during Uranium and Plutonium Chemical and Metallurgical Manufacturing in FSUE PO Mayak - 13616

Created technological scheme for treatment of liquid radioactive waste generated while uranium and plutonium chemical and metallurgical manufacturing consists of: - Liquid radioactive waste (LRW) purification from radionuclides and its transfer into category of manufacturing waste; - Concentration of suspensions containing alpha-nuclides and their further conversion to safe dry state (calcinate) and moving to long controlled storage. The following technologies are implemented in LRW treatment complex: - Settling and filtering technology for treatment of liquid intermediate-level waste (ILW) with volume about 1500m{sup 3}/year and alpha-activity from 10{sup 6} to 10{sup 8} Bq/dm{sup 3} - Membrane and sorption technology for processing of low-level waste (LLW) of radioactive drain waters with volume about 150 000 m{sup 3}/year and alpha-activity from 10{sup 3} to 10{sup 4} Bq/dm{sup 3}. Settling and filtering technology includes two stages of ILW immobilization accompanied with primary settling of radionuclides on transition metal hydroxides with the following flushing and drying of the pulp generated; secondary deep after settling of radionuclides on transition metal hydroxides with the following solid phase concentration by the method of tangential flow ultrafiltration. Besides, the installation capacity on permeate is not less than 3 m{sup 3}/h. Concentrates generated are sent to calcination on microwave drying (MW drying) unit. Membrane and sorption technology includes processing of averaged sewage flux by the method of tangential flow ultrafiltration with total capacity of installations on permeate not less than 18 m{sup 3}/h and sorption extraction of uranium from permeate on anionite. According to radionuclide contamination level purified solution refers to general industrial waste. Concentrates generated during suspension filtering are evaporated in rotary film evaporator (RFE) in order to remove excess water, thereafter they are dried on infrared heating facility. Solid concentrate produced is sent for long controlled storage. Complex of the procedures carried out makes it possible to solve problems on treatment of LRW generated while uranium and plutonium chemical and metallurgical manufacturing in Federal State Unitary Enterprise (FSUE) Mayak and cease its discharge into open water reservoirs. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Removal of the Plutonium Recycle Test Reactor - 13031

The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associated underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the core drill bit. A redesign is being completed to extract the 309 PRTR and entire Bio-Shield structure together as one monolith weighing 1100 Ton by cutting structural concrete supports. In addition, the PRTR has hundreds of contaminated process tubes and pipes that have to be severed to allow for a uniformly flush fit with a lower lifting frame. Thirty-two 50 mm (2 in) core drills must be connected with thirty-two wire saw cuts to allow for lifting columns to be inserted. Then eight primary saw cuts must be completed to severe the PRTR from the 309 Facility. Once the weight of the PRTR is transferred to the lifting frame, then the PRTR may be lifted out of the facility. The critical lift will be executed using four 450 Ton strand jacks mounted on a 9 m (30 LF) tall mobile lifting frame that will allow the PRTR to be transported by eight 600 mm (24 in) Slide Shoes. The PRTR will then be placed on a twenty-four line, double wide, self powered Goldhofer for transfer to the onsite CERCLA Disposal Cell (ERDF Facility), approximately 33 km (20 miles) away. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multiple recycle of REMIX fuel based on reprocessed uranium and plutonium mixture in thermal reactors

REMIX fuel consumption in WWER-1000 is considered. REMIX fuel is fabricated from non-separated mixture of uranium and plutonium obtained during NPP spent fuel reprocessing with further makeup by enriched natural uranium. It makes possible to recycle several times the total amount of uranium and plutonium obtained from spent fuel with 100% loading of the WWER-1000 core. The stored SNF could be also involved in REMIX fuel cycle by enrichment of regenerated uranium. The same approach could be applied to closing the fuel cycle of CANDU reactors. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New method of uranium and plutonium extraction in reprocessing of the spent nuclear fuel

It is shown that a two-stage process of uranium and plutonium extraction during the reprocessing of spent nuclear fuel solves the problem of obtaining a high-concentrated extract without increasing the loss risk with raffinate and avoids the accumulation of plutonium in the unit. A possible further optimization of the process would be the creation of steps inside the stages.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Greening of a Plutonium Facility through Personnel Safety, Operational Efficiency, and Infrastructure Improvements - 12108

Chemical and metallurgical operations involving plutonium and other hazardous materials account for most activities performed at the Los Alamos National Laboratory's Plutonium Facility (TA-55). Engineered barriers provide the most effective protection from hazardous materials. These safety features serve to protect workers and provide defense in depth against the hazards associated with operations. Although not designed to specifically meet environmental requirements the safety-based design does meet or exceed the requirements of the environmental regulations enacted during and since its construction. TA-55's Waste Services Group supports this safety methodology by ensuring safe, efficient and compliant management of all radioactive and hazardous wastes generated at the TA-55. A key function of this group is the implementation of measures that lower the overall risk of radiological and hazardous material operations. Processes and procedures that reduce waste generation compared to current, prevalent processes or procedures used for the same purpose are identified. Some of these 'Best Practices' include implementation of a chemical control system, elimination of aerosol cans, reduction in hazardous waste, implementation of zero liquid discharge, and the re-cyclization of nitric acid. P2/WMin opportunities have been implemented in the areas of personnel and facility attributes, environmental compliance, energy conservation, and green focused infrastructure expansion with the overall objective of minimizing raw material and energy consumption and waste generation. This increases technical knowledge and augments operational safety. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Remote Decommissioning of the Plutonium Experimental Extraction Facility, Sellafield - 17031

A redundant suite of gloveboxes formerly used for an experimental plutonium extraction process required decommissioning to avoid further degradation and a risk to other users of the Analytical Services building on Sellafield site. Following a full option selection process, remote techniques were chosen as the most appropriate (i.e. ALARP) decommissioning method. A nearby ventilation system from a previous project was re-engineered to ventilate the laboratory. Gloveboxes in neighbouring labs were cleared to create space to install a personnel access facility. The containment was reinforced where necessary to provide adequate protection from the remote machinery. Following a campaign of manual waste removal, including approximately 21 tonnes of lead chevron bricks released as exempt waste, a Brokk{sup R} 90 remotely-operated vehicle (ROV) was deployed to perform remote size reduction of the glovebox suite. The resulting plutonium-contaminated material (PCM) was delivered to a Kraft Raptor manipulator for sorting and consignment to an on-site store in 200-litre drums. Despite indications from pre-decommissioning surveys of the presence of ILW in the shielded section, none was found. Following the successful removal of the glovebox suite, and the emergence during the project of additional redundant gloveboxes within the Analytical Services building, the Remediation team has taken the opportunity to retain the decommissioning infrastructure as a remote glovebox breakdown facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing for safe and compliant open air demolition at Hanford's plutonium finishing plant - 15100

The Plutonium Finishing Plant (PFP), located in the 200 West Area of the U.S. Department of Energy (DOE) Hanford Site, began operations in 1949 and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut-down in 1996, and material stabilization completed in 2004. DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL) is tasked with the plant's deactivation, decommissioning, decontamination and demolition, to be completed by September 30, 2016. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is exploring, evaluating and implementing efficiencies to safely and compliantly prepare the facility for demolition. Since 2008, employees have prepared approximately 75 percent of the complex for demolition. More than 90 percent of the 232 glove boxes have been removed from ventilation and more than 80 percent of pencil tank units have been dispositioned. As decontamination, deactivation and removal nears completion on the remaining glove boxes, pencil tanks and other radiological and chemical processing infrastructure, CH2M HILL and DOE-RL are making preparations to demolish PFP itself, a Hazardous Category II nuclear facility (HazCat II). Conventional techniques used to demolish buildings heavily contaminated with radiological hazards typically involve extensive hands-on work to remove Material at Risk (MAR) and decontaminate the building to low levels before conventional demolition techniques can be used to remove the building. A safe and more cost effective approach is packaging MAR located in hard to access areas of the plant and removing it during demolition. That process, combined with affixing remaining contamination to walls, floors and equipment, performing detailed air dispersion modeling before demolition and air monitoring and dust suppression during demolition, will reduce employee risk and is more efficient in demolishing a HazCat II facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement of the plutonium hold-up in glove box before dismantling - 15111

The French Bruyeres-Le-Chatel CEA (Commissariat a l'Energie Atomique et aux Energies Alternatives - French Alternatives Energies and Atomic Energy Commission) research center is going through a period of cleaning and dismantling of theses old treatment facilities on fissile materials and others associated nuclides. Some very large glove boxes contained some machines like melting furnace which can't be moved and are dismantled in situ. We need to evaluate the quantity of fissile materials to prevent criticality risk, to bring the evidence to the safety authority, to manage for the best the radioprotection of the workers and to manage waste production. A melting furnace in a glove box was dismantled. Measurements by gamma spectrometry with an HPGe detector (High Purity Germanium) and passive neutron counting (coincidence counting with shift register) are done in situ (furnace in the glove box). In order to refine the measurements, some data acquisitions by sector of glove box were carried out. In view of the geometries to characterize, some modelings have been created, in order to correct the different attenuations and to determine the plutonium masses content in the glove box, including the use of infinite energy technique. For the measurement by passive neutron counting (coincidence counting with shift register), we have used two slabs in high density polythene including nine He3 counters in each slab. This measurement technique is complementary to gamma spectrometry, and allows quantizing the fissile material which would be included in interstice of high Z material. The 100-L and 200-L drums produced during the dismantling were also measured. Based on simplified assumptions to analyze in situ measurements, plutonium weight could be evaluated. This approach of measurement in amount, during and after dismantling, has allowed to quantize the fissile material mass present in the glove box and didn't produce waste package which wouldn't respected the technical specifications of storage outlets. The results show good agreement between in situ and waste measurements. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Progression of Safe and Compliant Demolition of Hanford's Plutonium Finishing Plant - 16566

Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is about to begin demolition of the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. The project team, partnering with DOE-Richland Operations Office (DOE-RL), is in the final stages of preparing to demolish the building by the Tri-Party Agreement Milestone date of September 30, 2016. Since 2008, employees have prepared approximately 85 percent of the building for demolition. All of the 52 pencil-shaped processing tanks and 95 percent of the 238 glove boxes have been removed. Work is progressing on dispositioning remaining glove boxes, filter boxes and ventilation ducts and chemical and drain lines. Demolition is scheduled to start in early 2016. In addition to wrapping up tasks like source term removal (or preparation for removal during pre-demolition) and decontamination, the project is also developing the strategy and process to perform physical open air demolition, including the use of 3D renderings and computer generated illustrations of building infrastructure to safely and compliantly demolish the building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a new criticality methodology to support decommissioning of legacy plutonium facilities

To decommission a legacy plutonium finishing facility, a number of gloveboxes need to be disposed of. These gloveboxes have been in place since the 1960's and were operational until the 1980's. A period of initial clean out and decommissioning took place in the 1990's and the first gloveboxes were removed from the line in the early 2000's. Compliance with downstream waste handling facility requirements meant that the gloveboxes needed to be removed using intensive 'hands-on' methods in order to size reduce them to fit into 200 litre (55 gallon) drums. This is the standard approach for handling waste items known as Plutonium Contaminated Material (PCM) on the Sellafield site and was credited in the criticality safety case for the decommissioning of the gloveboxes as it allowed each waste drum to be individually assayed such that the fissile content of the waste could be known. Not only was this approach time-consuming and laborious but as it involved operators working with cutting tools in a highly contaminated area it was challenged as being overly restrictive to operations and potentially hazardous to the workers. In order to decommission the remaining nine gloveboxes in the facility, a new decommissioning approach and associated criticality methodology has been developed. Instead of intensive size reduction and waste drum assay, the gloveboxes will be removed with little or no size reduction and put into storage crates without assay. The criticality assessor will review the operational history of each glovebox, along with the decommissioning records and relevant plant data, to make an evidence-based judgement that the crated glovebox represents no greater a residual criticality risk than would have been realised from the equivalent number of PCM drums that the standard decommissioning approach would have generated. This method identifies, in conjunction with the plant personnel, a number of review points to ensure that before the glovebox is removed any bulk residue material has been recovered and no more than a safe amount of moderating material (fixative) has been added to fix any remaining fissile contamination. Finally, once these review points have been confirmed to be complete - through a stakeholder meeting with criticality safety, plant operators and project managers - the glovebox will be placed in a crate, and this crate will be declared a Low Criticality Risk crate. No formal assay will be required prior to exporting the crate to the downstream waste handling facility and no fissile mass value will be assigned to the contents of the crate. No further intrusive work will be required on the crate and it can be safely stored without any spacing requirements, pending final disposal. (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Combined Effort to De-Inventory the New Brunswick Laboratory of Plutonium Certified Reference Materials - 20504

To de-inventory plutonium Certified Reference Materials standards (CRMs) from the New Brunswick National Laboratory (NBL), the Argonne National Laboratory (ANL) and Savannah River National Laboratory (SRNL) formed a unique team. This teaming arrangement leveraged the different capabilities and expertise of both laboratories, helping to ensure the effort would be performed both safely and cost-effectively. With the NBL then physically housed on the ANL site, ANL served as the host-site, providing the necessary facilities and support services (e.g., supplying everything from hoods, loading equipment, and scales to Health Physics supports). From a packaging perspective, ANL's responsibilities focused mainly on characterizing and preparing the contents for shipment, followed by performing the Shipper of Record activities. With SRNL being the Package Design Authority of the 9978, the Type B packaging used for this effort, SRNL's scope included developing a Safety Analysis Report in Packaging (SARP) Letter Amendment to add the CRMs as authorized contents to the 9978. Recognizing competency, ANL prodigiously tasked SRNL to perform the actual loading of the CRMs into the 9978s, while physically on the ANL site. This paper details five different aspects of this effort. They are: 1. Characterization/validation of the CRM contents. 2. Development of the 9978 SARP Letter Amendment for the content change. 3. Development of the nitrogen inerting method to address SARP identified potential flammability concerns. 4. Renewal of the SRNL 9978 loading procedure. 5. Performance of the actual work execution activities. In 2017, the first nine packages were successfully loaded and shipped from NBL, while in 2019, the last ten were successfully loaded and planned for shipment. Without ANL leveraging SRNL's strengths, the de-inventorying of NBL of its plutonium CRMs would have likely taken many years longer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗