Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Digital Control For Remote Manipulators

Multiple microprocessors enable large separations between controllers and manipulators. Controller for remote manipulator requires no direct mechanical connection between slave arm and master arm moved by human operator. Employs two-way digital data transmission rather than mechanical linkage between master and slave. Manipulator a considerable distance from operator. Software for controller distributed between master and slave locations. Organized into modules. Hardware and software for system demonstrated in laboratory model.

Bejczy, Antal K.↗

Psychiatric Components of a Health Maintenance Facility (HMF) on Space Station

The operational psychiatric requirements for a comprehensive Health Maintenance Facility (HMF) on a permanently manned Space Station are examined. Consideration is given to the psychological health maintenance program designed for the diagnosis of mental distress in astronauts during flight and for prevention of mental breakdown. The types of mental disorders that can possibly affect the astronauts in flight are discussed, including various organic, psychotic, and affective mental disorders, as well as anxiety, adjustment, and somatoform/dissociative disorders. Special attention is given to therapeutic considerations for psychiatric operations on Space Station, such as restraints, psychopharmacology, psychotherapy, and psychosocial support.

Patricia A Santy↗

Perovskite CsPbBr 3 Single-Crystal Detector Operating at 10 10 Photons s -1 mm -2 for Ultra-High Flux X-ray Detection

Semiconductors for detecting hard radiation are confronted with considerable problems when operating at high photon fluxes. A perovskite CsPbBr 3 single-crystal detector capable of operating at X-ray fluxes of up to 10 10 photons s -1 mm -2 with beam area ≤ 0.25 mm 2 at 58.61 keV for current-mode X-ray detection is reported. The spectrometer-grade melt-grown CsPbBr 3 detectors show a gamma-ray energy resolution of ~7.5% at 122 keV for 57 Co and dark current as low as 4.3 nA (0.5 nA mm -2 ) at a reverse bias voltage of 200 V (118 V mm -1 ). The detector is tested at X-ray energies of 8.2, 10, and 58.61 keV at a synchrotron light source under a reverse bias voltage of up to 1000 V (588 V mm -1 ). Under a sufficiently high bias voltage and within several hundreds of seconds X-ray exposure, good photocurrent linearity (goodness of fit R 2 > 0.99) and reproducibility are obtained up to a flux of ≈10 10 photons s -1 mm -2 at beam area 0.25 mm 2 with Lower Limit of Detection of ≈10 5 photons s -1 mm -2 and Charge Collection Efficiency of ≈100% for 58.61 keV X-rays. Therefore, wide application of CsPbBr 3 detectors in high-flux X-ray detection is anticipated.

36 MATERIALS SCIENCE↗

Nuclear Safety [Vol. 16, No. 2, March-April 1975]

Nuclear Safety covers significant developments in the field of nuclear safety. The scope is limited to topics relevant to the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, safety considerations in regard to the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 127 Quality Assurance in the Construction of Nuclear Power Plants by Sidney A. Bernsen, 141 1974 ANS Topical Meeting on Fast Reactor Safety by M. H. Fontana; CONTROL AND INSTRUMENTATION: 150 GBR-4 Protection Systems: Failures and Their Consequences by Peter Burgsmüller, J. J. Dekais, Albert Krähe, Raffaello Pignatelli, and Gottfried Vieider, 162 Standby Emergency Power Systems. Part 2—The Later Plants by E. W. Hagen; PLANT SAFETY FEATURES: 180 Radiotoxic Hazard Measure for Buried Solid Radioactive Waste by J. Hamstra, 190 The Thirteenth AEC Air-Cleaning Conference by D. W. Moeller, D. W. Underhill, and M. W. First, 203 Book Review: Nuclear Criticality Safety; CONSEQUENCES OF EFFLUENT RELEASE: 204 Environmental Radiation Effects of Nuclear Facilities in New York State by M. S. Terpilak and B. L. Jorgensen, 222 Book Review: Thermal Ecology; OPERATING EXPERIENCES: 223 Set-Point Drift in Nuclear Power-Plant Safety-Related Instrumentation Adapted by the Nuclear Safety Staff, 224 Diesel-Generator Operating Experience at Nuclear Power Plants, 227 Summary of Operating U. S. Power Reactors as of Jan. 1, 1975, 232 Selected Safety-Related Occurrences Reported in November and December 1974 Compiled by William R. Casto, 235 Recent Occurrences at Nuclear Reactors and Their Causes Compiled by William R. Casto; CURRENT EVENTS: 243 General Administrative Activities Compiled by Wm. B. Cottrell, 251 Action on Power-Reactor Projects Undergoing Regulatory Review or Consideration Compiled by Wm. B. Cottrell, 266 Action on Nonreactor Projects Undergoing Regulatory Review or Consideration Compiled by Wm. B Cottrell, 268 Proposed Rule Changes as of Jan. 1, 1975; MISCELLANY: 149 Course in Italy on High-Energy Radiation Dosimetry and Protection (Announcement), 250 Course at Northwestern on Safety of Light-Water-Cooled Nuclear Power Plants (Announcement), 266 Symposium of the Combined Effects on the Environment of Radioactive, Chemical, and Thermal Releases from the Nuclear Industry (Announcement), 271 Short Course on Engineering for Extreme Winds and Tornadoes (Announcement), 272 Three 1-Week Courses at MIT on Nuclear Power-Reactor Safety (Announcement), 272 Harvard University Short Courses (Announcement).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Performance and Loads Correlation of a UH-60A Slowed Rotor at High Advance Ratios

Measured data from the slowed rotor part of the 2010 UH-60A Airloads Rotor test in the NASA Ames 40- by 80- Foot Wind Tunnel are compared with CAMRAD II calculations. The emphasis in this initial study is to correlate overall trends. This analytical effort considers advance ratios from 0.3 to 1.0, with the rotor rotational speed at 40%NR. The rotor performance parameters considered are the thrust coefficient, power coefficient, L/DE, torque, and H-force. The blade loads considered are the half peak-to-peak, mid-span and outboard torsion, flatwise, and chordwise moments, and the pitch link load. For advance ratios . 0.7, the overall trends for the performance and loads (excluding the pitch link load) could be captured, but with substantial overprediction or underprediction. The correlation gradually deteriorates as the advance ratio is increased and for advance ratios . 0.8 there is no correlation. The pitch link load correlation is not good. There is considerable scope for improvement in the prediction of the blade loads. Considering the modeling complexity associated with the unconventional operating condition under consideration, the current predictive ability to capture overall trends is encouraging.

Kottapalli, Sesi B.↗

Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations

An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.

Frigm, Ryan C.↗

Management of Asymptomatic Renal Stones in Astronauts

Introduction: Management guidelines were created to screen and manage asymptomatic renal stones in U.S. astronauts. The risks for renal stone formation in astronauts due to bone loss and hypercalcuria are unknown. Astronauts have a stone risk which is about the same as commercial aviation pilots, which is about half that of the general population. However, proper management of this condition is still crucial to mitigate health and mission risks in the spaceflight environment. Methods: An extensive review of the literature and current aeromedical standards for the monitoring and management of renal stones was done. The NASA Flight Medicine Clinic's electronic medical record and Longitudinal Survey of Astronaut Health were also reviewed. Using this work, a screening and management algorithm was created that takes into consideration the unique operational environment of spaceflight. Results: Renal stone screening and management guidelines for astronauts were created based on accepted standards of care, with consideration to the environment of spaceflight. In the proposed algorithm, all astronauts will receive a yearly screening ultrasound for renal calcifications, or mineralized renal material (MRM). Any areas of MRM, 3 millimeters or larger, are considered a positive finding. Three millimeters approaches the detection limit of standard ultrasound, and several studies have shown that any stone that is 3 millimeters or less has an approximately 95 percent chance of spontaneous passage. For mission-assigned astronauts, any positive ultrasound study is followed by low-dose renal computed tomography (CT) scan, and flexible ureteroscopy if CT is positive. Other specific guidelines were also created. Discussion: The term "MRM" is used to account for small areas of calcification that may be outside the renal collecting system, and allows objectivity without otherwise constraining the diagnostic and treatment process for potentially very small calcifications of uncertain significance. However, a small asymptomatic MRM or stone within the renal collecting system may become symptomatic, and so affect launch and flight schedules, cause incapacitation during flight, and ultimately require medical evacuation. For exploration class missions, evacuation is unlikely. The new screening and management algorithm allows better management of mission risks, and will define the true incidence of renal stones in U.S. astronauts. This information will be used to refine future screening, countermeasures and treatment methods; and will also inform the needed capabilities to be flown on exploration-class missions.

Reyes, David↗

Management of Asymptomatic Renal Stones in Astronauts

Introduction: Management guidelines were created to screen and manage asymptomatic renal stones in U.S. astronauts. The risks for renal stone formation in astronauts due to bone loss and hypercalcuria are unknown. Astronauts have a stone risk which is about the same as commercial aviation pilots, which is about half that of the general population. However, proper management of this condition is still crucial to mitigate health and mission risks in the spaceflight environment. Methods: An extensive review of the literature and current aeromedical standards for the monitoring and management of renal stones was done. The NASA Flight Medicine Clinic's electronic medical record and Longitudinal Survey of Astronaut Health were also reviewed. Using this work, a screening and management algorithm was created that takes into consideration the unique operational environment of spaceflight. Results: Renal stone screening and management guidelines for astronauts were created based on accepted standards of care, with consideration to the environment of spaceflight. In the proposed algorithm, all astronauts will receive a yearly screening ultrasound for renal calcifications, or mineralized renal material (MRM). Any areas of MRM, 3 millimeters or larger, are considered a positive finding. Three millimeters approaches the detection limit of standard ultrasound, and several studies have shown that any stone that is 3 millimeters or less has an approximately 95 percent chance of spontaneous passage. For mission-assigned astronauts, any positive ultrasound study is followed by low-dose renal computed tomography (CT) scan, and flexible ureteroscopy if CT is positive. Other specific guidelines were also created. Discussion: The term "MRM" is used to account for small areas of calcification that may be outside the renal collecting system, and allows objectivity without otherwise constraining the diagnostic and treatment process for potentially very small calcifications of uncertain significance. However, a small asymptomatic MRM or stone within the renal collecting system may become symptomatic, and so affect launch and flight schedules, cause incapacitation during flight, and ultimately require medical evacuation. For exploration class missions, evacuation is unlikely. The new screening and management algorithm allows better management of mission risks, and will define the true incidence of renal stones in U.S. astronauts. This information will be used to refine future screening, countermeasures and treatment methods; and will also inform the needed capabilities to be flown on exploration-class missions.

Reyes, David↗

Four-Stage Multi-Physics Simulations to Assist Temperature Sensor Design for Industrial-Scale Coal-Fired Boiler

The growth of renewable energy sources presents a pressing challenge to the operation and maintenance of existing fossil fuel power plants, given that fossil fuel remains the predominant fuel source, responsible for over 60% of electricity generation in the United States. One of the main concerns within these fossil fuel power plants is the unpredictable failure of boiler tubes, resulting in emergency maintenance with significant economic and societal consequences. A reliable high-temperature sensor is necessary for in situ monitoring of boiler tubes and the safety of fossil fuel power plants. In this study, a comprehensive four-stage multi-physics computational framework is developed to assist the design, optimization installation, and operation of the high-temperature stainless-steel and quartz coaxial cable sensor (SSQ-CCS) for coal-fired boiler applications. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. With the simulation-guided sensor installation plan, the newly designed SSQ-CCSs have been employed for field testing for more than 430 days. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

42 ENGINEERING↗

A Definition of STS Accommodations for Attached Payloads

An input to a study conducted to define a set of carrier avionics for supporting large structures experiments attached to the Space Shuttle Orbiter is reported. The "baseline" Orbier interface used in developing the avionics concept for the Space Technology Experiments Platform, STEP, which Langley Research Center has proposed for supporting experiments of this sort is defined. Primarily, flight operations capabilities and considerations and the avionics systems capabilities that are available to a payload as a "mixed cargo" user of the Space Transportation System are addressed. Ground operations for payload integration at Kennedy Space Center, and ground operations for payload support during the mission are also discussed.

Echols, F. L.↗

MegaWatt Mayhem: Grid Operator Challenges Center Loads

This report provides a summary of the challenges faced by United States electricity grid operators in accommodating and anticipating the rapid deployment of large loads, particularly data centers, based on academic literature and industry working groups. The report highlights the unique requirements and operational characteristics of data centers, which differ significantly from traditional industrial loads. Key issues addressed utility planning considerations, with emphasis on the implications for grid operators, impacts to normal operations for grid operators, reliability considerations during periods of grid stress, and resilience considerations for the changing operational paradigms based on data centers. Real-world examples are used to highlight these challenges and the changes that grid operators must address. The findings underscore the necessity for coordinated efforts and innovative solutions from both grid operators and regulatory bodies to ensure the stable integration of large loads into the grid. This report is the first in a series that will explore the challenges of data center deployments based on several key power system perspectives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

A Simulation Study of Instrument Meteorological Condition Approaches to Dual Parallel Runways Spaced 3400 and 2500 Feet Apart Using Flight-Deck-Centered Technology

A number of our nations airports depend on closely spaced parallel runway operations to handle their normal traffic throughput when weather conditions are favorable. For safety these operations are curtailed in Instrument Meteorological Conditions (IMC) when the ceiling or visibility deteriorates and operations in many cases are limited to the equivalent of a single runway. Where parallel runway spacing is less than 2500 feet, capacity loss in IMC is on the order of 50 percent for these runways. Clearly, these capacity losses result in landing delays, inconveniences to the public, increased operational cost to the airlines, and general interruption of commerce. This document presents a description and the results of a fixed-base simulation study to evaluate an initial concept that includes a set of procedures for conducting safe flight in closely spaced parallel runway operations in IMC. Consideration of flight-deck information technology and displays to support the procedures is also included in the discussions. The procedures and supporting technology rely heavily on airborne capabilities operating in conjunction with the air traffic control system.

Waller, Marvin C.↗

GeoLab 2011: New Instruments and Operations Tested at Desert RATS

GeoLab is a geological laboratory and testbed designed for supporting geoscience activities during NASA's analog demonstrations. Scientists at NASA's Johnson Space Center built GeoLab as part of a technology project to aid the development of science operational concepts for future planetary surface missions [1, 2, 3]. It is integrated into NASA's Habitat Demonstration Unit, a first generation exploration habitat test article. As a prototype workstation, GeoLab provides a high fidelity working space for analog mission crewmembers to perform in-situ characterization of geologic samples and communicate their findings with supporting scientists. GeoLab analog operations can provide valuable data for assessing the operational and scientific considerations of surface-based geologic analyses such as preliminary examination of samples collected by astronaut crews [4, 5]. Our analog tests also feed into sample handling and advanced curation operational concepts and procedures that will, ultimately, help ensure that the most critical samples are collected during future exploration on a planetary surface, and aid decisions about sample prioritization, sample handling and return. Data from GeoLab operations also supports science planning during a mission by providing additional detailed geologic information to supporting scientists, helping them make informed decisions about strategies for subsequent sample collection opportunities.

Evans, Cindy A.↗

Quantifying the Impact of Systems Interdependencies in Space Systems Architectures

Due to the high number of systems in a space mission architecture and to their complex interactions, identifying risk and critical operational dependencies is not obvious. Traditional systems engineering methodology and risk assessment does not capture the impact of interactions between systems nor the cascading effects of disruptions. Based on these considerations, the Systems Operational Dependency Analysis methodology was developed for use by systems analysts and decision makers. This methodology utilizes a parametric model of interdependencies between systems to quantify the direct and indirect impact of system disruptions on other systems, as well as identify root causes. The results are effective at providing decision support for prioritizing technology investment based on risk reduction associated with potential system disruptions. Expanding on research presented at IAC 2018 and based on a collaboration with NASA Marshall Space Flight Center, this paper applies the Systems Operational Dependency Analysis methodology to NASA Lunar Gateway in collaboration with NASA’s lunar exploration plans. The paper presents a hierarchical representation of the interdependencies between a Gateway habitat’s systems and subsystems, demonstrates quantification of the impact of disruption, and assesses the criticality of the constituent systems and subsystems.

Guariniello, Cesare↗

Extravehicular activity compatibility evaluation of developmental hardware for assembly and repair of precision reflectors

This report presents results of tests performed in neutral buoyancy by two pressure-suited test subjects to simulate Extravehicular Activity (EVA) tasks associated with the on-orbit construction and repair of a precision reflector spacecraft. Two complete neutral buoyancy assemblies of the test article (tetrahedral truss with three attached reflector panels) were performed. Truss joint hardware, two different panel attachment hardware concepts, and a panel replacement tool were evaluated. The test subjects found the operation and size of the truss joint hardware to be acceptable. Both panel attachment concepts were found to be EVA compatible, although one concept was judged by the test subjects to be considerably easier to operate. The average time to install a panel from a position within arm's reach of the test subjects was 1 min 14 sec. The panel replacement tool was used successfully to demonstrate the removal and replacement of a damaged reflector panel in 10 min 25 sec.

Heard, Walter L., Jr.↗

An Analysis of Near Fields of 34m Antennas of JPL/NASA Deep Space Network

This paper addresses the issue of calculating near fields of the 34m Beam Waveguide (BWG) antennas of the NASA/JPL Deep Space Network (DSN). Calculating the near fields of DSN antennas are of interest in receive mode where the transmitting signals from nearby flying objects such as helicopters and airplanes could interfere with the operation of sensitive RF receiving system of DSN antennas, and in the transmit mode where fields from high-powered DSN antennas interfere with receivers on nearby flying objects, as well as safety considerations for the operators and visitors to the grounds surrounding the antenna sites. A complete and detailed analysis has been performed using PO/PTD techniques, including surface errors and support struts effects. Some results are presented, including comparisons with preliminary field tests.

near fields↗

Barium-Dispenser Thermionic Cathode

Improved reservoir cathode serves as intense source of electrons required for high-frequency and often high-output-power, linear-beam tubes, for which long operating lifetime important consideration. High emission-current densities obtained through use of emitting surface of relatively-low effective work function and narrow work-function distribution, consisting of coat of W/Os deposited by sputtering. Lower operating temperatures and enhanced electron emission consequently possible.

Wintucky, Edwin G.↗

Design Aspects of the VLBI2010 System - Progress Report of the IVS VLBI2010 Committee

This report summarizes the progress made in developing the next generation VLBI system, dubbed the VLBI2010 system. The VLBI2010 Committee of the International VLBI Service for Geodesy and Astrometry (IVS) worked on the design aspects of the new system. The report covers Monte Carlo simulations showing the impact of the new operating modes on the final products. A section on system considerations describes the implications for the VLBI2010 system parameters by considering the new modes and system-related issues such as sensitivity, antenna slew rate, delay measurement error. RF1, frequency requirements, antenna deformation, and source structure corrections_ This is followed by a description of all major subsystems and recommendations for the network, station. and antenna. Then aspects of the feed, polarization processing. calibration, digital back end, and correlator subsystems are covered. A section is dedicated to the NASA. proof-of-concept demonstration. Finally, sections tm operational considerations, on risks and fallback options, and on the next steps complete the report.

Petrachenko, Bill↗