Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “nuclear security”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

2022 Agnew and Metropolis Postdoc Fellow Showcase Event Book

Agnew National Security Postdoc Fellows pursue cutting-edge experimental, theoretical, computational science, and engineering research aligned with the national security mission. Metropolis Postdoc Fellows pursue cutting-edge research in the areas of computational and computer science, physics, and engineering. Computer simulation capabilities are developed in support of the stockpile stewardship program together with broader national nuclear security needs. Fellows have access to some of the most powerful supercomputers in the world to perform pioneering research.

42 ENGINEERING↗

Multilayered Network Models for Security: Enhancing System Security Engineering with Orchestration

Security engineering approaches can often focus on a particular domain—physical security, cyber security, or personnel security, for example. Yet, security systems engineering consistently faces challenges requiring socio-technical solutions to address evolving and dynamic complexity. While some drivers of this complexity stem from complex risk environments, innovative adversaries, and disruptive technologies, other drivers are endogenous and emerge from the interactions across security engineering approaches. In response, INCOSE's Systems Security Working Group identified the need to better coordinate “disparate security solutions [that] operate independently” as one of eleven key concepts in their IS21 FuSE Security Roadmap. From this perspective, this need for “security orchestration” aligns with the perspective that security is a property that emerges from interactions within complex systems. Current efforts at Sandia National Laboratories are developing a systems security engineering approach that describes high consequence facility (HCF) security as a multidomain set of interacting layers. The result is a multilayered network (MLN)-based approach that captures the interactions between infrastructure, physical components, digital components, and humans in nuclear security systems. This article will summarize the MLN-based approach to HCF security and describe two preliminary results demonstrating potential benefits from incorporating interactions across disparate security solutions. Here, leveraging the logical structure of networks, this MLN model-based approach provides an example of how security orchestration provides enhanced systems security engineering solutions.

42 ENGINEERING↗

Massachusetts Institute of Technology Reactor LEU Fuel Element Flow Test Conceptual Design – Hydraulic Reactor Design Parameters

The Massachusetts Institute of Technology Reactor (MITR-II, also referred to as MITR) is one of six U.S. high performance research reactors (USHPRR), including one critical facility, that is actively collaborating with the U.S. National Nuclear Security Administration (NNSA) Material Management and Minimization (M 3 ) Reactor Conversion Program to convert to the use of low-enriched uranium (LEU, < 20 wt% 235 U) fuel. The MIT Nuclear Reactor Laboratory has been working with the USHPRR Reactor Conversion (RC) Pillar at Argonne National Laboratory to perform fuel element design and fuel cycle performance analyses, steady-state thermal hydraulics safety analyses, and accident safety analyses in preparation for the conversion of MITR and support a preliminary Safety Analysis Report (SAR) for conversion to LEU fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗

DOE Challenges and Opportunities Associated with Accountable Nuclear Material Needs for Development and Commercialization of Fusion Nuclear Energy

Fusion energy represents a transformative opportunity to deliver a safe, plentiful, and carbon-free source of reliable primary power. In recent years, fusion research and development have accelerated significantly, particularly within the US, driven by decades of foundational public investment. Notably, in 2024 the US Department of Energy (DOE) established a comprehensive Fusion Energy Strategy aimed at collaborating with industry partners to enable the deployment of fusion power plants and grid integration by the 2030s. This strategy is chiefly implemented through the DOE Office of Science (SC) Fusion Energy Sciences program. This project was initiated to identify potential approaches for the Office of Environment, Safety, and Health (NA-ESH-12) within DOE’s National Nuclear Security Administration to begin engagement with the fusion community on future accountable material needs. The goal of the project is to inform and influence the supply of and demand for accountable nuclear materials as fusion energy is developed and commercialized. NA-ESH-12 must proactively engage with the fusion community regarding the production and management of accountable nuclear materials. Given the complexity and scale of materials required for research, pilot projects, and eventual commercial reactors, early coordination is vital. The project’s objective is to provide insights that will shape the supply and demand landscape for critical nuclear materials, ensuring that DOE is prepared to effectively support fusion energy development and commercialization. In FY 2025, an initial limited review was conducted to identify the status of the fusion energy community’s progress toward full-scale energy production and the need for accountable nuclear material. This included communications with SC, NA-ESH-12, Savannah River National Laboratory, and Oak Ridge National Laboratory, and attending the Rutgers University–sponsored Supply Chain Workshop: Scaling the Fusion Industry and the International Atomic Energy Agency’s Ninth DEMO Programme Workshop. The review to date indicates that the amounts of tritium, lithium-6, and deuterium required by the fusion industry will be dependent on fuel type, breeding technology, blankets, and R&D improvements. One concern is that the commercial sector does not have a sufficient supply chain to meet the demand for development and commercialization for fusion energy production. The supply and demand estimates for these materials should be routinely reviewed as fusion technologies mature.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Strategic Analyses and Assessments Office Annual Report 2023

The past year has seen a significant increase in focus on strategic issues with the continued aggression by Russia, the rapid expansion of China’s military—particularly their nuclear capabilities, North Korea’s rapid improvements in intercontinental ballistic missile (ICBM) technology, and the increase in Iranian fuel enrichment. The U.S. continues to modernize Nuclear Command Control and Communication and all three legs of its nuclear Triad—Columbia-class submarines, Sentinel ICBMs, and B-21 bombers—for the Department of Defense (DOD). At the same time, the National Nuclear Security Administration (NNSA) is updating its stockpile, producing the B61-12, the new B61-13, the W88 Alteration, the W87-1—with new pits, and the W80-4. This rework of the nuclear enterprise represents the most aggressive expansion of our capabilities and infrastructure in the modern era. At the same time, the Strategic Posture Commission completed its report to Congress and reported that the current modernization program, although clearly necessary, is insufficient to meet the threats that are emerging.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Electrically Heated Testing of the Kilowatt Reactor Using Stirling TechnologY (KRUSTY) Experiment Using a Depleted Uranium Core

The Kilopower project aims to develop and demonstrate scalable fission-based power technology for systems capable of delivering 1 to 10 kW of electric power with a specific power ranging from 2.5 to 6.5 W/kg. This technology could enable high-power science missions or could be used to provide surface power for manned missions to the Moon or Mars. NASA has partnered with the U.S. Department of Energy's National Nuclear Security Administration, Los Alamos National Laboratory, Nevada National Security Site (NNSS), and Y−12 National Security Complex to develop and test a prototypic reactor and power system using existing facilities and infrastructure. This technology demonstration, referred to as the "Kilowatt Reactor Using Stirling TechnologY (KRUSTY)," will undergo nuclear ground testing by the end of calendar year (CY) 2017 at the NNSS. The 1-kWe variation of the Kilopower system was chosen for the KRUSTY demonstration. The concept for the 1-kWe flight system consists of a 4 kWt highly enriched uranium-molybdenum reactor operating at 800 degC coupled to sodium heat pipes. The heat pipes deliver heat to the hot ends of eight 125-W Stirling convertors producing a net electrical output of 1 kW. Waste heat is rejected using titanium-water heat pipes coupled to carbon composite radiator panels. The KRUSTY test, based on this design, uses a prototypic highly enriched uranium-molybdenum core coupled to prototypic sodium heat pipes. The heat pipes transfer heat to two Advanced Stirling Convertors (ASC−E2s) and six thermal simulators, which simulate the thermal draw of full-scale power conversion units. Thermal simulators and Stirling engines are gas cooled. The most recent project milestone was the completion of nonnuclear system-level testing using an electrically heated depleted uranium (DU) (nonfissioning) reactor core simulator at the NASA Glenn Research Center. System-level testing has validated performance predictions and has demonstrated system-level operation and control in a test configuration that replicates the one to be used at the Device Assembly Facility (DAF) at the NNSS. Fabrication, assembly, and testing of the DU core has allowed for higher fidelity system-level testing at Glenn, and has validated the fabrication methods to be used on the highly enriched uranium core that will supply heat for the DAF KRUSTY demonstration.

Briggs, Maxwell H.↗

Molybdenum-99 from Molten Salt Reactor as a Source of Technetium-99m for Nuclear Medicine: Past, Current, and Future of Molybdenum-99

Technitium-99m ( 99m Tc), a widely used radioisotope, is used in tens of millions of medical diagnostic procedures annually. However, it is hard to store and must be immediately used upon production due to its short half-life (i.e., 6 h); thus, it is currently produced from 99 Mo, which itself is a result of 235 U fission. The majority of 99 Mo supplies to U.S. patients are currently provided by foreign producers and produced using highly enriched uranium (HEU). In order to minimize the proliferation risks of HEU-based medical isotope production, the U.S. Department of Energy’s National Nuclear Security Administration has funded a program to accelerate the development of technologies to produce 99 Mo without the use of HEU. Today, the global supply of 99 Mo depends on a limited number of nuclear reactors, and production has been interrupted unexpectedly since 2009 due to the fleet’s advanced age. Herein, alternative options for 99 Mo production are discussed, and one potential option is to obtain 99m Tc from molten salt reactors (MSRs). A MSR is a nuclear fission reactor that can operate at or close to atmospheric pressure with liquid fuel, which allows for producing isotopes in a timely manner. In this paper, the past and current production of 99 Mo via nuclear reactors is described, and the future of 99 Mo production by MSRs is discussed. The behavior and chemical properties of molybdenum in fluoride salts in MSRs and the possible extraction methods are also examined in addition to the limitation of current studies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Comparison of Results from Recent NNSA and CEA Measurements of the 239 Pu(n, f) Prompt Fission Neutron Spectrum

The National Nuclear Security Administration (NNSA)/DP French Alternative Energies and Atomic Energy Commission (CEA)/DAM agreement on cooperation on fundamental science is a U.S.-French collaborative effort to combine intellectual and experimental resources and further the relevant nuclear science. Recently, both the NNSA and CEA experimental teams performed high-statistics measurements of the 239 Pu(n, f) prompt fission neutron spectrum (PFNS) at the Los Alamos Neutron Science Center, both of which were recently published in the journal Physical Review C. These separate measurements used the same experimental area and a common neutron detector array, but differ in many aspects, including background assessments, data acquisition systems and philosophies, fission detectors, and PFNS extraction techniques. Hence, some aspects of the experimental methods and associated uncertainties are highly correlated while others are independent. The results from both measurements broke new ground for PFNS measurements given their higher accuracy and more detailed study of corrections necessary for the measured quantity compared to existing literature measurements, and both will significantly impact PFNS nuclear data evaluations for the foreseeable future. Here, the focus of this work is to document a comparison of the results from these distinct measurements in terms of the acquired data, the PFNS results, and the measured average PFNS energies. While systematic differences between the PFNS results are present on the 1–3% level, the acquired data relative to each respective measurement at low incident neutron energies are in remarkable agreement, as are the conclusions regarding the magnitude and position of features in the PFNS relating to second-chance fission, third-chance fission, and pre-equilibrium neutron emission.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

INL Site ARG-US Implementation – FY22 Activities and FY23 Plans

The Packaging Certification and Life Cycle Management program at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US provides necessary data for nuclear facility and system operation and maintenance, and has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Irradiated Fuel Storage Facility in relation to the upcoming Department of Energy (DOE) Spent Nuclear Fuel (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in INL’s Nuclear Science and Technology (NS&T) directorate. This investigation is expected to recommend INL site processes or facilities in which to implement ARG-US systems. INL has engaged local site technical and oversight representatives, security, nuclear safeguards, and program management personnel to identify good candidates for ARG-US test implementations. INL has identified the following high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. As a result, INL suggests three program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “Tank Farm,” and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions for completing the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of INL Site Implementation of ARG-US

The Packaging Certification and Life Cycle Management department at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US is used to provide necessary data for nuclear facility and system operation and maintenance. ARG-US has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Wet & Dry Fuel Storage Facility in relation to the upcoming DOE Spent (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in the Nuclear Science and Technology Directorate. This investigation is expected to recommend processes or facilities at the INL site at which to implement ARG-US systems. INL has engaged local site technical and oversite representatives, security, nuclear safeguards, and program management to identify good candidates for ARG-US test implementations. INL has identified high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. To these ends, INL suggests 3 program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “tank farm”, and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions needed to complete the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Index of Classified Reports Collection now available Vital resource for Weapons researchers, today’s mission work

The collection is made up of classified technical reports containing weapons data dating back to the start of the nuclear security enterprise. The information is compiled into reports, slides, handbooks and literature. It originated from Los Alamos, Lawrence Livermore, and Sandia Labs, as well as from the Department of Defense and likely every other organization involved in nuclear testing, including contractors and those that are now defunct.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

LLNS Request for Permanent Variance from 10 CFR 851 for the Construction of Commercial Type Structures and Systems

Lawrence Livermore National Security, LLC (LLNS) requests variance from10 CFR 851 (the Rule) for the construction of commercial type structures and systems. The request is based upon successful application of similar variances granted to LLNS in continued support of the National Nuclear Security Administration (NNSA) initiative to streamline the delivery of commercial type line-item construction projects under $50 million. This request is aligned with the approved NA-50 safety approach.

99 GENERAL AND MISCELLANEOUS↗

Closure Report for the Project Shoal Area: Subsurface Corrective Action Unit 447 Shoal,Nevada, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has prepared this Closure Report for subsurface Corrective Action Unit (CAU) 447 at the Shoal, Nevada, Site, which was formerly called the Project Shoal Area. The Shoal site was the location of an underground nuclear test in 1963 that resulted in residual radionuclide contamination at the detonation depth of 1211 feet (ft) (DOE 2015a). The environmental restoration process and Corrective Action strategy are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) statues and regulations. Responsibility for the environmental site restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The Shoal site is south of U.S. Highway 50, approximately 30 miles southeast of Fallon, in Churchill County, Nevada (Figure 1). The site was selected for underground nuclear testing in 1961, as part of the Vela Uniform Program. Vela was a research and development program directed toward locating, detecting, and identifying underground and high-altitude nuclear detonations. The Vela Uniform program was specific to underground detonations (AEC 1964). The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States’ ability to detect, identify, and locate underground nuclear detonations. The underground nuclear test at Shoal was a joint effort between the U.S. Department of Defense (DOD) and the U.S. Atomic Energy Commission (AEC), which was the predecessor agency to DOE. Figure 1 is a map showing the site location.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

LLNS Request for Permanent Variance from 10 CFR 851 for Construction

Lawrence Livermore National Security, LLC (LLNS) requests variance from 10 CFR 851 (the Rule) for construction work at Lawrence Livermore National Laboratory (LLNL). The request is based upon successful application of similar variances granted to LLNS in continued support of the National Nuclear Security Administration (NNSA) initiative to streamline the delivery of line-item construction projects under $50 million. This request is aligned with the approved NA 50 safety approach. Experience gained in the construction of the new LLNL Emergency Operations Center (EOC) under the variance granted in June 2020 and construction preparations to date on the Digital Infrastructure Capabilities Expansion (DICE) under the variance granted April 2022 is very encouraging. There are strong indicators that a benefit has been realized by both the subcontractors executing the work and the Laboratory. The variance has permitted local/regional construction businesses contracted to Management & Operation Contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851. This variance application was prepared according to the requirements in 10 CFR 851, Subpart D – Variances, § 851.31 Variance Process. This request is limited to subcontractor executed construction at LLNL.

42 ENGINEERING↗