Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Hydrocarbon-Seeded Ignition System for Small Spacecraft Thrusters Using Ionic Liquid Propellants

"Green" propellants based on Ionic-liquids (ILs) like Ammonium DiNitramide and Hydroxyl Ammonium Nitrate have recently been developed as reduced-hazard replacements for hydrazine. Compared to hydrazine, ILs offer up to a 50% improvement in available density-specific impulse. These materials present minimal vapor hazard at room temperature, and this property makes IL's potentially advantageous for "ride-share" launch opportunities where hazards introduced by hydrazine servicing are cost-prohibitive. Even though ILs present a reduced hazard compared to hydrazine, in crystalline form they are potentially explosive and are mixed in aqueous solutions to buffer against explosion. Unfortunately, the high water content makes IL-propellants difficult to ignite and currently a reliable "coldstart" capability does not exist. For reliable ignition, IL-propellants catalyst beds must be pre-heated to greater than 350 C before firing. The required preheat power source is substantial and presents a significant disadvantage for SmallSats where power budgets are extremely limited. Design and development of a "micro-hybrid" igniter designed to act as a "drop-in" replacement for existing IL catalyst beds is presented. The design requires significantly lower input energy and offers a smaller overall form factor. Unlike single-use "squib" pyrotechnic igniters, the system allows the gas generation cycle to be terminated and reinitiated on demand.

Whitmore, Stephen A.↗

Laser Communications Relay Demonstration (LCRD) Update and the Path Towards Optical Relay Operations

This paper provides a concept for an evolution of NASA's optical communications near Earth relay architecture. NASA's Laser Communications Relay Demonstration (LCRD), a joint project between NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory - California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). LCRD will provide a minimum of two years of high data rate optical communications service experiments in geosynchronous orbit (GEO), following launch in 2019. This paper will provide an update of the LCRD mission status and planned capabilities and experiments, followed by a discussion of the path from LCRD to operational network capabilities.

Space Communications↗

Laser Communications Relay Demonstration (LCRD) Update and the Path Towards Optical Relay Operations

This Presentation provides a concept for an evolution of NASAs optical communications near Earth relay architecture. NASA's Laser Communications Relay Demonstration (LCRD), a joint project between NASAs Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory - California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). LCRD will provide a minimum of two years of high data rate optical communications service experiments in geosynchronous orbit (GEO), following launch in 2019. This paper will provide an update of the LCRD mission status and planned capabilities and experiments, followed by a discussion of the path from LCRD to operational network capabilities.

Space Communications↗

LCRD Update and Path to Optical Relay Operations

Speaker and Presenter at the Lincoln Laboratory Communications Workshop on May 23, 2017 at the Massachusetts Institute of Technology Lincoln Laboratory in Lexington, MA. This presentation discusses a concept for an evolution of NASAs optical communications near-Earth relay architecture. NASA's Laser Communications Relay Demonstration (LCRD) is a joint project between NASAs Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). LCRD will provide a minimum of two years of high data rate optical communications service experiments in geosynchronous orbit (GEO) following launch in 2019. This presentation will provide an update of the LCRD mission status and planned capabilities and experiments, followed by a discussion of the path from LCRD to operational network capabilities.

Space Communications↗

We Just Want to Pump…You Up! Forecasting Grid-Connected Heat Pump Water Heater Energy Savings and Load Shifting Potential for the Southeast U.S.

Heat pump water heaters (HPWH) can achieve energy savings of 60-70% compared to conventional electric-resistance water heaters. However, even with a favorable simple payback period within the typical product lifetime, HPWHs make up only 1% of all electric water heaters sold in the residential sector. Market adoption is challenged, in part, by the lack of effective energy efficiency programs in the U.S. region with the greatest amount of residential electric water heaters. The recent integration of connected functionality into HPWHs offers the capability to shift load without undue negative impact on customers. This capability can provide value to utilities with peak load constraints, motivating them to promote HPWHs for the first time. This paper will present a methodology to forecast connected HPWH energy use and extrapolate load shifting potential for the Southeast U.S. region. The methodology leverages data from a robust connected HPWH field study conducted in the Pacific Northwest. A coefficient of performance (COP) relationship for HPWHs was developed using ambient and inlet water temperature data to forecast HPWH performance on a month-by-month basis. Using the forecasted COP, HPWH operating hours were calculated for meeting load, which serve as the proxy to extrapolate load shifting potential from the Pacific Northwest to the Southeast. As a use case, analytical results are presented for a specific utility. This methodology, in combination with market analysis, facilitates the development of customized energy savings and load shifting forecasts to understand the potential impacts of launching connected HPWH programs in specific utility service territories.

heat pump water heater, energy savings, load shift↗

Improving AIRS NRT Imagery for the Enhancement of Visualization Services in LANCE

The NASA Goddard Earth Sciences Data and Information Services Center (GES DISC) has been the home of processing, archiving, and distribution services for data from the Atmospheric Infrared Sounder (AIRS) mission since its launch in 2002. AIRS provides data enabling global observations of the atmospheric state. The GES DISC provides service to both AIRS standard products and Near Real-time (NRT) products. The AIRS NRT product is one important element in the Land, Atmosphere Near real-time Capability for EOS (LANCE). The LANCE processing of the AIRS NRT product and the generation of the imagery are performed at the GES DISC. The AIRS NRT imagery are generated by mosaicking and mapping the available AIRS 6-minute retrieval granules to a global cylindrical projection. The images are constantly refreshed when new granules are produced. The AIRS NRT Viewer and LANCE Worldview provide visualization services to online users for AIRS NRT imagery. The imagery include atmospheric temperature, humidity, precipitation, Dust Score, CO, and SO2. The AIRS Applications Development Team at NASA JPL developed a new orbit-based algorithm and software to improve the AIRS NRT imagery. The GES DISC is collaborating with the AIRS Applications Development Team for the implementation of the new algorithm and software. The improvements include image quality, new color palettes, and variable changes. In this presentation, we will detail the improvements and demonstrate visualization of the new imagery.

Ding, Feng↗

Artemis I Trajectory Design and Optimization

This paper presents the overall trajectory design and optimization process for NASA’s Artemis I mission to send an uncrewed Orion vehicle to a lunar Distant Retrograde Orbit (DRO). The on-orbit trajectory begins at the Space Launch System (SLS) core separation and ends at the Orion service module Earth Entry Interface (EI) point. The details of the trajectory optimization process are presented, including design of nominal and extended mission options, launch windows, and abort options. Novel design techniques are also discussed to account for contingencies, such as using auxiliary thrusters to protect against main engine failure and applying trajectory shaping to mitigate or reduce eclipse durations.

Artemis I↗

Launch Vehicle Flight Report - Nasa Project Apollo Little Joe 2 Qualification Test Vehicle 12-50-1

The Little Joe II Qualification Test Vehicle, Model 12-50-1, was launched from Army Launch Area 3 {ALA-3) at White Sands Missile Range, New Mexico, on 28 August 1963. This was the first launch of this class of boosters. The Little Joe II Launch Vehicle was designed as a test vehicle for boosting payloads into flight. For the Apollo Program, its mission is to serve as a launch vehicle for flight testing of the Apollo spacecraft. Accomplishment of this mission requires that the vehicle be capable of boosting the Apollo payload to parameters ranging from high dynamic pressures at low altitude to very high altitude flight. The fixed-fin 12-50 version was designed to accomplish the low-altitude parameter. The 12-51 version incorporates an attitude control system to accomplish the high altitude mission. This launch was designed to demonstrate the Little Joe II capability of meeting the high dynamic pressure parameter for the Apollo Program. For this test, a boiler-plate version of the Apollo capsule, service module and escape tower were attached to the launch vehicle to simulate weight, center of gravity and aerodynamic shape of the Apollo configuration. No attempt was made to separate the payload in flight. The test was conducted in compliance with Project Apollo Flight Mission Directive for QTV-1, NASA-MSC, dated 3 June 1963, under authority of NASA Contract NAS 9-492,

Source record↗

Design and simulation of EVA tools and robot end effectors for servicing missions of the HST

The Hubble Space Telescope (HST) was launched into near-earth orbit by the Space Shuttle Discovery on April 24, 1990. The payload of two cameras, two spectrographs, and a high-speed photometer is supplemented by three fine-guidance sensors that can be used for astronomy as well as for star tracking. A widely reported spherical aberration in the primary mirror causes HST to produce images of much lower quality than intended. A Space Shuttle repair mission in January 1994 installed small corrective mirrors that restored the full intended optical capability of the HST. A Second Servicing Mission (SM2) scheduled in 1997 will involve considerable Extra Vehicular Activity (EVA). To reduce EVA time, the addition of robotic capability in the remaining servicing missions has been proposed. Toward that end, two concept designs for a general purpose end effector for robots are presented in this report.

Naik, Dipak↗

The Effect of Predicted Vehicle Displacement on Ground Crew Task Performance and Hardware Design

NASA continues to explore new launch vehicle concepts that will carry astronauts to low- Earth orbit to replace the soon-to-be retired Space Transportation System (STS) shuttle. A tall vertically stacked launch vehicle (> or =300 ft) is exposed to the natural environment while positioned on the launch pad. Varying directional winds and vortex shedding cause the vehicle to sway in an oscillating motion. Ground crews working high on the tower and inside the vehicle during launch preparations will be subjected to this motion while conducting critical closeout tasks such as mating fluid and electrical connectors and carrying heavy objects. NASA has not experienced performing these tasks in such environments since the Saturn V, which was serviced from a movable (but rigid) service structure; commercial launchers are likewise attended by a service structure that moves away from the vehicle for launch. There is concern that vehicle displacement may hinder ground crew operations, impact the ground system designs, and ultimately affect launch availability. The vehicle sway assessment objective is to replicate predicted frequencies and displacements of these tall vehicles, examine typical ground crew tasks, and provide insight into potential vehicle design considerations and ground crew performance guidelines. This paper outlines the methodology, configurations, and motion testing performed while conducting the vehicle displacement assessment that will be used as a Technical Memorandum for future vertically stacked vehicle designs.

Atencio, Laura Ashley↗

Vandenberg Air Force Base Upper Level Wind Launch Weather Constraints

The 30th Operational Support Squadron Weather Flight (30 OSSWF) provides comprehensive weather services to the space program at Vandenberg Air Force Base (VAFB) in California. One of their responsibilities is to monitor upper-level winds to ensure safe launch operations of the Minuteman III ballistic missile. The 30 OSSWF tasked the Applied Meteorology Unit (AMU) to analyze VAFB sounding data with the goal of determining the probability of violating (PoV) their upper-level thresholds for wind speed and shear constraints specific to this launch vehicle, and to develop a tool that will calculate the PoV of each constraint on the day of launch. In order to calculate the probability of exceeding each constraint, the AMU collected and analyzed historical data from VAFB. The historical sounding data were retrieved from the National Oceanic and Atmospheric Administration Earth System Research Laboratory archive for the years 1994-2011 and then stratified into four sub-seasons: January-March, April-June, July-September, and October-December. The maximum wind speed and 1000-ft shear values for each sounding in each subseason were determined. To accurately calculate the PoV, the AMU determined the theoretical distributions that best fit the maximum wind speed and maximum shear datasets. Ultimately it was discovered that the maximum wind speeds follow a Gaussian distribution while the maximum shear values follow a lognormal distribution. These results were applied when calculating the averages and standard deviations needed for the historical and real-time PoV calculations. In addition to the requirements outlined in the original task plan, the AMU also included forecast sounding data from the Rapid Refresh model. This information provides further insight for the launch weather officers (LWOs) when determining if a wind constraint violation will occur over the next few hours on day of launch. The interactive graphical user interface (GUI) for this project was developed in Microsoft Excel using Visual Basic for Applications. The GUI displays the critical sounding data easily and quickly for the LWOs on day of launch. This tool will replace the existing one used by the 30 OSSWF, assist the LWOs in determining the probability of exceeding specific wind threshold values, and help to improve the overall upper winds forecast for the launch customer.

Shafer, Jaclyn A.↗

Eleven Countries, an Integrated Spacecraft: the Story of International Collaboration that Built the Orion Spacecraft and Powered the Success of the Artemis I Mission

The quest to return humans to the Moon in the next step towards humanity's exploration of space is more alive than ever. After a great deal of achievements, failures, and lessons learned, the Artemis I mission set o to the Moon on November 16, 2022, with the goal of testing a new rocket, the Space Launch System, and a new spacecraft, Orion: designed, assembled, and tested across two continents, and 11 countries. Behind this mission, decades of experience with the International Space Station, Autonomous Transfer Vehicle operations, and many other program collaborations built the know-how on how to succeed together in the toughest environment | deep space. The Artemis I mission proved to be an incredible success, meeting 161 total mission objectives, including 21 developed during the flight based on outperforming spacecraft. It was also a case-study in international collaboration, given that ESA, NASA, and industry partners Airbus and Lockheed Martin for the first time had to design, build, test, and fly a fully integrated human-rated spacecraft, with most critical functions dependent and interconnected across U.S. and European systems. The U.S.-built Orion Crew Module and Crew Module Adapter and European-built European Service Module (ESM) shared critical interfaces and commodities, from propulsion, avionics, active/passive thermal, electrical power generation, storage and distribution to the software that managed it all. In this paper, we will describe relevant aspects of the integrated spacecraft design, providing context for the challenges that the team faced in all phases required to get Orion ready to fly, and provide a direct account of how the joint team formed, trained, and supported the operations of the successful Artemis I mission. We will also explore the evolution of the partnerships, given that these allow a multi-national e ort to sustain the program production, share costs, leverage a broader base of engineering expertise, and build more diverse capabilities over the long haul to support the Artemis goals and objectives. Lastly, we will cover critical lessons learned and how the Orion Program has implemented these in preparation of the next Artemis missions to repeat the success of Artemis I. The purpose of this paper is to document knowledge we gained and lessons we learned through the development of an integrated Orion spacecraft, since it is imperative we build on this now, at the dawn of the Artemis Program, an international endeavor to push human space exploration.

Deep Space Exploration↗

Solid Propulsion Systems, Subsystems, and Components Service Life Extension

The service life extension of solid propulsion systems, subsystems, and components will be discussed based on the service life extension of the Space Transportation System Reusable Solid Rocket Motor (RSRM) and Booster Separation Motors (BSM). The RSRM is certified for an age life of five years. In the aftermath of the Columbia accident there were a number of motors that were approaching the end of their five year service life certification. The RSRM Project initiated an assessment to determine if the service life of these motors could be extended. With the advent of the Constellation Program, a flight test was proposed that would utilize one of the RSRMs which had been returned from the launch site due to the expiration of its five year service life certification and twelve surplus Chemical Systems Division BSMs which had exceeded their eight year service life. The RSRM age life tracking philosophy which establishes when the clock starts for age life tracking will be described. The role of the following activities in service life extension will be discussed: subscale testing, accelerated aging, dissecting full scale aged hardware, static testing full scale aged motors, data mining industry data, and using the fleet leader approach. The service life certification and extension of the BSMs will also be presented.

Hundley, Nedra H.↗

ASTRID sodium cooled fast reactor: Program for improving in service inspection and repair

In the frame of the CEA, EDF, AREVA coordinated research program for the development of Generation IV sodium-cooled fast reactors (SFR), the ASTRID project was launched in 2010. For the future prototype, the improvement of in-service inspection and repair (ISI and R) capabilities was identified as a major issue. Following the pluri-annual SFR research program, the ISI and R main R and D axes remain: i) improvement of the primary system conceptual design, ii) development of measurement and inspection techniques (continuous monitoring instrumentation and periodic inspection tools), iii) accessibility and associated robotics, and iv) development and validation of repair processes. Associated ISI and R needs are being defined through an iterative method between designers and instrumentation specialists: adaptation of the Design to ISI and R requirements, fission chamber development, validation of the ultrasonic and chemical transducers, of ultrasonic non destructive simulation, of acoustic surveillance, of laser repair intervention processes, of connected robotic equipment. Moreover, CEA, as leader of the ASTRID Project, is willing to find new contributors, partners or suppliers, in order to get innovative, diversified, exhaustive and efficient solutions. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evolution of the Florida Launch Site Architecture: Embracing Multiple Customers, Enhancing Launch Opportunities

The impending conclusion of the Space Shuttle Program and the Constellation Program cancellation unveiled in the FY2011 President's budget created a large void for human spaceflight capability and specifically launch activity from the Florida launch Site (FlS). This void created an opportunity to re-architect the launch site to be more accommodating to the future NASA heavy lift and commercial space industry. The goal is to evolve the heritage capabilities into a more affordable and flexible launch complex. This case study will discuss the FlS architecture evolution from the trade studies to select primary launch site locations for future customers, to improving infrastructure; promoting environmental remediation/compliance; improving offline processing, manufacturing, & recovery; developing range interface and control services with the US Air Force, and developing modernization efforts for the launch Pad, Vehicle Assembly Building, Mobile launcher, and supporting infrastructure. The architecture studies will steer how to best invest limited modernization funding from initiatives like the 21 st elSe and other potential funding.

Colloredo, Scott↗

STS-103 Crew Training

The Hubble Space Telescope (HST) team is preparing for NASA's third scheduled service call to Hubble. This mission, STS-103, will launch from Kennedy Space Center aboard the Space Shuttle Discovery. The seven flight crew members are Commander Curtis L. Brown, Pilot Scott J. Kelly, European Space Agency (ESA) astronaut Jean-Francois Clervoy who will join space walkers Steven L. Smith, C. Michael Foale, John M. Grunsfeld, and ESA astronaut Claude Nicollier. The objectives of the HST Third Servicing Mission (SM3A) are to replace the telescope's six gyroscopes, a Fine-Guidance Sensor, an S-Band Single Access Transmitter, a spare solid-state recorder and a high-voltage/temperature kit for protecting the batteries from overheating. In addition, the crew plans to install an advanced computer that is 20 times faster and has six times the memory of the current Hubble Space Telescope computer. To prepare for these extravehicular activities (EVAs), the SM3A astronauts participated in Crew Familiarization sessions with the actual SM3A flight hardware. During these sessions the crew spent long hours rehearsing their space walks in the Guidance Navigation Simulator and NBL (Neutral Buoyancy Laboratory). Using space gloves, flight Space Support Equipment (SSE), and Crew Aids and Tools (CATs), the astronauts trained with and verified flight orbital replacement unit (ORU) hardware. The crew worked with a number of trainers and simulators, such as the High Fidelity Mechanical Simulator, Guidance Navigation Simulator, System Engineering Simulator, the Aft Shroud Door Trainer, the Forward Shell/Light Shield Simulator, and the Support Systems Module Bay Doors Simulator. They also trained and verified the flight Orbital Replacement Unit Carrier (ORUC) and its ancillary hardware. Discovery's planned 10-day flight is scheduled to end with a night landing at Kennedy.

Source record↗

Virtualizing Resources for the Application Services and Framework Team

Virtualization is an emerging technology that will undoubtedly have a major impact on the future of Information Technology. It allows for the centralization of resources in an enterprise system without the need to make any changes to the host operating system, file system, or registry. In turn, this significantly reduces cost and administration, and provides a much greater level of security, compatibility, and efficiency. This experiment examined the practicality, methodology, challenges, and benefits of implementing the technology for the Launch Control System (LCS), and more specifically the Application Services (AS) group of the National Aeronautics and Space Administration (NASA) at the Kennedy Space Center (KSC). In order to carry out this experiment, I used several tools from the virtualization company known as VMWare; these programs included VMWare ThinApp, VMWare Workstation, and VMWare ACE. Used in conjunction, these utilities provided the engine necessary to virtualize and deploy applications in a desktop environment on any Windows platform available. The results clearly show that virtualization is a viable technology that can, when implemented properly, dramatically cut costs, enhance stability and security, and provide easier management for administrators.

Varner, Justin T.↗

Construction bidding cost of KSC's space shuttle facilities

The bidding cost of the major Space Transportation System facilities constructed under the responsibility of the John F. Kennedy Space Center (KSC) is described and listed. These facilities and Ground Support Equipment (GSE) are necessary for the receiving, assembly, testing, and checkout of the Space Shuttle for launch and landing missions at KSC. The Shuttle launch configuration consists of the Orbiter, the External Tank, and the Solid Rocket Boosters (SRB). The reusable Orbiter and SRB's is the major factor in the program that will result in lowering space travel costs. The new facilities are the Landing Facility; Orbiter Processing Facility; Orbiter Approach and Landing Test Facility (Dryden Test Center, California); Orbiter Mating Devices; Sound Suppression Water System; and Emergency Power System for LC-39. Also, a major factor was to use as much Apollo facilities and hardware as possible to reduce the facilities cost. The alterations to existing Apollo facilities are the VAB modifications; Mobile Launcher Platforms; Launch Complex 39 Pads A and B (which includes a new concept - the Rotary Service Structure), which was featured in ENR, 3 Feb. 1977, 'Hinged Space Truss will Support Shuttle Cargo Room'; Launch Control Center mods; External Tank and SRB Processing and Storage; Fluid Test Complex mods; O&C Spacelab mods; Shuttle mods for Parachute Facility; SRB Recovery and Disassembly Facility at Hangar 'AF'; and an interesting GSE item - the SRB Dewatering Nozzle Plug Sets (Remote Controlled Submarine System) used to inspect and acquire for reuse of SRB's.

Brown, Joseph Andrew↗