Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

TLRS-3 system upgrades

This presentation describes the upgrades to the Transportable Laser Ranging Systems serial number three (TLRS-3), and the impact that these upgrades will have on the TLRS-3 performance in the field. The four major areas of system upgrades are the HP-380 computer, the Optical Attenuation Mechanism (OAM), the upgraded spatial, spectral and temporal filtering for improved daylight ranging capability, and the software upgrade to enable the system to track the Etalon satellites. The TLRS-3 was returned to the Goddard Geophysical and Astronomical Observatory (GGAO) in December 1991 for system upgrades in preparation of the TOPEX/POSEIDON campaign scheduled to begin in the summer of 1992. Many system upgrades were incorporated into the system while interleaving planned facility maintenance making TLRS-3 a more versatile and more dependable laser ranging system. The TLRS-3 was initially baselined with the MOBLAS-7 via simultaneous satellite ranging on the LAGEOS, Ajisai, Starlette, and ERS-I satellites. During the upgrades and following completion of the system upgrades intercomparisons with the MOBLAS-7 were made to verify the integrity and accuracy of the system changes. Several other groups of personnel participated in the TLRS-3 upgrade and they are: the Survey Section, the Precision Measurement Equipment Laboratory, the Architectural and Engineering Services Department, the Precision Timing Section, and the station personnel at TLRS-3 and MOBLAS-7.

Eichinger, Richard↗

Autonomous Rovers for Mars Exploration

Rovers will play a critical role in the exploration of Mars. Near-term mission plans call for long traverses over unknown terrain, robust navigation and instrument placement, and reliable operations for extended periods of time. Longer-term missions may visit multiple science sites in a single day and perform opportunistic science data collection, as well as complex scouting, construction, and maintenance tasks in preparation for an eventual human presence. The Pathfinder mission demonstrated the potential for robotic Mars exploration but at the same time indicated the need for more rover autonomy. The highly ground-intensive control with infrequent communication and high latency limited the effectiveness of the Sojourner rover. When failures occurred, Sojourner often sat idle for extended periods of time, awaiting further commands from earth. In future missions, the tasks will be more complex and extended; hence there will be even more situations where things do not go exactly as planned. Significant advances in rover autonomy are needed to cope with increasing task complexity and greater execution uncertainty. Towards this end, we have designed an on-board executive architecture that incorporates robust operation, resource utilization, and failure recovery. In addition, we have designed ground tools to produce and refine contingent schedules that take advantage of the on-board architecture's flexible execution characteristics. Together, the on-board executive and the ground tools constitute an integrated rover autonomy architecture. This work draws from our experience with the Deep Space One autonomy experiment, with enhancements to ensure robust operation in the face of the unpredictable, complex environment that the rover will encounter on Mars. The rover autonomy architecture is currently being developed and deployed on the Marsokhod rover platform at NASA Ames Research Center. The capabilities of the rover autonomy architecture to support autonomous operations will be demonstrated concretely in upcoming field tests.

Anderson, Corin↗

Development of a Test Article to Demonstrate the Long Duration Storage of Liquid Hydrogen via a Two-Stage Active Cooling Approach

A NASA team is developing a test article for the purpose of demonstrating the long duration storage of liquid hydrogen utilizing passive Cryogenic Fluid Management and cryocoolers via a two-stage active cooling approach. Funded by NASA’s Technology Demonstration Mission Program and managed by the Cryogenic Fluid Management Portfolio Project, the team is leveraging demonstrations conducted under pervious NASA activities to develop a fully integrated test article that will demonstrate the zero boil-off storage of liquid hydrogen. This paper discusses the previous activities being leveraged from NASA’s Cryogenic Propellant Storage and Transfer project, the test article design and build, hardware and instrumentation selections, control methodology, and the planned primary and secondary test objectives. The test article assembly and demonstration are both to be conducted in the East Test Area at NASA Marshall Space Flight Center and are currently scheduled for Fiscal Year 2024.

Active Cooling↗

Stochastic simulation of occupant-driven energy use in a bottom-up residential building stock model

The residential buildings sector is one of the largest electricity consumers worldwide and contributes disproportionally to peak electricity demand in many regions. Strongly driven by occupant activities, household energy consumption is stochastic and heterogeneous in nature. However, most residential energy models applied by industry use homogeneous, deterministic activity schedules, which work well for predictions of annual energy consumption, but can result in unrealistic hourly or sub-hourly electric load profiles, with exaggerated or muted peaks. The increasing proportion of variable renewable energy generators means that representing the heterogeneity and stochasticity of occupant behavior is now crucial for reliable planning at both bulk-power and distribution-system scales. This work presents a novel and open-source occupancy simulation approach that can simulate a diverse set of individual occupant and household event schedules for all major electricity, fuel, and hot water end uses. To accomplish this, we evaluated three alternative occupant activity simulation approaches before selecting a hybrid combining time-inhomogeneous Markov chains and probability-sampling of event durations and magnitudes. Further, we integrated the stochastic occupancy simulation with an open-source bottom-up physics-simulation building stock model and published a set of 550,000 diverse household end-use activity schedules representing a national housing stock. The simulator was verified against time-use survey data, and simulation results were validated against measured end-use electricity data for accuracy and reliability. While we use data for the United States, our application demonstrates how similar approaches could be applied using the time-use survey data collected in many countries around the world.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Platform Management System Scheduling

The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

Hull, Larry G.↗

Crew-Centered Operations: What HAL 9000 Should Have Been

To date, manned space flight has maintained the locus of control for the mission on the ground. Mission control performs tasks such as activity planning, system health management, resource allocation, and astronaut health monitoring. Future exploration missions require the locus of control to shift to on-board due light speed constraints and potential loss of communication. The lunar campaign must begin to utilize a shared control approach to validate and understand the limitations of the technology allowing astronauts to oversee and direct aspects of operation that require timely decision making. Crew-centered Operations require a system-level approach that integrates multiple technologies together to allow a crew-prime concept of operations. This paper will provide an overview of the driving mission requirements, highlighting the limitations of existing approaches to mission operations and identifying the critical technologies necessary to enable a crew-centered mode of operations. The paper will focus on the requirements, trade spaces, and concepts for fulfillment of this capability. The paper will provide a broad overview of relevant technologies including: Activity Planning and Scheduling; System Monitoring; Repair and Recovery; Crew Work Practices.

Korsmeyer, David J.↗

Electric power system test and verification program

Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.

Rylicki, Daniel S.↗

Estimating Energy Market Schedules using Historical Price Data

The global climate crisis is expected to reshape the energy generation landscape in the coming decades. Increasing integration of non-dispatchable renewable energy resources into energy infrastructures and markets creates uncertainty as well as new opportunities for flexible energy systems. To conduct proper economic evaluation of flexible energy systems, such as integrated energy systems (IES), advancements in modelling of market interactions, such as bidding, is crucial. This work presents a shortcut algorithm which uses two mixed integer linear programs to compute dispatch schedules (e.g., hourly power production targets) that are constrained by the resource's bid information and characteristics (e.g., minimum up and down times) based on historical locational marginal price (LMP) data. The proposed algorithm is approximately 100 times faster and uses orders of magnitude less data than a full production cost model (PCM). We find the shortcut simulator recapitulates generator dispatch signals for the Prescient PCM with approximately 4% error for the RTS-GMLC test system.

electricity generation↗

QuikSCAT Mission

The QuikSCAT Mission of the National Aeronautics and Space Administration (NASA) is planned for launch in Spring 1999, reducing the data gap in ocean-wind vector created by the loss of the NASA Scatterometer (NSCAT) on the Japanese Advanced Earth Observing Satellite (ADEOS) spacecraft. The NSCAT instrument ceased functioning when ADEOS failed on June 30, 1997. The follow-on scatterometer for monitoring ocean winds, called SeaWinds, is scheduled for launch on the Japanese ADEOS-II spacecraft in 2000. The Jet Propulsion Laboratory (JPL) has met the challenge to develop and integrate the instrument, ground system, and launch vehicle in less than a year. QuikSCAT will use pencil-beam-antennas in a conical-scan design which is more compact than the fixed fan-beam design of NSCAT. The antenna will radiate ku-band microwaves at 40 and 46 incident angle and measure the backscatter power across a continuous 1800 km swath. QuikSCAT is capable of providing wind-speed and wind-direction at 25 km resolution over 92 percent of the Earth's ice-free oceans every day, under both clear and cloudy conditions. Standard data products will be delivered to science users within 14-days, and fast data products will be available to operational users within two hours of data acquisition. QuikSCAT will be managed by JPL for the NASA's Office of Earth Science Enterprise. It will be launched from Vandenberg Air Force Base, aboard a Titan II vehicle. The satellite core-systems was built by Ball Aerospace Systems Division, Boulder, CO. The operation of QuikSCAT is expected to overlap with ERS-2 and SeaWinds. Spaceborne scatterometers have demonstrated a broad spectrum of scientific applications, including weather systems, wind-driven ocean circulation, land vegetation, polar ice morphology and dynamics, and Ocean-atmosphere-ice interaction.

Liu, W. Timothy↗

Mission Operations of the Mars Exploration Rovers

A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.

Bass, Deborah↗

Estimating Energy Market Schedules Using Historical Price Data: Preprint

The global climate crisis is expected to reshape the energy generation landscape in the coming decades. Increasing integration of non-dispatchable renewable energy resources into energy infrastructures and markets increases uncertainty and creates new opportunities for flexible energy systems. To conduct proper economic evaluation of flexible energy systems, such as integrated energy systems (IES), advancements in modelling of market interactions, such as bidding, is crucial. This work presents a shortcut algorithm which uses two mixed integer linear programs to compute dispatch schedules (e.g., hourly power production targets) that are constrained by the resource's bid information and characteristics (e.g., minimum up and down times) based on historical locational marginal price (LMP) data. This is orders of magnitude less data than required for a market clearing calculation with a full production cost model (PCM). We find the shortcut simulator recapitulates generator dispatch signals for the Prescient PCM with approximately 4% error for the RTS-GMLC test system.

electricity generation↗

Planning for the semiconductor manufacturer of the future

Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

Fargher, Hugh E.↗

A development of logistics management models for the Space Transportation System

A new analytic queueing approach was described which relates stockage levels, repair level decisions, and the project network schedule of prelaunch operations directly to the probability distribution of the space transportation system launch delay. Finite source population and limited repair capability were additional factors included in this logistics management model developed specifically for STS maintenance requirements. Data presently available to support logistics decisions were based on a comparability study of heavy aircraft components. A two-phase program is recommended by which NASA would implement an integrated data collection system, assemble logistics data from previous STS flights, revise extant logistics planning and resource requirement parameters using Bayes-Lin techniques, and adjust for uncertainty surrounding logistics systems performance parameters. The implementation of these recommendations can be expected to deliver more cost-effective logistics support.

Carrillo, M. J.↗

Strategic and Tactical Functions in an Autonomous Air Traffic Management System

This paper evaluates, by means of fast-time simulation, performance of a candidate system for autonomous air traffic management. Advancing towards autonomy in air traffic management may be necessary in order for new air vehicle types such as electric Vertical Take Off and Landing (eVTOL) to operate safely and efficiently in airspace shared with conventional traffic. To account for uncertain prediction, autonomous air traffic management was divided into two integrated and coordinated subsystems: strategic scheduling, performed at predeparture, and tactical conflict detection and resolution, performed throughout the flight. The conflict detection and resolution subsystem contained a second tactical scheduling function that applied to flights operating in the airspace near the destination airport. This paper compares and contrasts the two subsystems and uses fast-time simulation to demonstrate the comparisons. A scenario of 54 flights inbound to Newark Liberty International Airport was simulated multiple times with different parameters. The scenario was created using flight plans recorded from the National Airspace System on a low weather, average traffic day in April 2018. Whereas the routes were not changed, the departure times of the flights were modified to increase arrival rates at the Newark runway and arrival meter fixes. Results of the simulations showed that the autonomous air traffic management system was able to safely manage the traffic, even with prediction uncertainty. In addition, they showed the importance of including flight holding maneuvers, in addition to path stretching, in conflict detection and resolution and of coordinating strategic and tactical scheduling. Finally, a tradeoff between absorbing the delay calculated by strategic scheduling on the ground versus in the air showed that taking most of the delay on the ground is cost effective for a simple idealized cost function. However, taking a little of the delay in the air prevented throughput on the runway from dropping for short periods due to trajectory prediction uncertainty.

air traffic control↗

Strategic and Tactical Functions in an Autonomous Air Traffic Management System

This paper evaluates, by means of fast-time simulation, performance of a candidate system for autonomous air traffic management. Advancing towards autonomy in air traffic management may be necessary in order for new air vehicle types such as electric Vertical Take Off and Landing (eVTOL) to operate safely and efficiently in airspace shared with conventional traffic. To account for uncertain prediction, autonomous air traffic management was divided into two integrated and coordinated subsystems: strategic scheduling, performed at predeparture, and tactical conflict detection and resolution, performed throughout the flight. The conflict detection and resolution subsystem contained a second tactical scheduling function that applied to flights operating in the airspace near the destination airport. This paper compares and contrasts the two subsystems and uses fast-time simulation to demonstrate the comparisons. A scenario of 54 flights inbound to Newark Liberty International Airport was simulated multiple times with different parameters. The scenario was created using flight plans recorded from the National Airspace System on a low weather, average traffic day in April 2018. Whereas the routes were not changed, the departure times of the flights were modified to increase arrival rates at the Newark runway and arrival meter fixes. Results of the simulations showed that the autonomous air traffic management system was able to safely manage the traffic, even with prediction uncertainty. In addition, they showed the importance of including flight holding maneuvers, in addition to path stretching, in conflict detection and resolution and of coordinating strategic and tactical scheduling. Finally, a tradeoff between absorbing the delay calculated by strategic scheduling on the ground versus in the air showed that taking most of the delay on the ground is cost effective for a simple idealized cost function. However, taking a little of the delay in the air prevented throughput on the runway from dropping for short periods due to trajectory prediction uncertainty.

air traffic control↗

Cryogenic Testing of the Thermal Vacuum Chamber and Ground Support Equipment for the James Webb Space Telescope in Chamber A at Johnson Space Center

The James Webb Space Telescope (JWST) is the largest cryogenic instrument telescope to be developed for space flight. The telescope will be passively cooled to 50 K and the instrument package will be at 40 K with the mid-infrared instrument at 6 K. The final cryogenic test of the Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) as an assembly (OTE + ISIM OTIS) will be performed in the largest 15 K chamber in the world, Chamber A at Johnson Space Center. The planned duration of this test will be 100 days in the middle of 2017. Needless to say, this ultimate test of OTIS, the cryogenic portion of JWST will be crucial in verifying the end-to-end performance of JWST. A repeat of this test would not only be expensive, but would delay the launch schedule (currently October 2018). Therefore a series of checkouts and verifications of the chamber and ground support equipment were planned and carried out between 2012 and 2016. This paper will provide a top-level summary of those tests, trades in coming up with the test plan, as well as some details of individual issues that were encountered and resolved in the course of testing.

thermal vacuum chamber↗

A Comparison of Machine Learning Methods for Frequency Nadir Estimation in Power Systems: Preprint

An increasing penetration level of inverter-based renewable energy resources changes the inertia of power systems, posing challenges for maintaining the desired system frequency stability. An accurate frequency nadir estimation is crucial for power system operators to prepare preventive actions against large frequency excursions. In this paper, five machine learning methods - linear regression, gradient boosting, support vector regression, an artificial neural network, and XGBoost - are applied to two different sets of preprocess data for the prediction of the frequency nadir in the Western Electricity Coordinating Council 240-bus system with high renewable penetration levels. The training and testing data sets are collected by extensive generation scheduling simulations on the Multi-timescale Integrated Dynamic and Scheduling (MIDAS) toolbox. Numerical results show that all five machine learning methods can achieve high performance accuracy for power system nadir frequency estimation. Among them, the gradient boosting and the XGBoost are clear winners by providing the best prediction accuracy.

data driven↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗