Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

407 records · Page 23

Concept report: Experimental vector magnetograph (EXVM) operational configuration balloon flight assembly

The observational limitations of earth bound solar studies has prompted a great deal of interest in recent months in being able to gain new scientific perspectives through, what should prove to be, relatively low cost flight of the magnetograph system. The ground work done by TBE for the solar balloon missions (originally planned for SOUP and GRID) as well as the rather advanced state of assembly of the EXVM has allowed the quick formulation of a mission concept for the 30 cm system currently being assembled. The flight system operational configuration will be discussed as it is proposed for short duration flight (on the order of one day) over the continental United States. Balloon hardware design requirements used in formulation of the concept are those set by the National Science Balloon Facility (NSBF), the support agency under NASA contract for flight services. The concept assumes that the flight hardware assembly would come together from three development sources: the scientific investigator package, the integration contractor package, and the NSBF support system. The majority of these three separate packages can be independently developed; however, the computer control interfaces and telemetry links would require extensive preplanning and coordination. A special section of this study deals with definition of a dedicated telemetry link to be provided by the integration contractor for video image data for pointing system performance verification. In this study the approach has been to capitalize to the maximum extent possible on existing hardware and system design. This is the most prudent step that can be taken to reduce eventual program cost for long duration flights. By fielding the existing EXVM as quickly as possible, experience could be gained from several short duration flight tests before it became necessary to commit to major upgrades for long duration flights of this system or of the larger 60 cm version being considered for eventual development.

Source record↗

Divertor leg filaments in NSTX-U

This study presents the first observation of divertor localized turbulence in the NSTX-Upgrade spherical tokamak. Previous work in NSTX discharges described fluctuations on the divertor target due to blobs generated on the low field side midplane. In the region that shows disconnection from upstream turbulence (private flux region and proximity of the strike point), divertor-localized fluctuations are observed via imaging of C III and D-α emission in diverted L-mode discharges and are characterized in this paper. Field-aligned filaments connected to the divertor target plate are radially localized at the separatrix on the outer divertor leg and in the private flux region on the inner divertor leg. These are limited to the region below the X-point with fluctuation levels up to 10%–20%. The filaments have comparable poloidal and radial correlation lengths (10–100 ion gyroradii ρ i ) and parallel correlation lengths of several meters. Toroidal mode numbers are in the range of 10–30 and 2–10 for outer and inner leg filaments. The poloidal motion of outer leg filaments has the same direction and comparable magnitude to advection due to E x B drift calculated by the multi-fluid edge transport code UEDGE with inclusion of cross field drifts. Disconnection between inner and outer leg filaments as well as the absence of correlation with upstream turbulence support the hypothesis of X-point disconnection for divertor leg filaments. Simulations with the ArbiTER linear eigenvalue solver and a resistive-balooning model were performed with a simulation grid limited to the divertor legs. Instabilities localized to the bad curvature side of the divertor legs were observed, in qualitative agreement with the experiment.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Assimilation of Sea Ice Thickness Derived from Cryosat-2 Along-Track Freeboard Measurements into the Met Office's Forecast Ocean Assimilation Model (FOAM)

The feasibility of assimilating sea ice thickness (SIT) observations derived from CryoSat-2 along-track measurements of sea ice freeboard is successfully demonstrated using a 3D-Var assimilation scheme, NEMOVAR, within the Met Office's global, coupled ocean–sea-ice model, Forecast Ocean Assimilation Model (FOAM). The CryoSat-2 Arctic freeboard measurements are produced by the Centre for Polar Observation and Modelling (CPOM) and are converted to SIT within FOAM using modelled snow depth. This is the first time along-track observations of SIT have been used in this way, with other centres assimilating gridded and temporally averaged observations. The assimilation leads to improvements in the SIT analysis and forecast fields generated by FOAM, particularly in the Canadian Arctic. Arctic-wide observation-minus-background assimilation statistics for 2015–2017 show improvements of 0.75 m mean difference and 0.41 m root-mean-square difference (RMSD) in the freeze-up period and 0.46 m mean difference and 0.33 m RMSD in the ice break-up period. Validation of the SIT analysis against independent springtime in situ SIT observations from NASA Operation IceBridge (OIB) shows improvement in the SIT analysis of 0.61 m mean difference (0.42 m RMSD) compared to a control without SIT assimilation. Similar improvements are seen in the FOAM 5 d SIT forecast. Validation of the SIT assimilation with independent Beaufort Gyre Exploration Project (BGEP) sea ice draft observations does not show an improvement, since the assimilated CryoSat-2 observations compare similarly to the model without assimilation in this region. Comparison with airborne electromagnetic induction (Air-EM) combined measurements of SIT and snow depth shows poorer results for the assimilation compared to the control, despite covering similar locations to the OIB and BGEP datasets. This may be evidence of sampling uncertainty in the matchups with the Air-EM validation dataset, owing to the limited number of observations available over the time period of interest. This may also be evidence of noise in the SIT analysis or uncertainties in the modelled snow depth, in the assimilated SIT observations, or in the data used for validation. The SIT analysis could be improved by upgrading the observation uncertainties used in the assimilation. Despite the lack of CryoSat-2 SIT observations available for assimilation over the summer due to the detrimental effect of melt ponds on retrievals, it is shown that the model is able to retain improvements to the SIT field throughout the summer months due to prior, wintertime SIT assimilation. This also results in regional improvements to the July modelled sea ice concentration (SIC) of 5 % RMSD in the European sector, due to slower melt of the thicker sea ice.

Emma K. Fiedler↗

Techbelt Energy Innovation Center

This project consisted of three main components 1) The primary goal of the project was to renovate and upgrade an existing commercial building to the highest possible environmentally sustainable level for the purpose of creating an energy incubator. This initiative was part of the Infrastructure Technologies Program, through which a sustainable energy demonstration facility was to be created and used as a research and community outreach base for sustainable energy product and process incubation; 2) In addition, fundamental energy related research on wind energy was performed; a shrouded wind turbine on the Youngstown State University campus was commissioned; and educational initiatives were implemented; and 3) The project also included an education and outreach component to inform and educate the public in sustainable energy production and career opportunities. Youngstown State University and the Tech Belt Energy Innovation Center (TBEIC) renovated a 37,000 square foot urban building which is now being used as a research and development hub for the region’s energy technology innovation industry. The building houses basic research facilities and business development in an incubator format. In addition, the TBEIC performs community outreach and education initiatives in advanced and sustainable energy. The building is linked to a back warehouse which will eventually be used as a build-out for energy laboratory facilities. The projects research component investigated shrouded wind turbines, and specifically the “Windcube” which was renamed the “Wind Sphere” during the course of the project. There was a specific focus on the development in the theory of shrouded wind turbines. The goal of this work was to increase the potential efficiency of wind turbines by improving the lift and drag characteristics. The work included computational modeling, scale models and full-sized design and construction of a test turbine. The full-sized turbine was built on the YSU campus as a grid-tie system that supplies the YSU research facility. Electrical power meters and weather monitors were installed to record the power generated and aid in continued study. In addition, an education/outreach component to help elicit creative engineering and design from amongst area students, faculty, entrepreneurs, and small business in the energy related fields was performed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

GaAsP/Si Tandem Solar Cells: Pathway to Low-Cost, High-Efficiency Photovoltaics

Si is the dominant PV technology, now and for the foreseeable future, due to its extensive manufacturing infrastructure, supply chain, feedstock availability, and highly optimized degree of fabrication processes, which altogether has produced an economic scenario where PV electricity generation is often cheaper than conventional fossil based generation. In many places, the overarching goal of grid parity has been achieved, but further improvement in performance-cost metrics are still needed to sustain the continued LCOE reductions needed to not only compete with conventional generation, but displace it on a global scale; a matter of critical importance if we stand any hope of slowing climate change. Nevertheless, single-junction Si PV is already nearing its physical limit, both in performance and cost, and is thus cannot meet these long-term goals alone. To this end, we are working on the development of monolithic III-V/Si tandem solar cells, which improve upon the performance of pure Si by providing enhanced utilization (reduced thermalization) of high-energy photons. This architecture nominally combines the substantial existing knowledge base, manufacturing infrastructure, and low cost of Si PV with the high efficiencies afforded by the well-established multijunction approach — the only proven way to break the single-junction limit. Although the metal-halide perovskite/Si tandem architecture has garnered substantial attention in recent years, serious questions regarding reliability and service lifetime remain, whereas III-V PV has a proven track record, including in the harsh concentrator and space environments. Additionally, there are multiple fabrication approaches to producing III-V/Si tandem cells, but we are focused on monolithic epitaxial integration as it is the most likely to yield the lowest ultimate LCOE in a fully mature, scaled technology. In this work we have produced multiple generations of GaAsP/Si tandem solar cells, demonstrating a more than 10% absolute AM1.5G efficiency improvement within the time frame of the project, including two verified world records. We have done this using industry-standard fabrication methods, showing that this platform can ultimately be manufactured at scale using existing or only slightly upgraded Si and III-V tooling. Our scientific and engineering advances across a range of fundamental and applied areas – III-V/Si heteroepitaxial integration, defect control in metamorphic III-V epitaxy, fundamental materials-oriented solar cell design and modeling methodology, and more – have created clear pathways for continued advances toward the goal of >30% AM1.5G cell efficiency (and >25% module) and will serve to inform the broader research community for well beyond this immediate application. Techno-economic modeling indicates that our approach can indeed meet SunShot/SETO LCOE targets, but as with any “post-Si” technology there are difficult, but not insurmountable barriers, requiring continued focused research and development efforts.

14 SOLAR ENERGY↗

Using Satellite Soil Moisture and Rainfall in the Landslide Hazard Assessment for Situational Awareness System

The Landslide Hazard Assessment for Situational Awareness system(LHASA)gives a global view of landslide hazard in nearly real time. Currently, it is being upgraded from version 1 to version 2, which entails improvements along several dimensions. These include the incorporation of new predictors, machine learning, and new event-based landslide inventories. As a result, LHASA version 2 substantially improves on the prior performanceand introduces a probabilistic element to the global landslide nowcast. Data from the soil moisture active-passive (SMAP) satellite has been assimilated into a globally consistent data product with a latency less than 3 days, known as SMAP Level 4. In LHASA, thesedata representthe antecedent conditions prior to landslide-triggering rainfall. In some cases, soil moisture may have accumulated over aperiod of many months. The model behind SMAP Level 4 also estimates the amount of snow on the ground, which is an important factor in some landslide events. LHASA also incorporates this information as an antecedent condition that modulates the response torainfall. Slope, lithology, and active faults were also used as predictor variables. These factors can have a strong influence on where landslides initiate.LHASA relies on precipitation estimates from the Global Precipitation Measurement mission to identify the locations where landslides are most probable. The low latency and consistent global coverage of these data make them ideal for real-time applications at continental to global scales. LHASA relies primarily on rainfall from the last 24 hours to spothazardous sites, which is rescaled by the local 99thpercentile rainfall.However, the multi-day latency of SMAP requires the use of a 2-day antecedent rainfall variable to represent the accumulation of rain between the antecedent soil moisture and current rainfall. LHASA merges these predictors with XGBoost, a commonly used machine-learning tool, relying on historical landslide inventories to develop the relationship between landslide occurrence and various risk factors. The resulting model relies heavily on current daily rainfall, but other factors also play an important role. LHASA outputsthe probability oflandslide occurrence ona grid of roughly one kilometer over all continents from 60 North to 60 South latitude. Evaluation over the period 2019-2020 showsthat LHASA version 2 doubles the accuracy of the global landslide nowcast without increasing the global false alarm rate. LHASA also identifies the areas where the human exposure to landslide hazard is most intense. Landslide hazard is divided into 4 levels: minimal, low, moderate, and high. Next, the number of persons and the length of major roads (primary and secondary roads)within each of these areas is calculated for every second-level administrative district (county). These results can be viewedthrough a web portal hosted at the Goddard Space Flight Center. In addition, users can download daily hazard and exposure data.LHASAversion 2uses machine learning and satellite data to identify areas of probable landslide hazard within hours of heavy rainfall. Itsglobal maps are significantly more accurate, and it now includes rapid estimates of exposed populations and infrastructure. In addition, a forecast mode will be implemented soon.

Thomas Stanley↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Preparing Distribution Utilities for the Future - Unlocking Demand-Side Management Potential: A Novel Analytical Framework

The balance of supply and demand in the power systems has traditionally been served solely through generation and network capacity planning and operations. However, with increased requirements for flexibility due to the uptake in variable renewable generation sources such as wind and solar there is a need to increased demand-side flexibility. In addition, there are increased communications and flexibility capabilities emerging on the demand-side from the adoption of advanced metering infrastructures and smart meter deployment and intelligent loads such as smart thermostats and schedulable white goods (e.g. dishwashers and washing machines). Unlocking demand-side flexibility can bring system benefits from peak load reduction bringing about generation capacity and network upgrade deferral, to reducing demand and more efficient utilization of generation and network capacity. Unlocking demand-side flexibility is an evolving process for utilities and solutions must be tailored to each specific customer group. Demand-side management (DSM) is a broad set of tools that can include demand response (both dispatchable and non-dispatchable), energy efficiency and distributed energy resources and demand-side technologies. The National Renewable Energy Laboratory (NREL), in collaboration with BSES Rajdhani Power Ltd. (BRPL) and Deloitte, examined the potential of DSM in BRPL’s service territory, developing detailed information on customer classes and willingness to participate in DSM. The study developed modeling frameworks for load analysis and the analysis tools to assess the potential of time-of-use tariffs in motivating customers to reduce their peak period energy consumption. The study shows that BRPL customers, specifically their domestic customers, are willing to participate in DSM programs and that time-of-use pricing can help BRPL reduce their peak demand and help unlock demand-side flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Communication and Control for Distributed Energy Resource Integration: Phase 2 Scientific Report

The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design and proof-of-design, and Phase II involves real-world demonstration of the Phase I design architecture. The scope of work for Phase II of this ACCP involves demonstrating the Phase I design architecture in large scale real-world settings while integrating with the operations of one or more electricity supplier feeder lines. The communication and control architectures for integrated demonstration shall encompass combinations of software and hardware components, including: sensors, data acquisition and communication systems, remote monitoring systems, metering (interval revenue, real-time), local and wide area networks, Web-based systems, smart controls, energy management/information systems with control and automation of building energy loads, and demand-response management with integration of real-time market pricing. For Phase II, BPL Global shall demonstrate the Phase I design for integrating and controlling the operation of more than 10 DER units, dispersed at various locations in one or more Independent System Operator (ISO) Control Areas, at an aggregated scale of more than 1 MW, to provide grid support. Actual performance data with respect to each specified function above is to be collected during the Phase II field demonstration. At a minimum, the Phase II demonstration shall span one year of field operations. The demonstration performance will need to be validated by the target customer(s) for acceptance and subsequent implementation. An ISO must be involved in demonstration planning and execution. As part of the Phase II work, BPL Global shall develop a roadmap to commercialization that identifies and quantifies the potential markets for the integrated, aggregated DER systems and for the communication and control technologies demonstrated in Phase I. In addition, the roadmap must identify strategies and actions, as well as the regional and national markets where the aggregated DER systems with communication and control solutions will be introduced, along with a timeline projected for introduction into each identified market. In Phase I of this project, we developed a proof-of-concept ACCP system and architecture and began to test its functionality at real-world sites. These sites had just over 10 MW of DERs and allowed us to identify what needed to be done to commercialize this concept. As a result, we started Phase II by looking at our existing platform and identified its strengths and weaknesses as well as how it would need to evolve for commercialization. During this process, we worked with different stakeholders in the market including: Independent System Operators, DER owners and operators, and electric utility companies to fully understand the issues from all of the different perspectives. Once we had an understanding of the commercialized ACCP system, we began to document and prepare detailed designs of the different system components. The components of the system with the most significant design improvements were: the on-site remote terminal unit, the communication technology between the remote site and the data center, and the scalability and reliability of the data center application. As we began to implement the Phase II ACCP system, we upgraded the real-world demonstration sites from Phase I of the project as well as added additional sites to broaden the types of DER the platform was tested with. We worked with the owners and operators of these sites to understand how the system was meeting their needs and made modifications throughout the project as needed. This also included an effort to continue to understand the barriers to commercial adoption of the ACCP architecture and standardized communication protocols. The final aspect of this phase of the project was to prepare resources to aid in the commercial adoption of the ACCP architecture and standardized communication protocols. This entailed: presentations at conferences, published articles and papers, and web-based technical resources to provide tools to aid in the design and implementation of ACCP systems.

03 NATURAL GAS↗

Computational Assessment of a 3-Stage Axial Compressor Which Provides Airflow to the NASA 11- by 11-Foot Transonic Wind Tunnel, Including Design Changes for Increased Performance

A 24 foot diameter 3-stage axial compressor powered by variable-speed induction motors provides the airflow in the closed-return 11- by 11-Foot Transonic Wind Tunnel (11-Foot TWT) Facility at NASA Ames Research Center at Moffett Field, California. The facility is part of the Unitary Plan Wind Tunnel, which was completed in 1955. Since then, upgrades made to the 11-Foot TWT such as flow conditioning devices and instrumentation have increased blockage and pressure loss in the tunnel, somewhat reducing the peak Mach number capability of the test section. Due to erosion effects on the existing aluminum alloy rotor blades, fabrication of new steel rotor blades is planned. This presents an opportunity to increase the Mach number capability of the tunnel by redesigning the compressor for increased pressure ratio. Challenging design constraints exist for any proposed design, demanding the use of the existing driveline, rotor disks, stator vanes, and hub and casing flow paths, so as to minimize cost and installation time. The current effort was undertaken to characterize the performance of the existing compressor design using available design tools and computational fluid dynamics (CFD) codes and subsequently recommend a new compressor design to achieve higher pressure ratio, which directly correlates with increased test section Mach number. The constant cross-sectional area of the compressor leads to highly diffusion factors, which presents a challenge in simulating the existing design. The CFD code APNASA was used to simulate the aerodynamic performance of the existing compressor. The simulations were compared to performance predictions from the HT0300 turbomachinery design and analysis code, and to compressor performance data taken during a 1997 facility test. It was found that the CFD simulations were sensitive to endwall leakages associated with stator buttons, and to a lesser degree, under-stator-platform flow recirculation at the hub. When stator button leakages were modeled, pumping capability increased by over 20 of pressure rise at design point due to a large reduction in aerodynamic blockage at the hub. Incorporating the stator button leakages was crucial to matching test data. Under-stator-platform flow recirculation was thought to be large due to a lack of seals. The effect of this recirculation was assessed with APNASA simulations recirculating 0.5, 1, and 2 of inlet flow about stators 1 and 2, modeled as axisymmetric mass flux boundary conditions on the hub before and after the vanes. The injection of flow ahead of the stators tended to re-energize the boundary layer and reduce hub separations, resulting in about 3 increased stall margin per 1 of inlet flow recirculated. In order to assess the value of the flow recirculation, a mixing plane simulation of the compressor which gridded the under-stator cavities was generated using the ADPAC CFD code. This simulation indicated that about 0.65 of the inlet flow is recirculated around each shrouded stator. This collective information was applied during the redesign of the compressor. A potential design was identified using HT0300 which improved overall pressure ratio by removing pre-swirl into rotor 1, replacing existing NASA 65 series rotors with double circular arc sections, and re-staggering rotors and the existing stators. The performance of the new design predicted by APNASA and HT0300 is compared to the existing design.

Turbomachinery↗

Characterizing peak electricity demand for U.S. households: an assessment of end-use loads and demand factors

Understanding household peak electricity demand is critical to evaluate the technical need for electrical infrastructure upgrades. This study characterizes peak loads for existing and new equipment using metered data from a convenience sample of 11,940 U.S. dwellings from four sources, including 911 from two sources with end-use metering. After standardized data cleaning and labeling, we derived descriptive statistics for key metrics, such as maximum demand and demand factors, and developed predictive models relating 60- to 15-min demand for the National Electrical Code (NEC). Mean 15-min maximum demand was 9.7 kW (median 9.0 kW; IQR 7.0–11.5 kW, 95% CI 9.6–9.8 kW), indicating spare capacity in 98% of homes with hypothetical 100 A panels. Maximum demand increased with floor area and number of high-demand loads. Dwelling maximum demand was driven by higher-power, longer-duration heating appliances and vehicle charging, while most user-operated appliances contributed little. Demand factors are used to account for how most devices contribute less than their rated power to maximum demand. Existing load mean demand factors (28%; median 10%; IQR 0–58%; CI 28–29%) were higher than those for new loads (21%; median 7%; IQR 0–35%; CI 20–21%), because new loads changed the timing and magnitude of maximum demand. New high-demand loads had higher than average demand factors (40–60%). Whole dwelling demand factors support the NEC's 40% assumption, but they challenge its conservative 100% treatment of new HVAC. We propose a data-driven 50% demand factor for new equipment, which would align with metered data, improve affordability, and modernize electrical codes.

Appliances↗