Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “gateway”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Dissociative double-photoionization of butadiene in the 25-45 eV energy range using 3-D multi-coincidence ion momentum imaging spectrometry

Dissociative double-photoionization of butadiene in the 25-45 eV energy range has been studied with tunable synchrotron radiation using full three-dimensional ion momentum imaging. Using ab initio calculations, the electronic states of the molecular dication below 33 eV are identified. The results of the measurement and calculation show that double ionization from π orbitals selectively triggers twisting about the terminal or central C–C bonds. We show that this conformational rearrangement depends upon the dication electronic state, which effectively acts as a gateway for the dissociation reaction pathway. For photon energies above 33 eV, three-body dissociation channels where neutral H-atom evaporation precedes C–C charge-separation in the dication species appear in the correlation map. The fragment angular distributions support a model where the dication species is initially aligned with the molecular backbone parallel to the polarization vector of the light, indicating a high probability for double-ionization to the “gateway states” for molecules with this orientation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Theoretical investigation of intersystem crossing in the cyanonitrene molecule, 1 NCN → 3 NCN

The NCN diradical is an important intermediate of prompt nitric oxide formation in flames. The mechanism of intersystem crossing (ISC) in the NCN molecule formed via pyrolysis or photolysis of NCN 3 is of relevance to the interpretation of experiments that utilize NCN 3 as a precursor for laboratory studies of NCN kinetics. This mechanism has been investigated by means of multi-reference configuration interaction calculations. From the potential energy surfaces for NCN 3 dissociation, it was inferred that both thermal and photo-chemical decomposition initially lead to NCN in its lowest singlet state, $\tilde{a}^{-1}$$Δ_g$, with a possible contribution from the $\tilde{b}^{-1}\Sigma_g^+$ state at low photolysis wavelengths. Direct formation of the triplet ground state $\tilde{X}^{-3}\Sigma_g^-$ is also feasible for the photolytic pathway. Ananalysis of surface crossings between $\tilde{a}$ or $\tilde{b}$ and the triplet ground state $\tilde{X}^{-3}\Sigma_g^-$ in the absence and presence of a helium atom revealed an ISC channel 1 NCN ($\tilde{a}$) → 3 NCN($\tilde{X}$) via a strongly bent structure. However, its barrier of 38 kcal mol -1 relative to the singlet minimum turned out to be much too high to explain the fast ISC observed in experiments. A rigid-bender model including Renner-Teller interactions was used to examine the occurrence of mixed-multiplicity rovibrational states-so-called gateway states-that could enhance collision-induced ISC. The results of this study indicate that a gateway mechanism is probably not operative in the case of the $\tilde{a}$/$\tilde{X}$pair of states in NCN.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Real-Time Hardware-in-the-Loop Distributed Energy Resources System Testbed using IEEE 2030.5 Standard

IEEE 2030.5 standard is drawing special attention among communication protocols for smart inverters and distributed energy resources (DER). Moreover, California Rule 21 mandates new DER must be ready to communicate to a host utility using the IEEE 2030.5 standard. Therefore, development of an effective real-time simulation method for managing DER using IEEE 2030.5 network is crucial. This paper presents a real-time hardware-in-the-loop (HIL) DER system testbed using the IEEE 2030.5 standard. The proposed real-time co-simulation testbed consists of a DER physical system simulation using OP AL-RT real-time simulator and a cyber system simulation including DER gateways and a DER management system (DERMS) cloud server. Custom-built client and server programs are developed to meet the compliant with IEEE 2030.5-2018 standard and implemented in the DER gateways and a DERMS server, respectively. Furthermore, the feasibility of the proposed testbed for DER systems is validated by experiments.

42 ENGINEERING↗

Seamless Wireless Communication Platform for Internet of Things Applications

The rapid growth of the Internet of Things (IoT) devices resulted in the proliferation of wireless technologies to cater to their increasing data rate requirements and support multiple applications. However, such ever-increasing wireless technologies present numerous challenges such as incompatible wireless standards, increased energy consumption, and insecure communication. The traditional gateways proposed in the literature suffers from limitations such as computational complexity, resource requirements, increased cost, and device size. We vision an era of seamless wireless communication to alleviate the aforementioned challenges in IoT applications. through three inter-dependent functionalities namely detection and identification of wireless technologies, energy-efficient transmit power control, and secure end-to-end communication. To prove the concept, a new gateway is proposed to achieve these three functionalities with only physical layer measurements so that the different communication protocols in the higher layers can be avoided. Novel schemes are conceptualized for resource-limited seamless IoT applications. Moreover, the conceptual seamless IoT platform is validated through software-based computer simulation and software-defined radio-based testbed implementation. Finally, the preliminary analysis demonstrates that the proposed platform has great potential in advancing seamless IoT applications.

97 MATHEMATICS AND COMPUTING↗

Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting in Leavenworth, KS

This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in a commercial parking lot lighting application, under the U.S. Department of Energy (DOE) Solid-State Lighting Technology GATEWAY Demonstration Program. The parking lot is for customers and employees of a Walmart Supercenter in Leavenworth, Kansas and this installation represents the first use of the LED Parking Lot Performance Specification developed by the DOE’s Commercial Building Energy Alliance. The application is a parking lot covering more than a half million square feet, lighted primarily by light-emitting diodes (LEDs). Metal halide wall packs were installed along the building facade. This site is new construction, so the installed baseline(s) were hypothetical designs. It was acknowledged early on that deviating from Walmart’s typical design would reduce the illuminance on the site. Walmart primarily uses 1000W pulse-start metal halide (PMH) lamps. In order to provide a comparison between both typical design and a design using conventional luminaires providing a lower illuminance, a 400W PMH design was also considered. As mentioned already, the illuminance would be reduced by shifting from the PMH system to the LED system. The Illuminating Engineering Society of North America (IES) provides recommended minimum illuminance values for parking lots. All designs exceeded the recommended illuminance values in IES RP-20, some by a wider margin than others. Energy savings from installing the LED system compared to the different PMH systems varied. Compared to the 1000W PMH system, the LED system would save 63 percent of the energy. However, this corresponds to a 68 percent reduction in illuminance as well. In comparison to the 400W PMH system, the LED system would save 44 percent of the energy and provide similar minimum illuminance values at the time of relamping. The LED system cost more than either of the PMH systems when comparing initial costs. However, when the life-cycle costs from energy and maintenance were factored into the scenario, the LED system had lower costs at the end of a 10-year analysis period. The LED system had a 6.1 year payback compared to the 1000W PMH system and a 7.5 year payback versus the 400W PMH system. The costs reflect high initial cost for the LED luminaire, plus more luminaires and (subsequently) more poles for the LED system. The other major issue affecting cost effectiveness was that Leavenworth, Kansas has very low electricity costs. The melded rate for this site was $0.056 per kWh for electricity. However, if the national electricity rate of $0.1022/kWh was used the payback would change to between four and five years for the LED system. This demonstration met the GATEWAY requirements of saving energy, matching or improving illumination, and being cost effective. The project also demonstrated that the Commercial Building Energy Alliance (CBEA) specification works in practice. Walmart appreciated having an entire site lighted by LEDs to gain more experience with the technology. Walmart is reviewing the results of the demonstration as they consider their entire real estate portfolio.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Phoebus: Network Middleware for Next-Generation Network Computing

The Phoebus project investigated algorithms, protocols, and middleware infrastructure to improve end-to-end performance in high speed, dynamic networks. The Phoebus system essentially serves as an adaptation point for networks with disparate capabilities or provisioning. This adaptation can take a variety of forms including acting as a provisioning agent across multiple signaling domains, providing transport protocol adaptation points, and mapping between distributed resource reservation paradigms and the optical network control plane. We have successfully developed the system and demonstrated benefits. The Phoebus system was deployed in Internet2 and in ESnet, as well as in GEANT2, RNP in Brazil and over international links to Korea and Japan. Phoebus is a system that implements a new protocol and associated forwarding infrastructure for improving throughput in high-speed dynamic networks. It was developed to serve the needs of large DOE applications on high-performance networks. The idea underlying the Phoebus model is to embed Phoebus Gateways (PGs) in the network as on-ramps to dynamic circuit networks. The gateways act as protocol translators that allow legacy applications to use dedicated paths with high performance.

99 GENERAL AND MISCELLANEOUS↗

Annual Report: Carbon Capture Simulation Initiative (CCSI) (30 September 2013)

The Carbon Capture Simulation Initiative (CCSI) is a partnership among national laboratories, industry and academic institutions that is developing and deploying state-of-the-art computational modeling and simulation tools to accelerate the commercialization of carbon capture technologies from discovery to development, demonstration, and ultimately the widespread deployment to hundreds of power plants. The CCSI Toolset will provide end users in industry with a comprehensive, integrated suite of scientifically validated models, with uncertainty quantification (UQ), optimization, risk analysis and decision making capabilities. The CCSI Toolset incorporates commercial and open-source software currently in use by industry and is also developing new software tools as necessary to fill technology gaps identified during execution of the project. Ultimately, the CCSI Toolset will (1) enable promising concepts to be more quickly identified through rapid computational screening of devices and processes; (2) reduce the time to design and troubleshoot new devices and processes; (3) quantify the technical risk in taking technology from laboratory-scale to commercial-scale; and (4) stabilize deployment costs more quickly by replacing some of the physical operational tests with virtual power plant simulations. CCSI is led by the National Energy Technology Laboratory (NETL) and leverages the Department of Energy (DOE) national laboratories’ core strengths in modeling and simulation, bringing together the best capabilities at NETL, Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), and Pacific Northwest National Laboratory (PNNL). The CCSI’s industrial partners provide representation from the power generation industry, equipment manufacturers, technology providers and engineering and construction firms. The CCSI’s academic participants (Carnegie Mellon University, Princeton University, West Virginia University, Boston University and the University of Texas at Austin) bring unparalleled expertise in multiphase flow reactors, combustion, process synthesis and optimization, planning and scheduling, and process control techniques for energy processes. During Fiscal Year (FY) 13, CCSI announced the initial release of its first set of computational tools and models during the October 2012 meeting of its Industry Advisory Board. This initial release led to five companies licensing the CCSI Toolset under a Test and Evaluation Agreement this year. By the end of FY13, the CCSI Technical Team had completed development of an updated suite of computational tools and models. The list below summarizes the new and enhanced toolset components that were released following comprehensive testing during October 2013. 1. FOQUS. Framework for Optimization and Quantification of Uncertainty and Sensitivity. Package includes: FOQUS Graphic User Interface (GUI), simulation-based optimization engine, Turbine Client, and heat integration capabilities. There is also an updated simulation interface and new configuration GUI for connecting Aspen Plus or Aspen Custom Modeler (ACM) simulations to FOQUS and the Turbine Science Gateway. 2. A new MFIX-based Computational Fluid Dynamics (CFD) model to predict particle attrition. 3. A new dynamic reduced model (RM) builder, which generates computationally efficient RMs of the behavior of a dynamic system. 4. A completely re-written version of the algebraic surrogate model builder for optimization (ALAMO). The new version is several orders of magnitude faster than the initial release and eliminates the MATLAB dependency. 5. A new suite of high resolution filtered models for the hydrodynamics associated with horizontal cylindrical objects in a flow path. 6. The new Turbine Science Gateway (Cluster), which supports FOQUS for running multiple simulations for optimization or UQ using a local computer or cluster. 7. A new statistical tool (BSS-ANOVA-UQ) for calibration and validation of CFD models. 8. A new basic data submodel in Aspen Plus format for a representative high viscosity capture solvent, 2-MPZ system. 9. An updated RM tool for CFD (REVEAL) that can create a RM from MFIX. A new lightweight, stand-alone version will be available in late 2013. 10. An updated RM integration tool to convert the RM from REVEAL into a CAPE-OPEN or ACM model for use in a process simulator. 11. An updated suite of unified steady-state and dynamic process models for solid sorbent carbon capture included bubbling fluidized bed and moving bed reactors. 12. An updated and unified set of compressor models including steady-state design point model and dynamic model with surge detection. 13. A new framework for the synthesis and optimization of coal oxycombustion power plants using advanced optimization algorithms. This release focuses on modeling and optimization of a cryogenic air separation unit (ASU). 14. A new technical risk model in spreadsheet format. 15. An updated version of the sorbent kinetic/equilibrium model for parameter estimation for the 1st generation sorbent model. 16. An updated process synthesis superstructure model to determine optimal process configurations utilizing surrogate models from ALAMO for adsorption and regeneration in a solid sorbent process. 17. Validation models for NETL Carbon Capture Unit utilizing sorbent AX. Additional validation models will be available for sorbent 32D in 2014. 18. An updated hollow fiber membrane model and system example for carbon capture. 19. An updated reference power plant model in Thermoflex that includes additional steam extraction and reinjection points to enable heat integration module. 20. An updated financial risk model in spreadsheet format.

01 COAL, LIGNITE, AND PEAT↗

Integrated, Automated Distributed Generation Technologies Demonstration

The purpose of the NETL Project was to develop a diverse combination of distributed renewable generation technologies and controls and demonstrate how the renewable generation could help manage substation peak demand at the ATK Promontory plant site. The Promontory plant site is located in the northwestern Utah desert approximately 25 miles west of Brigham City, Utah. The plant encompasses 20,000 acres and has over 500 buildings. The ATK Promontory plant primarily manufactures solid propellant rocket motors for both commercial and government launch systems. The original project objectives focused on distributed generation; a 100 kW (kilowatt) wind turbine, a 100 kW new technology waste heat generation unit, a 500 kW energy storage system, and an intelligent system-wide automation system to monitor and control the renewable energy devices then release the stored energy during the peak demand time. The original goal was to reduce peak demand from the electrical utility company, Rocky Mountain Power (RMP), by 3.4%. For a period of time we also sought to integrate our energy storage requirements with a flywheel storage system (500 kW) proposed for the Promontory/RMP Substation. Ultimately the flywheel storage system could not meet our project timetable, so the storage requirement was switched to a battery storage system (300 kW.) A secondary objective was to design/install a bi-directional customer/utility gateway application for real-time visibility and communications between RMP, and ATK. This objective was not achieved because of technical issues with RMP, ATK Information Technology Department’s stringent requirements based on being a rocket motor manufacturing facility, and budget constraints. Of the original objectives, the following were achieved: • Installation of a 100 kW wind turbine. • Installation of a 300 kW battery storage system. • Integrated control system installed to offset electrical demand by releasing stored energy from renewable sources during peak hours of the day. Control system also monitors the wind turbine and battery storage system health, power output, and issues critical alarms. Of the original objectives, the following were not achieved: • 100 kW new technology waste heat generation unit. • Bi-directional customer/utility gateway for real time visibility and communications between RMP and ATK. • 3.4% reduction in peak demand. 1.7% reduction in peak demand was realized instead.

17 WIND ENERGY↗

A Distributed Intelligent Automated Demand Response Building Management System

The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-­Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-­to-­building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov-­ March) and a steam absorption chiller for use in the warm months (April-­October). Lighting in the open office areas is provided by direct-­indirect luminaries with Building Management System-­based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load during the study period was 1175 kW. Several new tools facilitated this work, such as the Smart Energy Box, the distributed load controller or Energy Information Gateway, the web-­based DR controller (dubbed the Central Load-­Shed Coordinator or CLSC), and the Demand Response Capacity Assessment & Operation Assistance Tool (DRCAOT). In addition, an innovative data aggregator called sMAP (simple Measurement and Actuation Profile) allowed data from different sources collected in a compact form and facilitated detailed analysis of the building systems operation. A smart phone application (RAP or Rapid Audit Protocol) facilitated an inventory of the building’s plug loads. Carbon dioxide sensors located in conference rooms and classrooms allowed demand controlled ventilation. The extensive submetering and nimble access to this data provided great insight into the details of the building operation as well as quick diagnostics and analyses of tests. For example, students discovered a short-­cycling chiller, a stuck damper, and a leaking cooling coil in the first field tests. For our final field tests, we were able to see how each zone was affected by the DR strategies (e.g., the offices on the 7th floor grew very warm quickly) and fine-­tune the strategies accordingly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Daylighting Digital Dimmer SBIR Phase 2 Final Report

The primary focus of the Phase II Development is the implementation of two key technologies, Task To Wall (TTW) Control, and Wand Gesture light dimming control into an easy to use remote for SSL light control, the MoJo Remote. The MoJo Remote product family includes a battery powered wireless remote, a WiFi gateway as well as Mobile Applications for iOS and Android. Specific accomplishments during the second reporting period include: 1. Finalization and implementation of MoJo Remote Accelerometer and capacitive-touch based UI/UX, referred to as the Wand Gesture UI. 2. Issuance of Patent for Wand Gesture UI. 3. Industrial and Mechanical Design for MoJo Remote and MoJo Gateway. 4. Task To Wall implementation and testing in MoJo Remote. 5. Zooming User Interface (ZUI) for the Mobile App implemented on both iOS and Andriod. 6. iOS Mobile app developed to beta level functionality. 7. Initial Development of the Android Mobile Application. 8. Closed loop color control at task (demonstrated at 2016 SSL R&D Workshop). 9. Task To Wall extended to Color Control, working in simulation. 10. Beta testing begun in Late 2017/Early 2018. The MoJo Remote integrates the Patented TTW Control and the Wand Gesture innovative User Interface, and is currently in Beta testing and on the path to commercialization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packaged SMIP Smart Connector for Ectron Computers

The project provides appropriate software modules, which allow to represent a physical oven as a virtual oven model. For that a virtual oven model is developed, which defines oven parameters like temperature, power consumption but also the door status and the humidity. To connect a real oven to the virtual model for monitoring and control multiple sensors are used to collect data. Using a MQTT based data connection the measured parameters are send to the CESMII environment for further processing and monitoring. Within this project the CESMII model for the general oven was developed and provided. Further the sensors were connected to the actual oven. The sensor data is collected via means of a MQTT based data transfer protocol to a gateway module. The gateway module then translates and transfers the collected data to the actual CESMII oven model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration Assessment of Light Emitting Diode (LED) Commercial Garage Lights In the Providence Portland Medical Center, Portland, Oregon

This U.S. Department of Energy GATEWAY Demonstration project studied the applicability of light-emitting diode (LED) luminaires for commercial parking garage applications. High-pressure sodium (HPS) area luminaires were replaced with new LED area luminaires. The project was supported under the U.S. Department of Energy (DOE) Solid State Lighting Program. Other participants in the demonstration project included Providence Portland Medical Center in Portland, Oregon, the Energy Trust of Oregon, and Lighting Sciences Group (LSG) Inc. Pacific Northwest National Laboratory (PNNL) conducted the measurements and analysis of the results. PNNL manages GATEWAY demonstrations for DOE and represents their perspective in the conduct of the work. Quantitative and qualitative measurements of light and electrical power were taken at the site for both HPS and LED light sources. Economic costs were estimated and garage users’ responses to the new light sources were gauged with a survey. Six LED luminaires were installed in the below-ground parking level A, replacing six existing 150W HPS lamps spread out over two rows of parking spaces. Illuminance measurements were taken at floor level approximately every 4 ft on a 60-ft x 40-ft grid to measure light output of these LED luminaires which were termed the “Version 1” luminaires. PNNL conducted power measurements of the circuit in the garage to which the 6 luminaires were connected and determined that they drew an average of 82 W per lamp. An improved LED luminaire, Version 2, was installed in Level B of the parking garage. Illuminance measurements were not made of this second luminaire on site due to higher traffic conditions, but photometric measurements of this lamp and Version 1 were made in an independent testing laboratory and power usage for Version 2 was also measured. Version 1 was found to produce 3600 lumens and Version 2 was found to produce 4700 lumens of light and to consume 78 Watts. Maximum and minimum light levels were measured for the HPS and LED Version 1 luminaires and projected for the Version 2 luminaires. Maximum light levels were 23.51 foot candles, 20.54 fc, and 26.7 fc respectively and minimum light levels were 1.49 fc, 1.45 fc, and 1.88 fc. These results indicate very similar or even slightly higher light levels produced by the LED lamps, despite the higher lumen output of the HPS lamp. The LED lamps provide higher luminaire efficacy because all of the light is directed down and out. None of it is “lost” in the fixture. Also the HPS luminaire had poorly designed optics and a plastic covering that tended to get dirty and cracked, further decreasing the realized light output.[is this an accurate way to say this?] Consumer perceptions of the Version 2 LED were collected via a written survey form given to maintenance and security personnel. More than half felt the LED luminaires provided more light than the HPS lamps and a majority expressed a preference for the new lamps when viewing the relamped area through a security camera. Respondents commented that the LED luminaires were less glary, created less shadows, had a positive impact on visibility, and improved the overall appearance of the area. PNNL conducted an economic analysis and found that the Version 1 lamp produced annual energy savings of 955 kWh and energy cost savings of $76.39 per lamp at electricity rates of 6.5 cents per kWh and $105.03 at 11 cents per kWh. PNNL found that the Version 2 lamp produced annual energy savings of 991 kWh and energy cost savings of $79.26 per lamp at electricity rates of 6.5 cents per kWh and $108.98 at 11 cents per kWh. PNNL also calculated simple payback and found that Version 1 showed paybacks of 5.4 yrs at 6.5c/kWh and 4.1 yrs at 11c/kWh while Version 2 showed paybacks of 5.2 yrs at 6.5c/kWh and 3.9 yrs at 11c/kWh.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SciDAC's Earth System Grid Center for Enabling Technologies Semi-Annual Progress Report for the Period April 1, 2009 through September 30, 2009

This report summarizes work carried out by the ESG-CET during the period April 1, 2009 through September 30, 2009. It includes discussion of highlights, overall progress, period goals, collaborations, papers, and presentations. To learn more about our project, and to find previous reports, please visit the Earth System Grid Center for Enabling Technologies (ESG-CET) website. This report will be forwarded to the DOE SciDAC program management, the Office of Biological and Environmental Research (OBER) program management, national and international collaborators and stakeholders (e.g., the Community Climate System Model (CCSM), the Intergovernmental Panel on Climate Change (IPCC) 5th Assessment Report (AR5), the Climate Science Computational End Station (CCES), the SciDAC II: A Scalable and Extensible Earth System Model for Climate Change Science, the North American Regional Climate Change Assessment Program (NARCCAP), and other wide-ranging climate model evaluation activities). During this semi-annual reporting period, the ESG-CET team continued its efforts to complete software components needed for the ESG Gateway and Data Node. These components include: Data Versioning, Data Replication, DataMover-Lite (DML) and Bulk Data Mover (BDM), Metrics, Product Services, and Security, all joining together to form ESG-CET's first beta release. The launch of the beta release is scheduled for late October with the installation of ESG Gateways at NCAR and LLNL/PCMDI. Using the developed ESG Data Publisher, the ESG II CMIP3 (IPCC AR4) data holdings - approximately 35 TB - will be among the first datasets to be published into the new ESG enterprise system. In addition, the NCAR's ESG II data holdings will also be published into the new system - approximately 200 TB. This period also saw the testing of the ESG Data Node at various collaboration sites, including: the British Atmospheric Data Center (BADC), the Max-Planck-Institute for Meteorology, the University of Tokyo Center for Climate System Research, and the Australian National University. This period, a total of 14 national and international sites installed an ESG Data Node for testing. During this period, we also continued to provide production-level services to the community, providing researchers worldwide with access to CMIP3 (IPCC AR4), CCES, and CCSM, Parallel Climate Model (PCM), Parallel Ocean Program (POP), and Cloud Feedback Model Intercomparison Project (CFMIP), and NARCCAP data.

54 ENVIRONMENTAL SCIENCES↗

Exponential Backoff and Its Security Implications for Safety-Critical OT Protocols over TCP/IP Networks

The convergence of Operational Technology (OT) and Information Technology (IT) networks has become increasingly prevalent with the growth of Industrial Internet of Things (IIoT) applications. This shift, while enabling enhanced automation, remote monitoring, and data sharing, also introduces new challenges related to communication latency and cybersecurity. Oftentimes, legacy OT protocols were adapted to the TCP/IP stack without an extensive review of the ramifications to their robustness, performance, or safety objectives. To further accommodate the IT/OT convergence, protocol gateways were introduced to facilitate the migration from serial protocols to TCP/IP protocol stacks within modern IT/OT infrastructure. However, they often introduce additional vulnerabilities by exposing traditionally isolated protocols to external threats. This study investigates the security and reliability implications of migrating serial protocols to TCP/IP stacks and the impact of protocol gateways, utilizing two widely used OT protocols: Modbus TCP and DNP3. Our protocol analysis finds a significant safety-critical vulnerability resulting from this migration, and our subsequent tests clearly demonstrate its presence and impact. A multi-tiered testbed, consisting of both physical and emulated components, is used to evaluate protocol performance and the effects of device-specific implementation flaws. Through this analysis of specifications and behaviors during communication interruptions, we identify critical differences in fault handling and the impact on time-sensitive data delivery. The findings highlight how reliance on lower-level IT protocols can undermine OT system resilience, and they inform the development of mitigation strategies to enhance the robustness of industrial communication networks.

DNP3↗

Computer simulator for a mobile telephone system

A software simulator was developed to assist NASA in the design of the land mobile satellite service. Structured programming techniques were used by developing the algorithm using an ALCOL-like pseudo language and then encoding the algorithm into FORTRAN 4. The basic input data to the system is a sine wave signal although future plans call for actual sampled voice as the input signal. The simulator is capable of studying all the possible combinations of types and modes of calls through the use of five communication scenarios: single hop systems; double hop, signal gateway system; double hop, double gateway system; mobile to wireline system; and wireline to mobile system. The transmitter, fading channel, and interference source simulation are also discussed.

Schilling, D. L.↗

Requirements for a mobile communications satellite system. Volume 1: Executive summary

Three types of satellite-aided mobile communications are considered for users in areas not served by (terrestrial) cellular radio systems. In System 1, mobile units are provided a direct satellite link to a gateway station, which serves as the interface to the terrestrial toll network. In System 2, a terrestrial radio link similar to those in cellular systems connects the mobile unit to a translator station; each translator relays the traffic from mobile units in its vicinity, via satellite, to the regional gateway. It is not feasible for System 2 to provide ubiquitous coverage. Therefore, System 3 is introduced, in which the small percentage of users not within range of a translator are provided a direct satellite link as in System 1. While System 2 can operate with leased satellite capacity, Systems 1 and 3 require a dedicated satellite. A major portion of this study is concerned with the design of a satellite for System 1. A weight limit of 10,000 lbs, corresponding to the projected 1990 STS capability, is imposed on the design. Frequency re-use of the allocated spectrum, through multiple satellite beams, is employed to generate the specified system capacity. Both offset-fed and center-fed reflectors are considered. For an assumed 10-MHz allocation and a population of 350,000 subscribers, a two-satellite system is required. The reflector diameters corresponding to offset-fed and center-fed geometries are 46 m and 62 m, respectively. Thus, large-space-structure technology is inherent to the implementation of System 1. In addition to establishing the technical requirements for the three types of satellite systems, the monthly service charge needed to provide a specified return on invested capital is computed. A net present value analysis is used for this purpose.

Source record↗

Requirements for a mobile communications satellite system. Volume 2: Technical report

Three types of satellite aided mobile communications are considered for users in areas not served by (terrestrial) cellular radio systems. In system 1, mobile units are provided a direct satellite link to a gateway station, which serves as the interface to the terrestrial toll network. In system 2, a terrestrial radio link similar to those in cellular systems connects the mobile unit to a translator station; each translator relays the traffic from mobile units in its vicinity, via satellite, to the regional gateway. It is not feasible for system 2 to provide obiquitous coverage. Therefore, system 3 is introduced, in which the small percentage of users not within range of a translator are provided a direct satellite link as in system 1.

Horstein, M.↗

Land mobile satellite system requirements

A Land Mobile Satellite System (LMSS) provides voice, data and related communications services to moving vehicles and persons. Communications between the mobiles and satellite are in the 806-890 MHz band. The satellite translates these signals to a ""fixed services band'' such as 14/12 GHz band (Ku-band), and communicates in this band with fixed terminals called gateways. The gateways are located at convenient places such as telephone switches (which provide entry into the national telephone system), dispatcher headquarters, computer centers, etc. Communications are therefore principally mobile to fixed. A third communications link, also at Ku-band, is needed between the satellite and a single fixed ground station. This link provides satellite command, telemetry and ranging and also provides a network control function. The latter, through a common signalling system, receives requests and assigns channel slots, and otherwise controls, monitors and polices the network and collects billing information.

Kiesling, J. D.↗