Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flange”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Titanium alloy as a potential low radioactivation vacuum material

For the vacuum systems of high-intensity beam accelerators, low radioactivation materials with good vacuum characteristics and high mechanical strength are required. The titanium alloy Ti-6Al-4V was investigated as a potential low activation vacuum material with high mechanical strength for the fabrication of vacuum components, particularly the flanges of beam pipes, in the J-PARC 3 GeV synchrotron. The dose rate of Ti-6Al-4V when irradiated by a 400 MeV proton was observed to decrease more rapidly than that of stainless steel. Furthermore, the generated radioactive isotopes were nuclides with relatively short half-lives. The outgassing rate per unit area of Ti-6Al-4V was approximately 10{sup −8 }Pa m{sup 3}/s m{sup 2} after pumping for 100 h, which is the same as the typical value for stainless steel. Additionally, the hydrogen concentration in bulk Ti-6Al-4V was reduced to approximately 1 ppm by vacuum firing at 700 °C for 9 h; the mechanical strength was not reduced by this process. These results indicate that Ti-6Al-4V is a good candidate for use as a low activation vacuum material with high mechanical strength.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Low-cost, high-performance nonevaporable getter pumps using nonevaporable getter pills

Nonevaporable getter (NEG) pumps are widely used for maintaining a clean ultrahigh vacuum (UHV) of ≤10{sup −8 }Pa because of their high pumping speeds for hydrogen (H{sub 2}) and active gases in the UHV region. In addition, they are oil free, evaporation free, sputtering free, sublimation free, magnetic field free, vibration free, economical, compact, lightweight, and energy saving. In the present paper, the authors report a new NEG pump which is composed of commercial 60 NEG pills (ϕ10 × 3 mm; 70 wt. % Zr, 24.6 wt. % V, and 5.4 wt. % Fe), titanium parts, a DN 40 conflat flange, and a tantalum heater. The NEG pills are vertically and radially aligned around the heater to maximize the effective area for pumping. After activation at 400 °C for 30 min, the pumping speeds of the NEG pump were measured with the orifice method. Pumping speeds of 140–130, 200–140, 190–130, and 35–17 l/s were estimated for H{sub 2}, CO, CO{sub 2}, and N{sub 2} gasses, respectively, in a pumped-quantity range of 0.01–0.1 Pa l. Since the NEG pump is composed of a heating unit and a NEG module, the pumping speeds can be improved by increasing the number of NEG modules. These NEG pumps are favorable alternatives to sputtering ion pumps or titanium sublimation pumps.

36 MATERIALS SCIENCE↗

Fielding the LANL Gas Cherenkov Detector (GCD-3) at the National Ignition Facility: The engineering challenges of designing, analyzing, fabricating, testing, and commissioning the next-generation GCD detector and WellDIM3.9m insertion manipulator for use at NIF

We report that fielding the LANL third-generation Gas Cherenkov Detector (GCD-3) at the National Ignition Facility (NIF) revealed an array of complex engineering challenges. Fielding the GCD-3 Detector in a 3.9 meter re-entrant Well on the NIF Target Chamber required the development of a specialized detector deployment system named the WellDIM3.9m Diagnostic Manipulator (WellDIM). The most stringent design requirement entailed a no-load/no-contact condition with the Well, which dictated that all seismic loads be transferred to the Target Chamber port flange. The WellDIM transports the GCD-3 into the Well at a distance of 3.9m from Target Chamber Center. Finally, the GCD-3 Detector, outfitted with additional shielding to mitigate higher NIF backgrounds, will serve as a prototype for the future, heavily shielded “Super-GCD”.

42 ENGINEERING↗

Development of miniaturized, spectroscopically assisted Penning gauges for fractional helium and hydrogen neutral pressure measurements

Direct measurements of the helium (He) fractional neutral pressure in the neutral gas around fusion devices is challenging because of the small mass difference between the abundant D2 molecules and the He atoms which will be produced by D-T fusion. To study He exhaust, Penning gauges were used to measure total neutral pressure assisted by spectroscopy to resolve the D and He partial pressures. In this contribution, initial results are shown from developing this technique into a miniaturized configuration for direct in-situ measurements in the divertor of fusion devices. The configuration is based off a gauge originally designed for the National Spherical Tokamak Experiment-Upgrade (NSTX-U). The goal of this new miniaturized design it to reduce the space required by the gauge on the device and use of the inherent magnetic field of the machine rather than permanent magnets inside the gauge, enabling it to be adapted into a system that can be extended directly into the divertor region. The feasibility test of the method for NSTX-U and the Wendelstein 7-X (W7-X) stellarator are surveyed. For W7-X, a commercial Penning Gauge has been installed on an outboard vacuum flange as a generic feasibility test in the neutral gas environment of a stellarator. At an integration time of 25s, helium lines can be seen down to 10^-5 mbar and H-alpha lines down to 10^-6 mbar. Successful measurement of the total as well as the fractional neutral pressures of He and H has been shown. A first prototype of the miniature Penning gauge has been tested in Madison and shows a near linear power law scaling between current and pressure: I = C*P^n with n = 1.0 - 1.2. Pressure measurements were achieved starting at 10^-3 mbar and down to 10^-6 mbar. A modular gauge is being assembled, which allows easy interchangeability of the anode to test new anode geometries, in order to improve optical access and increase spectroscopic sensitivity. This shall enable an increase of the time resolution of the spectroscopically assisted fractional neutral pressure measurements to up to 1kHz.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Modified Slow Tuner Design for Cavity 1 Inside LCLS II Cryomodules

Initial LCLS-II cryomodule testing at Fermilab showed microphonics on the furthest upstream cavity (number 1) at least factor 2 larger than on the rest of the cavities. Testing indicated that this was a difference in the mechanical support of cavity 1, not a local acoustic source. Further investigation pointed to the upstream beam-pipe of the cavity 1. The upstream cavity flange has a solid spool piece connection to the beamline gate valve unlike the other cavities, which all connect through bellows. The gate valve's weight is supported by sliding system (free in z-axis) connected to large diameter Helium gas return pipe. The tuner design was modified to transform interface between cavity#1 and gate valve. Arms of the tuner for cavity 1 were extended and became the support structure for gate valve, eliminating the connection to the helium return pipe. Modification of the tuner design and results in microphonics mitigations will be presented.

43 PARTICLE ACCELERATORS↗

Challenges to Reliable Production Nitrogen Doping of Nb for SRF Accelerating Cavities

Over the last several years, alloying of the surface layer of niobium SRF cavities has been demonstrated to beneficially lower the superconducting RF surface resistance. Nitrogen, titanium, and oxygen have all been demonstrated as effective alloying agents, occupying interstitial sites in the niobium lattice within the RF penetration depth and even deeper, when allowed to thermally diffuse into the surface at appropriate temperatures. The use of nitrogen for this function has been often termed ’nitrogen doping’ and is being applied in the LCLS-II and LCLS-II HE projects. We report characterization studies of the distribution of nitrogen into the exposed niobium surface and how such distribution is affected by the quality of the vacuum furnace environment in which the doping takes place, and the complexity of nitride crystal growth on different grain orientations of surface niobium. Using state-of-the-art quantification methods by dynamic secondary ion mass spectrometry (SIMS) depth profiling in niobium, we identify several phenomena involving furnace-sourced contamination. We also highlight a potential issue with N₂ flow constraints from the flange ’caps’ used during heat treatments.

Reece, Charles↗

Wakefield Computations for the Injector (Part I)

In this document, we report on basic wakefield computations used to establish the impedance budget for the LCLS injector. Systematic comparisons between analytic formulae and results from ABCI are done. Finally, a comparison between 2D and 3D wakefield calculations are given for a cross. The three parts of the document are presented as follows: (1) ABCI computations for a few structures (Flange, Bellows...); (2) Comparison analytic with ABCI runs; and (3) Comparison Cross and Cavity using MAFIA.

43 PARTICLE ACCELERATORS↗

AHTR Mechanical, Structural, And Neutronic Preconceptual Design

This report provides an overview of the mechanical, structural, and neutronic aspects of the Advanced High Temperature Reactor (AHTR) design concept. The AHTR is a design concept for a large output Fluoride salt cooled High-temperature Reactor (FHR) that is being developed to enable evaluation of the technology hurdles remaining to be overcome prior to FHRs becoming a commercial reactor class. This report documents the incremental AHTR design maturation performed over the past year and is focused on advancing the design concept to a level of a functional, self-consistent system. The AHTR employs plate type coated particle fuel assemblies with rapid, off-line refueling. Neutronic analysis of the core has confirmed the viability of a 6-month 2-batch cycle with 9 weight-percent enriched uranium fuel. Refueling is intended to be performed automatically under visual guidance using dedicated robotic manipulators. The present design intent is for used fuel to be stored inside of containment for at least 6 months and then transferred to local dry wells for intermediate term, on-site storage. The mechanical and structural concept development effort has included an emphasis on transportation and constructability to minimize construction costs and schedule. The design intent is that all components be factory fabricated into rail transportable modules that are assembled into subsystems at an on-site workshop prior to being lifted into position using a heavy-lift crane in an open-top style construction. While detailed accident identification and response sequence analysis has yet to be performed, the design concept incorporates multiple levels of radioactive material containment including fully passive responses to all identified design basis or non-very-low frequency beyond design basis accidents. Key building design elements include: 1) below grade siting to minimize vulnerability to aircraft impact, 2) multiple natural circulation decay heat rejection chimneys, 3) seismic base isolation, and 4) decay heat powered back-up electricity generation. The report provides a preconceptual design of the manipulators, the fuel transfer system, and the salt transfer loops. The mechanical handling of the fuel and how it is accomplished without instrumentation inside the salt is described within the report. All drives for the manipulators reside outside the reactor top flange. The design has also taken into account the transportability of major components and how they will be assembled on site

Varma, Venugopal Koikal↗

75K Leak Test of October 2014

A leaking flange in Room 34B in May 2014 led to an awareness that secondary containment in some rooms at the Radioactive Liquid Waste Treatment Facility (RLWTF), Building 50-01, would not hold the contents of the largest vessel in the room. A proposal was developed to unplug floor drains, thereby allowing the 75K tank to be used as a large sump. A six day leak test, conducted from Oct-02 to Oct-08, clearly demonstrated that the 75K tank is leak-free below the level (36%) sufficient to hold the entire contents of the largest vessel within the RLWTF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nitrogen Monitoring of West Hackberry 117 Cavern Wells

U.S. Strategic Petroleum Reserve (SPR) oil storage cavern West Hackberry 117 was tested under extended nitrogen monitoring following a successful mechanical integrity test in order to validate a newly developed hydrostatic column model to be used to differentiate between normal "tight" well behavior and small-leak behavior under nitrogen. High resolution wireline pressure and temperature data were collected during the test period and used in conjunction with the hydrostatic column model to predict the nitrogen/oil interface and the pressure along the entire fluid column from the bradenhead flange nominally at ground surface to bottom of brine pool. Results here and for other SPR caverns have shown that wells under long term nitrogen monitoring do not necessarily pressurize with a relative rate (P N2 /P brine) of 1. The theoretical relative pressure rate depends on the well configuration, pressure and the location of the nitrogen-oil interface and varies from well to well. For the case of WH117 the predicted rates were 0.73 for well A and 0.92 for well B. The measured relative pressurization rate for well B was consistent with the model prediction, while well A rate was found to be between 0.58-0.68. A number of possible reasons for the discrepancy between the model and measured rates of well A are possible. These include modeling inaccuracy, measurement inaccuracy or the possibility of the presence of a very small leak (below the latest calculated minimum detectable leak rate).

02 PETROLEUM↗

Handling and Emplacement Options for Deep Borehole Disposal Conceptual Design

This report presents conceptual design information for a system to handle and emplace packages containing radioactive waste, in boreholes 16,400 ft deep or possibly deeper. Its intended use is for a design selection study that compares the costs and risks associated with two emplacement methods: drill-string and wireline emplacement. The deep borehole disposal (DBD) concept calls for siting a borehole (or array of boreholes) that penetrate crystalline basement rock to a depth below surface of about 16,400 ft (5 km). Waste packages would be emplaced in the lower 6,560 ft (2 km) of the borehole, with sealing of appropriate portions of the upper 9,840 ft (3 km). A deep borehole field test (DBFT) is planned to test and refine the DBD concept. The DBFT is a scientific and engineering experiment, conducted at full-scale, in-situ, without radioactive waste. Waste handling operations are conceptualized to begin with the onsite receipt of a purpose-built Type B shipping cask, that contains a waste package. Emplacement operations begin when the cask is upended over the borehole, locked to a receiving flange or collar. The scope of emplacement includes activities to lower waste packages to total depth, and to retrieve them back to the surface when necessary for any reason. This report describes three concepts for the handling and emplacement of the waste packages: 1) a concept proposed by Woodward-Clyde Consultants in 1983; 2) an updated version of the 1983 concept developed for the DBFT; and 3) a new concept in which individual waste packages would be lowered to depth using a wireline. The systems described here could be adapted to different waste forms, but for design of waste packaging, handling, and emplacement systems the reference waste forms are DOE-owned high- level waste including Cs/Sr capsules and bulk granular HLW from fuel processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and fabrication of a 30 T superconducting solenoid using overpressure processed Bi2212 round wire

High field superconducting magnets are used in particle colliders, fusion energy devices, and spectrometers for medical imaging and advanced materials research. Magnets capable of generating fields of 20-30 T are needed by future accelerator facilities. A 20-30 T magnet will require the use of high-temperature superconductors (HTS) and therefore the challenges of high field HTS magnet development need to be addressed. Superconducting Bi 2 Sr 2 CaCu 2 O x (Bi2212) conductors fabricated by the oxide-powder-in-tube (OPIT) technique have demonstrated the capability to carry large critical current density of 10 5 A/cm 2 at 4.2 K and in magnetic fields up to 45 T. Available in round wire multi-filamentary form, Bi2212 may allow fabrication of 20-50 T superconducting magnets. Until recently the performance of Bi2212 has been limited by challenges in realizing high current densities (J c ) in long lengths. This problem now is solved by the National High Magnetic Field Lab using an overpressure (OP) processing technique, which uses external pressure to process the conductor. OP processing also helps remove the ceramic leakage that results when Bi-2212 liquid leaks out from the sheath material and reacts with insulation, coil forms, and flanges. Significant advances have also been achieved in developing novel insulation materials (TiO 2 coating) and Ag-Al sheath materials that have higher mechanical strengths than Ag-0.2wt.% Mg, developing heat treatment approaches to broadening the maximum process temperature window, and developing high-strength, mechanical reinforced Bi-2212 cables. In the Phase I work, we leveraged these new opportunities to prototype overpressure processed solenoids and test them in background fields of up to 14 T. Additionally a design of a fully superconducting 30 T solenoid was produced. This work in conjunction with the future path outlined in the Phase II proposal would provide a major step toward qualifying Bi2212 technology for use in high-field accelerator magnets. Additionally, the performance parameters match key requirements of a final muon beam cooling solenoid. This technology will also be of interest to high-field NMR manufacturers.

43 PARTICLE ACCELERATORS↗

A DOE/Fusion Energy Sciences Research/Education Program at PVAMU Study of Rotamak Plasmas

During recent years (2004-2015), with DOE support, the PVAMU plasma research group accomplished new instrumentation development, conducted several new plasma experiments, and is currently poised to advance with standing-wave microwave plasma propulsion research. On the instrumentation development, the research group completed: (i) building a new plasma chamber with metal CF flanges, (ii) setting up of a 6kW/2450MHz microwave input system as an additional plasma heating source at our rotamak plasma facility, (iii) installation of one programmatic Kepco ATE 6-100DMG fast DC current supply system used in rotamak plasma shape control experiment, built a new microwave, standing-wave experiment chamber and (iv) established a new plasma lab with field reversal configuration capability utilizing 1MHz/200kW RF (radio frequency) wave generator. Some of the new experiments conducted in this period also include: (i) assessment of improved magnetic reconnection at field-reversed configuration (FRC) plasma, (ii) introduction of microwave heating experiments, and (iii) suppression of n = 1 tilt instability by one coil with a smaller current added inside the rotamak’s central pipe. These experiments led to publications in Physical Review Letters, Reviews of Scientific Instruments, Division of Plasma Physics (DPP) of American Physical Society (APS) Reports, Physics of Plasmas Controlled Fusion, and Physics of Plasmas (between 2004 and 2015). With these new improvements and advancements, we also initiated and accomplished design and fabrication of a plasma propulsion system. Currently, we are assembling a plasma propulsion experimental system that includes a 5kW helicon plasma source, a 25 cm diameter plasma heating chamber with 1MHz/200kW RF power rotating magnetic field, and a 60 cm diameter plasma exhaust chamber, and expect to achieve a plasma mass flow of 0.1g/s with 60km/s ejection. We anticipate several propulsion applications in near future as we advance our capabilities. Apart from scientific staff members, several students (more than ten undergraduate students and two graduate students from several engineering and science disciplines) were supported and worked on the equipment and experiments during the award period. We also anticipate that these opportunities with current expansions may result in a graduate program in plasma science and propulsion engineering disciplines. *Corresponding Author – Dr. Saganti, Regents Professor and Professor of Physics – pbsaganti@pvamu.edu

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Chrysler Upset Protrusion Joining Techniques for Joining Dissimilar Metals

The project goal was to develop and demonstrate a robust, cost effective, and versatile joining technique, known as Upset Protrusion Joining (UPJ), for joining challenging dissimilar metal com-binations, especially those where one of the metals is a die cast magnesium (Mg) component. Since two of the key obstacles preventing more widespread use of light metals (especially in high volume automotive applications) are 1) a lack of robust joining techniques and 2) susceptibility to galvanic corrosion, and since the majority of the joint combinations evaluated in this project include die cast Mg (the lightest structural metal) as one of the two materials being joined, and since die casting is the most common and cost effective process for producing Mg components, then successful project completion provides a key enabler to high volume application of lightweight materials, thus potentially leading to reduced costs, and encouraging implementation of lightweight multi-material vehicles for significant reductions in energy consumption and reduced greenhouse gas emissions. Eco-nomic benefits to end-use consumers are achieved primarily via the reduction in fuel consumption. Unlike currently available commercial processes, the UPJ process relies on a very robust mechanical joint rather than intermetallic bonding, so the more cathodic material can be coated prior to joining, thus creating a robust isolation against galvanic attack on the more anodic material. Additionally, since the UPJ protrusion is going through a hole that can be pre-drilled or pre-punched prior to coating, the UPJ process is less likely to damage the coating when the joint is being made. Further-more, since there is no additional cathodic material (such as a steel fastener) used to create the joint, there is no joining induced galvanic activity beyond that of the two parent materials. In accordance with its originally proposed plan, this project has successfully developed process variants of UPJ to enable joining of Mg die castings to aluminum (Al) and steel sheet components of various thicknesses, strengths and coating configurations. While most development focused on the simpler round boss version of the process, an additional phase of the work focused on devel-opment of an oval boss version to support applications with narrow flanges, while yet another vari-ant of the process, known as Upset Cast Riveting (UCR), was developed and evaluated for joining mixed metals that may not necessarily include Mg or Al die cast components. Although each varia-tion posed unique challenges described later in the report, all variations were successfully produced and evaluated, and each could be further developed for specific types of commercial applications. In this project, UPJ performed favorably against the benchmark self-pierce riveting (SPR) process in Mg AM60B to Al 6013 combinations although significant corrosion challenges were observed in both processes, especially for the bare Mg to bare Al configurations. Additional challenges were observed in joining Mg to steel with the UPJ process (SPR was not evaluated for this combination as it was not considered viable). To pass FCA’s specified corrosion tests with Mg/steel combina-tions, new steel treatments were evaluated, as well as adhesives and sealed edges. These showed significant improvement. In general, UPJ performed very well in Mg to Al 6016 combinations, even in corrosion evaluation of the bare Mg to bare Al configuration (again, SPR was not evaluated for this material combination as the 1.1 mm thick Al6016 sheet thickness was considered too thin for the SPR process). The improvement in corrosion performance of the Mg to Al 6016 combina-tion over the Mg to Al 6013 combination was thought to be a result of the lower copper content in the Al 6016 alloy. Oval boss joints showed substantial improvement in all joint strength criteria compared to 8.0-mm diameter round boss joints but were not evaluated for corrosion performance. The improved joint strength is likely a result of larger shear area. Cosmetic corrosion performance of all test assemblies (UPJ, UCR and SPR) was a challenge due to exposed edges and crevices al-lowing undercutting of the coatings. In real world component applications, the exposed edges, so prevalent on the joining test coupons, would be less prevalent and easier to protect.

36 MATERIALS SCIENCE↗

PAGOSA Simulations for the LANL Blast Tube

A parameter study was performed for the Los Alamos National Laboratory Blast Tube to tune geometry to best replicate peak blast pressures from experiments. Charge placement, reflecting wall thickness, flange gap width, and reflecting wall stand-off were sampled using a Latin-Hypercube design to train a Radial Basis Function Network surrogate model. This surrogate model was then used with a Nelder - Mead Simplex minimization routine to minimize error for the surrogate predictions.

47 OTHER INSTRUMENTATION↗

HFIR Cold Source Upgrade Options

Several cold source configurations that provide 40% to 90% higher brightness than the reference cold source in broad ranges of wavelengths longer than ~ 2 Å were identified. These CS configurations use hydrogen volumes 2.5 to 4 times larger than the reference source, require a nearly pure para-hydrogen for operation (99% para-hydrogen was assumed in the calculations), and impose heating 1.9 to 2.7 times higher than the reference cold source. Implementation would require adding an ortho-para hydrogen converter and increasing the refrigeration capacity. The brightness increase varies considerably with energy through the cold and thermal neutron range; however, the shapes of the curves of the brightness-increase-versus-energy are very similar for all the configurations analyzed. Up to 2.3 times higher brightness is observed around 3 Å wavelength. The even higher gains of 3.1 at 35 Å are practically of lower interest. Meanwhile, around 1.5 Å a brightness decrease of up to 50% is seen for all but one configuration. The configurations with connected HB-1 and HB-4 beamtubes allow the extraction of neutron beams from both sides of the cold source, therefore effectively doubling the potential number of instruments served, while providing brightness increases in the 40 % to 90 % range. A higher intensity neutron source, which would deliver ~2 times more neutrons down the beamtube, at brightness increased up to 45 %, can be obtained by increasing the radius of the HB-4 and the cold source by ~ 1 cm; which can be realized within the restrictions imposed by the reactor vessel flanges.

47 OTHER INSTRUMENTATION↗

Integrated Component-Specific Measurements to Develop Emission Factors for Compressors and Gas Gathering Lines

The Department of Energy (DOE) National Energy Technology Laboratory (NETL) and other critical stakeholders (e.g., U.S. Environmental Protection Agency (USEPA), state regulators, and industry) seek to more accurately characterize and quantify methane emissions from compressors and gathering lines within the Gathering and Boosting (G&B) segment of the natural gas system network. These efforts will reduce uncertainties in emissions estimates in USEPA’s current Green House Gas Inventory (GHGI) under their Greenhouse Gas Reporting Program (GHGRP). For this study, four G&B stations in the Gulf Coast Area were visited four times over the course of one year. Components were classified according to equipment and component type and emissions from select components were measured using multiple measurement technologies. The following major equipment types were considered: i) compressors, ii) separators, iii) dehydrators, iv) coalescers, v) slug catchers, vi) yard piping, vii) tanks, and viii) gathering lines. Individual components on each equipment type were further divided into the following main categories: i) connectors, ii) valves, iii) pressure relief valves (PRV), iv) meters, v) gauges, vi) regulators, vii) pneumatic device vents, and viii) compressor vents (e.g., distance piece vents [DPVs] and rod packing vents [RPVs]). Components were screened for the presence of leaks and venting emissions with an optical gas imaging (OGI) camera, and methane emission rates were measured using a microdilution high volume sampler. Downwind emissions were measured using an Open Path Fourier Transform Infrared (OP-FTIR) Spectrometer. Data were evaluated to assess correlation with site, equipment, time, and operational variables. Key findings and recommendations from the study include: A) Different counting methodologies can result in vastly different component counts, thus influencing total emissions calculations using Subpart W population EFs. A standard methodology should be adopted for classifying and counting components in order to minimize inconsistencies across studies and instruct stakeholders responsible for GHGI reporting. B) Results support current component subcategories listed in USEPA Subpart W, including the subdivision of connectors (flanged and “other”) and pneumatic device vents (intermittent, continuous low bleed, and continuous high bleed). C) Emission rates vary across sites and a relationship between higher emissions and compressor age was observed for some components. D) Component emission rates varied between field campaigns. The type of components contributing to overall measured emissions also varied among field campaigns. However, the emission rate variability was larger between different components (of the same category) than the variability in one component over the four field campaigns. Therefore, when calculating emission factors, it is not necessary to take repeat measurements to capture component variability. E) Measuring the emission rate of a sample for an extended period of time is not necessary to capture the average component emission rate. F) For reporting purposes, excluding liquid lines from site-wide screening may have a negligible effect on component-related emissions. However, from a site management perspective, malfunctioning components were not uncommon on liquid lines and contributed substantially to fugitive emissions at some sites. G) Population EFs, whether including or excluding liquid lines, were a conservative estimate of fugitive emissions. Leaker EFs consistently underestimated emissions at the field sites. Measurements at more sites, particularity sites in other areas of the country, need to be completed before determining the accuracy of EFs.

03 NATURAL GAS↗

Nitrogen Monitoring of West Hackberry 117 Cavern Wells (Revision 1)

U.S. Strategic Petroleum Reserve (SPR) oil storage cavern West Hackberry 117 was tested under extended nitrogen monitoring following a successful mechanical integrity test in order to validate a newly developed hydrostatic column model to be used to differentiate between normal “tight” well behavior and small-leak behavior under nitrogen. High resolution wireline pressure and temperature data were collected during the test period and used in conjunction with the hydrostatic column model to predict the nitrogen/oil interface and the pressure along the entire fluid column from the bradenhead flange nominally at ground surface to bottom of brine pool. Results here and for other SPR caverns have shown that wells under long term nitrogen monitoring do not necessarily pressurize with a relative rate (P N2 /P brine ) of 1. The theoretical relative pressure rate depends on the well configuration, pressure and the location of the nitrogen-oil interface and varies from well to well. For the case of WH117 the predicted rates were 0.73 for well A and 0.92 for well B. The measured relative pressurization rate for well B was consistent with the model prediction, while well A rate was found to be between 0.58-0.68. A number of possible reasons for the discrepancy between the model and measured rates of well A are possible. These include modeling inaccuracy, measurement inaccuracy or the possibility of the presence of a very small leak (below the latest calculated minimum detectable leak rate).

54 ENVIRONMENTAL SCIENCES↗