Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “engine qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Design, analysis and test verification of advanced encapsulation systems

An analytical methodology for advanced encapsulation designs was developed. From these methods design sensitivities are established for the development of photovoltaic module criteria and the definition of needed research tasks. Analytical models were developed to perform optical, thermal, electrical and analyses on candidate encapsulation systems. From these analyses several candidate systems were selected for qualification testing. Additionally, test specimens of various types are constructed and tested to determine the validity of the analysis methodology developed. Identified deficiencies and/or discrepancies between analytical models and relevant test data are corrected. Prediction capability of analytical models is improved. Encapsulation engineering generalities, principles, and design aids for photovoltaic module designers is generated.

Garcia, A., III↗

The Solid Rocket Booster Auxiliary Power Unit: Meeting the Challenge

The thrust vector control systems of the solid rocket boosters are turbine-powered, electrically controlled hydraulic systems which function through hydraulic actuators to gimbal the nozzles of the solid rocket boosters and provide vehicle steering for the Space Shuttle. Turbine power for the thrust vector control systems is provided through hydrazine fueled auxiliary power units which drive the hydraulic pumps. The solid rocket booster auxiliary power unit resulted from trade studies which indicated significant advantages would result if an existing engine could be found to meet the program goal of 20 missions reusability and adapted to meet the seawater environments associated with ocean landings. During its maturation, the auxiliary power unit underwent many design iterations and provided its flight worthiness through full qualification programs both as a component and as part of the thrust vector control system. More significant, the auxiliary power unit has successfully completed six Shuttle missions.

Hughes, R. W.↗

NASA's Automated Rendezvous and Docking/Capture Sensor Development and Its Applicability to the GER

This paper will address how a common Automated Rendezvous and Docking/Capture (AR&D/C) sensor suite can support Global Exploration Roadmap (GER) missions, and discuss how the model of common capability development to support multiple missions can enable system capability level partnerships and further GER objectives. NASA has initiated efforts to develop AR&D/C sensors, that are directly applicable to GER. NASA needs AR&D/C sensors for both the robotic and crewed segments of the Asteroid Redirect Mission (ARM). NASA recently conducted a commonality assessment of the concept of operations for the robotic Asteroid Redirect Vehicle (ARV) and the crewed mission segment using the Orion crew vehicle. The commonality assessment also considered several future exploration and science missions requiring an AR&D/C capability. Missions considered were asteroid sample return, satellite servicing, and planetary entry, descent, and landing. This assessment determined that a common sensor suite consisting of one or more visible wavelength cameras, a three-dimensional LIDAR along with long-wavelength infrared cameras for robustness and situational awareness could be used on each mission to eliminate the cost of multiple sensor developments and qualifications. By choosing sensor parameters at build time instead of at design time and, without having to requalify flight hardware, a specific mission can design overlapping bearing, range, relative attitude, and position measurement availability to suit their mission requirements with minimal nonrecurring engineering costs. The resulting common sensor specification provides the union of all performance requirements for each mission and represents an improvement over the current systems used for AR&D/C today. NASA's AR&D/C sensor development path could benefit the International Exploration Coordination Group (ISECG) and support the GER mission scenario by providing a common sensor suite upon which GER objectives could be achieved while minimizing development costs. The paper will describe the concepts of operations of these missions and how the common sensors are utilized by each mission. It will also detail the potential partnerships and contribution of the International community in the development of this common AR&D/C sensor suite.

Hinkel, Heather↗

Technology Development of Automated Rendezvous and Docking/Capture Sensors and Docking Mechanism for the Asteroid Redirect Crewed Mission

This paper will describe the technology development efforts NASA has underway for Automated Rendezvous and Docking/Capture (AR&D/C) sensors and a docking mechanism and the challenges involved. The paper will additionally address how these technologies will be extended to other missions requiring AR&D/C whether robotic or manned. NASA needs AR&D/C sensors for both the robotic and crewed segments of the Asteroid Redirect Mission (ARM). NASA recently conducted a commonality assessment of the concept of operations for the robotic Asteroid Redirect Vehicle (ARV) and the crewed mission segment using the Orion crew vehicle. The commonality assessment also considered several future exploration and science missions requiring an AR&D/C capability. Missions considered were asteroid sample return, satellite servicing, and planetary entry, descent, and landing. This assessment determined that a common sensor suite consisting of one or more visible wavelength cameras, a threedimensional LIDAR along with long-wavelength infrared cameras for robustness and situational awareness could be used on each mission to eliminate the cost of multiple sensor developments and qualifications. By choosing sensor parameters at build time instead of at design time and, without having to requalify flight hardware, a specific mission can design overlapping bearing, range, relative attitude, and position measurement availability to suit their mission requirements with minimal nonrecurring engineering costs. The resulting common sensor specification provides the union of all performance requirements for each mission and represents an improvement over the current systems used for AR&D/C today. These sensor specifications are tightly coupled to the docking system capabilities and requirements for final docking conditions. The paper will describe NASA's efforts to develop a standard docking system for use across NASA human spaceflight missions to multiple destinations. It will describe the current design status and the considerations and technologies involved in developing this docking mechanism.

Hinkel, Heather↗

Technology Development of Automated Rendezvous and Docking/Capture Sensors and Docking Mechanism for the Asteroid Redirect Crewed Mission

This paper will describe the technology development efforts NASA has underway for Automated Rendezvous and Docking/Capture (AR and D/C) sensors and a docking mechanism and the challenges involved. The paper will additionally address how these technologies will be extended to other missions requiring AR and D/C whether robotic or manned. NASA needs AR&D/C sensors for both the robotic and crewed segments of the Asteroid Redirect Mission (ARM). NASA recently conducted a commonality assessment of the concept of operations for the robotic Asteroid Redirect Vehicle (ARV) and the crewed mission segment using the Orion crew vehicle. The commonality assessment also considered several future exploration and science missions requiring an AR and D/C capability. Missions considered were asteroid sample return, satellite servicing, and planetary entry, descent, and landing. This assessment determined that a common sensor suite consisting of one or more visible wavelength cameras, a threedimensional LIDAR along with long-wavelength infrared cameras for robustness and situational awareness could be used on each mission to eliminate the cost of multiple sensor developments and qualifications. By choosing sensor parameters at build time instead of at design time and, without having to requalify flight hardware, a specific mission can design overlapping bearing, range, relative attitude, and position measurement availability to suit their mission requirements with minimal nonrecurring engineering costs. The resulting common sensor specification provides the union of all performance requirements for each mission and represents an improvement over the current systems used for AR and D/C today. These sensor specifications are tightly coupled to the docking system capabilities and requirements for final docking conditions. The paper will describe NASA's efforts to develop a standard docking system for use across NASA human spaceflight missions to multiple destinations. It will describe the current design status and the considerations and technologies involved in developing this docking mechanism.

Hinkel, Heather↗

Development of the propulsion subsystem for the Viking 75 Orbiter

The development of the Viking 75 Orbiter propulsion subsystem has been completed and qualification is under way. This development required an extension of the Mariner Mars 1971 propulsion subsystem technology to meet the Viking 75 requirements of three times the burn time and five times the number of burns. Modifications have been incorporated into the rocket engine to increase the cooling margin for the 2700-second Mars orbit insertion burn. This capability has been demonstrated in both engine firings and subsystem tests. A new surface tension device has been developed to position the propellants (N2O4 and MMH) over the tank outlets during zero-g flight. Extensive scale model testing has been conducted to prove this propellant management concept. This subsystem will provide midcourse corrections, an orbit insertion burn and 20 orbit trims for the Viking 75 Spacecraft. The Viking Project is managed by the Langley Research Center, National Aeronautics and Space Administration.

Vote, F. C.↗

Antenna technology for orbital Very Long Baseline Interferometry (VLBI)

Since it is not economically feasible to construct steerable antennas much larger than 100 meters on Earth (400 meters for fixed telescopes), radio interferometry became a very useful technique for high resolution astronomy observations of quasars, galactic nuclei, and interstellar hydroxyl (OH) and water vapor (H2O) masers. The subsystems necessary to do the space VLBI experiment appear are available but require space qualifications. There are several 50-meter antenna concepts that could be used. Certainly there are problems to be solved. Feed positioning with respect to reflector, pointing such a large structure to accuracy indicated, and integration into the Shuttle control system are all significant engineering challenges. However, there are no problems that are insurmountable in the latter part of this decade.

Hamilton, E. C.↗

Development of Shape Memory Alloys- Challenges and Solutions

Shape memory alloys (SMAs) are a unique class of multifunctional materials that have the ability to recover large deformations or generate high stresses in response to thermal, mechanical andor electromagnetic stimuli. These abilities have made them a viable option for actuation systems in aerospace, medical, and automotive applications, amongst others. However, despite many advantages and the fact that SMA actuators have been developed and used for many years, so far they have only found service in a limited range of applications. In order to expand their applications, further developments are needed to increase their reliability and stability and to address processing, testing and qualification needed for large-scale commercial application of SMA actuators. In this seminar, historical inhibitors of SMA applications and current research efforts by NASA Glenn Research Center and collaborators will be discussed. Relationships between fundamental physicalscientific understanding, and the direct transition to engineering and design of mechanisms using these novel materials will be highlighted. Examples will be presented related to targeted alloy development, microstructural control, and bulk-scale testing as a function of stresses, temperatures and harsh environments. The seminar will conclude with a summary of SMA applications under development and current advances.

Shape Memory Alloy↗

Computational Design to Advance AM Fabrication of High Gamma Prime Alloys for Hot Gas Path Components in Gas Turbine Engines: A Pathway to Enhanced Gas Turbine Efficiency and Energy Saving (Final CRADA Report)

Raising turbine inlet temperature is a key lever for improving industrial gas-turbine efficiency and power output, but it increases thermo-mechanical demands on hot-gas-path components. Additive manufacturing (AM), particularly laser powder bed fusion (L-PBF), enables complex internal cooling features in critical components such as turbine tip shoes that are difficult to produce by conventional casting. However, qualification of new high-temperature AM alloys and aggressive geometries is often limited by trial-and-error iteration of build parameters and post-build heat treatments, with cracking during stress relieving or hot isostatic pressing (HIP) being a recurring failure mode.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spacecraft thermal vacuum testing

An approach for developing a general thermal vacuum test program philosophy is discussed. Guidelines are established that will assist the project engineer in relating the risk associated with flying any spacecraft to its test program. Computerized techniques can be used to help ascertain these guidelines, which relate the risk to the level of test (component, subsystem, etc), as well as to the type of test (development, qualification, etc). The interrelationship between the test program and the analytical effort is also discussed. The Skylab Apollo telescope mount general thermal vacuum test program, including test schedules, instrumentation, and test results is also discussed.

Elam, B. F.↗

Third Aerospace Environmental Technology Conference

The elimination of CFC's, Halons, TCA, other ozone depleting chemicals, and specific hazardous materials is well underway. The phaseout of these chemicals has mandated changes and new developments in aerospace materials and processes. We are beyond discovery and initiation of these new developments and are now in the implementation phase. This conference provided a forum for materials and processes engineers, scientists, and managers to describe, review, and critically assess the evolving replacement and clean propulsion technologies from the standpoint of their significance, application, impact on aerospace systems, and utilization by the research and development community. The use of these new technologies, their selection and qualification, their implementation, and the needs and plans for further developments are presented.

Whitaker, A. F.↗

ATR Fuel Management

The sixth Core Internals Changeout (CIC) of ATR was completed on March 21, 2022, and Nuclear Testing (NT) commenced shortly thereafter. In support of NT, 235U flux wires were attached to flux wands using electrical tape and installed in water channels 2, 6, 11, 15 and 19 in each of the 40 ATR Mark VII fuel elements that comprise an ATR core to perform low power flux measurements during ATR Cycle 170CIC NT-3. The flux wands were fabricated from Poly (Methyl Methacrylate), or PMMA. Irradiated cobalt capsules were loaded in the ATR Northeast Irradiation Housing Assembly (NEIHA), the East Flux Trap (EFT), South Flux Trap (SFT), inboard A-positions and various H-positions as a 170CIC NT-3 core reactivity hold-down mechanism. The PMMA flux wands received significant gamma dose from the irradiated cobalt during NT-3 which caused discoloration, embrittlement and swelling of the flux wands. The removal of the degraded flux wands from the 0.078 in. wide by 50 in. long fuel element coolant channels has been a unique challenge. This presentation summarizes the cleaning techniques used to remove the flux wand debris from the elements, an aggressive PMMA irradiation experiment performed concomitantly with initial cleaning efforts, and planned inspection and qualification techniques that will be applied in the future to potentially requalify the impacted elements for re-use.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Materials and processes for Shuttle engine, external tank, and Solid Rocket Booster

The paper deals with the materials and processes for three Space Shuttle elements: Space Shuttle Main Engines (SSME), the External Tank (ET), and the Solid Rocket Boosters (SRB), beginning with an overview of the materials selection, tracking and control system. SSME materials and processes are considered with emphasis on hydrogen environment embrittlement, LOX/GOX compatibility, stress corrosion cracking, and hydraulic fluid testing and qualification. The ET is examined with attention given to welding and fracture mechanics, and the thermal protection system. The SRB is discussed with emphasis on corrosion prevention, stress corrosion and fracture toughness, the integrated test bed for in situ corrosion protection verification, aluminum processing, and the thermal protection system.

Schwinghamer, R. J.↗

Application of Digital Radiography to Weld Inspection for the Space Shuttle External Fuel Tank

This slide presentation reviews NASA's use of digital radiography to inspect the welds of the external tanks used to hold the cryogenic fuels for the Space Shuttle Main Engines. NASA has had a goal of replacing a significant portion of film used to inspect the welds, with digital radiography. The presentation reviews the objectives for converting to a digital system from film, the characteristics of the digital system, the Probability of detection study, the qualification and implementation of the system.

Ussery, Warren↗

Technology Development of Automated Rendezvous and Docking/Capture Sensors and Docking Mechanism for the Asteroid Redirect Crewed Mission

This paper will describe the technology development efforts NASA has underway for Automated Rendezvous and Docking/Capture (AR&D/C) sensors and a docking mechanism and the challenges involved. The paper will additionally address how these technologies will be extended to other missions requiring AR&D/C whether robotic or manned. NASA needs AR&D/C sensors for both the robotic and crewed segments of the Asteroid Redirect Mission (ARM). NASA recently conducted a commonality assessment of the concept of operations for the robotic Asteroid Redirect Vehicle (ARV) and the crewed mission segment using the Orion spacecraft. The commonality assessment also considered several future exploration and science missions requiring an AR&D/C capability. Missions considered were asteroid sample return, satellite servicing, and planetary entry, descent, and landing. This assessment determined that a common sensor suite consisting of one or more visible wavelength cameras, a three-dimensional LIDAR along with long-wavelength infrared cameras for robustness and situational awareness could be used on each mission to eliminate the cost of multiple sensor developments and qualifications. By choosing sensor parameters at build-time instead of at design-time and, without having to requalify flight hardware, a specific mission can design overlapping bearing, range, relative attitude, and position measurement availability to suit their mission requirements with minimal non-recurring engineering costs. The resulting common sensor specification provides the union of all performance requirements for each mission and represents an improvement over the current systems used for AR&D/C today. These sensor specifications are tightly coupled to the docking system capabilities and requirements for final docking conditions. The paper will describe NASA's efforts to develop a standard docking system for use across NASA human spaceflight missions to multiple destinations. It will describe the current design status and the considerations and technologies involved in developing this docking mechanism.

Hinkel, Heather↗

Design and Demonstration of the Mars Organic Molecule Analyzer (MOMA) on the ExoMars 2018 Rover

The Mars Organic Molecule Analyzer (MOMA) investigation is a key astrobiology experiment scheduled to launch on the joint ESA-Roscosmos ExoMars 2018 rover mission. MOMA will examine the chemical composition of geological samples acquired from depths of up to two meters below the martian surface, where fragile organic molecules may be protected from destructive cosmic radiation and/or oxidative chemical reactions. The heart of the MOMA mass spectrometer subsystem (i.e., MOMA-MS) is a miniaturized linear ion trap (LIT) that supports two distinct modes of operation to detect: i) volatile and semi-volatile, low-to-moderate mass organics (less than or equal to 500 Da) via pyrolysis coupled with gas chromatography mass spectrometry (pyr/GCMS); and, ii) more refractory, moderate-to-high mass compounds (up to 1000 Da) via laser desorption (LDMS) at ambient Mars pressures. Additionally, the LIT mass analyzer enables selective ion trapping via multi-frequency waveform ion excitation (e.g., stored waveform inverse Fourier transform, or SWIFT), and structural characterization of complex molecules using tandem mass spectrometry (MSIMS). A high-fidelity Engineering Test Unit (ETU) of MOMAMS, including the LIT subassembly, dual-gun electron ionization source, micropirani pressure gauge, solenoid-driven aperture valve, redundant detection chains, and control electronics, has been built and tested at NASA GSFC under relevant operational conditions (pressure, temperature, etc.). Spaceflight qualifications of individual hardware components and integrated subassemblies have been validated through vibration, shock, thermal, lifetime, and performance evaluations. The ETU serves as a pathfinder for the flight model buildup, integration and test, as the ETU meets the form, fit and function of the flight unit that will be delivered to MPS in late 2015. To date, the ETU of MOMA-MS has been shown to meet or exceed all functional requirements, including mass range, resolution, accuracy, instrumental drift, and Iimit-of-detection specifications, thereby enabling the primary science objectives of the MOMA investigation and ExoMars 2018 mission.

Mars Organic Molecule Analyzer↗

Overview of Iodine Propellant Hall Thruster Development Activities at NASA Glenn Research Center

NASA is continuing to invest in advancing Hall thruster technologies for implementation in commercial and government missions. There have been several recent iodine Hall propulsion system development activities performed by the team of the NASA Glenn Research Center, the NASA Marshall Space Flight Center, and Busek Co. Inc. In particular, the work focused on qualification of the Busek BHT-200-I, 200 W and the continued development of the BHT-600-I Hall thruster propulsion systems. This presentation presents an overview of these development activities and also reports on the results of short duration tests that were performed on the engineering model BHT-200-I and the development model BHT-600-I Hall thrusters.

Electric Propulsion↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗