System benefits of industrial battery storage: A comparison of grid and facility control and dispatch

Customer-owned, distributed battery installations are being incentivized by utilities to increase installed battery capacity. In many of these incentive agreements, the battery owner relinquishes battery control to the utility in exchange for incentive money. The industrial sector has lagged in storage installation when compared to the residential and commercial sectors. This study compares the economic advantages to utilities and industrial facilities in different dispatch control situations. The study presents a novel framework for the optimization of multiple systems using load profiles from the industrial, residential, and commercial sectors. Case studies are presented to illustrate different dispatch scenarios. Further, the simulations showed more fiscal benefit for the industrial facilities to dispatch the battery for electrical demand reduction than utility dispatch. In the case studies, facility dispatch control resulted in an increase of facility savings by a factor of about 8.7 when compared to utility dispatch. Battery size plays a significant factor on the impact of the grid’s generating costs, showing that larger batteries can provide significant benefit even if dispatched by the facility. Future policies concerning industrial battery installations should consider overall economic benefits to utility and facility in the form of rate structures and incentive participation based on battery size.

25 ENERGY STORAGE↗

A Multi-objective Microgrid Assessment and Sizing Framework for Economic and Resilience Benefits

This paper presents an innovative multi-objective assessment and sizing framework for battery energy storage system paired with photovoltaics for a cost-effective and resilient microgrid. In the proposed framework, we simultaneously consider i) economic benefits from bundling grid services in grid-connected mode and ii) enhanced resilience by operating the microgrid in island mode upon outages of the main grid. Instead of simply treating resilience as another monetary value stream, this paper models resilience and economic benefits as two separate objectives. Multi-objective optimization is developed to explore different sizing and dispatch options and generate the Pareto front to assist decision-making in system design. Case studies on a real-world microgrid project in Puget Sound Energy system are presented to illustrate the proposed modeling and sizing methods.

Battery energy storage, Microgrid, Optimal Sizingp↗

Modelling wind power spatial-temporal correlation in multi-interval optimal power flow: A sparse correlation matrix approach

The significantly increasing deployment of wind power necessitates that system operation considers the spatial-temporal correlation of power forecast from different wind power plants. How to model this spatial-temporal correlation in the actual system dispatch is challenging. In this paper, a sparse correlation matrix is utilized to efficiently model the spatial-temporal correlation of wind power forecast in the generation dispatch model. A novel, adjustable, and distributionally-robust chance-constrained multi-interval optimal power flow (ADRCC-MIOPF) model is proposed to obtain reliable economic dispatch (ED) solutions. The spatial-temporal correlation of wind power plants power forecasts is represented by the sparse correlation covariance matrix obtained from historical, time series wind power forecast error data. The chance constraints in the ADRCC-MIOPF model are transformed into a set of second-order-cone (SOC) constraints in which an adjustable coefficient in the chance constraints controls the robustness of the ADRCC-MIOPF model to the wind power forecast errors distribution. Case studies performed on the PJM 5-bus system and IEEE 118-bus system verify the proposed method to improve the system security and reduce the cost especially under the high wind penetration levels. All the cases can be solved within several minutes for both the small and large cases which validates the efficiency of the proposed sparse matrix model. In addition, considering the spatial-temporal correlation of wind power forecast and the distributional robustness of wind power forecast error leads to a more reliable economic dispatch with lower system violations.

17 WIND ENERGY↗

Accelerated Voltage Regulation in Multi-Phase Distribution Networks Based on Hierarchical Distributed Algorithm

Here, we introduce a hierarchical distributed algorithm to solve optimal power flow (OPF) problems that aim at dispatching controllable distributed energy resources (DERs) for voltage regulation at minimum cost. The proposed algorithm highlights unprecedented scalability to large multi-phase distribution networks by jointly exploring the tree/subtrees structure of a large radial distribution network and the structure of the linearized distribution power flow (LinDistFlow) model to derive a hierarchical, distributed implementation of the primal-dual gradient algorithm that solves OPF. The proposed implementation significantly reduces the computation loads compared to the centrally coordinated implementation of the same primal-dual algorithm without compromising optimality. Numerical findings on a 4,521-node test feeder show that the designed algorithm achieves more than 10-fold acceleration in the speed of convergence compared to the centrally coordinated primal-dual algorithm through reducing and distributing computational loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Hybrid Optimization and Deep Learning Algorithm for Cyber-Resilient DER Control

With the proliferation of distributed energy resources (DERs) in the distribution grid, it is a challenge to effectively control a large number of DERs resilient to the communication and security disruptions, as well as to provide the online grid services, such as voltage regulation and virtual power plant (VPP) dispatch. To this end, a hybrid feedback-based optimization algorithm along with deep learning forecasting technique is proposed to specifically address the cyber-related issues. The online decentralized feedback-based DER optimization control requires timely, accurate voltage measurement from the grid. However, in practice such information may not be received by the control center or even be corrupted. Therefore, the long short-term memory (LSTM) deep learning algorithm is employed to forecast delayed/missed/attacked messages with high accuracy. The IEEE 37-node feeder with high penetration of PV systems is used to validate the efficiency of the proposed hybrid algorithm. The results show that 1) the LSTM-forecasted lost voltage can effectively improve the performance of the DER control algorithm in the practical cyber-physical architecture; and 2) the LSTM forecasting strategy outperforms other strategies of using previous message and skipping dual parameter update.

cyber-resilient algorithm↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Getting brighter: Impacts of improved day-ahead solar forecasts in high-solar, high-storage electricity systems

This paper analyzes the impacts of improved day-ahead solar forecasts on costs and dispatch in the solar-rich Southeast U.S. It uses an optimized high-solar, high-storage resource portfolio in which solar generation capacity accounts for 45 % of total installed capacity (34 %–36 % of generation) and energy storage capacity (43 GW) is equivalent to 33 % of peak demand. In a base scenario, improved day-ahead solar forecasts reduce production costs by $\$87$ million per year ($\$0.13$ per MWh load, $2023$$). This level of savings is within the range or lower than earlier studies of solar forecast improvements at lower levels of solar generation (<25 % of total generation). In this study, solar expansion was accompanied by two important sources of flexibility for managing solar forecast error: energy storage and day-ahead solar curtailment. Furthermore, the analysis finds that regional coordination complements day-ahead solar forecast improvements while natural gas commitment flexibility is a substitute for forecast improvements, as the improved solar forecast leads to sub-optimal commitment of thermal units. Day-ahead solar forecast improvements reduce reserves required to manage forecast error by 30 %. Fewer reserves to manage large, infrequent solar forecast errors could be an important benefit of improved solar forecasts.

14 SOLAR ENERGY↗

Reliability Constrained Priority Load Shedding for Aerospace Power System Automation

The need for improving load shedding on board the space station is one of the goals of aerospace power system automation. To accelerate the optimum load-shedding functions, several constraints must be involved. These constraints include congestion margin determined by weighted probability contingency, component/system reliability index, generation rescheduling. The impact of different faults and indices for computing reliability were defined before optimization. The optimum load schedule is done based on priority, value and location of loads. An optimization strategy capable of handling discrete decision making, such as Everett optimization, is proposed. We extended Everett method to handle expected congestion margin and reliability index as constraints. To make it effective for real time load dispatch process, a rule-based scheme is presented in the optimization method. It assists in selecting which feeder load to be shed, the location of the load, the value, priority of the load and cost benefit analysis of the load profile is included in the scheme. The scheme is tested using a benchmark NASA system consisting of generators, loads and network.

Momoh, James A.↗

Scenario Creation and Power-Conditioning Strategies for Operating Power Grids with Two-Stage Stochastic Economic Dispatch

A significant difficulty associated with the use of stochastic programming to solve optimal power flow problems on a 5-minute timescale is the quality of renewable energy scenarios input by the user. This is especially true when considering power systems with high penetrations of renewable energy, e.g. wind power. This paper introduces the use of stochastic programming to solve the DC optimal power flow problem with scenarios drawn directly from high-fidelity data sets. Hence, the proposed method avoids the problem of lost physics by finding high-fidelity analogs that can describe future states of the system. Furthermore, this method can be simply extended to output multi-period scenarios to the stochastic program. We demonstrate the effectiveness of this technique by simulating dispatch operations on a synthetic test system over the course of a week.

94 GMLC - Grid Modernization Laboratory Consortium↗

Integrated Dispatching and Charging Management of an Autonomous Electric Vehicle Ride-Hailing Fleet

Electrification and autonomous driving are two important trends in transportation systems. The convergence of these two technologies will introduce opportunities to improve transportation systems' operation and energy efficiency. One potential application is the commercial ride-hailing fleet with autonomous electric vehicles (AEVs). In order to harvest promising benefits from introducing AEVs into ride-hailing fleets, some unavoidable challenges will need to be resolved to ensure the fleets operates functionally and efficiently. This paper discusses the challenges of dispatching AEVs and their interactions with charging infrastructure. An integrated decision making framework for dispatching and charging has been designed using a system optimization approach to study the AEVs' management within the period when they drop off passengers and pick up the next passengers. Its potential fleet-wide benefits have been illustrated by comparing operations under a heuristic approach. A simulation platform has been designed to test different decision making strategies for the ride-hailing AEV fleets operational performance. Using this platform, detailed case studies have been performed with different fleet sizes, dispatching strategies, and charging infrastructure network settings. Comprehensive analyses from various aspects have been conducted to understand the AEVs' fleet operation performance, (e.g., zero occupancy vehicle miles traveled, successfully served ratio of ride-hailing requests, fleet vehicle charging downtime, and charging infrastructure utilization). Results have provided a deep understandings on operation's dynamics under various fleet system configurations and also have demonstrated advantages of the optimization-based approach for the AEV fleet management. Studies in this paper inform better designs on the future of sophisticated management strategies and charging infrastructure to support ride-hailing AEV fleet operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Real-Time Corrective Switching in Response to Simultaneous Contingencies

The standard optimal power flow (OPF) problem is an economic dispatch (ED) problem combined with transmission constraints, which are based on a static topology. Prior research has demonstrated that cooptimization of generation dispatch and transmission topology results in cost savings. However, the computational complexity associated with topology control (TC) has been a major deterrent to its implementation. The proposed work investigates the application of a heuristic, a greedy algorithm, to improve the computational time for the TC problem while still maintaining the ability to find quality solutions. An expression is derived, which indicates the impact on the objective for a marginal change in the state of a transmission line. This expression is used to generate a priority list with potential candidate lines for switching, which may provide huge improvements to the system. The advantage of this method is that it is a fast heuristic as compared to using mixed integer programming (MIP) to find a solution. The heuristic is tested on real-time applications such as N-1 events, N - m events (m simultaneous contingencies), and cascading events. The proposed algorithm specifically targets cases that lead to load shedding in the system and provides a quick and efficient method to restore the loads by improving the deliverability of reserves via TC. Simulation results on the IEEE 73 bus test system and the IEEE 118 bus test system suggest a significant improvement in the amount of load served to the system with TC as opposed to without TC with minimal time and computation.

Electric power systems↗

Iterative methods in GPU-resident linear solvers for nonlinear constrained optimization

Linear solvers are major computational bottlenecks in a wide range of decision support and optimization computations. The challenges become even more pronounced on heterogeneous hardware, where traditional sparse numerical linear algebra methods are often inefficient. For example, methods for solving ill-conditioned linear systems have relied on conditional branching, which degrades performance on hardware accelerators such as graphical processing units (GPUs). To improve the efficiency of solving ill-conditioned systems, our computational strategy separates computations that are efficient on GPUs from those that need to run on traditional central processing units (CPUs). Our strategy maximizes the reuse of expensive CPU computations. Iterative methods, which thus far have not been broadly used for ill-conditioned linear systems, play an important role in our approach. In particular, we extend ideas from Arioli et al., (2007) to implement iterative refinement using inexact LU factors and flexible generalized minimal residual (FGMRES), with the aim of efficient performance on GPUs. In conclusion, we focus on solutions that are effective within broader application contexts, and discuss how early performance tests could be improved to be more predictive of the performance in a realistic environment.

97 MATHEMATICS AND COMPUTING↗

Scenario Creation and Power-Conditioning Strategies for Operating Power Grids with Two-Stage Stochastic Economic Dispatch

A significant difficulty associated with the use of stochastic programming to solve optimal power flow problems on a 5-minute timescale is the quality of renewable energy scenarios input by the user. This is especially true when considering power systems with high penetrations of renewable energy, e.g. wind power. This paper introduces the use of stochastic programming to solve the DC optimal power flow problem with scenarios drawn directly from high-fidelity data sets. Hence, the proposed method avoids the problem of lost physics by finding high-fidelity analogs that can describe future states of the system. Furthermore, this method can be simply extended to output multi-period scenarios to the stochastic program. We demonstrate the effectiveness of this technique by simulating dispatch operations on a synthetic test system over the course of a week.

analog forecast↗

Minimizing Uncertainties Impact in Decision Making with an Applicability Study for Economic Power Dispatch

This report summaries the work performed under the LDRD project on the preliminary study on knowledge automation, where specific focus has been made on the investigation of the impact of uncertainties of human decision making onto the optimization of the process operation. At first the statistics on signals from the Brain-Computing Interface (BCI) is analyzed so as to obtain the uncertainties characterization of human operators during the decision making phase using the electroencephalogram (EEG) signals. This is then followed by the discussions of an architecture that reveals the equivalence between optimization and closed loop feedback control design, where it has been shown that all the optimization problems can be transferred into the control design problem for closed loop systems. This has led to a “closed loop” framework, where the structure of the decision making is shown to be subjected to both process disturbances and controller’s uncertainties. The latter can well represent the uncertainties or randomness occurred during human decision making phase. As a result, a stochastic optimization problem has been formulated and a novel solution has been proposed using probability density function (PDF) shaping for both the cost function and the constraints using stochastic distribution control concept. A sufficient condition has been derived that guarantees the convergence of the optimal solution and discussions have been made for both the total probabilistic solution and chanced constrained optimization which have been well-studied in optimal power flows (OPF) area. A simple case study has been carried out for the economic dispatch of powers for a grid system when there are distributed energy resources (DERs) in the system, and encouraging results have been obtained showing that a significant savings on the generation cost can be expected.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Decentralized wind uncertainty management: Alternating direction method of multipliers based distributionally-robust chance constrained optimal power flow

How to manage wind power uncertainty in system operation is an urgent and important issue, especially under substantially increasing penetration levels of wind generation in electric power systems. With increasing numbers of wind power plants (WPPs) integrated into power systems, their variability and uncertain power outputs become a challenge to maintaining system reliability. Traditional stochastic optimization-based models face the curse of dimensionality when the number of WPPs increases. This paper proposes a novel decentralized wind power uncertainty management model. In this model, conventional generators optimize their power capacity output and their participation to mitigate wind power uncertainty locally with only limited information exchange with the system operators. First, a distributionally-robust chance-constrained optimal power flow (DRCC-OPF) model is deployed to schedule the generation and reserve considering the wind power forecast uncertainty. Then, the alternating direction method of multipliers (ADMM) is used to reformulate the DRCC-OPF model into the distributed optimization model for each conventional generator and WPP. The tests on a small PJM 5-bus system and the IEEE 118-bus system demonstrate that the proposed decentralized model can increase the operation reliability without sacrificing system operating cost, especially when the wind power penetration levels are high. Using the proposed model, the optimal solutions can be obtained within one minute, for all studied cases, which verifies the computation efficiency of the proposed decentralized model. Furthermore, considering a large number of WPPs integrated into the system, the proposed decentralized method obtains a lower operating cost within one minute which demonstrates its efficiency to deal with high dimension of uncertainties.

17 WIND ENERGY↗

Modeling and Simulation Capability Development Plan

This report provides an assessment of the current status of the modelling and simulation capability for the Nuclear-Renewable Hybrid Energy System (N-R HES). The current capabilities are separated in: • Creation of the system boundary condition. More in detail this refer to the capability to create either demand, renewable supply, price profiles etc.. • Creation of a numerical representation of the physical model of a N-R HES system • Derivation, from the actual performance of the physical system, the cash flow to perform the economical assessment • Optimization of N-R HES configuration and dispatch Those capabilities are the ones which enable the workflow summarize in Figure 1below.

97 MATHEMATICS AND COMPUTING↗

Report on the Economic Optimization of a Demonstration Case for a Static N-R HES Configuration using RAVEN

The synthetic time history generation algorithm in RAVEN has been extensively tested and used to perform qualitative assessments of the statistical characteristics of the net demand vs. demand for different values of the penetration of wind generation. Reported results highlight the need to consider the impact of variable renewable on the electricity net demand profile, due to the increase in its volatility with increased wind penetration. This analysis provides a strong foundation for the modeling and simulation needs expressed under the "Nuclear-Renewable Hybrid Energy Systems" (NRHES) project. Following this confirmative analysis the entire stochastic optimization framework has been tested in a demo case. The case chosen is an optimization driven by profitability for a system composed by a nuclear plant and a hydrogen production industrial process. This type of economical analysis is aimed to assess the capability of a hybrid system to penetrate the current energy market. In this sense it differs from the approach suggested under NRHES, where a cost minimization approach is suggested. This analysis is instead aimed to show the flexibility of the developed framework, e.g. for the evaluation of retrofitting projects of already existing plants. The system considered is subject to variable prices of electricity, which are simulated using the algorithm for the production of synthetic time histories. The physical system is considered without inertia so that it can be replaced by dispatching rules based on the highest marginal profit. Two optimization problems have been considered, for the first the size of the nuclear power plant is fixed and the optimization variable is the capacity of the hydrogen production plant. For the second, both plant sizes are optimization parameters while the overall capital expenditure is caped. The economical figures of merits considered are the Internal Rate of Return (IRR) and/or Profitability Index (PI) for the first one (since no cap is placed on the investment size) and Net Present Value (NPV) and/or IRR for the second one where the capital expenditure is constrained. Economic input data concerning capital costs, size-scaling factors, and operational costs for both plants have been collected from literature in order to achieve a simulation as realistic as possible. More work will be needed to obtain even more realistic numbers, possibly from industrial partners, and considering market elasticity for the hydrogen market. In order to perform the optimization of the cases described above, the economical external RAVEN module (CashFlow) for financial analysis has been improved in flexibility and generality. Some improvements have also been made to the optimization algorithm for a more efficient treatment of the boundary constrains. In conclusion three major results have been obtained: a) collection of the economical parameters characterizing the nuclear power plants and hydrogen production plants, b) extension of the financial analysis module (CashFlow) to drive the calculation of all needed cash flow streams and c) the testing of the full framework in a nearly final configuration.

97 MATHEMATICS AND COMPUTING↗