Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “direct load control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

403 records · Page 23

A Hybrid AI/ML and Computational Mechanics Based Approach for Time-Series State and Fatigue Life Estimation of Nuclear Reactor Components

Environmental fatigue modeling is a complex problem due to multiple failure modes and their intermixing. The failure modes are function of various underlying causes in addition to the corrosive effect of reactor coolant environment. Some of the major causes are time-dependence of material associated with cyclic loading, load sequence effect associated with random/variable amplitude loading, effect of strain amplitude and rates, effect of varying temperature (along both temporal and spatial directions) and the effect of mean strain and stress. The nonlinear intermixing of failure modes associated with above mentioned causing parameters makes the environmental fatigue modeling is a challenging task. Because of this challenge, fatigue is traditionally being modeled based on experimental data. However, test based empirical approach often requires hundreds of fatigue tests to model the above-mentioned intermixing failure causes even for a single material system. The problem is further exaggerated for reactor component made from multi-material systems such as made from both carbon and stainless-steel base metals and their similar and dissimilar metal welds. With the difficulty of conducting hundreds of fatigue tests to capture the above-mentioned intermixing failure causes, fatigue modeling approaches often depends on empirical models based on limited available test data such as available through ASME code and NUREG 6909. However, these limited test-data-based models may not be enough to accurately predict the life of reactor components. Accurate prediction of life of reactor component would become a necessity, particularly when the license of the reactors to be extended for long-term-operation (LTO) that is for well beyond its original design life of 40 years. The requirement of extending the license of reactor under LTO requires hundreds of fatigue tests to be conducted to understand the mechanism associated with the above-mentioned interdependent failure causes. However, conducting large number of fatigue tests is not a feasibility due to the cost involved. To address this issues Argonne National Laboratory (ANL) with the sponsorship of DOE Light Water Reactor Sustainability (LWRS) program trying to develop a hybrid predictive modeling approach. This is based on limited experiment-data, Artificial-intelligence (AI) – Machine-Learning (ML) - Deep-Learning (DL) based techniques and Multiphysics-computational-mechanics based modeling tools. The hybrid approach not-only can improve the accuracy of the existing stress analysis and fatigue modeling approach but also can reduce the over-dependency on test-based approach. Towards this goal following are some of the major contributions based on ANL’s FY-20 environmental fatigue modeling activities: 1) A cyclic plasticity material model database for 82/182 dissimilar metal weld, which can be readily shared with US nuclear industry and regulatory agency on request. 2) A well validated analytical modeling methodology to perform cycle-by-cycle stress prediction under both constant amplitude fatigue loading and variable amplitude fatigue loading (with load-sequence effect). 3) An AI/ML/DL based methodology to predict unmeasurable cyclic strain based on other available sensor signals. This type of approach can be used for estimating strain in real reactor components from other sensor readings. 4) An AI/ML based approach to improve the US capability on environmental fatigue testing. This is by improving ANL’s existing environmental fatigue testing capacity to conduct ASME required strain-controlled tests (by controlling strain amplitudes and its rate), while not measuring the strain (due to the difficulty of placing an extensometer in a narrow autoclave in a PWR-water-test system). 5) A simulation and experiment based probabilistic modeling methodology for time-series fatigue state and life estimation of reactor metal such as dissimilar metal weld.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimized Carbon Fiber Composites in Wind Turbine Blade Design: Follow-On Studies

This project has identified opportunities to bring further reductions in the mass and cost of modern wind turbine blades through the use of alternative material systems and manufacturing processes. The fiber reinforced polymer material systems currently used by the wind industry have stagnated as the technology continues to mature and as a means to reduce risk while introducing new products with continually increasing blade lengths. However, as blade lengths continue to increase, the challenge of controlling blade mass becomes even more critical to enabling the associated levelized cost of energy reductions. Stiffer and stronger reinforcement fibers can help to resolve the challenges of meeting the loading demands while limiting the increase in weight, but these materials are substantially more expensive than the traditional E-glass fiber systems. One goal of this project and associated work is to identify pathways that improve the cost-effectiveness of carbon fiber such that it is the reinforcement of choice in the primary structural elements of wind blades. The use of heavy-tow textile carbon fiber material systems has been shown to reduce the blade mass by 30-31% when used in the spar cap and by up to 7% when used in edgewise reinforcement. A pultrusion cost model was developed to enable a material cost comparison that includes an accurate estimate of the intermediate manufacturing step of pultrusion for the carbon fiber composite. Material cost reductions were revealed in most cases for the heavy-tow textile carbon fiber compared to infused fiberglass. The use of carbon fiber in the edgewise reinforcement produced the most notable material cost reduction of 33% for the heavy-tow textile carbon fiber. The mass and cost savings observed when using carbon fiber in edgewise reinforcement demonstrate a clear opportunity of this design approach. A carbon fiber conversion cost model was expanded to include a characterization of manufacturing costs when using advanced conversion processes with atmospheric plasma oxidation. This manufacturing approach was estimated to reduce the cost of carbon fiber material systems by greater than 10% and can be used with textile carbon systems or traditional carbon fiber precursors. The pultrusion cost model was also used to assess the opportunity for using pultruded fiberglass in wind blades, studying conventional E-glass fiber reinforcement. When using pultruded fiberglass as the spar cap material for two design classifications, the blade weight was reduced by 6% and 9% compared to infused fiberglass. However, due to the relatively large share of the pultrusion manufacturing cost compared to fiber cost, the spar cap material cost increased by 12% and 7%. When considering the system benefits of reduced blade mass and potentially lower blade manufacturing costs for pultruded composites, there may be opportunity for pultruded E-glass in wind blade spar caps, but further studies are needed. There is a clearer outcome for using pultruded fiberglass in the edgewise reinforcement where it resulted in a blade mass reduction of 2% and associated reinforcement material cost reduction of 1% compared to infused E-glass. The use of higher performing glass fibers, such as S-glass and H-glass systems, will produce greater mass savings but a study is needed to assess the cost implications for these more expensive systems. The most likely opportunity for these high-performance glass fibers is in the edgewise reinforcement, where the increased strength will reduce the damage accumulation of this fatigue-driven component. The blade design assessments in this project characterize the controlling material properties for the primary structural components in the flapwise and edgewise directions for modern wind blades. The observed trends with low and high wind speed turbine classifications for carbon and glass fiber reinforced polymer systems help to identify where cost reductions are needed, and where improvements in mechanical properties would help to reduce the material demands.

17 WIND ENERGY↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Systems Analysis of Biomass and Coal Co-firing Power Plants with Deep Carbon Capture Toward Net-zero Emissions

Achieving a net-zero emission economy in the United States requires integrating diverse low-carbon and negative-emission technologies into the existing fossil fuel-dominant power fleet. Potential technologies from the low-carbon portfolio include renewable power, fossil power with carbon capture and storage (CCS), bioenergy with CCS (BECCS), and direct air capture (DAC). Renewable power is a clean energy source but has to pair with costly battery storage to provide dispatchable electricity. Fossil power with CCS offers dispatchable electricity yet still relies on DAC to offset residual emissions, even when deploying deep CCS with more than 90% CO2 capture. Coal-biomass co-firing with CCS, a subset of BECCS, is a reliable energy production technology that can be retrofitted from existing electricity generation units (EGUs). Power plant retrofit maximizes the use of the current U.S. coal power fleet without the need for large-scale deployment of new renewable power, battery storage, or DAC. Retrofitting coal-biomass co-firing with deep CCS in EGUs is a promising option, but not a universal solution. Biomass co-firing at a power plant introduces economic challenges and indirectly poses pressure on land and water resources. Meanwhile, retrofitting deep CCS affects plant efficiency and raises electricity generation costs. Overall, the technical feasibility and economic viability of plant retrofits vary across EGUs, as they are contingent upon the regional availability of biomass, unit-specific characteristics, site-specific fuel supply costs, and adjacent CO2 storage potential. Government incentives like 45Q can improve the retrofit viability, though the impact requires further quantification. A comprehensive analysis at the unit level is essential to address the question regarding the fate of the U.S. coal-fired electricity generation fleet toward the net-zero emission goal. This study conducts a systematic techno-economic-environmental assessment of EGUs to identify the viability of biomass co-firing and deep CCS retrofits in the U.S. coal-fired power fleet. Specifically, it characterizes the techno-economic performance of deep carbon capture, estimates life cycle greenhouse gas (GHG) emissions, and conducts a fleet-level assessment on retrofit viability. The key objectives are (1) to estimate the unit-specific performance and retrofitted cost under various biomass co-firing levels and CO2 capture rates; (2) to determine the possibility of reaching net-zero emission at the fleet level; (3) to quantify the cumulative capacities that are suitable for plant retrofits under current and future biomass supply scenarios; and (4) to improve the understanding of policy impacts on such retrofits to help the power sector’s transition to a net-zero economy. Techno-economic Model of Deep Carbon Capture. This study develops the performance and economic models for Monoethanolamine-based post-combustion CO2 capture at 95–99% capture rates. The process is simulated in Aspen Plus, analyzing the performance of carbon capture technology by varying the plant sizes, solvent lean loading, CO2 concentrations, and flue gas inlet temperature. Based on the key inputs and output parameters of CO2 capture, a reduced-order performance model of deep carbon capture is formulated. In addition, an engineering-economic model integrating the performance metrics is developed to estimate the capital as well as operation and maintenance (O&M) costs. Capital cost estimations follow the framework of the Integrated Environmental Control Model (IECM) and incorporate data regressions from three technical reports by IECM, the National Energy Technology Laboratory (NETL), and the National Renewable Energy Laboratory. The O&M cost estimation utilizes the actual inventory consumption rate and labor requirements. Both performance and cost models are embedded into IECM v13.0-beta, a fossil-fuel power plant modeling tool. Life Cycle Assessment of Power Plants. This study estimates the GHG emissions of power plants through life cycle assessment (LCA). The LCA scope includes fuel supply, combustion-based power generation, and CO2 transport and storage. The fuel-based life cycle module is designed following the framework of the NETL Unit Process Library and CO2U LCA Guidance Toolkit. The module is then incorporated into IECM v13.0-beta. The process-based LCA is applied to estimate the GHG emissions of coal and biomass supply, coal- and coal-biomass co-firing power plant operation, as well as CO2 pipeline transport and geographical sequestration. An uncertainty analysis is conducted to quantify the variability and uncertainty associated with the LCA using the Latin Hypercube Sampling (LHS) method. Fleet-level Assessment. This study evaluates the technical and economic feasibility of selected coal-fired EGUs, examines the role of tax credits in retrofit viability, and assesses the competitiveness of retrofitted units against other low-carbon options. Unit screening identifies EGUs for the study, focusing on new, efficient baseload units with air pollution controls. The power plant databases are then established to organize unit-specific information on performance and operating conditions from the relevant public databases. Biomass for co-firing retrofits is selected based on home and neighboring county availability, ensuring sustained operation with at least a 5% co-firing level. The CO2 storage site is determined by state-level storage potential, with ArcGIS Pro and NETL CO2 Saline Storage Cost Model used to identify the optimal balance between the nearest transport distances and affordable storage costs. The latest IECM v13.0-beta is then employed to configure and evaluate the eligible EGUs with or without the deployment of deep CCS and biomass co-firing. A supply curve is established to illustrate the cumulative installed capacity suitable for retrofits at different cost levels. A sensitivity analysis on tax credits for carbon sequestration is performed. Finally, a unit-level cost comparison is conducted among retrofitted plants, renewable power with battery storage, and abated fossil fuels with DAC. Expected Results. This study evaluates the technical, economic, and environmental metrics of each EGU across an array of CO2 capture rates and biomass co-firing level scenarios. Unit-level comparisons will identify critical factors influencing technical performance. The supply curves with and without tax incentives will provide insights into the impact of tax credits on biomass co-firing and CCS deployment. The cost comparisons with renewables and DAC-retrofit will assess the competitiveness of the retrofitted units. Life cycle emissions from each unit will be assessed to identify the scenarios under which net-zero emissions can be achieved. These analyses are expected to determine the total coal-fired capacity suitable for serving as a low-carbon energy source with or without tax incentives. The study results are novel in identifying optimal unit-specific strategies for producing carbon-neutral power, whether through retrofitting EGUs with deep CCS, biomass co-firing, DAC, or installing renewable power with battery. The findings will provide insight into nationwide efforts to ensure reliable, affordable, and low-carbon electricity. It also will inform investment decisions and policies in the deployment of deep carbon capture and negative emission technologies for a net-zero energy future.

Biomass Co-firing↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

IACMI Project 4.7: Pultruded Textile Carbon Fiber for Spar Caps (Final Report)

The primary objective of this project was to demonstrate the potential to significantly reduce the cost of wind turbine blades with carbon fiber reinforced polymer (CFRP) structure. Applicability of textile carbon fibers (TCF) were evaluated for use in pultruded spar cap (SC) elements as a path to cost reduction for utility scale wind turbine blades. In earlier work for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), a collaboration of Sandia National Laboratory (SNL), Oak Ridge National Laboratory (ORNL), and Montana State University has demonstrated potential for pultruded TCF to compete with infused fiberglass and commercially available carbon fiber pultruded sections for spar cap construction. In the design cases evaluated, the TCF sections fared well when compared on cost per unit composite stiffness and cost per unit composite compressive strength for those designs [1]. Both stiffness and compressive strength tend to be key factors in the design of blade composite Spar Cap which carry the bulk of the blade structural loads in bending. Spar Cap design tends to distribute largely symmetric tensile and compressive stresses to opposite sides of the spar structure, but since carbon fiber composite compressive strength is typically 20-50% lower than tensile strength, the compressive loading reaches failure levels well before the tensile loading. Stiffness is critical in containing the large tip deflection in high wind loading situations. However, materials and process development were very limited in the earlier study and the work in this project was expanded to make the comparative information more representative of what will be required in order to make further inroads towards implementation. Similar to that study, this project team confirmed that the primary materials of interest for pultruded spar cap elements should be thermoset (TS) resins reinforced by carbon fibers, utilizing as high a percentage of TCF as practical to benchmark cost and performance against commercial carbon fibers. To make the closest comparison possible and eliminate specific test article size, resin selection, and equipment/operational nuance effects, the team planned to pultrude sections with 100% commercially available carbon fiber (Panex 35 carbon fiber from Zoltek) as well as samples utilizing high fractions of TCF. The resin system chosen was based on formulations recommended by large wind industry supplier Hexion and consisted of Hexion resin RSL-4597, curing agent CCA-138, and internal mold release additive 117, along with common kaolin filler ASP400P from BASF. As commonly deployed in spar cap configurations, the team had a mold built to pultrude a rectangular spar cap element of 100mm width and 3mm thickness. The extremely limited number of samples produced for the earlier study were produced with a “generic” epoxy utilized for a variety of applications by the pultruder contracted to produce test articles for demonstration purposes. More importantly, those samples were produced at a fiber fraction only slightly over 50%. Based on feedback from our industrial advisory team for that project and strongly recommended by this project team, the consensus is that it is highly desirable to obtain fiber fractions of 65-68% for significant penetration in wind blade spar cap. Although this requirement has yet to be exhaustively confirmed in readily available information, this was established as a project goal and informally decided we needed to exceed 60% fiber fraction to gain serious industry consideration. Previous TCF pultrusion trials have been challenged by the lack of robust TCF packages, resulting in non-uniform tension across and between tows, as well as excess labor and waste for removal of interleaved paper. The non-uniform tension and associated intermingling of tows in textile acrylic fiber tows and associated difficulties created from broken filaments in carbon fiber conversion inhibit the ordered packing necessary to enhance fiber fraction elevation. (These “cross-overs” are not considered undesirable for textile applications and there is some sense that they might be advantageous for those applications). In addition to work that is ongoing at the acrylic fiber manufacturers to improve their formats, The Institute of Advanced Composites Manufacturing Innovation (IACMI) Project 6.12 (report PA16-0349-6.12-01) [2] has developed and demonstrated a more robust packaging and creeling approach that at least partially addresses these issues, thus improving control of the TCF feed into the pultrusion unit. It was hoped that these and other improvements currently being implemented would allow us to achieve fiber fractions at least approaching these fiber fraction targets. During this project, sections utilizing 100% commercially available carbon fiber reinforcement were produced as a baseline, as well as sections reinforced with about 94% TCF and the balance being commercially available fiber for comparison. The most important finding was that similar to results reported in the earlier WETO-funded project and results from tests of TCF reported at IACMI meetings, this work demonstrated that sections pultruded with TCF in an epoxy resin frequently utilized in actual spar cap production had stiffness and compressive strengths largely comparable to similar sections pultruded with a commercially available carbon fiber also frequently utilized in the wind industry. Although the amount of that data is limited, some of the tensile strength results were actually closer than would have been expected based on fiber strength results provided by the TCF and commercial fiber producers. The actual test data are reported and discussed in detail in Section 5. The pultruded sections dominated by TCF reinforcement were approximately 8-10% lower in fiber fraction than for the sections produced using commercial fiber alone, making direct comparison difficult. The COVID-19 project has provided significant insight into the current state-of-the-art with various TCF product forms. The data obtained in this project will guide the planned improvements at the precursor level, especially in attaining uniform tensioning and payout to facilitate enhanced fiber fractions and overall processability of the TCF composites. The project team is providing guidance to stakeholders concerning the attributes, needs, and potential demand for TCF in wind blade spar caps. Results achieved in this project are consistent with findings in the related work cited [1] and support this guidance and the high potential for this product type. TCF precursor-producing partners continue to express interest in enhancing their product forms and the team looks forward to working with these improved materials as they become available.

42 ENGINEERING↗