Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

STS-77 Flight Day 8

On this eighth day of the STS-77 mission, the flight crew, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., take time out from their schedule to discuss the progress of the mission with reporters. Casper said the flight has been highly successful so far, having accomplished all of the goals. Mission Specialists Dan Bursch and Andy Thomas described protein crystal growth and plant growth experiments being conducted throughout the flight in the Spacehab module. And Mario Runco discussed testing soft drink samples in the Fluids Generic Bioprocessing Apparatus.

Source record↗

STS-91: Flight Crew Meets with Family and Friends at Launch Complex 39A

The crew (Commander Charles J. Precourt, Pilot Dominic L. Pudwill Gorie, Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet L. Kavandi and Valery Victorovitch Ryumin) take time from their busy schedule to chat with friends and family, at a distance. They also pose for group and single pictures.

Source record↗

A Comparison of Center/TRACON Automation System and Airline Time of Arrival Predictions

Benefits from information sharing between an air traffic service provider and a major air carrier are evaluated. Aircraft arrival time schedules generated by the NASA/FAA Center/TRACON Automation System (CTAS) were provided to the American Airlines System Operations Control Center in Fort Worth, Texas, during a field trial of a specialized CTAS display. A statistical analysis indicates that the CTAS schedules, based on aircraft trajectories predicted from real-time radar and weather data, are substantially more accurate than the traditional airline arrival time estimates, constructed from flight plans and en route crew updates. The improvement offered by CTAS is especially advantageous during periods of heavy traffic and substantial terminal area delay, allowing the airline to avoid large predictive errors with serious impact on the efficiency and profitability of flight operations.

Heere, Karen R.↗

Enhancements to TetrUSS for NASA Constellation Program

The NASA Constellation program is utilizing Computational Fluid Dynamics (CFD) predictions for generating aerodynamic databases and design loads for the Ares I, Ares I-X, and Ares V launch vehicles and for aerodynamic databases for the Orion crew exploration vehicle and its launch abort system configuration. This effort presents several challenges to applied aerodynamicists due to complex geometries and flow physics, as well as from the juxtaposition of short schedule program requirements with high fidelity CFD simulations. NASA TetrUSS codes (GridTool/VGRID/USM3D) have been making extensive contributions in this effort. This paper will provide an overview of several enhancements made to the various elements of TetrUSS suite of codes. Representative TetrUSS solutions for selected Constellation program elements will be shown. Best practices guidelines and scripting developed for generating TetrUSS solutions in a production environment will also be described.

Pandya, Mohagna J.↗

Exploring Sustained Food Production in the Veggie Vegetable Production System

Since 2014, the Veggie vegetable production system on the International Space Station has intermittently supplied astronaut crews with fresh produce. To assess the potential for continuous crop production in Veggie and develop a baseline for future space crop production systems, a 120-day study was conducted to determine methodology for inputs, optimal yield, food safety standards, and crew involvement. ‘Amara’ mustard and ‘Red Russian’ kale were grown as initial crops, followed by ‘Extra Dwarf’ pakchoi and shungiku as final crops. Previous grow-outs in Veggie have included harvests at 28-35 days after initiation. In this study, a 56-day grow-out with multiple harvests from the same plants was compared to the conventional, single harvest Veggie schedule. Unlike previous Veggie studies which grew all plants simultaneously, this test staggered initiation and harvest, aiming for consistent and increased production. Plant pillows were initiated in pairs weekly and positioned to reduce shading. Completed pillows were immediately replaced with fresh ones. The multi-harvest scheme used fewer pillows, totaling 46% less pillow mass than the single harvest method. Yield varied by crop and harvest scheme, when compared as fresh edible biomass production across 56-day time increments. ‘Red Russian’ kale yielded similarly across harvest schemes. In the multiple-harvest schedule, ‘Amara’ mustard and shungiku yielded 23% to 25% higher, respectively, while ‘Extra Dwarf’ pakchoi had 43% lower yield. Microbial analysis of the plants indicated no culturable human pathogens. Microbial load of a given plant appeared to depend more on system age than plant age; across harvest methods, aerobic plate counts from final crops were higher than those of initial crops. This project also considered the complexity of crew involvement in a continuous production scenario. New crew procedures that periodically remove plant material from the Veggie root mat would be needed under continuous production to prevent potential pathogens and unpleasant odors. This study supports future space crop production scenarios and was funded by NASA’s Human Research Program.

Jess M Bunchek↗

Simulation/Emulation Techniques: Compressing Schedules With Parallel (HW/SW) Development

NASA has always been in the business of balancing new technologies and techniques to achieve human space travel objectives. NASA's Kedalion engineering analysis lab has been validating and using many contemporary avionics HW/SW development and integration techniques, which represent new paradigms to NASA's heritage culture. Kedalion has validated many of the Orion HW/SW engineering techniques borrowed from the adjacent commercial aircraft avionics solution space, inserting new techniques and skills into the Multi - Purpose Crew Vehicle (MPCV) Orion program. Using contemporary agile techniques, Commercial-off-the-shelf (COTS) products, early rapid prototyping, in-house expertise and tools, and extensive use of simulators and emulators, NASA has achieved cost effective paradigms that are currently serving the Orion program effectively. Elements of long lead custom hardware on the Orion program have necessitated early use of simulators and emulators in advance of deliverable hardware to achieve parallel design and development on a compressed schedule.

Mangieri, Mark L.↗

Sustained Veggie: A Continuous Food Production Comparison

The International Space Station’s Veggie system intermittently supplies the crew with fresh produce. To assess the potential for continuous crop production in Veggie and develop a baseline for future space crop production systems, a 120-day study was conducted to determine methodology for inputs, optimal yield, and crew involvement. ‘Amara’ mustard and ‘Red Russian’ kale were grown as initial crops, followed by ‘Extra Dwarf’ pak choi and shungiku as final crops. Previous grow-outs in Veggie have included harvests at 28-35days after initiation. In this study, a 56-day grow-out with multiple harvests from the same plants was compared to the conventional, single harvest Veggie schedule. Unlike previous Veggie studies which grew all plants simultaneously, this test staggered initiation and harvest, aiming for consistent and increased production. Plant pillows were initiated in pairs weekly and positioned to reduce shading. Completed pillows were immediately replaced with fresh ones. The multi-harvest scheme used fewer pillows, totaling 46% less pillow mass than the single harvest method. Scaled to 56-day increments, yield varied by crop and harvest scheme. ‘Red Russian’ kale yielded similarly across harvest schemes. In the multiple-harvest schedule, ‘Amara’ mustard and shungiku yielded 23% to 25% higher, respectively, while ‘Extra Dwarf’ pak choi had43% lower yield. Microbial analysis of the plants indicated no culturable human pathogens. Microbial load of a given plant appears to depend more on system age than plant age. Across harvest methods, aerobic plate counts from final crops were higher than those of initial crops. This project also considered the complexity of crew involvement in a continuous production scenario. New crew procedures that periodically remove plant material from the Veggie root mat are needed under continuous production to prevent potential pathogens and unpleasant odors. This study supports future space crop production scenarios and was funded by NASA’s Human Research Program.

Jess M Bunchek↗

Applications Study of Aero-Maneuvering Orbit-to-Orbit Shuttle (AMOOS), Executive Summary

Preliminary designs and the supporting analysis for both the Aeromaneuvering Orbit-to-Orbit Shuttle (AMOOS) and the Aeromaneuvering Recovery System (AMRS) are presented. The AMOOS design is shown to yield from twice to almost three times the high energy, round-trip payloads as a purely propulsive vehicle of the same weight. Typically AMOOS can perform a crew rotation mission to equatorial geosynchronous orbit in one space shuttle launch. The flight test program analysis modeled parameters such as maximum dynamic pressure, heating rates, guidance, stability and recovery. Two model flight schedules were developed, one consisting of four flights and the other of two flights. The former is considered a very low risk, high information return program whereas the latter is a minimal cost program consistent with reasonable data returns and chance of success. The AMOOS and AMRS guidance scheme developed using linear regulator theory proved a precise and accurate guidance scheme. Both it and a classical linear system's based scheme were evaluated using 65 simulated trajectories in which the position in the entry corridor and the atmospheric density were varied randomly.

White, J.↗

STS-88 Crew Interview: Frederick "Rick" Sturckow

Frederick Sturckow discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also disscusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.

Source record↗

STS-88 Crew Interview: Nancy Currie

Nancy Currie discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also disscusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.

Source record↗

STS-88 Crew Interview: Sergei Krikalev

Sergei Krikalev discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also discusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.

Source record↗

STS-88 Crew Interview: Robert Cabana

Commander Robert D. Cabana discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also disscusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.

Source record↗

STS-88 Crew Interview: Jim Newman

Jim Newman discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also discusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.

Source record↗

STS-88 Crew Interview: Jerry Ross

Jerry Ross discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also disscusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.

Source record↗

A study of low mass x-ray binaries

The entire effort under this contract during the period through January 1992 was devoted to a study of the cost and schedule required to put an upgraded Aries payload on the ASTRO-SPAS carrier provided by the German space agency, DARA. The ASTRO-SPAS is flown on the Space Shuttle, deployed by the crew for 5 to 7 days of free-flying observations and then recovered and returned to Earth. The spectrograph was to be provided by a collaboration involving the Lockheed Palo Alto Research Laboratory (LPARL), the Center for Astrophysics and Space Astronomy (CASA) at the U. of Colorado and the Mullard Space Science Laboratory (MSSL) in England. The payload for the ASTRO-SPAS mission included our own spectrograph and an instrument provided by Dr. Joachim Trumper of the Max Planck Institute (MPI) in Garching, Germany. A meeting was held in late July, 1991 with German scientists, DARA representatives and MBB, the ASTRO-SPAS spacecraft contractor. Sufficient information was exchanged to allow us to complete the study and the name LEXSA (Low Energy X-ray Spectrograph on ASTRO-SPAS) was given to our instrument and HERTA (High Energy x-Ray Telescope on ASTR0-SPAS) to the German instrument. The combination was called SPECTRO-SPAS. On October 1, 1991 CASA and LPARL submitted a cost and brief technical proposal to NASA on results of the study. The total cost over 4 fiscal years was 6.16 M dollars including CASA costs. NASA Headquarters was briefed on 3 October on details of the proposal. They found our costs reasonable, but indicated that the NASA FY '92 budget is extremely tight, they could not readily identify where the -S2.3M for LEXSA could be found and it was not clear that FY '93 would improve.

Catura, Richard C.↗

An Intelligent Crop Planning Tool for Controlled Ecological Life Support Systems

This paper describes a crop planning tool developed for the Controlled Ecological Life Support Systems (CELSS) project which is in the research phases at various NASA facilities. The Crop Planning Tool was developed to assist in the understanding of the long term applications of a CELSS environment. The tool consists of a crop schedule generator as well as a crop schedule simulator. The importance of crop planning tools such as the one developed is discussed. The simulator is outlined in detail while the schedule generator is touched upon briefly. The simulator consists of data inputs, plant and human models, and various other CELSS activity models such as food consumption and waste regeneration. The program inputs such as crew data and crop states are discussed. References are included for all nominal parameters used. Activities including harvesting, planting, plant respiration, and human respiration are discussed using mathematical models. Plans provided to the simulator by the plan generator are evaluated for their 'fitness' to the CELSS environment with an objective function based upon daily reservoir levels. Sample runs of the Crop Planning Tool and future needs for the tool are detailed.

Whitaker, Laura O.↗

STS-89 Day 02 Highlights

On this second day of the STS-89 mission, the flight crew, Cmdr. Terrence W. Wilcutt, Pilot Frank Edwards, and Mission Specialists Michael P. Anderson, James F. Reilly, Bonnie J. Dunbar, Salizhan Shakirovich Sharipov, David A. Wolf and Andrew S.W. Thomas, take time from their schedule to discuss with radio station KNX of Los Angeles the STS-89 mission and Thomas' transfer to the Mir Space Station.

Source record↗

The Impact of Information Technology on the Design, Development, and Implementation of a Lunar Exploration Mission

From the beginning to the present expeditions to the Moon have involved a large investment of human labor. This has been true for all aspects of the process, from the initial design of the mission, whether scientific or technological, through the development of the instruments and the spacecraft, to the flight and operational phases. In addition to the time constraints that this situation imposes, there is also a significant cost associated with the large labor costs. As a result lunar expeditions have been limited to a few robotic missions and the manned Apollo program missions of the 1970s. With the rapid rise of the new information technologies, new paradigms are emerging that promise to greatly reduce both the time and cost of such missions. With the rapidly increasing capabilities of computer hardware and software systems, as well as networks and communication systems, a new balance of work is being developed between the human and the machine system. This new balance holds the promise of greatly increased exploration capability, along with dramatically reduced design, development, and operating costs. These new information technologies, utilizing knowledge-based software and very highspeed computer systems, will provide new design and development tools, scheduling mechanisms, and vehicle and system health monitoring capabilities that have hitherto been unavailable to the mission and spacecraft designer and the system operator. This paper will utilize typical lunar missions, both robotic and crewed, as a basis to describe and illustrate how these new information system technologies could be applied to all aspects such missions. In particular, new system design tradeoff tools will be described along with technologies that will allow a very much greater degree of autonomy of exploration vehicles than has heretofore been possible. In addition, new information technologies that will significantly reduce the human operational requirements will be discussed.

Gross, Anthony R.↗