Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost and performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Small Launch Vehicle Concept Development for Affordable Multi-Stage Inline Configurations

The Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study of two configurations of a three-stage, inline, liquid propellant small launch vehicle concept developed on the premise of maximizing affordability by targeting a specific payload capability range based on current and future industry demand. The initial configuration, NESC-1, employed liquid oxygen as the oxidizer and rocket propellant grade kerosene as the fuel in all three stages. The second and more heavily studied configuration, NESC-4, employed liquid oxygen and rocket propellant grade kerosene on the first and second stages and liquid oxygen and liquid methane fuel on the third stage. On both vehicles, sensitivity studies were first conducted on specific impulse and stage propellant mass fraction in order to baseline gear ratios and drive the focus of concept development. Subsequent sensitivity and trade studies on the NESC-4 concept investigated potential impacts to affordability due to changes in gross liftoff mass and/or vehicle complexity. Results are discussed at a high level to understand the impact severity of certain sensitivities and how those trade studies conducted can either affect cost, performance, or both.

Beers, Benjamin R.↗

Plasma Cleaning

NASA's Kennedy Space Center has developed two solvent-free precision cleaning techniques: plasma cleaning and supercritical carbon dioxide (SCCO2), that has equal performance, cost parity, and no environmental liability, as compared to existing solvent cleaning methods.

supercritical fluid cleaning↗

NASA's SPACE LAUNCH SYSTEM: Development and Progress

NASA is embarked on a new era of space exploration that will lead to new capabilities, new destinations, and new discoveries by both human and robotic explorers. Today, the International Space Station (ISS) and robotic probes are yielding knowledge that will help make this exploration possible. NASA is developing both the Orion crew vehicle and the Space Launch System (SLS) (Figure 1), that will carry out a series of increasingly challenging missions leading to human exploration of Mars. This paper will discuss the development and progress on the SLS. The SLS architecture was designed to be safe, affordable, and sustainable. The current configuration is the result of literally thousands of trade studies involving cost, performance, mission requirements, and other metrics. The initial configuration of SLS, designated Block 1, will launch a minimum of 70 metric tons (mT) (154,324 pounds) into low Earth orbit - significantly greater capability than any current launch vehicle. It is designed to evolve to a capability of 130 mT (286,601 pounds) through the use of upgraded main engines, advanced boosters, and a new upper stage. With more payload mass and volume capability than any existing rocket, SLS offers mission planners larger payloads, faster trip times, simpler design, shorter design cycles, and greater opportunity for mission success. Since the program was officially created in fall 2011, it has made significant progress toward launch readiness in 2018. Every major element of SLS continued to make significant progress in 2015. Engineers fired Qualification Motor 1 (QM-1) in March 2015 to test the 5-segment motor, including new insulation, joint, and propellant grain designs. More than 70 major components of test article and flight hardware for the Core Stage have been manufactured. Seven test firings have been completed with an RS-25 engine under SLS operating conditions. The test article for the Interim Cryogenic Propulsion Stage (ICPS) has also been completed. Major work continues in 2016 as the program continues both flight and development RS-25 engine testing, begins welding test article and flight core stage tanks, completes stage adapter manufacturing, and test fires the second booster qualification motor. This paper will discuss the program's key accomplishments to date and the challenging work ahead for what will be the world's most capable launch vehicle.

Honeycutt, John↗

NASA's Space Launch System: Development and Progress

NASA is embarked on a new era of space exploration that will lead to new capabilities, new destinations, and new discoveries by both human and robotic explorers. Today, the International Space Station (ISS), supported by NASA's commercial partners, and robotic probes, are yielding knowledge that will help make this exploration possible. NASA is developing both the Orion crew vehicle and the Space Launch System (SLS) that will carry out a series of increasingly challenging missions that will eventually lead to human exploration of Mars. This paper will discuss the development and progress on the SLS. The SLS architecture was designed to be safe, affordable, and sustainable. The current configuration is the result of literally thousands of trade studies involving cost, performance, mission requirements, and other metrics. The initial configuration of SLS, designated Block 1, will launch a minimum of 70 metric tons (t) into low Earth orbit - significantly greater capability than any current launch vehicle. It is designed to evolve to a capability of 130 t through the use of upgraded main engines, advanced boosters, and a new upper stage. With more payload mass and volume capability than any rocket in history, SLS offers mission planners larger payloads, faster trip times, simpler design, shorter design cycles, and greater opportunity for mission success. Since the program was officially created in fall 2011, it has made significant progress toward first launch readiness of the Block 1 vehicle in 2018. Every major element of SLS continued to make significant progress in 2015. The Boosters element fired Qualification Motor 1 (QM-1) in March 2015, to test the 5-segment motor, including new insulation, joint, and propellant grain designs. The Stages element marked the completion of more than 70 major components of test article and flight core stage tanks. The Liquid Engines element conducted seven test firings of an RS-25 engine under SLS conditions. The Spacecraft/Payload Integration and Evolution element marked completion of the upper stage test article. Major work continues in 2016 as the program continues both flight and development RS-25 engine testing, begins welding test article and flight core stage tanks, completes stage adapter manufacturing, and test fires the second booster qualification motor. This paper will discuss the program's key accomplishments to date and the challenging work ahead for what will be the world's most capable launch vehicle.

Honeycutt, John↗

Supportability Challenges, Metrics, and Key Decisions for Future Human Spaceflight

Future crewed missions beyond Low Earth Orbit (LEO) represent a logistical challenge that is unprecedented in human space flight. Astronauts will travel farther and stay in space for longer than any previous mission, far from timely abort or resupply from Earth. Under these conditions, supportability { defined as the set of system characteristics that influence the logistics and support required to enable safe and effective operations of systems { will be a much more significant driver of space system lifecycle properties than it has been in the past. This paper presents an overview of supportability for future human space flight. The particular challenges of future missions are discussed, with the differences between past, present, and future missions highlighted. The relationship between supportability metrics and mission cost, performance, schedule, and risk is also discussed. A set of pro- posed strategies for managing supportability is presented (including reliability growth, uncertainty reduction, level of repair, commonality, redundancy, In-Space Manufacturing (ISM) (including the use of material recycling and In-Situ Resource Utilization (ISRU) for spares and maintenance items), reduced complexity, and spares inventory decisions such as the use of predeployed or cached spares - along with a discussion of the potential impacts of each of those strategies. References are provided to various sources that describe these supportability metrics and strategies, as well as associated modeling and optimization techniques, in greater detail. Overall, supportability is an emergent system characteristic and a holistic challenge for future system development. System designers and mission planners must carefully consider and balance the supportability metrics and decisions described in this paper in order to enable safe and effective beyond-LEO human space flight.

Owens, Andrew C.↗

Streamlining the Design Tradespace for Earth Imaging Constellations

Distributed Spacecraft Missions (DSMs) are gaining momentum in their application to Earth Observation (EO) missions owing to their unique ability to increase observation sampling in spatial, spectral, angular and temporal dimensions simultaneously. DSM design includes a much larger number of variables than its monolithic counterpart, therefore, Model-Based Systems Engineering (MBSE) has been often used for preliminary mission concept designs, to understand the trade-offs and interdependencies among the variables. MBSE models are complex because the various objectives a DSM is expected to achieve are almost always conflicting, non-linear and rarely analytical. NASA Goddard Space Flight Center is developing a pre-Phase A tool called "Trade-space Analysis Tool for Constellations" (TAT-C) to initiate constellation mission design. The tool will allow users to explore the tradespace between various performance, cost and risk metrics (as a function of their science mission) and select Pareto optimal architectures that meet their requirements. This paper focuses on the tradespace search and how it can be streamlined by combining physical rules, as well as well-designed orbit and coverage computations, thus yielding significant speed-ups. Two use cases are shown as representative examples of the utility of TAT-C generated trades, and results are preliminarily validated against AGI's Systems Tool Kit.

Science Data Processing↗

Comparative Analysis of Static and Dynamic Probabilistic Risk Assessment

Implementation of risk-informed design allows the design team to thoroughly explore the risks of a system while iterating the operations concept, design, and requirements until the system meets mission objects and is achievable within constraints. To arrive at a space system design that is likely to meet all constraints placed upon mass, cost, performance and risk, the system requirements must be understood and traded against each other as early as the conceptual design phase. Depending on the project phase and the goals of the risk analysis, various PRA methodologies could be used to produce quantitative risk estimates to enable such a process. In order to better understand the applicability, advantages, and limitations of various PRA methodologies, a comparative analysis of three bottom-up, component-based PRA approaches was performed. The three methods examined are a traditional static fault tree, a fault tree hybrid, and a dynamic Monte Carlo simulation. Each approach was used to assess a generic reaction control system (RCS) thruster pod and mission. The methods are assessed in terms of the process of modeling a system, the actionable information produced for the design team, and the overall fidelity of the quantitative risk evaluation generated. The paper also discusses the applicability of each methodology to the different phases of system development.

Probablistic↗

Evolutionary computing for spacecraft power subsystem design search and optimization

Multi-objective optimization involves finding one or more optimal solutions when there is more than one conflicting objective. This means that a solution that is better in one objective compromises or trades-off, other objectives. Trade Studies are conducted by flight projects to create mission concepts with different trade-off solutions for mass, cost, performance and risk.

Hua, Hook↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

A Circularity Assessment for Silicon Solar Panels Based on Dynamic Material Flow Analysis

Solar photovoltaics (PV) are the fastest growing renewable energy technology for clean, inexpensive, and sustainable electricity generation. Along with numerous technical roadmaps to improve system cost, performance and reliability, the PV industry should also plan to handle large volumes of silicon panel waste, which is initially estimated to be ~13 million metric tons (MT) by 2050 in the U.S. alone. Understanding the magnitude of material needs and how material flows throughout the PV panel life cycle could respond to design, operational and different end-of-life (EOL) circular pathways will help transition into a circular, resource-conserving economy. Herein, we introduce a dynamic material flow analysis (DMFA) framework based on electricity generation to quantify time-series stocks and flows of bulk PV materials (e.g., solar glass and aluminum frames) throughout the life cycles of utility-scale silicon PV systems in the U.S. in the period 2000-2100. We apply the model to a range of scenarios to understand how material demands depend on selected PV-related parameters, different material circularity strategies, and recent module design trends (e.g., bifacial, frameless). We found that float glass and aluminum in PV installations would likely reach 100 million MT and 12 million MT by 2100, respectively, in the baseline scenario. The most influential parameters for PV installation and subsequent waste reduction are found to be module lifetime, module efficiency, annual degradation, and material reduction. Module recycling and component remanufacturing were found to be the most effective material circularity strategies for waste minimization. Panel reuse has negligible savings on waste under current module efficiencies compared to replacements with newer generations with higher efficiency. Ongoing trends to produce larger power frameless modules could save 10 million MT of glass and ~9 million MT of aluminum. Our results enable advanced planning for future materials needs and provide insight into potential opportunities to minimize waste.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Circularity Assessment for Silicon Solar Panels Based on Dynamic Material Flow Analysis: Preprint

Solar photovoltaics (PV) are the fastest growing renewable energy technology for clean, inexpensive, and sustainable electricity generation. Along with numerous technical roadmaps to improve system cost, performance and reliability, the PV industry should also plan to handle large volumes of silicon panel waste, which is initially estimated to be ~13 million metric tons (MT) by 2050 in the U.S. alone. Understanding the magnitude of material needs and how material flows throughout the PV panel life cycle could respond to design, operational and different end-of-life (EOL) circular pathways will help transition into a circular, resource-conserving economy. Herein, we introduce a dynamic material flow analysis (DMFA) framework based on electricity generation to quantify time-series stocks and flows of bulk PV materials (e.g., solar glass and aluminum frames) throughout the life cycles of utility-scale silicon PV systems in the U.S. in the period 2000-2100. We apply the model to a range of scenarios to understand how material demands depend on selected PV-related parameters, different material circularity strategies, and recent module design trends (e.g., bifacial, frameless). We found that float glass and aluminum in PV installations would likely reach 100 million MT and 12 million MT by 2100, respectively, in the baseline scenario. The most influential parameters for PV installation and subsequent waste reduction are found to be module lifetime, module efficiency, annual degradation, and material reduction. Module recycling and component remanufacturing were found to be the most effective material circularity strategies for waste minimization. Panel reuse has negligible savings on waste under current module efficiencies compared to replacements with newer generations with higher efficiency. Ongoing trends to produce larger power frameless modules could save 10 million MT of glass and ~9 million MT of aluminum. Our results enable advanced planning for future materials needs and provide insight into potential opportunities to minimize waste.

circular economy↗

Pathways to a Sustainable Aviation Ecosystem: Aviation Energy Research and Operation Simulator (AEROSim)

The National Renewable Energy Laboratory (NREL) has developed highly accessible tools for ground vehicle modeling, making it easy to quickly compare powertrains and estimate the impact of technology improvements on fuel/energy consumption, performance, cost, and battery life. With AEROSim, NREL advanced aircraft, enabling the same level of ease and versatility in comparing aircraft designs across a range of scenarios and conditions.

advanced air mobility↗

High-performance and cost-effective membrane electrode assemblies for advanced proton exchange membrane water electrolyzers: Long-term durability assessment

In this work, improved activity and durability performance of a two-cell (86 cm 2 ) proton exchange membrane water electrolyzer (PEMWE) stack is reported for the first time. Both membrane electrode assemblies (MEAs) contain one order of magnitude lower platinum group metal (PGM) loadings compared to the state-of-the-art PEMWEs and incorporate novel Pt recombination layers. The high-performance and cost-effective MEAs are fabricated by the unique reactive spray deposition technology (RSDT). This advanced methodology allows for one-step fabrication of MEAs and ensures precise control and distribution of the catalyst composition and loading. The RSDT-fabricated MEAs contain only 0.2 and 0.3 mg PGM cm –2 loading in the cathode and anode electrodes, respectively, and demonstrate excellent activity and durability for over 3000 h of operation at industrially-relevant operating conditions without showing significant loss in performance. This novel work shows that a significant cost reduction for PEMWEs is achieved while maintaining excellent durability, high catalysts activities, and low hydrogen cross-over.

Proton exchange membrane water electrolyzer↗

Observations on Cost Modeling and Performance Measurement of Long Term Archives

This paper describes a prototype suite of Excel-based tools that could be used for estimating lifecycle costs for newly planned or modified long-term archival facilities. These tools may also prove valuable for monitoring the long-term performance of such facilities once operational. Cost estimation is by analogy, using statistical curve-fitting techniques across a database of comparable data activities. The database currently includes 29 operational data centers ranging from small (2 FTEs) to large (66 FTEs), and is readily expandable to include additional activities specifically involving data preservation and added value. Each comparable data center is described in terms of its staffing, throughput workload, archival and distribution requirements, levels of user service, overall complexity, degree of automation, and other data, comprising 94 distinct descriptors in all. The descriptors were developed by normalizing heterogeneous data from the various centers and mapping them into an Excel framework consistent with the OAIS reference model. A user-friendly tool is provided for generating input to and updating the comparables database. This tool can also be used to benchmark the performance (in terms of cost versus throughput) of an operational data center, and to update the staffing, cost and workload data on a periodic basis. The comparables database could thus provide a history of staffing and throughput over time, as a means of performance monitoring and providing feedback for continuous improvement. Ancillary tools are also provided for performing "what-if' cost exercises for planning purposes, and for graphical display of data and results. We provide a high-level description of the tools; present our experiences and observations on gathering the information and maintaining the database; and discuss how this tool set might be applied to long term archives.

Fontaine, Kathy↗