Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “core facility location”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Dismantling the nuclear research reactor Thetis

The research reactor Thetis, in service since 1967 and stopped in 2003, is part of the laboratories of the institution of nuclear science of the University of Ghent. The reactor, of the pool-type, was used as a neutron-source for the production of radio-isotopes and for activation analyses. The reactor is situated in a water pool with inner diameter of 3 m. and a depth of 7.5 m. The reactor core is situated 5.3 m under water level. Besides the reactor, the pool contains pneumatic loops, handling tools, graphite blocks for neutron moderation and other experimental equipment. The building houses storage rooms for fissile material and sources, a pneumatic circuit for transportation of samples, primary and secondary cooling circuits, water cleaning resin circuits, a ventilation system and other necessary devices. Because of the experimental character of the reactor, laboratories with glove boxes and other tools were needed and are included in the dismantling program. The building is in 3 levels with a crawl-space. The ground-floor contains the ventilation installation, the purification circuits with tanks, cooling circuits and pneumatic transport system. On the first floor, around the reactor hall, the control-room, visiting area, end-station for pneumatic transport, waste-storage room, fuel storage room and the labs are located. The second floor contains a few laboratories and end stations of the two high speed transfer tubes. The lowest level of the pool is situated under ground level. The reactor has been operated at a power of 150 kW and had a max operating power of 250 kW. Belgoprocess has been selected to decommission the reactor, the labs, storage halls and associated circuits to free release the building for conventional reuse and for the removal of all its internals as legal defined. Besides the dose-rate risk and contamination risk, there is also an asbestos risk of contamination. During construction of the installation, asbestos-containing materials were used, which must be removed in controlled conditions. The ventilation system is considered free from nuclear contamination but it contains asbestos. This paper covers the organization of the dismantling work, the technical execution aspect and conclusions already known (dismantling is ongoing as this is written). (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Criticality Analysis of FSV Spent Nuclear Fuel in the DOE Standard Canister

The U.S. Department of Energy (DOE) is responsible for managing over 300 types of spent nuclear fuel (SNF). To manage this large variety of fuel types, DOE plans to employ standardized canisters for the transportation, long-term storage, and eventual disposal of SNF. Idaho National Laboratory is currently supporting DOE’s SNF Packaging Demonstration Project, in which Fort Saint Vrain (FSV) fuel assemblies will be loaded into a DOE Standard Canister. This paper presents criticality calculations demonstrating that all four or five FSV fuel assemblies loaded into the DOE Standard Canister will remain subcritical in any expected normal or credible abnormal conditions. Previous criticality analyses were performed for one FSV fuel assembly and 12 Peach Bottom Core 2 fuel elements loaded into a DOE Standard Canister. This paper covers the criticality analysis performed for loading both four and five FSV fuel assemblies into a DOE Standard Canister. Various intact and degraded mode configurations were modeled in conducting the criticality calculations. This analysis encompassed three different configurations: (1) a single DOE Standard Canister loaded into a concrete storage overpack, (2) seven DOE Standard Canisters loaded into a concrete storage overpack, and (3) nine DOE Standard Canisters loaded into a concrete storage overpack. The overpack dimensions were varied for each of the three configurations, and transport, storage, and disposal scenarios were analyzed for each configuration. For transport scenarios, a pair of degradation cases was analyzed. In the first case, the fuel compacts became degraded and were removed from the fuel block, then deposited at the bottom of a horizontally placed canister, thereby simulating a drop event. The canister was considered to remain intact. In the second case, the spacing between horizontally placed canisters in a nine-canister overpack was reduced such that the canisters were piled on top of each other, simulating a drop event. For this case, no degradation of the canister internals or fuel was considered. For storage scenarios, the water moderator location in the system was varied to enable identification of the most reactive configurations. Dry and wet conditions were analyzed for the fuel materials, canister, and overpack. For disposal scenarios, two degradation cases were analyzed. In the first, the stainless-steel internals of the canister degraded to either hematite or goethite under both dry and wet conditions. In the second case, degraded FSV fuel formed a uranium-water slurry that filled the coolant/void holes. None of the cases presented exceeded the application specific upper subcritical limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

5.1.6 Demo #6: NanoStitch (NAWAStitch) Multifunctional Composites Trade Validation

The overall objective of the NanoStitch Multifunctional Composites Trade Validation Demonstration project was to determine the value proposition of adding NanoStitch to rapid-cure composite systems for structures used in the expanding sector of advanced air mobility (AAM) and specifically electric vertical take-off and landing (eVTOL) aircraft. The expected value proposition was stronger composite parts, with new multifunctional attributes, that are lower cost to fabricate and maintain. NanoStitch is a new composite innovation where a contiguous vertically aligned carbon nanotube (VACNT) forest is located between each ply of a laminate composite resulting in improved mechanical properties as well as other multifunctional properties such as enhanced thermal and electrical conductivity. NanoStitch was originally distributed by N12, later acquired by NAWA Technologies, now called NAWAStitch, and henceforth referred to in this document as NAWAStitch. Two significant evaluations were framed to help meet the overall objective. First, was Task 1 to evaluate the effects that adding NAWAStitch to a rapid cure material system would have on the mechanical and processing properties of the material. Second, was Task 2 to evaluate the workability of adding NAWAStitch to practical flight demonstration articles. From previous research, it was already known that the application of NAWAStitch to a composite structure can enhance the mechanical properties of that structure. However, this project will help the engineering community understand those benefits and the basic structural strength values to apply when incorporating NAWAStitch material into composite structure that utilizes a rapid-cure resin system, which is novel. Testing showed that by adding NAWAStitch to the prepreg, most material properties were improved because the VACNTs strengthened the resin to fiber interface, and the interface itself, between plies. For example compression strength improved by more than 20%, and erosion resistance by more than 50%. The UDRI team identified two flight demonstration articles through discussions with Aurora Flight Sciences (Aurora) and reviewing literature on air mobility and the eVTOL market. The demonstration articles were a thin skin honeycomb panel and a section from an eVTOL propeller blade. The manufacturing and testing trials of the demonstration articles were as follows: • NAWAStitch added no manufacturing complexity or detriment to the article physical qualities, while at the same time added multifunctional properties such as enhanced rain erosion and electrothermal de-icing besides enhanced mechanical properties • VACNTs did not increase or hurt the mechanical properties of the interface between honeycomb core materials and the thin skin face sheet • Demonstrated successful de-icing function in an eVTOL propeller meeting real-world specifications in uniformity and endurance • Multifunctional eVTOL propeller cost analysis showed a cost savings of at least 67 % for a single propeller blade with multifunctional de-icing capability and improved mechanical properties which equates to a potential savings of $10,116 per eVTOL aircraft with six three-bladed propellers Overall, the results of this project can provide additional tools for the composite industry to optimize energy efficiency through faster and stronger composite parts that are lower cost to fabricate and maintain. Additionally, the results of this effort can help US industry like NAWA America set the stage for rapid growth and establishment of a manufacturing facility in Ohio. The project has given NAWA America the basic understanding of how the addition of VACNTs to a composite structure can affect the mechanical properties and hence point them to potential commercial applications. The project has also provided Teijin Carbon US with another potential material application for their rapid cure materials that are manufactured at the Renegade facility in Miamisburg, OH.

36 MATERIALS SCIENCE↗

HLRW management during MR reactor decommissioning in NRC 'Kurchatov Institute'

A program of decommissioning of MR research reactor in the Kurchatov institute started in 2008. The decommissioning work presumed a preliminary stage, which included: removal of spent fuel from near reactor storage; removal of spent fuel assemble of metal liquid loop channel from a core; identification, sorting and disposal of radioactive objects from gateway of the reactor; identification, sorting and disposal of radioactive objects from cells of HLRW storage of the Kurchatov institute for radwaste creating form the decommissioning of MR. All these works were performed by a remote controlled means with use of a remote identification methods of high radioactive objects. A distribution of activity along high radiated objects was measured by a collimated radiometer installed on the robot Brokk-90, a gamma image of the object was registered by gamma-visor. Spectrum of gamma radiation was measured by a gamma locator and semiconductor detector system. For identification of a presence of uranium isotopes in the HLRW a technique, based on the registration of characteristic radiation of U, was developed. For fragmentation of high radiated objects was used a cold cutting technique and dust suppression system was applied for reduction of volume activity of aerosols in air. The management of HLRW was performed by remote controlled robots Brokk-180 and Brokk-330. They executed sorting, cutting and parking of high radiated part of contaminated equipment. The use of these techniques allowed to reduce individual and collective doses of personal performed the decommissioning. The average individual dose of the personnel was 1,9 mSv/year in 2011, and the collective dose is estimated by 0,0605 man x Sv/year. Use of the remote control machines enables reducing the number of working personal (20 men) and doses. X-ray spectrometric methods enable determination of a presence of the U in high radiated objects and special cans and separation of them for further spent fuel inspection. The sorting of radwaste enabled shipping of the LLRW and ILRW to special repositories and keeping of the HLRW for decay in the Kurchatov institute repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminated Soil Volume Estimation at the Maywood Site - 12292

As part of the ongoing remediation process at the Maywood Formerly Utilized Sites Remedial Action Program properties, Argonne National Laboratory assisted the U.S. Army Corps of Engineers (USACE) New York District in revising contaminated soil volume estimates for the remaining areas of the Stepan/Sears properties that require soil remediation. As part of the volume estimation process, an initial conceptual site model (ICSM) was prepared for the entire site that captured existing information (with the exception of soil sampling results) pertinent to the possible location of surface and subsurface contamination above cleanup requirements. This ICSM was based on historical anecdotal information, aerial photographs, and the logs from several hundred soil cores that identified the depth of fill material and the depth to bedrock under the site. Specialized geostatistical software developed by Argonne was used to update the ICSM with historical sampling results and down-hole gamma survey information for hundreds of soil core locations; both sampling results and down-hole gamma data were coded to identify whether the results indicated the presence of contamination above site cleanup requirements. Significant effort was invested in developing complete electronic data sets for the site by incorporating data contained in various scanned documents, maps, etc. The updating process yielded both a best guess estimate of contamination volumes and upper and lower bounds on the volume estimate that reflected the estimate's uncertainty. The site-wide contaminated volume estimate (with associated uncertainty) was adjusted to reflect areas where remediation was complete; the result was a revised estimate of the remaining soil volumes requiring remediation that the USACE could use for planning. Other environmental projects may benefit from this process for estimating the volume of contaminated soil. A comparison of sample and DHG results for various stations with the site ICSM provides one measure of the quality of site understanding relative to the presence of contamination and its likely extent. A second measure of the quality of a contaminated soil volume estimate, in the case of BAASS, is a comparison of the best guess volume estimate with the conservative volume estimate. For Maywood, the conservative volume estimate is more than double the best guess. The data available for the site indicate that the preponderance of this difference is attributable to uncertainty about the exact depth of known contamination. The observed depth of contamination based on sample results and DHG data often varied significantly among adjacent soil cores. In the case of Maywood, where a significant amount of remediation has already taken place, a third measure of the quality of the volume estimates is the retrospective estimate of contaminated soil volumes for areas that have already been remediated [2]. The USACE is currently comparing the latest BAASS volume estimates for those areas with records indicating what was actually removed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

iTOUGH2-IFC: An Integrated Flow Code in Support of Nagra's Probabilistic Safety Assessment:--User's Guide and Model Description

This document describes the development and use of the Integrated Flow Code (IFC), a numerical code and related model to be used for the simulation of time-dependent, two-phase flow in the near field and geosphere of a gas-generating nuclear waste repository system located in an initially fully water-saturated claystone (Opalinus Clay) in Switzerland. The development of the code and model was supported by the Swiss National Cooperative for the Disposal of Radioactive Waste (Nagra), Wettingen, Switzerland. Gas generation (mainly H{sub 2}, but also CH{sub 4} and CO{sub 2}) may affect repository performance by (1) compromising the engineered barriers through excessive pressure build-up, (2) displacing potentially contaminated pore water, (3) releasing radioactive gases (e.g., those containing {sup 14}C and {sup 3}H), (4) changing hydrogeologic properties of the engineered barrier system and the host rock, and (5) altering the groundwater flow field and thus radionuclide migration paths. The IFC aims at providing water and gas flow fields as the basis for the subsequent radionuclide transport simulations, which are performed by the radionuclide transport code (RTC). The IFC, RTC and a waste-dissolution and near-field transport model (STMAN) are part of the Integrated Radionuclide Release Code (IRRC), which integrates all safety-relevant features, events, and processes (FEPs). The IRRC is embedded into a Probabilistic Safety Assessment (PSA) computational tool that (1) evaluates alternative conceptual models, scenarios, and disruptive events, and (2) performs Monte-Carlo sampling to account for parametric uncertainties. The preliminary probabilistic safety assessment concept and the role of the IFC are visualized in Figure 1. The IFC was developed based on Nagra's PSA concept. Specifically, as many phenomena as possible are to be directly simulated using a (simplified) process model, which is at the core of the IRRC model. Uncertainty evaluation (scenario uncertainty, conceptualization uncertainty, parametric uncertainty) is handled by the outer shell of the PSA model; it is not further discussed in this report. Moreover, justifications for the inclusion or exclusion of FEPs as well as for certain simplifying assumptions are available or can be obtained using detailed process models and other supporting information. The IFC is both a numerical code and a model of a repository system. The numerical code is a modification of the multiphase, multicomponent simulator TOUGH2 (Pruess et al., 1999), as implemented within the iTOUGH2 (Finsterle, 2007abc) framework. The code modifications are mainly concerned with the implementation of relevant FEPs as outlined in Nagra (2007a, AN 07-115), as well as removal of processes and features that are not needed within the IFC; the modifications are summarized in Appendix A1. In addition, the IFC includes a model, i.e., a simplified representation of the repository system. Specifically, a computational grid was generated, which includes the emplacement tunnels for spent fuel, high-level wastes, as well as long-lived intermediate-level wastes. Moreover, the model represents engineered barriers (backfill, seals, plugs, etc.), various tunnels and other underground facilities, and includes a simplified representation of the geological structure, i.e., the host rock (including the excavation disturbed zone (EDZ) around the underground openings), confining units, local aquifers, and a highly transmissive zone. The IFC model was designed in close collaboration with Nagra. This report describes all functional requirements of the IFC and how they are implemented in the IFC. The input formats needed to invoke added modeling capabilities are documented. Finally, the IFC model grid is described, and results from a test simulation are presented.

54 ENVIRONMENTAL SCIENCES↗

AGR-1 Irradiated Compact 6-1-1 PIE Report: Evaluation of As-Irradiated Fuel Performance Using Leach Burn Leach, IMGA, Materialography, and X-ray Tomography

The AGR-1 irradiation test train consisted of six independently monitored capsules. All capsules contained twelve compacts in three stacks of four compacts each [Pope 2010]. Compact 6-1-1 was located in capsule 6, at the top of the test train. The compact was in stack 1 (one of the two stacks closest to the core) in position 1 (at the bottom of the 4 compact stack). Compact 6-1-1 was identified in the fabrication data package as LEU01-46T-Z32 [Hunn et al. 2006]. Details of the compact fabrication and measured properties can be found in that data package. The compact lot was made using TRISO-coated particles designated as AGR-1 Baseline fuel. These particles contained 19.7% enriched mixed uranium oxideuranium carbide (UCO) kernels with a O/U atomic ratio of ~1.36 and a C/U atomic ratio of ~0.33 [Pope 2010]. Details of the coated particle fabrication and measured properties can be found in the data package for the AGR-1 Baseline particles [Hunn and Lowden 2006]. The compact was irradiated at the INL Advanced Test Reactor (ATR) to an average calculated burn-up of 15.1% fissions per initial metal atom (FIMA) and an average calculated fast fluence of 3.0 x 10 25 n/m 2 [Sterbentz 2011] at a calculated volume averaged and time averaged temperature of approximately 1111°C [Hawkes 2012]. Capsules were disassembled and preliminary compact and graphite holder inspection was performed [Demkowicz et al. 2011]. Compact 6-1-1 was shipped to ORNL and post-irradiation examination (PIE) was performed according to examination plan PLN-3624 [Demkowicz 2010-2]. All the examination plan objectives listed below were completed except item 6, which was deleted due to limited funding. 1. Determine the inventory of fission products retained in the compact matrix, but not contained by the SiC and determine the number of exposed kernels or particles with defective SiC layers using the deconsolidation-leach-burn-leach method. 2. Gamma count all particles to quantify 137Cs inventory for comparison with calculated values and gamma spectrometric measurements made on the whole compact. Also, attempt to quantify the inventory of any other fission products for which gamma emissions are observed. 3. Characterize each particle based on the 137 Cs/ 144 Ce ratio to identify particles with low Cs retention that may be the result of a failed SiC coating. 4. Gamma count a subset of particles to determine the 110m Ag inventory for comparison with calculated values and gamma spectrometric measurements made on the whole compact. Also, attempt to quantify the inventory of other fission products observed. 5. Microscopically inspect selected particles to determine the condition of the kernels and coatings. This could include kernel migration, coating microstructures and defects, fission product attack of the SiC layer, and fission product migration in the coating layers. 6. Perform high temperature fission product release tests on a subset of particles in order to calibrate the collection efficiency of the Core Conduction Cooldown Test Facility (CCCTF) deposition cup for selected fission products. Gamma count particles before and after the heating test to quantify the released fission product fractions. 7. Archive remaining particles for later use. Compact 6-1-1 LBL began with compact deconsolidation in the Building 3525 hot cell, followed by two nitric acid leaches of the particles and matrix residue using a Soxhlet extraction apparatus. The matrix residue was then burned and the ash was leached twice with boiling nitric acid. The deconsolidated particles underwent an IMGA analysis to determine gamma-emitting isotope inventories for individual particles; the most conspicuous elements with reduced inventories, indicating fission product release, were silver and europium. During the IMGA analysis, particles with low silver were identified and a subset of these was set aside for materialography and x-ray. After the completion of the IMGA study, about 10% of the particles (421) were set aside as an archive and the remainder burned back and leached twice in the Soxhlet apparatus. Figure 1 shows a flow chart detailing the PIE of Compact 6-1-1.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Basic Data Report for Well Plugging and Abandonment and Reconfiguration Activities for Fiscal Year 2005 (Rev. 1)

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic and mixed waste under a permit issued by the New Mexico Environment Department (NMED). WIPP is located 26 miles east of Carlsbad, New Mexico, in eastern Eddy County (Figure 1). Disposal panels are mined in the Permian Salado Formation at a depth of about 2,150 feet below ground surface (bgs). Over the years a number of groundwater monitor wells have been installed for site characterization and to monitor temporal and spatial changes in groundwater elevation and chemistry at WIPP. Many of the wells in the fiscal year (FY) 2005 program were selected for plugging and abandonment (P&A) due to redundancy. In other words, the well pads have multiple wells that monitor the Culebra ("Culebra") Member of the Rustler Formation when only one is necessary. These multi-well locations are a relic of various aquifer testing programs associated with the site characterization of WIPP. Additionally, the multi-well locations had wells that were completed in both the Culebra and the Magenta ("Magenta") Members of the Rustler Formation for dual monitoring of these intervals. The intervals were separated by inflatable packers used as bridge plugs, and over the years these packers have aged and their integrity compromised. For these wells, the packers were removed and the wells were converted to Magenta-only monitor wells. The FY 2005 program was initiated on March 31, 2005, and concluded on July 16, 2005. The FY 2005 program initially included 25 wells requiring workover (P&A, Magenta reconfiguration, cleaning and keeping). During the process, the U.S. Bureau of Land Management (BLM) requested transfer of two wells (H-7c and H-8c) to their ownership for future livestock watering. These wells were transferred to the BLM through execution of Form wr-03, Declaration of Owner of Underground Water Rights, between the New Mexico Office of the State Engineer (NMOSE), the BLM, and the DOE Carlsbad Field Office (CBFO). One well (H-2b2) was cleaned and retained as a Culebra monitor well for continued use. One well (H-3d) was converted to a shallow well to monitor the formational contact between the Dewey Lake Redbeds Formation and the Santa Rosa Formation in support of the DP-831 discharge permit monitoring program. Nine dual-completion wells were reconfigured as Magenta-only monitor wells, and 12 wells were plugged and abandoned permanently. This report presents the summary in the same order that the wells were worked in the field.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completion Report for the Well ER-6-2 Site Corrective Action Unit 97: Yucca Flat - Climax Mine

Well ER-6-2 and its satellite hole, Well ER-6-2 No.1, were drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. Well ER-6-2 was drilled in two stages in 1993 and 1994; the satellite hole, Well ER-6-2 No.1 was drilled nearby in 1993 but was abandoned. The wells were drilled as part of a hydrogeologic investigation program for the Yucca Flat-Climax Mine Corrective Action Unit Number 97, in the northeastern portion of the Nevada Test Site. The wells are located in Yucca Flat, within Area 6 of the Nevada Test Site. The wells provided information regarding the radiological and hydrogeological environment in a potentially down-gradient position from tests conducted in northern and central Yucca Flat. Construction of Well ER-6-2 began with a 1.2-meter-diameter surface conductor hole, which was drilled and cased off to a depth of 30.8 meters below the surface. A 50.8-centimeter diameter surface hole was then rotary drilled to the depth of 578.5 meters and cased off to the depth of 530.4 meters. The hole diameter was then reduced to 27.0 centimeters, and the borehole was advanced to a temporary depth of 611.4 meters. The borehole was conventionally cored to a total depth of 1,045 meters with a diameter of 14.0 centimeters. Borehole sloughing required cementing and re-drilling of several zones. The open-hole completion accesses the lower carbonate aquifer, the CP thrust fault, and the upper clastic confining unit. A fluid level depth of 543.2 meters was most recently measured in the open borehole in September 2007. No radionuclides were encountered during drilling. The satellite hole Well ER-6-2 No.1 was drilled approximately 15.2 meters north of Well ER-6-2 on the same drill pad. This was planned to be used as an observation well during future hydrologic testing at Well ER-6-2; however, the satellite hole was abandoned at the depth of 399 meters due to stuck drill pipe, and was subsequently cemented to the surface. Detailed lithologic descriptions with stratigraphic assignments in this report are based on composite drill cuttings samples collected every 3 meters, cores taken between the depths of 619.3 and 1,042.4 meters, and geophysical log data. Stratigraphic assignments within the Paleozoic section are based on paleontological analyses. The well was collared in alluvium and at 30.8 meters penetrated Paleozoic carbonate rocks. These consisted of dolostone with minor shale and limestone of the Bonanza King Formation, and limestone with minor quartzite, sandstone, and dolostone assigned to the Guilmette Formation. The borehole reached total depth in a shale unit assigned to the Chainman Shale. The units below the Bonanza King Formation are overturned due to faulting and folding and, therefore, are stratigraphically upside-down.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Safety [Vol. 36, No. 1, January-June 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 1 The Chornobyl Accident Revisited, Part II: The State of the Nuclear Fuel Located Within the Chornobyl Sarcophagus, A A. Borovoi and A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 33 Nuclear Power Safety in Central and Eastern Europe, R. Wilson; 46 Safety of Nuclear Power Reactors in the Former Eastern European Countries, S. Chakraborty; 53 Technical Note: On the Definition of Common-Cause Failures, H. Paula; ACCIDENT ANALYSIS: 58 Modeling and Analysis of Core-Debris Recriticality During Hypothetical Severe Accidents in the Advanced Neutron Source Reactor, S.-H. Kim, V. Georgevich, D. B. Simpson, C. O. Slater, and R. P. Taleyarkhan; 68 Ignitability of Hydrogen/Oxygen/Diluent Mixtures in the Presence of Hot Surfaces, R. K. Kumar and G. W. Koroll; 94 Coupled RELAP5 and CONTAIN Accident Analysis Using PVM, K. A. Smith, A. J. Baratta, and G. E. Robinson; CONTROL AND INSTRUMENTATION: 109 Application of Fuzzy Logic in Nuclear Reactor Control Part I: An Assessment of State-of-the-Art, A. S. Heger, N. K. Alang-Rashid, and M. Jamshidi; DESIGN FEATURES: 122 Twenty-Third DOE/NRC Nuclear Air-Cleaning and Treatment Conference, R. R. Bellamy, J. J. Hayes, and M. W. First; ENVIRONMENTAL EFFECTS: 135 Atmospheric Dispersion and the Radiological Consequences of Normal Airborne Effluents from a Nuclear Power Plant, D. Fang, C. Z. Sun, and L. Yang; 142 Calculation of Distribution Coefficients for Radionuclides in Soils and Sediments, I. Puigdomenech and U. Bergstrom: OPERATING EXPERIENCES: 155 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 158 Operating Experience Feedback Report—Reliability of Safety-Related Steam Turbine-Driven Standby Pumps Used in U.S. Commercial Nuclear Power Plants, J. R. Boardman; 166 Turbine Building Hazards, H. L Ornstein; RECENT DEVELOPMENTS: 169 Reports, Standards, and Safety Guides, D. S. Queener; 175 Proposed Rule Changes as of Dec. 31,1994; ANNOUNCEMENTS: 32 Harvard School of Public Health In-Place Filter Testing Workshop; 134 International Conference on Advances in the Operational Safety of Nuclear Power Plants; 193 30th Tennessee Industries Week; 193 DOE Technical Standards Program 1995 Workshop; 194 Multiphase Flow Experiments and Instrumentation; 180 The Authors; 185 Indexes to Nuclear Safety, Volumes 34 and 35.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2020 Exascale Computing Project Annual Meeting (Executive Summary Report)

The Exascale Computing Project (ECP) delivers specific applications, software products, and outcomes on DOE computing facilities. Integration across these elements for specific hardware technologies for exascale system instantiations is fundamental to ECP success. The outcome of the ECP is the delivery of a capable exascale computing ecosystem to provide breakthrough solutions addressing our most critical challenges in scientific discovery, energy assurance, economic competitiveness, and national security. This outcome is not a matter of ensuring more powerful computing systems. The ECP is designed to create more valuable and rapid insights from a wide variety of applications (“capable”), which requires a much higher level of inherent efficacy in all methods, software tools, and ECP-enabled computing technologies to be acquired by DOE laboratories (“ecosystem”). The ECP annual meeting provides a unique opportunity for the core technical expertise in the United States focused on achieving this next plateau of computational science and computing performance to engage in direct discussions on project execution. Face-to-face gatherings in technical communities like this are common and needed for the exchange of scientific ideas and technical performance. The ECP annual meeting stands apart from other technical conferences and meetings in the computing community as it is uniquely and solely focused on the execution of the ECP and the integration of technical activities leading to the creation of the exascale computing ecosystem for the future. The direct interaction of key critical technical staff, who are leaders in their respective fields, and the resulting give-and-take between software, applications, and hardware and the technical co-design therein, is unique and essential to the effective execution of the ECP. The first annual meeting was held in Knoxville, Tennessee, January 31 – February 2, 2017 and brought together, for the first time, a diverse collection of researchers from 16 DOE national laboratories as well as university computer and computational science researchers to discuss shared problems and joint solutions for the development of a capable exascale computing ecosystem. These interactions resulted in focused technical plans and an energized community centered on advances for ECP. The second annual meeting was held in Knoxville, Tennessee, February 5–9, 2018. It included 643 individual thought leaders and performers in application development, software research and deployment, and hardware research and integrators, all of whom are part of the multifaceted, billion dollar HPC community. This meeting provided a platform to discuss and disseminate numerous examples where researchers with common goals and synergistic solutions came together for the first time to deliver tangible results. Additionally, at the 2018 meeting, ECP researchers had the opportunity to digest all US HPC vendor R&D product roadmaps pointing to exascale – not only to learn how their research can play a role, but, more importantly, to influence those roadmaps to ensure successful delivery on DOE applications that will contribute to (if not solve) problems of national interest in national security, science, energy, and health, as well as growing security threats. The third annual meeting was held in Houston, Texas, January 14–17, 2019. With a 19% increase in the number of registrations (768 people), and the change in location, the third annual meeting was considered the most impactful of the three at the time. The new website provided a better platform for the dissemination of the content, the new venue as a meeting hotel instead of a conference center facilitated interactions and discussions after event hours, and the addition of an award-winning mobile event conference app (Whova) transformed dramatically the attendee experience at the event. This fourth annual meeting was held in Houston, Texas, February 3-7, 2020. This meeting had an increase in the number of attendees for a total of 824 people registered (782 attendees) and included numerous enhancements based on feedback and lessons learned from previous meetings, some of which are listed here: Improved quality of the sessions, their material and the whole program.; Had more industry participation and addition of external collaborators from overseas.; Published the full agenda earlier to better accommodate attendance and travel plans based on schedule.; Centralized all sessions in one venue.; Provided additional hotels and room blocks for the attendees.; Improved communication with the audience (links, material, directions, notifications, etc.) to go paperless.; Enhanced side meeting scheduling, management and user experience.; Made available additional space and tables for impromptu meetings and side discussions.; Improved IT and A/V solutions for speakers. In addition, our final survey captured the following points as opportunities for improvement in future meetings: consider a different meeting location that is more pedestrian friendly, reduce talks during working meals to allow more collaboration and informal time, adapt the agenda to acknowledge attendees from different timezones, consider recording some of the tutorials and/or sessions to share broadly with the HPC community, have a larger poster room, provide additional power strips, and improve the WiFi.

97 MATHEMATICS AND COMPUTING↗

Validation of RELAP-7 for Forced Convective and Natural Circulation Reactor Flows

New reactor designs such as small modular reactors and newly proposed passive safety systems rely on natural circulation two-phase flow cooling of the reactor core under accident conditions. Without a pump to drive the flow, the circulation rate is a strong function of void fraction. Under these conditions where the flow rate, pressure drop, and heat transfer are all closely coupled through the mixture density, the accurate prediction of void fraction is pivotal. Furthermore, while these passive systems boast a more reliable cooling option, the sensitivity of the system to two-phase flow instabilities is more likely than in forced convective cooling and can result in dangerous density wave or flow excursion conditions. Improvement of one-dimensional system codes and further development of three-dimensional code capability are all important efforts in addressing these issues. The proposed work is a critical step towards providing confidence through validation of the capability of thermal-hydraulic tools to meet the emerging challenges in reactor simulation. Historically, system analysis codes develop a stiffness over time due to fine-tuning of adjustable code parameters that result in a reluctance or inability to adopt improved models. Therefore, a rigorous effort should be invested in preparation for RELAP-7 to identify required modeling improvements of constitutive relations and validation of the code applicability to the wide range of possible reactor flow conditions. Part of this validation involves the uncertainty quantification which is a critical step in the Code Scaling, Applicability, and Uncertainty (CSAU) methodology and Best-Estimate Plus Uncertainty (BEPU) licensing method. BEPU allows recovery of safety margins and potentially optimizing plant performance, resulting in economic benefit for the reactor operators. Beginning with the collection of past experimental data covering prototypic LWR conditions, this document reviews three critical datasets available for the validation of system codes. The experimental methods, procedures, facilities, instrumentation, and supplementary information are consolidated to aid the validation efforts of this work and future projects. These three datasets (824 conditions) are chosen due to their wide acceptance and demonstrated application for code validation. Two experimental datasets from the Nuclear Power Engineering Corporation (NUPEC) span prototypic conditions of Boiling Water Reactors (BWR) and Pressurized Water Reactors (PWR). These datasets are labeled as the BFBT (BWR Full-size Fine-mesh Bundle Test) and the PSBT (PWR Subchannel and Bundle Test) datasets respectively. The third dataset is taken in an internally heated annulus that is scaled based on a BWR subassembly and includes two-phase flows important to post-blowdown analysis. Together, the datasets consider the full range of pressure and mass flux expected in LWR forced convective flows from steady-state to long term cooling conditions. Recognizing the deficiency of available data under low-pressure, low-flow, a new natural circulation dataset consisting of 107 conditions is obtained. With system pressures ranging between 145 and 950 kPa, natural circulation is driven by a heat flux up to 275 kW/m2 in a 3 m long heated region of the annulus test section which is followed by a 2 m long unheated region before entering a condenser. Stable natural circulation flow rates in this facility were measured to be between 182 and 590 kg/m2-s. Pressure and temperature are measured at ten locations in the facility. In addition, measurements of void fraction, interfacial area concentration, and gas velocity are obtained at five axial locations in the annulus test section. The RELAP5-3D code demonstrates good accuracy for void fraction predictions in BFBT and PSBT benchmarks, but shows relatively large discrepancy in the annulus experiments at lower pressures. In two-phase natural circulation, large oscillations are observed in many system parameters during the simulation of 19 experiment cases which were conducted at low pressures, and the model shows good predictive performance with the remaining 88 experiment cases. However, some discrepancies in void fraction and temperature predictions are found which may require improved constitutive modeling under these low-pressure, low-flow condition. The quantified uncertainty in void fraction predictions in three forced convection benchmarks due to uncertainties in boundary conditions and geometries are relatively small, except for a few cases in the annulus experiment. The output uncertainty of the natural circulation model is quantified by considering the measurement error in boundary conditions, and it is shown that the output uncertainty ranges are relatively small for the range of conditions considered. Through this work, a clear pathway is provided for validation of RELAP7 once the code is available.

42 ENGINEERING↗

Pressure-Fed LOX/LCH4 Reaction Control System for Spacecraft: Transient Modeling and Thermal Vacuum Hotfire Test Results

An integrated cryogenic liquid oxygen, liquid methane (LOX/LCH4) reaction control system (RCS) was tested at NASA Glenn Research Center's Plum Brook Station in the Spacecraft Propulsion Research Facility (B-2) under vacuum and thermal vacuum conditions. The RCS is a subsystem of the Integrated Cryogenic Propulsion Test Article (ICPTA), a pressure-fed LOX/LCH4 propulsion system composed of a single 2,800 lbf main engine, two 28 lbf RCS engines, and two 7 lbf RCS engines. Propellants are stored in four 48 inch diameter 5083 aluminum tanks that feed both the main engine and RCS engines in parallel. Helium stored cryogenically in a composite overwrapped pressure vessel (COPV) flows through a heat exchanger on the main engine before being used to pressurize the propellant tanks to a design operating pressure of 325 psi. The ICPTA is capable of simultaneous main engine and RCS operation. The RCS engines utilize a coil-on-plug (COP) ignition system designed for operation in a vacuum environment, eliminating corona discharge issues associated with a high voltage lead. There are two RCS pods on the ICPTA, with two engines on each pod. One of these two engines is a heritage flight engine from Project Morpheus. Its sea level nozzle was removed and replaced by an 85:1 nozzle machined using Inconel 718, resulting in a maximum thrust of 28 lbf under altitude conditions. The other engine is a scaled down version of the 28 lbf engine, designed to match the core and overall mixture ratios as well as other injector characteristics. This engine can produce a maximum thrust of 7 lbf with an 85:1 nozzle that was additively manufactured using Inconel 718. Both engines are film-cooled and capable of limited duration gas-gas and gas-liquid operation, as well as steady-state liquid-liquid operation. Each pod contains one of each version, such that two engines of the same thrust level can be fired as a couple on opposite pods. The RCS feed system is composed of symmetrical 3/8 inch lines that tap off of the main propellant manifold to send LOX and LCH4 outboard to the RCS pods. A Thermodynamic Vent System (TVS) is used to condition propellants at each pod by venting through an orifice and then routing the cold expansion products back through tubing that is welded along a large portion of the main RCS feed lines. Prior to final installation on the ICPTA, the RCS engines were tested in a small vacuum chamber at the Johnson Space Center (JSC) Energy Systems Test Area (ESTA) to verify functionality of the new COP ignition system and check out operation of the vacuum nozzles. After engine-level testing, the RCS engines were installed on the vehicle and a series of integrated hot-fire tests were performed at JSC consisting of various pulsing and steady-state firings as well as integrated main engine/RCS operation. The ICPTA was then integrated into the Plum Brook B-2 facility for vacuum and thermal/vacuum testing. Testing in the B-2 facility was composed of multiple thermal and pressure environments. The first set of tests were performed under ambient temperature and altitude pressure conditions. These tests consisted of a range of minimum impulse bit (MIB) pulsing sequences with low duty cycle, analogous to a coast phase in which the RCS is primarily used for station keeping. The primary goal of this sequence is to understand how propellant conditions were effected without an active TVS. In this scenario, consistent gas-gas operation is desirable since it results in a smaller MIB and more efficient propellant consumption. Multiple skin thermocouples are mounted on the feedlines, in addition to a submerged thermocouple on each commodity, in order to gather thermal data on the system. Higher duty cycle pulsing tests were then performed, analogous to an ascent or landing mission phase. The primary goal of this sequence was to examine how well the engines self-conditioned without active TVS when starting from a quiescent state. The TVS was then activated during some tests to demonstrate the capability to quickly condition the engines for higher pulsing demand scenarios. A thermocouple at the TVS outlet allows for the calculation of energy absorbed by the vented propellant. Lastly, tests with longer pulses and multiple engines firing either in sequence or simultaneously were run in order to gather transient system response data on waterhammer. Six total high-speed pressure transducers are installed on the RCS system, one sensor at the end of each propellant manifold line on the pods, and one at the tap-off location for each commodity. This will allow for the accurate characterization of waterhammer in the system under various propellant conditions and firing sequences. Other instrumentation for this test series includes nozzle throat thermocouples, chamber pressure measurement, heat soakback measurement, and tank wall plume impingement temperature measurement. The next set of tests were performed to demonstrate simultaneous main engine and RCS operation. Data from this test will be used to examine if there is any change to nominal operation of the RCS as a result of feed system interaction or other phenomenon. Some of these tests began under high vacuum conditions (target ambient pressure less than 1x10(exp -3) torr) and others began at altitude conditions. The last set of tests were performed with the B-2 cold wall active. Under these tests, many of the same low duty cycle MIB tests were repeated in order to characterize how propellant conditions changed with the lower heat leak. In this scenario the RCS manifold experiences much less heat leak, resulting in a change to how well the engines self-condition. As a result, an increase in maximum waterhammer pressures and a change in natural frequency of the system was expected due to higher density propellants. The lower heat leak should also result in a change to the MIB pulse profile, and data will be examined to understand how MIB repeatability is affected in the different operating environments. Parallel to the test efforts, a set of transient model development efforts were made to predict RCS performance. The primary effort was aimed at producing a SINDA/FLUINT model to predict propellant conditioning up to the engine inlet as a function of different environmental and operating parameters, with the goal of predicting chamber pressure, TVS performance, and propellant consumption over time. Preliminary results for this effort will be presented in comparison with test data. Additional modeling efforts were made using SINDA/FLUINT to predict waterhammer in the system since the software is capable of handling multiphase transient fluid dynamics. These results will be compared with the high-speed pressure transducer test data for validation purposes.

Atwell, Matthew J.↗

Estimate of Gamma Dose Rates from Arrays of Fermi-1 Blanket Elements During the MEDE Process

The Enrico Fermi Atomic Power Plant Unit 1 (Fermi-1) was a sodium-cooled fast breeder reactor located in Monroe County, Michigan. The reactor was powered by a core of enriched uranium metal alloy driver fuel, which was enveloped by an axial and radial blanket material consisting of depleted uranium metal alloyed with 3 wt.% molybdenum. There are 406 axial and 559 radial irradiated sodium-bonded Fermi-1 blanket assemblies in storage at INL, totaling 34 metric tons of heavy metal. Disposal of the Fermi-1 blanket material directly into a geological repository is prohibited due to the reactive characteristic of its bond sodium. A melt drain evaporate (MEDE) process can effectively remove bond sodium from Fermi-1 blanket material. Consequently, planning is underway to apply a MEDE process to treat the 34 metric tons of heavy metal of irradiated Fermi-1 blanket material. Given the irradiated Fermi-1 blanket material’s relatively low power history and 50+ years of decay, it can be treated in a shielded glovebox. To assess the requisite shielding, the dose rates of the Fermi-1 blanket elements in various process configurations are needed. The method to perform the dose rate calculations is to first generate an average source term and associated photon source spectra for the Fermi-1 blanket material in SCALE and then use the associated photon spectra to calculate dose rates using MCNP6.2 in seven representative geometries. Dose rates in rem/h were calculated on contact (1 cm from outer geometry surface), 30 cm away from outer geometry surface, and 1 m from outer geometry surface at axial heights spanning the length of the blanket material within the geometry. The maximum average dose rate for the single Fermi-1 radial blanket element is ~0.60 rem/h, for the Fermi-1 radial blanket assembly ~1.10 rem/h, for the single Fermi-1 axial blanket element ~0.5 rem/h, for the Fermi-1 axial blanket assembly ~1.01 rem/h, for the MEDE can ~ 0.98 rem/h, for the Fermi Storage Canister ~ 0.83 rem/h, and for the MEDE cans in the DOE Standard Canister ~0.51 rem/h. Based on these maximum average values, the bounding dose rates are assumed to be 3× the average dose rates calculated for the axial blanket material and 7.6× the average dose rates calculated for the radial blanket material, based on the distribution of Fermi-1 blanket material assembly burnup.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and applications of retro-reflective surfaces for ultrasound in LBE

The Belgian Nuclear Research Centre SCK-CEN is in the process of developing MYRRHA - a fast flux research reactor to replace the aging BR2. MYRRHA is conceptualized as an accelerator driven system cooled by lead bismuth eutectic mixture (LBE). As LBE is opaque to visual light, ultrasonic measurement techniques are employed as the main technology to provide feedback to submerged operations when needed. Conceptually, MYRRHA is a pool type reactor divided in a cold lower plenum and hot upper plenum separated by a diaphragm that forces the main flow through the core. The main flow is cooled by four heat exchangers and driven by two liquid metal pumps. One of the tasks tackled using ultrasound is locating a potentially lost fuel assembly to assist a recovery operation. As all fuel manipulations in MYRRHA are performed in the lower plenum, a potentially lost fuel assembly is located in the lower plenum. Buoyancy will force the lost fuel assembly to float against the diaphragm unless it is still partially inserted in the core. Because of the latter situation, an ultrasonic scan localizing the fuel assembly should be performed from a large distance to avoid a collision with such a partially inserted fuel assembly. Unfortunately, standard machined stainless steel objects, such as a fuel assembly, reflect an ultrasonic pulse in a specular way which induces stringent requirements on the alignment of the ultrasonic sensor with respect to the fuel assembly as we cannot rely on diffuse reflections and/or scattering of the ultrasonic pulse. Moreover, increasing the distance also increases geometric spreading and absorption of the pulse weakening the signal amplitude even faster to noise levels when deviating from perfect alignment. An alternative approach consists in relying on reflections from the known surroundings: a lost fuel assembly will block the line-of-sight to the diaphragm resulting in an anomaly in the reflection - either a shorter than expected time-of-flight of the pulse or a complete absence of a reflection like a shadow. In that way, it suffices to align the sensor with the diaphragm instead of the fuel assembly which is much easier to achieve as the robotics on which the sensor is mounted move parallel with the diaphragm. The alignment requirement in the latter approach can be further relaxed by using a tiling of retro-reflectors on the lower surface of the diaphragm. In that way, alignment becomes less vital and the main source of acoustic energy loss - geometric spread of the beam - is almost completely removed, leaving only absorption losses. In this paper, we present the first results in developing a retro reflectance surface for ultrasound in LBE. We present experimental results for different designs of retro-reflectors in both water and LBE. We discuss both linear and array retro-reflectors of different sizes and investigate the influence of the main relevant ultrasonic parameters such as wavelength and spot size on the strength of the received reflection under different alignment angles. We also demonstrate how retro-reflective surfaces can be exploited when localizing objects using linear and rotating scanning methods. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Exploratory Design of a Reactor/Fuel Cycle Using Spent Nuclear Fuel Without Conventional Reprocessing - 13579

General Atomics has started design of a waste to energy nuclear reactor (EM2) that can use light water reactor (LWR) spent nuclear fuel (SNF). This effort addresses two problems: using an advanced small reactor with long core life to reduce nuclear energy overnight cost and providing a disposal path for LWR SNF. LWR SNF is re-fabricated into new EM2 fuel using a dry voloxidation process modeled on AIROX/ OREOX processes which remove some of the fission products but no heavy metals. By not removing all of the fission products the fuel remains self-protecting. By not separating heavy metals, the process remains proliferation resistant. Implementation of Energy Multiplier Module (EM2) fuel cycle will provide low cost nuclear energy while providing a long term LWR SNF disposition path which is important for LWR waste confidence. With LWR waste confidence recent impacts on reactor licensing, an alternate disposition path is highly relevant. Centered on a reactor operating at 250 MWe, the compact electricity generating system design maximizes site flexibility with truck transport of all system components and available dry cooling features that removes the need to be located near a body of water. A high temperature system using helium coolant, electricity is efficiently produced using an asynchronous high-speed gas turbine while the LWR SNF is converted to fission products. Reactor design features such as vented fuel and silicon carbide cladding support reactor operation for decades between refueling, with improved fuel utilization. Beyond the reactor, the fuel cycle is designed so that subsequent generations of EM2 reactor fuel will use the previous EM2 discharge, providing its own waste confidence plus eliminating the need for enrichment after the first generation. Additional LWR SNF is added at each re-fabrication to replace the removed fission products. The fuel cycle uses a dry voloxidation process for both the initial LWR SNF re-fabrication and later for EM2 discharge reuse. The EM2 waste disposal profile is effectively only fission products, which reduces the mass (about 3% vs LWR), average half life, heat and long term radio-toxicity of the disposal. Widespread implementation of EM2 fuel cycle is highly significant as it would increase world energy reserves; the remaining energy in U.S. LWR SNF alone exceeds that in the U.S. natural gas reserves. Unlike many LWR SNF disposition concepts, the EM2 fuel cycle conversion of SNF produces energy and associated revenue such that the overall project is cost effective. By providing conversion of SNF to fission products the fuel cycle is closed and a non-repository LWR SNF disposition path is created and overall repository requirements are significantly reduced. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reactor Vessel and Reactor Vessel Internals Segmentation at Zion Nuclear Power Station - 13230

Zion Nuclear Power Station (ZNPS) is a dual-unit Pressurized Water Reactor (PWR) nuclear power plant located on the Lake Michigan shoreline, in the city of Zion, Illinois approximately 64 km (40 miles) north of Chicago, Illinois and 67 km (42 miles) south of Milwaukee, Wisconsin. Each PWR is of the Westinghouse design and had a generation capacity of 1040 MW. Exelon Corporation operated both reactors with the first unit starting production of power in 1973 and the second unit coming on line in 1974. The operation of both reactors ceased in 1996/1997. In 2010 the Nuclear Regulatory Commission approved the transfer of Exelon Corporation's license to ZionSolutions, the Long Term Stewardship subsidiary of EnergySolutions responsible for the decommissioning of ZNPS. In October 2010, ZionSolutions awarded Siempelkamp Nuclear Services, Inc. (SNS) the contract to plan, segment, remove, and package both reactor vessels and their respective internals. This presentation discusses the tools employed by SNS to remove and segment the Reactor Vessel Internals (RVI) and Reactor Vessels (RV) and conveys the recent progress. SNS's mechanical segmentation tooling includes the C-HORCE (Circumferential Hydraulically Operated Cutting Equipment), BMT (Bolt Milling Tool), FaST (Former Attachment Severing Tool) and the VRS (Volume Reduction Station). Thermal segmentation of the reactor vessels will be accomplished using an Oxygen- Propane cutting system. The tools for internals segmentation were designed by SNS using their experience from other successful reactor and large component decommissioning and demolition (D and D) projects in the US. All of the designs allow for the mechanical segmentation of the internals remotely in the water-filled reactor cavities. The C-HORCE is designed to saw seven circumferential cuts through the Core Barrel and Thermal Shield walls with individual thicknesses up to 100 mm (4 inches). The BMT is designed to remove the bolts that fasten the Baffle Plates to the Baffle Former Plates. The FaST is designed to remove the Baffle Former Plates from the Core Barrel. The VRS further volume reduces segmented components using multiple configurations of the 38i and horizontal reciprocating saws. After the successful removal and volume reduction of the Internals, the RV will be segmented using a 'First in the US' thermal cutting process through a co-operative effort with Siempelkamp NIS Ingenieurgesellschaft mbH using their experience at the Stade NPP and Karlsruhe in Germany. SNS mobilized in the fall of 2011 to commence execution of the project in order to complete the RVI segmentation, removal and packaging activities for the first unit (Unit 2) by end of the 2012/beginning 2013 and then mobilize to the second unit, Unit 1. Parallel to the completion of the segmentation of the reactor vessel internals at Unit 1, SNS will segment the Unit 2 pressure vessel and at completion move to Unit 1. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MPEX AI Digital Twins

All magnetically confined plasma fusion power plant concepts (Tokamak, Spherical Tokamak, Stellarator, Mirror, ...) must exhaust the heat and plasma from the core confinement region to the material walls. The primary channel for this exhaust is through a plasma divertor which directs plasma along open magnetic field lines to a material target. The Material Plasma Exposure eXperiment (MPEX) illustrated in Figure 1, is a high-power, steady-state linear plasma device designed to produce the plasma material interaction (PMI) conditions of the divertor of future magnetic confinement fusion power plants: energy flux 20MW/m 2 , ion fluence 1031/m 2 , pulse duration 106 sec. These goals of plasma exposure in MPEX are well beyond those achieved in magnetic fusion experimental devices. Successfully achieving these high power steady state conditions for long pulses requires operational control of the heating and particle sources and the plasma flux to the walls and target. The MPEX AI Hot Spot Controller, proposed in this project, will help achieve the operational milestones of MPEX. The MPEX device will begin commissioning at the end of FY26. A smaller proto-MPEX was operated for 14,666 plasma discharges and will resume operation in September of 2025 as proto-MPEX-lite, with reduced capability, to test a new window for the Helicon plasma source. The proto-MPEX data has undergone surrogate modeling with machine learning methods (R. Archibald, 2022 IEEE International Conference on Big Data). This proto-MPEX data will be used to begin development of the AI digital twins described in this white paper. The scientific mission of MPEX is to qualify materials of different composition for use in the high energy and plasma flux conditions of a fusion power plant. The materials exposed in MPEX will in some cases be exposed to high neutron fluxes at other ORNL facilities to measure the changes to their PMI properties. The targets exposed in MPEX will be transported under vacuum to a Surface Analysis Station (SAS). The SAS will be equipped with the following diagnostics: Focused Ion Beam (FIB) for trench milling, 100-400 angstrom resolution scanning electron microscope (SEM), surface mapping x-ray spectrometer, high resolution camera, and a future upgrade to a laser induced breakdown spectroscopy quadruple mass spectrometer (LIBS-QMS). The MPEX experiments will generate diverse pre- and post-exposure measurement data of detailed material properties down to the crystal grain level in 3D for post-exposure assessment of PMI damage (e.g. cracking, melting, erosion and redeposition of the material). Physics models for the PMI, and how the material composition and manufacturing impact its performance under high energy plasma exposure, need to be validated with MPEX data to guide the selection of new candidate materials. Our vision for the MPEX AI Digital Twins project is to supply experimental and physics model simulation data to train Artificial Intelligence (AI) models for data processing, analysis, operational control, PMI and materials simulation to maximize the scientific output of the MPEX device. Ultimately, an AI digital twin of MPEX material assessment metrics for tested and synthetic material types with simulated PMI will be trained by the AI Modeling Teams on the experimental and physics simulation data submitted to the American Science Cloud by this project. A purely empirical search for the best material is inefficient given the finite number of samples that can be tested on MPEX. In order to expand the material properties database for training the MPEX Material Assessment AI Digital Twin, and to gain physics understanding of the PMI processes, physics models of the material properties and PMI processes are required. The physics simulations provide detailed simulation data, like impact angles for plasma ions, sputtering yields, transport of the ionized sputtered target material in the plasma, and redeposition locations. This simulation data expands the measurement data for deeper physics understanding. The experimental data is essential to validate the PMI and material structure simulation models. The validated models can then be used to generate new simulation data of MPEX material assessments for synthetic material compositions that have not been exposed in MPEX. These predictive simulations, plus the whole experimental dataset, will be used to train the MPEX Material Assessment AI Digital Twin allowing a rapid generative AI search for new materials with reduced PMI damage by interpolating the domain of the training set. These new optimum materials can be simulated with the physics codes and/or tested in MPEX. The ability of AI neural networks to interpolate multi-dimensional parameter spaces and generate virtual data is exploited for a more efficient search for optimum materials. The advent of the Transformational AI Models Consortium (TAIMC) is an opportunity to engage with state of the art private and public AI developers to achieve the goals of the AI digital twins and AI accelerated physics models proposed in this project. Our partners at ORNL from the Advance Scientific Computing Research (ASCR) organization will collaborate in accelerating the integrated plasma material interaction simulation framework. This simulation framework will provide a platform for generating simulation data across a range of physical fidelities, including hybrid methods that produce multi-fidelity results. This data will be leveraged for AI model development, both for generation of surrogates and the automation of simulation campaigns. A part of the research below will include collaborative efforts with the TAIMC to (i) adapt data storage approaches to ensure AI-readiness, (ii) provide a protypical exemplar to inform and exercise constructed workflows, and (iii) generate and share data, using the TAIMC unified AI data standard, for foundational models that will be trained from multiple sources across the DOE complex. We will also collaborate with the TAIMC, as well as the planned AI modeling teams, to develop approaches for reducing the cost of data generation. These include tailored multi-fidelity approaches as well as fine-tuning strategies to augment general, large-scale foundational models.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗