Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Technical Support Plan”

This plan outlines the systemic and coordinated management of the CNSSC technical support programme. In accordance with the CNSSC Strategy Implementation Plan and Memoranda of Understanding among stakeholders, Centralia Border Guards (CBG) and Centralia Nuclear Energy Agency (CNEA) will lead the effort to develop standardized approach to technical support and will provide technical support to the following CNSSC stakeholders: CBG, CNEA, Centralia National Police (CNP), Centralia Coast Guard (CCG), and CentrAtom/Centralia Nuclear Power Plant (CNPP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Depot-Based Vehicle Data for National Analysis of Medium- and Heavy-Duty Electric Vehicle Charging

Medium- and heavy-duty vehicles (MHDVs) are a major source of greenhouse gases and local criteria air pollutants. Electrifying MHDVs may reduce these harmful emissions, which disproportionately impact disadvantaged communities. Due to their relatively high per-vehicle energy needs, consistent fleet operations, and frequent colocation of multiple vehicles at depots, MHDVs may have more spatially and temporally concentrated charging demands than light-duty passenger electric vehicles. That charging concentration means their electrification may require careful advance planning and coordination to manage potential impacts to the electrical grid via charge management or infrastructure upgrades. However, MHDV duty cycles and parking schedules are highly variable across vocations of operation, and there is a shortage of nationally representative, vocationally diverse public data describing typical MHDV operations. This report summarizes the methodology - designed with national representativeness in mind - used to create a new set of data describing typical daily driving distances, dwell durations, and normalized electric vehicle depot charging load curves for MHDVs. The dataset reflects the subset of MHDV operating patterns that may originate from a consistent depot each day and rely on the same depot for charging. In addition to trucks with depot-centric vocational patterns, the data describes operations of transit buses and school buses, each with a depot-centric focus. The dataset is available to the public and suitable for national analysis. It can inform research, infrastructure planning, and policymaking regarding the electrification of MHDVs.

33 ADVANCED PROPULSION SYSTEMS↗

Smart Charging of Fleet and Personal Electric Vehicles through Joint Vehicle-to-Grid Optimization

As electric vehicle (EV) adoption accelerates, vehicle-to-grid (V2G) strategies offer advantages over unmanaged charging (V0G) by enhancing grid stability, reducing fleet operation costs, and supporting integration of variable generation resources. This research develops a day-ahead optimization framework linked with agent-based simulations to evaluate coordinated V2G participation by fleet and personal EVs under 5 energy-pricing settings in Austin, Texas. Three scenarios (V0G, fleet-only V2G, and joint-V2G) are examined, considering real-time price and grid profiles, health-damage costs, and operational constraints for both fleet and personal EVs. Results show how V2G scenarios shift fleet EV charging to mid-day while enabling strategic battery-discharge during evening peaks, mitigating grid stress and lowering EV energy costs. V2G delivers close to 80% energy-cost savings for a 2000-EV fleet in Austin on grid-stressed days, with 55% lower charging pollutant outputs. Joint-V2G amplifies system-level benefits by complementing fleet discharge, but smart-charging equipment costs can offset those benefits.

Electric vehicle↗

Distributed Load Shedding Application Architecture and Bi-Level Predictive Estimator Algorithm

Increasing penetrations of distributed renewables are decreasing the effectiveness of traditional decentralized under-frequency load shedding (UFLS) schemes. As more distribution circuits begin to back-feed the transmission system, operation of traditional UFLS may exacerbate frequency instability. This paper presents the conceptual framework for a data-rich environment to coordinate UFLS across multiple distribution providers based on the laminar coordination framework in order to ensure optimal adaptive setting of UFLS relays. Communication and control are enabled through a distributed implementation of the IEC 61968-1 Common Information Model message bus structure. In addition to the proposed architecture, a novel adaptive UFLS scheme informed by a bi-level state estimator to create optimal relay setpoints is introduced. Initial simulation results are presented for the IEEE 14-bus test system on scenarios leading to mis-operation of traditional UFLS.

Anderson, Alexander A.↗

Data Interfaces for Automated Vehicle Services - A Municipality Perspective

As Automated Vehicle (AV) services proliferate, data sharing between AV operators and municipal agents is assuming greater importance. Information on the dynamic nature of the road system such as incidents to avoid, weather hazards (such as flooding), construction and detours, as well as active safety concerns (e.g. - riots) is important for AV operators. Such information cannot be directly sensed from a vehicle's sensor array, but instead must be communicated in a timely and trustworthy channel. Municipalities are interested in pushing this information to AV operators to support emergency response efforts, reduce traffic in construction zones, and generally improve operation of the system. Similarly, information on vehicle safety such as disengagements, as well as critical information on the use of roadway system (trips, origin and destination patterns) are important performance factors for municipalities to understand utilization and plan for appropriate infrastructure. As mobility shifts to on-demand options, the need for safe and coordinated pick-up and drop-off zones will increase (potentially reducing parking needs). For all of these reasons, communication flows between AV operators and municipalities are becoming increasingly important. This paper investigates the functions, emerging practices and protocols for sharing of such critical data, and identifies gaps in and challenges in existing practices. Additionally, case studies are used to highlight the impacts of data sharing between AV operators and municipalities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lift & Learn: Physics-informed machine learning for large-scale nonlinear dynamical systems

In this work, we present Lift & Learn, a physics-informed method for learning low-dimensional models for large-scale dynamical systems. The method exploits knowledge of a system’s governing equations to identify a coordinate transformation in which the system dynamics have quadratic structure. This transformation is called a lifting map because it often adds auxiliary variables to the system state. The lifting map is applied to data obtained by evaluating a model for the original nonlinear system. This lifted data is projected onto its leading principal components, and low-dimensional linear and quadratic matrix operators are fit to the lifted reduced data using a least-squares operator inference procedure. Analysis of our method shows that the Lift & Learn models are able to capture the system physics in the lifted coordinates at least as accurately as traditional intrusive model reduction approaches. This preservation of system physics makes the Lift & Learn models robust to changes in inputs. Numerical experiments on the FitzHugh–Nagumo neuron activation model and the compressible Euler equations demonstrate the generalizability of our model.

97 MATHEMATICS AND COMPUTING↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Optimizing first- and last-mile public transit services leveraging transportation network companies (TNC)

First-mile last-mile (FMLM) mobility services that connect riders to public transit can lead to improved transit accessibility and network efficiency if such services are convenient and reliable. However, many current FMLM services are inefficient and costly because they are inflexible (e.g., fixed supply of shuttles) and do not leverage collected data for optimized decision making. At the same time, new forms of shared mobility can provide added flexibility and real-time analytics to FMLM systems when carefully integrated. This study evaluates performance and cost implications of public/private coordination between transit shuttles and transportation network companies (TNC) in the FMLM context. A real-time operations model was developed to simulate daily operations for an existing FMLM system using real-world demand data. Three supply strategies were tested with varying levels of flexibility: (1) Status Quo (two 23-passenger on-demand shuttles), (2) Hybrid (one 23-passenger on-demand shuttle + TNC), and (3) TNC Only (exclusively use TNC services). Results indicated that the added flexibility of the Hybrid service design (using shuttles and TNCs) improved service performance (a 7.7% improvement), reduced daily operating costs (– 6.0%), and improved service reliability (95th percentile travel times decreased by up to 40% during peak periods). In addition, the Hybrid service design was more robust to variations in demand. Here, the Hybrid service was significantly cheaper to operate (– 31.6%) at reduced demand levels (50% of normal), and improved service performance (a 10.2% improvement) when demand levels were increased (150% of normal). These findings emphasize the importance of flexibility in FMLM service designs, especially when demand is sparse and variable.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Process planning for hybrid manufacturing using additive friction stir deposition

Additive friction stir deposition (AFSD) provides a solid-state approach to metal deposition that does not rely on local melting and solidification, but rather on kinetic energy and plastic flow. Here, in this study, AFSD is combined with structured light scanning, turning, and milling to produce metal components while considering the unique requirements imposed by the hybrid manufacturing process sequences. Two demonstrations are presented which include: 1) a cylindrical build plate selection to enable coordinate system transfer between deposition and turning of a hollow cone; and 2) intermittent deposition-machining operations with structured light scanning to fabricate a two-sided hexagon-cylinder geometry.

36 MATERIALS SCIENCE↗

Reconfigurable Intelligent Surfaces in Action for Nonterrestrial Networks

Next-generation communication technology will be made possible by cooperation between terrestrial networks with nonterrestrial networks (NTNs) composed of high-altitude platform stations (HAPSs) and satellites. Further, as humanity embarks on the long road to establish new habitats on other planets, the cooperation between NTNs and deep-space networks (DSNs) will be necessary. In this regard, we propose the use of reconfigurable intelligent surfaces (RISs) to improve coordination between these networks given that RISs perfectly match the size, weight, and power (SWaP) restrictions of operating in space. Here, a comprehensive framework of RIS-assisted nonterrestrial and interplanetary communications is presented that pinpoints challenges, use cases, and open issues. Furthermore, the performance of RIS-assisted NTNs under environmental effects, such as solar scintillation and satellite drag, is discussed in light of simulation results.

42 ENGINEERING↗

Optimal Siting of EV Fleet Charging Station Considering EV Mobility and Microgrid Formation for Enhanced Grid Resilience

Coordinating infrastructure planning for transportation and the power grid is essential for enhanced reliability and resilience during operation and disaster management. This paper presents a two-stage stochastic model to optimize the location of electric vehicle fleet charging stations (FEVCSs) to enhance the resilience of a distribution network. The first stage of this model deals with the decision to place an FEVCS at the most favorable and optimized location, whereas the second stage aims to minimize the weighted sum of the value of lost load in multiple potential scenarios with different faults. Indeed, the second stage is a joint grid restoration scheme with network reconfiguration and microgrid formation using available distributed generators and fleet electric vehicles. The proposed model is tested on a modified IEEE-33 node distribution network and a four-node transportation network. Case studies demonstrate the effectiveness of the proposed model.

25 ENERGY STORAGE↗

Performance Evaluation of Distributed Energy Resource Management Systems Using Software- and Hardware-in-the-Loop

Distributed energy resource management systems (DERMS) are an important emerging technology for coordinating distributed energy resources (DERs) integrated in power distribution networks. These solutions implement a software platform to monitor, control, and coordinate DERs in real time to provide aggregate grid services to the electric utility or distribution system operator. To move DERMS technology forward, research and performance validation in a laboratory environment are needed to ensure proper function of DERMS prior to field deployment. This presentation presents a generic hardware-in-the-loop (HIL) platform to evaluate performance of DERMS using software-in-the-loop (SIL) and power HIL. The platform provides realistic testing in a laboratory environment, including accurate modeling of full-scale distribution systems, DERMS software controllers, and at-power distributed energy resources (DERs), such as solar and battery inverters. Two case studies are presented to demonstrate how the platform can be used independently as an integrated development and validation approach for different projects. Laboratory testing results are included to showcase the voltage regulation performance of each study and the benefits of implementing such a platform for DERMS evaluation.

DERMS↗

DSO+T: Integrated System Simulation (DSO+T Study: Volume 2)

This report summarizes an integrated co-simulation model used by the Distribution System Operator with Transactive (DSO+T) study to represent an electrical generation, delivery, and end-load systems for the purposes of assessing the viability and value proposition of transactive energy coordination of flexible assets versus a business-as-usual case. The integrated co-simulation model includes the bulk generation and transmission system, including the day-ahead and real-time scheduling and dispatch of thermal generators. Forty distribution system operators were modelled in detail, including tens of thousands of residential and commercial buildings and their flexible end-loads. These included HVAC systems, residential water heaters, electric vehicles, and stationary, behind-the-meter, batteries. Both wholesale market and end-load results for the business-as-usual case are presented and compared to actual ERCOT system data to assess the accuracy and representativeness of the resulting model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Gas-Electric Energy System Decarbonization Planning

As energy utilities implement climate change mitigation policies, system planners require strategies for achieving affordable emissions reductions. Coordinated planning of electric power and natural gas systems will allow synergistic investments to address cross-sector operational constraints, competing uses for net-zero emissions fuels, and shifts in energy demands across energy carriers. In this study, we develop a novel optimization program that finds the cost-minimizing mix of infrastructure expansion or reduction across gas and electric systems to satisfy sector-specific emissions constraints. Alongside energy supply resources, our framework allows for central-planning of end-use equipment stocks to allow switching between gas and electric appliances upon failure or premature replacement. The proposed model is used to simulate case study scenarios for a benchmark 24-pipe gas network coupled to a 24-node power system test network. We find that electrification of greater than 80% of core gas demands is a component of the least-cost solution for modeled energy systems. Despite this substitution, the gas system is maintained to service difficult-to-electrify customers and to deliver net-zero emissions gas to electricity generators in times of peak electricity demand. Restricting electrification of gas appliances increases reliance on power- to-gas technologies and increases annual costs by 15% in 2040. Neglecting constraints on pipeline blending of hydrogen can produce a misleading result that relies on hydrogen blend fractions of greater than 50%. In all cases, we find the average costs of delivered gas increase nearly 5-fold across the decarbonization transition, highlighting the importance of future work investigating cost-allocation strategies for ensuring an equitable energy transition.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Uncertainty quantification and reliability assessment for intermodal freight transportation

Intermodal freight optimization models support cost-effective, low-emission, and timely goods movement by coordinating trucks, rail, and barges. These models determine optimal flows, routing, and modal switches while respecting infrastructure and operational constraints. However, their real-world utility is often undermined by pervasive uncertainties-such as fluctuating transportation costs and emissions, variable terminal capacities, and uncertain freight demand-that distort key performance outcomes, including total system cost, carbon footprint, and transit time reliability. This study presents a structured framework for quantifying uncertainty in intermodal freight transportation (IFT) optimization. The framework evaluates how input uncertainty affects system performance and reliability, a critical need for ensuring that model-based decisions remain robust under real-world variability, especially amid volatile fuel prices, shifting demand, and growing disruptions. It integrates three complementary methods: (1) Sobol-based global sensitivity analysis to identify influential parameters affecting cost, emissions, and transit time, (2) Monte Carlo-based capacity perturbation analysis to assess robustness under probabilistic facility disruptions, and (3) Monte Carlo filtering with Bayesian inference to detect threshold-based performance vulnerabilities. The results highlight diesel truck unit cost as the dominant driver of variability. To improve system resilience, planners should prioritize uncertainty in fuel-related parameters when designing intermodal strategies.

Intermodal freight transportation↗

Quantum Ising model on (2+1)-dimensional anti–de Sitter space using tensor networks

We study the quantum Ising model on (2+1)-dimensional anti-de Sitter space using matrix product states (MPS) and matrix product operators (MPOs). We explore the bulk phase diagram of the theory on regular tessellations of hyperbolic space with coordination number seven and find disordered and ordered phases separated by a phase transition. We find that the boundary-boundary spin correlation function exhibits power law scaling deep in the disordered phase of the Ising model consistent with holography. At the critical point, we find the boundary entanglement entropy scales logarithmically with subsystem size but away from this, we see a linear scaling. In comparison, the full system exhibits a volume law scaling, which is expected in chaotic and/or highly connected systems. We also measure out of time ordered correlators (OTOCs) to explore the scrambling behavior of the theory.

Quantum spin models↗

Topological Guided Detection of Extreme Wind Phenomena: Implications for Wind Energy

Extreme wind phenomena play a crucial role in the efficient operation of wind farms for renewable energy generation. However, existing detection methods are computationally expensive, limited to specific coordinate. In real-world scenarios, understanding the occurrence of these phenomena over a large area is essential. Therefore, there is a significant demand for a fast and accurate approach to forecast such events. In this paper, we propose a novel method for detecting wind phenomena using topological analysis, leveraging the gradient of wind speed or critical points in a topological framework. By extracting topological features from the wind speed profile within a defined region, we employ topological distance to identify extreme wind phenomena. Our results demonstrate the effectiveness of utilizing topological features derived from regional wind speed profiles. We validate our approach using high-resolution simulations with the Weather Research and Forecasting model (WRF) over a month in the US East Coast.

MATHEMATICS AND COMPUTING,WIND ENERGY↗