Decommissioning of the Chernobyl NPP: Problems, Progress, Prospects - 18485
Decommissioning of the Chernobyl NPP provides a special case due to a number of peculiarities: it is prescheduled decommissioning, the facilities undergone a major accident with off-site contamination, no previous experience of decommissioning of RBMK-type nuclear power units, unavailability of proper spent fuel and radioactive waste management infrastructure, special types of waste. The most challenging issue is the final decommissioning of the Unit 4 destroyed by the major accident on 26 April 1986. Neither of four RBMK-1000 nuclear power units was in operation till the end of the design-based lifetime, Units 1 and 3 being in operation for 19 years each, Units 2 and 4 even less. The last operating unit, Unit 3, was permanently shutdown on December 15 2000, however the main obstacle to complete a complex technological and radiological survey was spent fuel left in reactor pools and in the core due to lack of capacity in the existing interim spent fuel storage of wet type (ISF-1). So removal of spent fuel from the core and reactor pools was considered as one of the priority tasks. While construction of ISF-2 (of dry type) was delayed due to different reasons, safety reassessment and modernization of ISF-1 enabled capacity increase and transfer of all non-damaged fuel assemblies into ISF-1. Thus Chernobyl NPP Units were fully vacated from spent fuel. Since that Chernobyl NPP Units are considered as the radioactive waste facility. Dismantlement of Units 1,2 turbine hall equipment is on the way and some progress is achieved in technical solution for fragmentation of long-size equipment. All dismantled equipment after decontamination and characterization is either released from regulatory control or disposed as solid radioactive waste. The details are discussed in the paper. Eventually the comprehensive technological and radiological survey of Chernobyl NPP Units had been completed and detailed decommissioning programme had been endorsed. The decommissioning strategy chosen for the Chernobyl NPP is based on the deferred dismantlement approach, so final dismantlement of all equipment and constructions is supposed after some period of decay storage. However, the issue of the final state of the site and its further use is still open. The main reason for it is the lack of clear picture as for the destroyed Unit 4, as technical solutions concerning its highly damaged and contaminated constructions and so called fuel containing masses (FCM) are not available yet. It could be reasonably predicted also that the internal part of the so called exclusion zone will not be released into non-restricted use in near future due to characteristics of its contamination. Possible implications of these and other factors on further decommissioning activities and some approaches to find solutions are discussed in the paper. (authors)