Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building engineers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Autonomous In-space Construction, Maintenance, and Reconfiguration Using Programmable Meta-Material

NASA ARC's Coded Structures Laboratory (CSL) is developing autonomous construction, maintenance, and reconfiguration technologies to meet long-duration and deep space infrastructure needs, in accordance with long-term NASA goals of "in-space reliance" and "mass-less exploration." We seek to achieve these capabilities by utilizing a "programmable meta-material" approach that integrates emerging advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Through the ARMADAS project, we have shown assembly of high-performance engineered cellular materials using multiple cooperating mobile robotic assemblers. In this paper, we describe how such a programmable meta-material architecture may shift the paradigm of how we design, build, manufacture, and operate future space infrastructure and assets. The core of a programmable meta-material architecture consists of 3 main technology sub-areas: the structure, the assembly agents, and the assembly algorithms. We co-design these systems to ensure an adaptable system that can create and reconfigure structures from a base set of building block components. From this core technology, we can branch out and expand the capability of the system through additional secondary component types and robotic agents to perform activities such as inspections, maintenance, repair, payload installation, or perform power and communications interconnect. As these technologies mature, future designers will be able to utilize the system to rapidly integrate and operate assets in space or on planetary surfaces from a set of well-tested part library, or create their own modules to integrate into the system. A core trait to the development of this system is the automation approach. Because of the modular and functional discrete (pixel-like) nature of the structural system, a diverse set of powerful algorithms for analysis, planning, and simulation can be adapted and leveraged to optimize construction, maintenance, and dynamic reorganization (as hardware with programmable form and function). With an ability to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted, we discuss the influence of a programmable meta-material architecture on mission design, build, and operations. For the "design phase", we discuss project lifecycle effects, costs, time, and performance. For the "build phase", we discuss reusability, ISRU, manufacturing, material logistics, and scalability. And for "operations", we discuss autonomy, maintenance and upgrades, reliability, and reconfiguration. Autonomy and modularity are the primary enabling traits of this system. Engineering systems that utilize a modular and reconfiguration building block approach such as digital communication and computation systems, currently lead all other areas of technology in size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials lifecycle management and expand our space exploration mission capabilities.

in space assembly↗

Decision Support Systems for Launch and Range Operations Using Jess

The virtual test bed for launch and range operations developed at NASA Ames Research Center consists of various independent expert systems advising on weather effects, toxic gas dispersions and human health risk assessment during space-flight operations. An individual dedicated server supports each expert system and the master system gather information from the dedicated servers to support the launch decision-making process. Since the test bed is based on the web system, reducing network traffic and optimizing the knowledge base is critical to its success of real-time or near real-time operations. Jess, a fast rule engine and powerful scripting environment developed at Sandia National Laboratory has been adopted to build the expert systems providing robustness and scalability. Jess also supports XML representation of knowledge base with forward and backward chaining inference mechanism. Facts added - to working memory during run-time operations facilitates analyses of multiple scenarios. Knowledge base can be distributed with one inference engine performing the inference process. This paper discusses details of the knowledge base and inference engine using Jess for a launch and range virtual test bed.

Thirumalainambi, Rajkumar↗

A Possible Approach for Addressing Neglected Human Factors Issues of Systems Engineering

The increasing complexity of safety-critical applications has led to the introduction of decision support tools in the transportation and process industries. Automation has also been introduced to support operator intervention in safety-critical applications. These innovations help reduce overall operator workload, and filter application data to maximize the finite cognitive and perceptual resources of system operators. However, these benefits do not come without a cost. Increased computational support for the end-users of safety-critical applications leads to increased reliance on engineers to monitor and maintain automated systems and decision support tools. This paper argues that by focussing on the end-users of complex applications, previous research has tended to neglect the demands that are being placed on systems engineers. The argument is illustrated through discussing three recent accidents. The paper concludes by presenting a possible strategy for building and using highly automated systems based on increased attention by management and regulators, improvements in competency and training for technical staff, sustained support for engineering team resource management, and the development of incident reporting systems for infrastructure failures. This paper represents preliminary work, about which we seek comments and suggestions.

Johnson, Christopher W.↗

AIAA Aerospace America Magazine - Year in Review Article, 2010

NASA Stennis Space Center has implemented a pilot operational Integrated System Health Management (ISHM) capability. The implementation was done for the E-2 Rocket Engine Test Stand and a Chemical Steam Generator (CSG) test article; and validated during operational testing. The CSG test program is a risk mitigation activity to support building of the new A-3 Test Stand, which will be a highly complex facility for testing of engines in high altitude conditions. The foundation of the ISHM capability are knowledge-based integrated domain models for the test stand and CSG, with physical and model-based elements represented by objects the domain models enable modular and evolutionary ISHM functionality.

Figueroa, Fernando↗

NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success

NASA is working toward the first launch of a new, unmatched capability for deep space exploration, with launch readiness planned for 2018. The initial Block 1 configuration of the Space Launch System will more than double the mass and volume to Low Earth Orbit (LEO) of any launch vehicle currently in operation - with a path to evolve to the greatest capability ever developed. The program formally began in 2011. The vehicle successfully passed Preliminary Design Review (PDR) in 2013, Key Decision Point C (KDPC) in 2014 and Critical Design Review (CDR) in October 2015 - nearly 40 years since the last CDR of a NASA human-rated rocket. Every major SLS element has completed components of test and flight hardware. Flight software has completed several development cycles. RS-25 hotfire testing at NASA Stennis Space Center (SSC) has successfully demonstrated the space shuttle-heritage engine can perform to SLS requirements and environments. The five-segment solid rocket booster design has successfully completed two full-size motor firing tests in Utah. Stage and component test facilities at Stennis and NASA Marshall Space Flight Center are nearing completion. Launch and test facilities, as well as transportation and other ground support equipment are largely complete at NASA's Kennedy, Stennis and Marshall field centers. Work is also underway on the more powerful Block 1 B variant with successful completion of the Exploration Upper Stage (EUS) PDR in January 2017. NASA's approach is to develop this heavy lift launch vehicle with limited resources by building on existing subsystem designs and existing hardware where available. The systems engineering and integration (SE&I) of existing and new designs introduces unique challenges and opportunities. The SLS approach was designed with three objectives in mind: 1) Design the vehicle around the capability of existing systems; 2) Reduce work hours for nonhardware/ software activities; 3) Increase the probability of mission success by focusing effort on more critical activities.

Hutt, John J.↗

Adapting Analysis Tools to Engine Externals Analysis

Market forces are driving industry to reproduce product cycle time (the time required to conceive, design, build, test, validate and deliver a product). Application of existing tools in new areas can reduce the time required to design a new product and increase the confidence of acceptable test results later in the expensive testing and validation phase. Finite element methods, computational fluid dynamics codes and sharing of CAD datasets when applied to the design of engine externals can provide methods for product improvement and expedited delivery to the customer.

Dunkelberg, Ken↗

Human engineering analysis for the high speed civil transport flight deck

The Boeing Company is investigating the feasibility of building a second generation supersonic transport. If current studies support its viability, this airplane, known as the High Speed Civil Transport (HSCT), could be launched early in the next century. The HSCT will cruise at Mach 2.4, be over 300 feet long, have an initial range of between 5000 and 6000 NM, and carry approximately 300 passengers. We are presently involved in developing an advanced flight deck for the HSCT. As part of this effort we are undertaking a human engineering analysis that involves a top-down, mission driven approach that will allow a systematic determination of flight deck functional and information requirements. The present paper describes this work.

Regal, David M.↗

The Texas Remote Sensing Training Project

The project was designed to train federal, state and regional agency managers, scientists and engineers. A one-week seminar was designed and implemented to build vocabulary, introduce technical subject areas and give students enough training to allow them to relate remote sensing technology to operational agency projects. The seminar was designed to perform the dual function of conveying enough remote sensing information to be of value as a stand-alone and preparing students for detailed pattern recognition training. The LARSYS III portion of the training project was executed exactly as designed in the LARSYS training materials package; the LARSYS package did not contain a LANDSAT training module. Two LANDSAT training modules were developed using Texas LANDSAT data. One module contained central Texas data and the second module contained coastal zone data.

Wells, J. B.↗

Matera Laser Ranging Observatory (MLRO): An overview

The Agenzia Spaziale Italiana (ASI) is currently under negotiation with the Bendix Field Engineering Corporation (BFEC) of the Allied Signal Aerospace Company (ASAC) to build a state-of-the-art laser ranging observatory for the Centro di Geodesia Spaziale, in Matera, Italy. The contract calls for the delivery of a system based on a 1.5 meter afocal Cassegrain astronomical quality telescope with multiple ports to support a variety of experiments for the future, with primary emphasis on laser ranging. Three focal planes, viz. Cassegrain, Coude, and Nasmyth will be available for these experiments. The open telescope system will be protected from dust and turbulence using a specialized dome which will be part of the building facilities to be provided by ASI. The fixed observatory facility will be partitioned into four areas for locating the following: laser, transmit/receive optics, telescope/dome enclosure, and the operations console. The optical tables and mount rest on a common concrete pad for added mechanical stability. Provisions will be in place for minimizing the effects of EMI, for obtaining maximum cleanliness for high power laser and transmit optics, and for providing an ergonomic environment fitting to a state-of-the-art multipurpose laboratory. The system is currently designed to be highly modular and adaptable for scaling or changes in technology. It is conceived to be a highly automated system with superior performance specifications to any currently operational system. Provisions are also made to adapt and accommodate changes that are of significance during the course of design and integration.

Varghese, Thomas K.↗

Advanced End-to-end Simulation for On-board Processing (AESOP)

Developers of data compression algorithms typically use their own software together with commercial packages to implement, evaluate and demonstrate their work. While convenient for an individual developer, this approach makes it difficult to build on or use another's work without intimate knowledge of each component. When several people or groups work on different parts of the same problem, the larger view can be lost. What's needed is a simple piece of software to stand in the gap and link together the efforts of different people, enabling them to build on each other's work, and providing a base for engineers and scientists to evaluate the parts as a cohesive whole and make design decisions. AESOP (Advanced End-to-end Simulation for On-board Processing) attempts to meet this need by providing a graphical interface to a developer-selected set of algorithms, interfacing with compiled code and standalone programs, as well as procedures written in the IDL and PV-Wave command languages. As a proof of concept, AESOP is outfitted with several data compression algorithms integrating previous work on different processors (AT&T DSP32C, TI TMS320C30, SPARC). The user can specify at run-time the processor on which individual parts of the compression should run. Compressed data is then fed through simulated transmission and uncompression to evaluate the effects of compression parameters, noise and error correction algorithms. The following sections describe AESOP in detail. Section 2 describes fundamental goals for usability. Section 3 describes the implementation. Sections 4 through 5 describe how to add new functionality to the system and present the existing data compression algorithms. Sections 6 and 7 discuss portability and future work.

Mazer, Alan S.↗

Modular Software for Spacecraft Navigation Using the Global Positioning System (GPS)

The Goddard Space Flight Center Flight Dynamics and Mission Operations Divisions have jointly investigated the feasibility of engineering modular Global Positioning SYSTEM (GPS) navigation software to support both real time flight and ground postprocessing configurations. The goals of this effort are to define standard GPS data interfaces and to engineer standard, reusable navigation software components that can be used to build a broad range of GPS navigation support applications. The paper discusses the GPS modular software (GMOD) system and operations concepts, major requirements, candidate software architecture, feasibility assessment and recommended software interface standards. In additon, ongoing efforts to broaden the scope of the initial study and to develop modular software to support autonomous navigation using GPS are addressed,

Truong, S. H.↗

Bion-11 Spaceflight Mission

The Sensors 2000! Program, in support of the Space Life Sciences Payloads Office at NASA Ames Research Center developed a suite of bioinstrumentation hardware for use on the Joint US/Russian Bion I I Biosatellite Mission (December 24, 1996 - January 7, 1997). This spaceflight included 20 separate experiments that were organized into a complimentary and interrelated whole, and performed by teams of US, Russian, and French investigators. Over 40 separate parameters were recorded in-flight on both analog and digital recording media for later analysis. These parameters included; Electromyogram (7 ch), Electrogastrogram, Electrooculogram (2 ch), ECG/EKG, Electroencephlogram (2 ch), single fiber firing of Neurovestibular afferent nerves (7 ch), Tendon Force, Head Motion Velocity (pitch & yaw), P02 (in vivo & ambient), temperature (deep body, skin, & ambient), and multiple animal and spacecraft performance parameters for a total of 45 channels of recorded data. Building on the close cooperation of previous missions, US and Russian engineers jointly developed, integrated, and tested the physiologic instrumentation and data recording system. For the first time US developed hardware replaced elements of the Russian systems resulting in a US/Russian hybrid instrumentation and data system that functioned flawlessly during the 14 day mission.

Skidmore, M.↗

Flying Cassini with Virtual Operations Teams

The Cassini Program's challenge is to fly a large, complex mission with a reduced operations budget. A consequence of the reduced budget is elimination of the large, centrally located group traditionally used for uplink operations. Instead, responsibility for completing parts of the uplink function is distributed throughout the Program. A critical strategy employed to handle this challenge is the use of Virtual Uplink Operations Teams. A Virtual Team is comprised of a group of people with the necessary mix of engineering and science expertise who come together for the purpose of building a specific uplink product. These people are drawn from throughout the Cassini Program and participate across a large geographical area (from Germany to the West coast of the USA), covering ten time zones. The participants will often split their time between participating in the Virtual Team and accomplishing their core responsibilities, requiring significant planning and time management. When the particular uplink product task is complete, the Virtual Team disbands and the members turn back to their home organization element for future work assignments. This time-sharing of employees is used on Cassini to build mission planning products, via the Mission Planning Virtual Team, and sequencing products and monitoring of the sequence execution, via the Sequence Virtual Team. This challenging, multitasking approach allows efficient use of personnel in a resource constrained environment.

Dodd, Suzanne↗

The Integration of a Load Limiter to an Orbiter Over-Center Mechanism

This paper summarizes the design process used to relieve the predicted high loads on a Space Shuttle Orbiter mechanism prior to the STS-112 flight. The overloading of the mechanism was due to a dynamic response between the orbiter and payload that was specific to this payload s mass and attachment scheme. A solution was devised by adding a component that prevented overload of the mechanism. In addition, the introduction of the new component neither interfered with the normal operation nor required extra-vehicular activity from a crewmember. By utilizing rapid prototyping technology, engineers were able to verify clearances and feasibility while preparing to build the flight hardware. This design solution was successfully flown on STS-112 and STS-113.

Gilmore, Adam↗

Project trades model for complex space missions

A Project Trades Model (PTM) is a collection of tools/simulations linked together to rapidly perform integrated system trade studies of performance, cost, risk, and mission effectiveness. An operating PTM captures the interactions between various targeted systems and subsystems through an exchange of computed variables of the constituent models. Selection and implementation of the order, method of interaction, model type, and envisioned operation of the ensemble of tools rpresents the key system engineering challenge of the approach. This paper describes an approach to building a PTM and using it to perform top-level system trades for a complex space mission. In particular, the PTM discussed here is for a future Mars mission involving a large rover.

web services↗

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.↗

A Process for Comparing Dynamics of Distributed Space Systems Simulations

The paper describes a process that was developed for comparing the primary orbital dynamics behavior between space systems distributed simulations. This process is used to characterize and understand the fundamental fidelities and compatibilities of the modeling of orbital dynamics between spacecraft simulations. This is required for high-latency distributed simulations such as NASA s Integrated Mission Simulation and must be understood when reporting results from simulation executions. This paper presents 10 principal comparison tests along with their rationale and examples of the results. The Integrated Mission Simulation (IMSim) (formerly know as the Distributed Space Exploration Simulation (DSES)) is a NASA research and development project focusing on the technologies and processes that are related to the collaborative simulation of complex space systems involved in the exploration of our solar system. Currently, the NASA centers that are actively participating in the IMSim project are the Ames Research Center, the Jet Propulsion Laboratory (JPL), the Johnson Space Center (JSC), the Kennedy Space Center, the Langley Research Center and the Marshall Space Flight Center. In concept, each center participating in IMSim has its own set of simulation models and environment(s). These simulation tools are used to build the various simulation products that are used for scientific investigation, engineering analysis, system design, training, planning, operations and more. Working individually, these production simulations provide important data to various NASA projects.

Cures, Edwin Z.↗

The New LOTIS Test Facility

The Large Optical Test and Integration Site (LOTIS) at the Lockheed Martin Space Systems Company in Sunnyvale, CA is designed for the verification and testing of optical systems. The facility consists of an 88 foot temperature stabilized vacuum chamber that also functions as a class 10k vertical flow cleanroom. Many problems were encountered in the design and construction phases. The industry capability to build large chambers is very weak. Through many delays and extra engineering efforts, the final product is very good. With 11 Thermal Conditioning Units and precision RTD s, temperature is uniform and stable within 1oF, providing an ideal environment for precision optical testing. Within this chamber and atop an advanced micro-g vibration-isolation bench is the 6.5 meter diameter LOTIS Collimator and Scene Generator, LOTIS alignment and support equipment. The optical payloads are also placed on the vibration bench in the chamber for testing. This optical system is designed to operate in both air and vacuum, providing test imagery in an adaptable suite of visible/near infrared (VNIR) and midwave infrared (MWIR) point sources, and combined bandwidth visible-through-MWIR point sources, for testing of large aperture optical payloads. The heart of the system is the LOTIS Collimator, a 6.5m f/15 telescope, which projects scenes with wavefront errors <85 nm rms out to a 0.75 mrad field of view (FOV). Using field lenses, performance can be extended to a maximum field of view of 3.2 mrad. The LOTIS Collimator incorporates an extensive integrated wavefront sensing and control system to verify the performance of the system.

Bell, R. M.↗