Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “baseline program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Strengthening Retrofit Markets for Comprehensive Savings in Multifamily Buildings (Interim Final Report)

Energy efficiency is vitally important in Maine. Nearly 70% of Maine households rely on fuel oil as their primary energy source for home heating, a higher share than in any other state. Coupled with the state's long, cold winters, Maine's dependence on oil renders homeowners particularly vulnerable to fluctuating fuel costs. With $\$$4.5 million in seed funding from the Energy Department's Better Buildings Neighborhood Program, the Governor's Energy Office (GEO), through Efficiency Maine Trust (the Trust), is spurring Maine landlords to lower their monthly energy bills and improve comfort for their tenants during the state's cold winter months and increasingly warmer summers. Maine's aging multifamily housing stock can be expensive to heat and costly to maintain. It is not unusual to find buildings with little or no insulation, drafty windows, and significant air leaks, making them ideal candidates for energy efficiency upgrades. Maine modeled its Multifamily Efficiency Program (MEP) after the state's highly successful Home Energy Savings Program (HESP) for single-family homes. HESP provided cash incentives and financing opportunities to owners of one-to four-unit structures, which resulted in thousands of energy assessments and whole-house energy upgrades in 225 communities. Maine's new MEP multifamily energy efficiency upgrade and weatherization initiative focuses on small to medium-sized (i.e., five to 20 units) apartment buildings. The program's energy efficiency upgrades will provide at least 20% energy savings for each upgraded multifamily unit. The Trust’s MEP relies on a network of approved program partners who help move projects through the pipeline from assessment to upgrade. MEP has two components: benchmarking and development of an Energy Reduction Plan (ERP). Using the ENERGY STAR® Portfolio Manager benchmarking tool, MEP provides an assessment of current energy usage in the building, establishes a baseline for future energy efficiency improvements, and enables tracking and monitoring of future energy usage at the building— all at no cost to the building owner. The ERP is developed by a program partner using either the Trust’s approved modeling or prescriptive tools; it provides detailed information about the current energy related conditions in the building and recommends energy efficiency, health, and safety improvements. The Trust's delivery contractor provides quality assurance and controls throughout the process. Through this effort, MEP's goal is to establish a self-sustaining, market-driven program, demonstrating the value of energy efficiency to other building owners. The increasing value of properties across the state will help incentivize these owners to continue upgrades after the grant period has ended. Targeting urban areas in Maine with dense clusters of multifamily units—such as Portland, Lewiston- Auburn, Bangor, and Augusta—MEP engaged a variety of stakeholder groups early on to design its multifamily program. Through direct emails and its website, program officials invited lending institutions, building professionals, engineering firms, equipment distributors, and local property owners associations to attend open meetings around the state to learn about the goals of the multifamily program and to help define its parameters. These meetings helped program administrators understand the diversity of the customer base: some owners are individuals with a single building, while other owners are groups of people or management companies with an entire portfolio of multifamily buildings. The diversity of the customer base notwithstanding, owners see MEP as an opportunity to make gains in their respective properties. Consistently high turnouts at stakeholder meetings fueled greater customer interest as awareness of the program spread through word of mouth. The program also gained traction by utilizing the program partner networks and building on the legacy of the Trust’s successful HESP for single-family residences. MEP offers significant incentives for building owners to participate in the upgrade program. Wholebuilding benchmarking services are available to most multifamily housing buildings free of charge. The service provides the building owner with an assessment of the building's current energy efficiency as compared to other multifamily buildings on a national scale, establishes a baseline to measure future improvements, and enables owners to track monthly energy consumption using the ENERGY STAR Portfolio Manager. Once the benchmarking process is complete, the program links building owners with approved program partners (e.g., energy professionals, home performance contractors) to identify and implement specific energy-saving opportunities in the building. Program partners can also provide project quotes with estimated financing incentives and payback period calculations that enable building owners to make informed decisions. What's more, the Trust provides two financial incentives for successful completion of program milestones. The first is a per-unit incentive for completion of an approved ERP (i.e., $\$$100 per unit if a prescriptive path is followed, and $\$$200 per unit for a modeled ERP). Upon final inspection of the installed project scope of work, an incentive of $\$$1,400 per unit or 50% of installed cost—whichever is less—is paid. The Trust originally established a $\$$1 million loan-loss reserve fund (LLRF) to further enhance financing opportunities for qualified multifamily building owners. This funding mechanism was designed to connect building owners with lenders that retain the mortgages for their properties and encourages the lenders to offer financing for energy efficiency improvements. However, there has been no interest in the LLRF and therefore the LLRF has been reduced. Ultimately, MEP plans to build an online tool for building owners to assess opportunities to make upgrades in their multifamily units. The tool will include a performance rating system to provide a way for building owners to more easily understand energy use in their building, and how it could be improved with energy efficiency upgrades. Prospective tenants will also be able to use the rating system to make informed decisions about where to rent. Furthermore, the rating can be incorporated into real estate listings as a way for prospective home buyers and the real estate financial community to evaluate a home's operating costs. The Trust’s MEP has identified the state's most experienced energy professionals, vendors, suppliers, and contractors that install energy efficiency equipment in the multifamily sector to be qualified program partners. To be eligible for partnership, energy assessment professionals and contractors are required to have demonstrated experience in the multifamily sector and hold associated professional certifications, such as Building Operator Certification (BOC), Certified Energy Manager (CEM), Professional Engineer (PE), or Building Performance Institute (BPI) Multifamily Building Analyst. Widespread program interest has enabled the Trust to redirect funds that might otherwise be needed for program promotion to building capacity through contractor training. In addition to boosting professional training and certification opportunities, MEP teaches its partners how to market the multifamily program to prospective multifamily homeowners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Residential Building Energy Code Field Study

This document presents a methodology for assessing baseline energy efficiency in new single-family residential buildings and quantifying related savings potential. The approach was developed by Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) Building Energy Codes Program with the objective of assisting states as they assess energy efficiency in residential buildings and implementation of their building energy codes, as well as to target areas for improvement through energy codes and broader energy-efficiency programs. It is also intended to facilitate a consistent and replicable approach to research studies of this type and establish a transparent data set to represent baseline construction practices across U.S. states.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Perspectives for Measuring Neutrino Cross-Sections at Short Baseline Detectors (ICARUS and DUNE-PRISM-like Detector) and Their Implications for Precision Physics

Neutrino physics is rapidly advancing with current and future experiments promising high-statistics data, enabling unprecedented accuracy in measuring Standard Model (SM) parameters and providing crucial insights into neutrino-nucleus interactions. The ICARUS experiment, utilizing LAr TPC technology, is pivotal in this growth. As the far detector of the SBN program at Fermilab, ICARUS is set to investigate the neutrino anomalies observed in LSND and MiniBooNE and prepare for future long-baseline experiments like DUNE. Positioned along the BNB and 5.75°off-axis from the NuMI beamline, ICARUS benefits from numerous neutrino interactions, allowing for precise neutrino-argon nucleus cross-section measurements, which will benchmark future DUNE measurements. This work presents the prospects and progress in measuring the cross-section of the NuMI νµ CC inclusive channel in the ICARUS experiment. High-statistics data will also enable precise determinations of fundamental parameters like the weak mixing angle and the neutrino charge radius (NCR), crucial for testing the SM and exploring potential new physics. This work includes studies of future near detectors, such as DUNE-PRISM, which are sensitive to radiative corrections in neutrino-electron scattering. The DUNE-PRISM configuration allows for the analysis of different neutrino energy spectra, promising accurate NCR measurements with controlled systematic uncertainties.

Moreno-Granados, Guadalupe↗

Emerging Tools to Support DILI Assessment in Clinical Trials with Abnormal Baseline Serum Liver Tests or Pre-existing Liver Diseases

Abstract Based on the late Dr. Hyman Zimmerman’s observation that hepatocellular drug-induced liver injury (DILI) leading to jaundice carries a ≥ 10% fatality risk (coined as Hy’s law by others), evaluation of Drug-Induced Serious Hepatotoxicity (eDISH) continues to play a central role in the assessment of a study drug’s liability for acute hepatocellular DILI. The eDISH identifies drugs in clinical trials with DILI fatality (death or transplant) risk that may be unacceptable in a post-market setting. As a two-dimensional graph that plots peak total bilirubin (TB) versus peak serum aminotransferase levels for each patient during study drug or comparator treatment, eDISH identifies potential cases of acute, modest, and serious hepatocellular DILI for in-depth analysis of liver tests (LT) and clinical course so that the likelihood of causal association with the study drug can be determined. Unfortunately, the generalizable utility of this tool only pertains to trials enrolling patients with normal or near normal (NNN) baseline (BL) serum LTs. The eDISH does not necessarily apply to trials of patients with abnormal baseline (ABN-BL) LTs that often coincide with underlying liver disorders. Because drug development programs being reviewed by the FDA increasingly target liver disorders, we are often challenged to evaluate DILI risk in trials of patients with ABN-BL LTs. Also, the high background prevalence of metabolic dysfunction associated steatotic liver disease (MASLD) means patients with LTs above NNN may need to be enrolled in trials treating non-liver disorders to reflect the target population. Such study populations create challenges for industry and regulators because eDISH may not reliably categorize or identify potential cases of DILI for further analysis, as it so efficiently does in NNN-BL trials. We describe the main functionalities of eDISH in NNN-BL trials to understand what should be emulated by new tools or eDISH modifications. We then discuss non-eDISH–based plots that may be useful in ABN-BL trials.

Amirzadegan, Jasmine↗

Development and validation of a diabetes risk score among two populations

The purpose of this study was to assess the validity of a practical diabetes risk score amongst two heterogenous populations, a working population and a non-working population. Study population 1 (n = 2,089) participated in a large-scale screening program offered to retired workers to discover previously undetected/incipient chronic illness. Study population 2 (n = 3,293) was part of a Colorado worksite wellness program health risk assessment. We assessed the relationship between a continuous diabetes risk score at baseline and development of diabetes in the future using logistic regression. Receiver operating curves and sensitivity/specificity of the models were calculated. Across both study populations, we observed that participants with diabetes at follow-up had higher diabetes risk scores at baseline than participants who did not have diabetes at follow-up. On average, the odds ratio of developing diabetes in the future was 1.38 (95% CI: 1.26–1.50, p < 0.0001) for study population 1 and 1.68 (95% CI: 1.45–1.95, p-value < 0.0001) for study population 2. These findings indicate that the diabetes risk score may be generalizable to diverse individuals, and thus potentially a population level diabetes screening tool. Minimally-invasive diabetes risk scores can aid in the identification of sub-populations of individuals at risk for diabetes.

60 APPLIED LIFE SCIENCES↗

Benchmarking Demand Flexibility in Commercial Buildings and Flattening the Duck – Addressing Baseline and Commissioning Challenges

With the transition from our traditional electric grid to a cleaner grid with renewable power generation, there is a need to enable building loads to be flexible. Load shedding and shifting will be essential for flattening the “Duck” for decarbonization. This paper explored the trend in the timing of DR events as a reflection of the grid’s needs using recent four years of event data from 203 retail stores in 11 states. The events are becoming significantly shorter with 2-hour duration being the most popular; shifting to late afternoon and early evening is another trend beyond California. Benchmarking will be essential for accounting DF as a reliable grid resource. This paper addresses a challenging aspect of benchmarking – inaccuracies in counterfactual baseline methods can introduce significant DF metrics variations in addition to weather and building characteristics related factors. The conventional “10/10” with adjustment baseline method has inherent limitation by design for load shifting applications. Therefore, it is imperative to identify alternative methods. This study compared three hourly regression baseline methods with “10/10” methods using two groups of commercial buildings that participated in DR programs: (1) 121 big-box retail stores, and (2) 11 office buildings in CA. The 14-day hourly outdoor temperature regression method was found to produce least error in the tested datasets and is promising for load shifting. The paper also pointed out that commissioning issues can also be a significant barrier for achieving consistent DF performance, which building managers and utilities should be aware of.

Liu, Jingjing↗

Summary of Plutonium-238 Production Alternatives Analysis (Final Report)

The Team implemented a two-phase evaluation process. During the first phase, a wide variety of past and new candidate facilities and processing methods were assessed against the criteria established by DOE for this assessment. Any system or system element selected for consideration as an alternative within the project to reestablish domestic production of Pu-238 must meet the following minimum criteria: Any required source material must be readily available in the United States, without requiring the development of reprocessing technologies or investments in systems to separate material from identified sources. It must be cost, schedule, and risk competitive with existing baseline technology. Any identified facilities required to support the concept must be available to the program for the entire project life cycle (notionally 35 years, unless the concept is so novel as to require a shorter duration). It must present a solution that can generate at least 1.5 Kg of Pu-238 oxide per year, for at least 35 years. It must present a low-risk, near-term solution to the National Aeronautics and Space Administration’s urgent mission need. DOE has implemented this requirement by eliminating from project consideration any alternative with key technologies at less than Technology Readiness Level 5. The Team evaluated the options meeting these criteria using a more detailed assessment of the reasonable facility variations and compared them to the preferred option, which consists of target irradiation at the Advanced Test Reactor (ATR) and the High Flux Isotope Reactor (HFIR), target fabrication and chemical separations processing at the ORNL Radiochemical Engineering Development Center, and neptunium 237 storage at the Materials and Fuels Complex at INL. This preferred option is consistent with the Records of Decision from the earlier National Environmental Policy Act (NEPA) documentation

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Technical Report: Thermoelectric-Enhanced Cookstove Add-on (TECA) for Clean Biomass Cookstoves

This program seeks to demonstrate a solution to enhance existing biomass cookstove performance through the use of RTI’s Thermoelectric Enhanced Cookstove Add-on (TECA) device. The self-powered TECA device captures a portion of heat from the stove and converts it to electricity through a thermoelectric (TE) device to power a blower. Colorado State University and Envirofit International are partners to support the air injection design and commercialization to enhance combustion in the stove and reduce emissions. Relevance: By demonstrating a proof of concept of the approach with the Envirofit M-5000 stove and TECA device, we hope to apply this technology to existing stoves that are already in use and reduce emissions for stoves that have already found user acceptance to provide a true health benefit. Challenges: The technical challenges include achieving Tier 4 emissions from a biomass stove and for such a stove to operate reliably in the harsh field environment. Additional challenges include the fact that it is difficult to develop a cost effective solution and insure adoption and proper use in the field. Outcomes: In this program we have demonstrated PM emissions at 82 mg/MJd, a 70% reduction as compared to baseline stove operation. We have also developed a stove optimization approach that reduces the number of costly experiments. We have evaluated component-level reliability and will be testing the stove prototype in the field for performance and reliability.

09 BIOMASS FUELS↗

Commercial Building Energy Code Field Study: Data Collection Methodology and Protocol

In support of the U.S. Department of Energy’s Commercial Buildings Energy Code Field Study, this data collection methodology and protocol provides guidance on all aspects of undertaking a compliance study, from development of a sampling plan to recruitment to code requirements and compliance checks for each energy code measure specified to be collected. The protocol also includes a data collection form that captures all key information needed for analysis of commercial energy code compliance. This methodology was developed by the Institute for Market Transformation in coordination with Pacific Northwest National Laboratory (PNNL) and the U.S. Department of Energy Building Energy Codes Program with the objective of assisting states, jurisdictions, utilities and others as they seek to measure and demonstrate compliance rates with energy codes in commercial buildings, as well as to target areas for improvement through increased energy code compliance and broader energy-efficiency programs. It is also intended to facilitate a consistent and replicable approach to research studies of this type and establish a transparent data set representing baseline construction practices across the U.S.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial Building Energy Code Field Study: Data Collection Methodology and Protocol

In support of the U.S. Department of Energy’s Commercial Buildings Energy Code Field Study, this data collection methodology and protocol provides guidance on all aspects of undertaking a compliance study, from development of a sampling plan to recruitment to code requirements and compliance checks for each energy code measure specified to be collected. The protocol also includes a data collection form that captures all key information needed for analysis of commercial energy code compliance. This methodology was developed by the Institute for Market Transformation in coordination with Pacific Northwest National Laboratory (PNNL) and the U.S. Department of Energy Building Energy Codes Program with the objective of assisting states, jurisdictions, utilities and others as they seek to measure and demonstrate compliance rates with energy codes in commercial buildings, as well as to target areas for improvement through increased energy code compliance and broader energy-efficiency programs. It is also intended to facilitate a consistent and replicable approach to research studies of this type and establish a transparent data set representing baseline construction practices across the U.S.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Light Dark Matter Analysis Using NO$\nu$A Near Detector

Dark matter (DM) is believed to account for 85$\%$ of the matter content of the Universe. The leading dark matter candidate is the WIMP (weakly interacting massive particles). Light dark matter (LDM) refers to WIMP candidates with a mass of less than 1 GeV. The concept of LDM has been developed in order to explain the 511 keV $\gamma$-rays from the galactic bulge, as observed by the INTEGRAL satellite. There are a lot of candidates for light DM, and these candidates span a wide range of potential masses and couplings to the visible sector. Probing the vast parameter space of light-dark matter requires a correspondingly broad experimental program that can include neutrino fixed target experiments. NOvA is a high luminosity long-baseline fixed-target accelerator neutrino experiment at Fermilab that can provide a potentially interesting probe in searching for signatures of DM scattering with electrons in its near detectors. We aim to search for the MeV-scale dark matter particles that might be generated within the NuMI beam and produce detectable electron scattering signals in NOvA Near Detector. In this talk, we present our analysis of the single electron events using a simulated sample and show the sensitivity of the NOvA experiment.

79 ASTRONOMY AND ASTROPHYSICS↗

PIP-II: the new heart of Fermilab

The PIP-II project http://pip2.fnal.gov is an essential upgrade of Fermilab’s particle accelerator complex and includes the construction of a 215-meter-long linear particle accelerator. It is the first U.S. particle accelerator project with significant contributions from international partners. Research institutions in France, India, Italy and the UK will build major components of the new particle accelerator. PIP-II will become the new heart of the Fermilab accelerator complex. Its high-intensity proton beams will provide a flexible platform for the long-term future of the Fermilab accelerator complex and the U.S. accelerator-based particle physics program. The upgrade will enable Fermilab’s accelerator complex to generate an unprecedented stream of neutrinos—subtle, subatomic particles that could hold the key to understanding the universe’s evolution—by creating the world’s most intense high-energy neutrino beams. This capability positions Fermilab to be the world leader in accelerator-based neutrino research. It enables the scientific program for the international, Fermilab-hosted Deep Underground Neutrino Experiment (DUNE) and Long-Baseline Neutrino Facility (LBNF). http://www.fnal.gov/dune

43 PARTICLE ACCELERATORS↗

DUNE Phase II: scientific opportunities, detector concepts, technological solutions

The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy toward the implementation of this leading-edge, large-scale science project. The 2023 report of the US Particle Physics Project Prioritization Panel (P5) reaffirmed this vision and strongly endorsed DUNE Phase I and Phase II, as did the European Strategy for Particle Physics. While the construction of the DUNE Phase I is well underway, this White Paper focuses on DUNE Phase II planning. DUNE Phase-II consists of a third and fourth far detector (FD) module, an upgraded near detector complex, and an enhanced 2.1 MW beam. The fourth FD module is conceived as a “Module of Opportunity”, aimed at expanding the physics opportunities, in addition to supporting the core DUNE science program, with more advanced technologies. This document highlights the increased science opportunities offered by the DUNE Phase II near and far detectors, including long-baseline neutrino oscillation physics, neutrino astrophysics, and physics beyond the standard model. It describes the DUNE Phase II near and far detector technologies and detector design concepts that are currently under consideration. A summary of key R&D goals and prototyping phases needed to realize the Phase II detector technical designs is also provided. DUNE's Phase II detectors, along with the increased beam power, will complete the full scope of DUNE, enabling a multi-decadal program of groundbreaking science with neutrinos.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Development and Demonstration of Advanced Engine and Vehicle Technologies For Class 8 Heavy Duty Vehicle (Supertruck II)

The PACCAR SuperTruck II program has completed the planned technical work on the project. This work includes the planned vehicle demonstrator showing a greater than 100% improvement in vehicle freight efficiency (on a ton-mile-per-gallon basis) relative to a 2009 baseline, and an engine system demonstration achieving a greater than 55% engine brake thermal efficiency at a 65-mph cruise point on a dynamometer. Both program targets were exceeded by PACCAR with robust margins. Finally, PACCAR used technologies that have a possible route to production, with no specialty or unrealistic solutions proposed.

33 ADVANCED PROPULSION SYSTEMS↗

Design of the LBNF Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a wide band neutrino beam toward underground detectors placed at the SURF Facility in South Dakota, about 1,300 km away. The main elements of the facility are a primary proton beamline and a neutrino beamline. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab’s Main Injector. Neutrinos are produced after the protons hit a solid target and produce mesons which are subsequently focused by magnetic horns into a 204 m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial proton beam power is expected to be 1.2 MW; however, the facility is designed to be upgradeable to 2.4 MW. We discuss here the design status and the associated challenges as well as plans for improvements before baselining the facility.

43 PARTICLE ACCELERATORS↗

Canadian Nuclear Laboratories Waste Management: Challenges and the Integrated Waste Strategy - 19160

Canadian Nuclear Laboratories (CNL) currently faces various waste management challenges and CNL's Integrated Waste Strategy is adapting to manage them. As Canada's premier nuclear science and technology organization, CNL is a global leader in developing peaceful and innovative applications from nuclear technology through its expertise in the scientific field, including physics, metallurgy, chemistry, biology and engineering. As demands change, CNL is shifting its focus to alpha therapies for cancer treatments and sustainable energy solutions. The next decade will see CNL decommission the sites it manages across Canada, whilst transforming Chalk River Laboratories (CRL) into a new, world-class facility which will have the capability to demonstrate the commercial viability of advanced reactor designs including Small Modular Reactors (SMRs). This is being enabled through an accelerated decommissioning program for all CNL operated sites, while renovating CRL, which includes revitalizing essential site infrastructure, and investment in new, world-class science facilities in a modern campus environment. With decommissioning and revitalization occurring simultaneously, the long-term strategy and vision for CNL presents some unique challenges to waste management. Therefore, integrated, collaborative and coordinated waste management is a vital component to ensuring a successful future. The Integrated Waste Strategy coordinates, and provides alignment of, waste management across CNL and: - Includes all CNL operated (Atomic Energy of Canada Limited (AECL) owned) sites; - Considers all CNL managed waste (including radioactive and non-radioactive operational, decommissioning, legacy and historic waste) for the planned lifetime of the sites; - Defines waste routes using a life cycle approach (from the generation of waste to final disposal) A baseline Integrated Waste Strategy and associated action plan to mitigate identified gaps and issues have been produced. A program of work is underway to close those gaps identified in a consistent, transparent, prioritized and justified manner. One of the key challenges is to ensure that waste management planning is completed effectively and in a timely manner. This will enable the provision of suitable and sufficient waste capability to meet CNL's long-term strategy. The Integrated Waste Strategy has been developed and maintained through engagement at all levels across CNL, ensuring buy-in of proposed solutions. Key process stakeholders include generators of CNL managed waste to ensure integrated consideration of legacy, current and future waste generation; waste management personnel to identify requirements, including processing, storage, transport and disposal; AECL as the client and waste liability owner; and the public to ensure they understand the 'big picture' regarding waste strategy. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the Neutrinos from Stored Muons Facility - nuSTORM

Neutrino beams produced from the decay of muons in a racetrack-like decay ring (the so called Neutrino Factory) provide a powerful way to study neutrino oscillation physics and, in addition, provide unique beams for neutrino interaction studies. The Neutrinos from STORed Muons (nuSTORM) facility uses a neutrino factory-like design. Due to the particular nature of nuSTORM, it can also provide an intense, very pure, muon neutrino beam from pion decay. This so-called 'Neo-conventional' muon-neutrino beam from nuSTORM makes nuSTORM a hybrid neutrino factory. Here in this paper we describe the facility and give a detailed description of the neutrino beams that are available and the precision to which they can be characterized. We then show its potential for a neutrino interaction physics program and present sensitivity plots that indicate how well the facility can perform for short-baseline oscillation searches. Lastly, we comment on the performance potential of a 'Neo-conventional' muon neutrino beam optimized for long-baseline neutrino-oscillation physics.

43 PARTICLE ACCELERATORS↗

Evaluation of PGAS communication paradigms with geometric multigrid

Partitioned Global Address Space (PGAS) languages and one-sided communication enable application developers to select the communication paradigm that balances the performance needs of applications with the productivity desires of programmers. In this paper, we evaluate three different one-sided communication paradigms in the context of geometric multigrid using the miniGMG benchmark. Although miniGMG's static, regular,and predictable communication does not exploit the ultimate potential of PGAS models, multigrid solvers appear in many contemporary applications and represent one of the most important communication patterns. We use UPC++, a PGAS extension of C++, as the vehicle for our evaluation, though our work is applicable to any of the existing PGAS languages and models. We compare performance with the highly tuned MPI baseline, and the results indicate that the most promising approach towards achieving performance and ease of programming is to use high-level abstractions, such as the multidimensional arrays provided by UPC++, that hide data aggregation and messaging in the runtime library.

Shan, H↗