Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Wind Technologies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

GE 1.5 ESS Wind Turbine Retrofit Controller Development (CRADA Final Report)

National Renewable Energy Laboratory (NREL) and Bachmann electronic corp. will collaborate on the development of a software application to be used on an existing aftermarket Bachmann controller, utilizing and existing Bachmann software platform, which will be used on the General Electric (GE) 1.5 ESS wind turbine. This retrofit will significantly enhance NREL’s ability to control experiments it is planning to conduct on the GE 1.5 wind turbine as part of the Gearbox Reliability Collaborative, Atmosphere to Electrons and other future R&D. The proposed work is leveraging ongoing Department of Energy (DOE) Annual Operating Plan activities on the GE 1.5 ESS wind turbine at the National Wind Technology Center.

17 WIND ENERGY↗

Wind Energy Instrumentation Development Roadmap

The current instrumentation for observing the complex flow fields in and around wind plants struggles to match the fidelity of existing simulation tools. As a result, these measurement limitations create a hurdle for validating and assessing the quality of the wind plant numerical models. This roadmap for instrumentation development recommendations was created to offer guidance on narrowing the gap between measurement and simulation fidelity. A process was established to identify where gaps in instrumentation exist for wind energy test campaigns by analyzing the capabilities of instrumentation for capturing the various important phenomena at the necessary resolution for both the science goal and validation objectives. To this end, a multi-disciplinary team of experts on instrumentation, wind energy, and atmospheric science was assembled to identify these significant instrumentation needs. A recommendation for instrumentation to be developed is provided, and the framework developed through this process is expected to be useful to the design of future test campaigns. The mapping tools developed for this process will be distributed as part of a future International Energy Agency Wind Technology Collaboration Program task on instrumentation development.

17 WIND ENERGY↗

Wind Energy Workforce Development: A Roadmap to a Sustainable Wind Industry (Poster)

As the United States moves toward a vision of greatly expanded wind energy use as outlined in the U.S. Department of Energy's 20% Wind Energy by 2030 report, the need for skilled workers at all levels in the industry is repeatedly identified as a critical issue. This presentation is an overview of the educational infrastructure and expected industry needs to support the continued development of avibrant U.S. wind industry through a discussion of the activities identified that must be put in place to train workers. The paper will also provide a framework to address issues raised from each of the education and industry sectors, identifying a roadmap for developing an educational infrastructure to support wind technology. The presentation will also provide an understanding of the availableresources, materials, and programs available across the industry. This presentation provides an overview of the educational infrastructure and expected industry needs to support the continued development of a vibrant U.S. wind industry as part of a collaborative effort to develop a wind workforce roadmap. This presentation will provide 1) A review of needed programs to train workers for the windindustry; 2) An overview of the importance education will play if the nation is to expand wind energy (both in development and deployment terms) and a review of ongoing activities with a focus on federal efforts; 3) A review of the materials and resources available across the industry and a framework to address issues raised from each of the education and industry sectors.

17 WIND ENERGY↗

Wind Energy Deployment in Isolated Islanded Power Systems: Challenges & Realities (Poster)

Rising costs of fuels, energy surety, and the carbon impacts of diesel fuel are driving remote and islanded communities dependent on diesel power generation to look for alternatives. Over the past few years, interest in using wind energy to reduce diesel fuel consumption has increased dramatically, potentially providing economic, environmental, social, and security benefits to the energy supply of isolated and islanded communities. However, the task of implementing such systems has remained elusive and subject to many cases of lower-than-expected performance. This poster describes the current status of integrating higher contribution wind technology into islanded power systems, the progress of recent initiatives implemented by the U.S. Department of Energy and Interior, and some of the lingering technical and commercial challenges. Operating experience from a number of power systems is described. The worldwide market for wind development in islanded communities (some of these supplying large domestic loads) provides a strong market niche for the wind industry, even in the midst of a slow global recovery.

17 WIND ENERGY↗

Mesoscale to Microscale Coupling for a Wind Ramp Case over Complex Terrain

Within the wind energy community, it has become increasingly important to simulate realistic weather events at high fidelity in order to improve wind turbine design, wind farm efficiency, and power forecasting. One of the major difficulties in simulating atmospheric events with numerical models at high fidelity is in accurately transitioning from the mesoscale to the microscale. The mesoscale flow, when input into the large-eddy simulation (LES) domain, will be free of resolved turbulence; needing sufficient time and space (known as fetch) for resolved-scale turbulence to develop. In order to reduce this fetch, several methods exist in which the temperature field, wind field, or both, are stochastically perturbed in order to accelerate the generation of turbulence. However, for cases involving complex terrain, it remains unclear if these perturbation processes are necessary, and if the interaction of the flow over the terrain, alone, is sufficient to generate adequate turbulence. In this study, a wind ramp event observed at the National Wind Technology Center (NWTC) outside of Boulder, CO is simulated first with a mesoscale model and then, using the simulated mesoscale solution as initial and boundary conditions, within a microscale LES solver. The mesoscale solution generated by the Weather Research and Forecasting (WRF) model accurately captures the wind ramp event with only a slight temporal shift and a small temperature bias when compared to the meteorological towers in the NWTC site. This information is then taken as the initial and boundary conditions within the Simulator for Wind Farm Applications (SOWFA) microscale LES model with varying terrain inputs. These inputs include the high-resolution (roughly 30 m grid spacing) terrain data from the Shuttle Radar Topography Mission (SRTM) (Figure 1a), as well as, three intermediate terrain resolution data sets produced by applying a uniform convolution window to the SRTM data with varying window sizes (Figure 1b-d). These are compared to the WRF terrain data interpolated to the high-resolution microscale grid (Figure 1e) in order to determine the impact of low-resolution (about 1 km grid spacing) terrain data on turbulence generation. The wind field is compared at several heights and distances along the dominant wind flow axis between each of the terrain cases. It is found that the development of turbulence across the domain is accelerated as terrain information increases in fidelity. Further, because this ramp event at the location of interest is largely influenced by the interaction of the short-wave trough with the terrain, as the topographic information decreases in fidelity the accuracy of the ramp event is decreased. To make generalizations and describe the benefits and shortcomings of this approach, several of the existing perturbation techniques are employed and compared to that of turbulence generation through topographic features.

17 WIND ENERGY↗

Wind Turbine Safety and Function Test Report for the ARE 442 Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, four turbines were tested at the National Wind Technology Center (NWTC) as a part of this project. Safety and function testing is one of up to five tests that were performed on the turbines, including power performance, duration, noise, and power quality tests. Test results provide manufacturers with reports that can be used for small wind turbine certification. The test equipment includes an ARE 442 wind turbine mounted on a 100-ft free-standing lattice tower. The system was installed by the NWTC Site Operations group with guidance and assistance from Abundant Renewable Energy.

17 WIND ENERGY↗

Wind Turbine Safety and Function Test Report for the Gaia-Wind 11-kW Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers to wind energy expansion by providing independent testing results for small wind turbines (SWT). In total, four turbines were tested at the National Wind Technology Center (NWTC) as a part of this project. Safety and function testing is one of up to five tests performed on the turbines, including power performance, duration, noise, and power-quality tests. The results of the testing provide the manufacturers with reports that can be used for small wind turbine certification. The test equipment includes a Gaia-Wind 11-kW wind turbine mounted on an 18-m monopole tower. Gaia-Wind Ltd. manufactured the turbine in Denmark. The system was installed by the NWTC site operations group with guidance and assistance from Gaia-Wind.

17 WIND ENERGY↗

New Siemens Research Turbine - time lapse

The National Renewable Energy Laboratory (NREL) and Siemens Energy Inc. recently commissioned a new 2.3 megawatt Siemens wind turbine at NREL's National Wind Technology Center. This video shows a time lapse of the installation. The turbine is the centerpiece of a multi-year project to study the performance and aerodynamics of a new class of large, land-based machines — in what will be the biggest government-industry research partnership for wind power generation ever undertaken in the U.S.

17 WIND ENERGY↗

Energy Equity Opportunities in Distributed Wind Hybrid Systems for Rural Loads

Distributed wind (DW) hybrid systems, or combinations of distributed energy resources with wind technologies, have the potential to provide energy equity benefits for rural loads. However, project developers and end-users do not understand these benefits well. This report outlines energy equity opportunities that result directly from DW-hybrid projects and proposes a framework that demonstrates how to consider equity in the DW-hybrid system, which can enhance existing resilience and valuation tools by incorporating a way to include equity considerations. Energy equity opportunities achievable with DW-hybrid systems for rural loads are defined by the core principles of energy justice for use in a proposed equity framework. As well, a catalog of equity resources, metrics, technology-agnostic frameworks, and best practices are linked in an attached Excel file. Electric cooperatives, technical assistance providers (including national laboratory and DOE staff), DW project developers, and technology providers can use this work to understand, evaluate, and define equitable outcomes for potential DW-hybrid projects.

17 WIND ENERGY↗

Wind Turbine Generator System Duration Test Report for the Gaia-Wind 11 kW Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, five turbines are being tested at the National Renewable Energy Laboratory's (NRELs) National Wind Technology Center (NWTC) as a part of thisproject. Duration testing is one of up to five tests that may be performed on the turbines, including power performance, safety and function, noise, and power quality tests. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification. The test equipment includes a Gaia-Wind 11 kW wind turbine mounted on an 18 m monopole tower.Gaia-Wind Ltd. manufactured the turbine in Denmark, although the company is based in Scotland. The system was installed by the NWTC Site Operations group with guidance and assistance from Gaia-Wind.

17 WIND ENERGY↗

Journey Mapping Distributed Wind Deployment: Installer Perspectives

This work uses journey maps to assess the deployment of distributed wind technologies through the perspective of installers. Journey mapping is a human-centered design method that chronologically traces processes from the perspective of those who participate in them. The journey map will be leveraged to identify deployment pain points (i.e., manifestations of generic deployment barriers) that the Strategize, Engage, Network and Deploy (SEND) Distributed Wind project team will seek to address in future work.

17 WIND ENERGY↗

Planetary Load Sharing in Three-Point- Mounted Wind Turbine Gearboxes: Preprint

Wind turbine gearboxes do not achieve their expected design life. The cost of gearbox replacements and rebuilds and the downtime associated with these failures increase the cost of wind energy. In 2007, the U.S. Department of Energy established the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC). Its goals are to understand the root causes of premature gearbox failures and improve their reliability. To date, the GRC has focused on a 750-kW drivetrain with a three-stage, three-point-mounted gearbox. A nonproprietary version of the gearbox containing CRBs with C3 clearances in the planetary stage was customized. Two of these gearboxes, GB1 and GB2, were manufactured and then tested in the National Wind Technology Center's 2.5-MW dynamometer and in the field. Major GRC findings include the detrimental effect of rotor moments on planetary load sharing and predicted fatigue, and the risk of bearing sliding in low-torque conditions for three-point configuration drivetrains. Based on the knowledge gained from testing and analysis of the original design, the GRC gearbox was redesigned to improve its load-sharing characteristics and predicted fatigue. This new gearbox is named GB3. As shown in Figure 1, its key improvement is the incorporation of preloaded TRBs that support the planet carrier and planets. Roller loads can be optimized and bearing life maximized with a small preload [4]. These preloaded bearings, along with interference-fitted planet pins, improve alignments and load-sharing characteristics. A semi-integrated planet bearing design also increases capacity and eliminates outer race fretting. Romax Technology, with Powertrain Engineers and the Timken Company (Timken), completed the redesign. Timken manufactured and instrumented the planet gears and bearings. Brad Foote Gearing manufactured the other gearing and assembled the gearbox.

17 WIND ENERGY↗

Wind Turbine Generator System Duration Test Report for the Mariah Power Windspire Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, five turbines are being tested at the National Wind Technology Center (NWTC) as a part of the first round of this project. Duration testing is one of up to five tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality tests. NWTC testing results provide manufacturers with reports that may be used to meet part of small wind turbine certification requirements. This duration test report focuses on the Mariah Power Windspire wind turbine.

17 WIND ENERGY↗

Five grand challenges of offshore wind financing in the United States

Offshore wind energy has the potential to play a critical role in fostering a renewable energy transformation in the United States. This owes to its massive technical potential, strategic location near densely populated coastlines, and - relative to onshore wind and solar - high capacity factors and consistent production. The Biden Administration's target to build 30 GW of offshore wind capacity by 2030 (from 0.04 GW today) requires the creation and swift development of a new industry that interlinks the wind and power industries with the maritime sector. Critical to its success is financing. While financial capital is abundant, deploying it for offshore wind faces major challenges. We identify and describe five grand challenges affecting offshore wind finance in the U.S. Failing to address these challenges may put deployment targets at risk. The challenges include (1) Early years financing: navigating the complexities, timing mismatches, and high costs of projects in the development phase; (2) Policy support for project financial solvency: addressing the uncertainty and systematic transfers of tax credits away from offshore wind, characteristic of the U.S. Investment Tax Credit; (3) Workforce development: building a skilled workforce for an emerging market; (4) Transmission and integration barriers: upgrading the power grid to reliably support large scale offshore wind integration; and (5) Floating wind development: financing the development and scale-up of floating offshore wind technologies. The second challenge has already been solved to a large extent by the Inflation Reduction Act.

17 WIND ENERGY↗

Duration Test Report for the Ventera VT10 Wind Turbine

This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small wind turbines. Five turbines were tested at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) as a part of round one of this project. Duration testing is one of up to five tests that may be performed on the turbines, including power performance, safety and function, noise, and power quality. Test results will provide manufacturers with reports that can be used to fulfill part of the requirements for small wind turbine certification. The test equipment included a grid-connected Ventera Energy Corporation VT10 wind turbine mounted on an 18.3-m (60-ft) self-supporting lattice tower manufactured by Rohn.

17 WIND ENERGY↗

Swift Wind Turbine Testing

The purpose of this project was to independently test the Swift wind turbine according to the AWEA Small Wind Turbine Performance and Safety Standard. This project was part of the U.S. Department of Energy’s (DOE’s) Independent Testing project. The project was established to help providers of small wind turbines the opportunity to validate the product to AWEA standards. The National Wind Technology Center (NWTC) conducted testing that included duration, safety and function, power performance, and acoustic. Successful operation of the turbine was confirmed in the results of the testing. Duration requirements were met, there were no safety issues, power performance was established, and the acoustic level was verified to be low compared to other similar turbines. Data results can be assembled and submitted to the Small Wind Certification Council (SWCC) for certification of the turbine to AWEA standards.

17 WIND ENERGY↗