Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Thinking systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

The Summer of Hydrogen

Ground crew veterans at Kennedy Space Center still talk about what they call "the summer of hydrogen"-the long, frustrating months in 1990 when the shuttle fleet was grounded by an elusive hydrogen leak that foiled our efforts to fill the orbiter's external fuel tank. Columbia (STS-35) was on Launch Pad A for a scheduled May 30 launch when we discovered the hydrogen leak during - tanking. The external fuel tank is loaded through the orbiter. Liquid hydrogen flows through a 17-inch umbilical between the orbiter and the tank. During fueling, we purge the aft fuselage with gaseous nitrogen to reduce the risk of fire, and we have a leak-detection system in the mobile launch platform, which samples (via tygon tubing) the atmosphere in and around the vehicle, drawing it down to a mass spectrometer that analyzes its composition. When we progressed to the stage of tanking where liquid hydrogen flows through the vehicle, the concentration of hydrogen approached four percent-the limit above which it would be dangerously flammable. We had a leak. We did everything we could think of to find it, and the contractor who supplied the flight hardware was there every day, working alongside us. We did tanking tests, which involved instrumenting the suspected leak sources, and cryo-loaded the external tank to try to isolate precisely where the leak originated. We switched out umbilicals; we replaced the seals between the umbilical and the orbiter. We inspected the seals microscopically and found no flaws. We replaced the recirculation pumps, and we found and replaced a damaged teflon seal in a main propulsion system detent cover, which holds the prevalve-the main valve supplying hydrogen to Space Shuttle Main Engine 3 -in the open position. The seal passed leak tests at ambient temperature but leaked when cryogenic temperatures were applied. We added new leak sensors-up to twenty at a time and tried to be methodical in our placements to narrow down the possible sources of the problem. We even switched orbiters, sending Columbia back to the Vehicle Assembly Building and bringing out Atlantis, scheduled to fly as STS-38. Two shuttles on their mobile launchers passing in the night was a majestic sight, but not one you want to see if you're trying to get an orbiter launched. None of this told us where the leak was, or if we were dealing with more than one leak source.

Weber, Philip↗

Learning Approach on the Ground State Energy Calculation of Helium Atom

This research investigated the role of learning approach on the ground state energy calculation of Helium atom in improving the concepts of science teachers at university level. As the exact solution of several particles is not possible here we used approximation methods. Using this method one can understand easily the calculation of ground state energy of any given function. Variation Method is one of the most useful approximation methods in estimating the energy eigen values of the ground state and the first few excited states of a system, which we only have a qualitative idea about the wave function.The objective of this approach is to introduce and involve university teacher in new research, to improve their class room practices and to enable teachers to foster critical thinking in students.

74 ATOMIC AND MOLECULAR PHYSICS↗

Decarbonized Electric Grid: Defining, Measuring, and Integrating Decarbonization into Electricity Sector Policy and Planning

Traditionally, electric grid planning seeks to maintain safe, reliable, efficient, and affordable service for current and future customers. As policies, expectations of the energy system, and the threat landscape evolve, additional objectives for power system planners are emerging, including decarbonization, resilience, and equity. Renewable and clean energy goals, especially in the context of deep decarbonization strategies, are changing the mix of resources on the electric grid and prompting new considerations for grid architecture. The increased frequency and severity of extreme weather events over the last two decades, coupled with cybersecurity concerns, have elevated resilience as a key system need. More recently, there has been greater focus on equity and energy justice in grid planning to ensure that disadvantaged communities are not adversely affected by grid modernization and have equal access to its benefits. In response, new thinking around multi-objective decision planning is exploring improvements in grid planning processes to better integrate approaches to meet decarbonization, resilience, and equity objectives. To provide a foundation for this work, a series of white papers was produced to summarize these emerging objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Electric Grid: Defining, Measuring, and Integrating Resilience into Electricity Sector Policy and Planning

Traditionally, electric grid planning seeks to maintain safe, reliable, efficient, and affordable service for current and future customers. As policies, expectations of the energy system, and the threat landscape evolve, additional objectives for power system planners are emerging, including decarbonization, resilience, and equity. Renewable and clean energy goals, especially in the context of deep decarbonization strategies, are changing the mix of resources on the electric grid and prompting new considerations for grid architecture. The increased frequency and severity of extreme weather events over the last two decades, coupled with cybersecurity concerns, have elevated resilience as a key system need. More recently, there has been greater focus on equity and energy justice in grid planning to ensure that disadvantaged communities are not adversely affected by grid modernization and have equal access to its benefits. In response, new thinking around multi-objective decision planning is exploring improvements in grid planning processes to better integrate approaches to meet decarbonization, resilience, and equity objectives. To provide a foundation for this work, a series of white papers was produced to summarize these emerging objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Equitable Electric Grid: Defining, Measuring, and Integrating Equity into Electricity Sector Policy and Planning

Traditionally, electric grid planning seeks to maintain safe, reliable, efficient, and affordable service for current and future customers. As policies, expectations of the energy system, and the threat landscape evolve, additional objectives for power system planners are emerging, including decarbonization, resilience, and equity. Renewable and clean energy goals, especially in the context of deep decarbonization strategies, are changing the mix of resources on the electric grid and prompting new considerations for grid architecture. The increased frequency and severity of extreme weather events over the last two decades, coupled with cybersecurity concerns, have elevated resilience as a key system need. More recently, there has been greater focus on equity and energy justice in grid planning to ensure that disadvantaged communities are not adversely affected by grid modernization and have equal access to its benefits. In response, new thinking around multi-objective decision planning is exploring improvements in grid planning processes to better integrate approaches to meet decarbonization, resilience, and equity objectives. To provide a foundation for this work, a series of white papers was produced to summarize these emerging objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ares I-X Flight Test Development Challenges and Success Factors

The NASA Constellation Program's Ares I-X rocket launched successfully on October 28, 2009 collecting valuable data and providing risk reduction for the Ares I project. The Ares I-X mission was formulated and implemented in less than four years commencing with the Exploration Systems Architecture Study in 2005. The test configuration was founded upon assets and processes from other rocket programs including Space Shuttle, Atlas, and Peacekeeper. For example, the test vehicle's propulsion element was a Shuttle Solid Rocket Motor. The Ares I-X rocket comprised a motor assembly, mass and outer mold line simulators of the Ares I Upper Stage, Orion Spacecraft and Launch Abort System, a roll control system, avionics, and other miscellaneous components. The vehicle was 327 feet tall and weighed approximately 1,800,000 pounds. During flight the rocket reached a maximum speed of Mach 4.8 and an altitude of 150,000 feet. The vehicle demonstrated staging at 130,000 feet, tested parachutes for recovery of the motor, and utilized approximately 900 sensors for data collection. Developing a new launch system and preparing for a safe flight presented many challenges. Specific challenges included designing a system to withstand the environments, manufacturing large structures, and re-qualifying heritage hardware. These and other challenges, if not mitigated, may have resulted in test cancellation. Ares I-X succeeded because the mission was founded on carefully derived objectives, led by decisive and flexible management, implemented by an exceptionally talented and dedicated workforce, and supported by a thorough independent review team. Other major success factors include the use of proven heritage hardware, a robust System Integration Laboratory, multi-NASA center and contractor team, concurrent operations, efficient vehicle assembly, effective risk management, and decentralized element development with a centralized control board. Ares I-X was a technically complex test that required creative thinking, risk taking, and a passion to succeed.

Askins, Bruce↗

Integrating Safety and Mission Assurance in Design

This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safety and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

Cianciola, Chris↗

Enabling Advanced Air Mobility Operations through Appropriate Trust in Human-Autonomy Teaming: Foundational Research Approaches and Applications

Emerging Advanced Air Mobility(AAM)operations will be enabled by increasingly autonomous systems, requiring technologies to take on more responsibilities and fundamentally altering traditional human-automation interaction paradigms. The growing reliance on higher levels of automation will necessitate research to identify capabilities and principles that facilitate humans and machines working and thinking better together, i.e., human-autonomy teaming (HAT). Trust is an inherent requirement in effective teams because when members work interdependently, those agents (human, automation) must be willing to accept a level of risk to rely upon each other to reach goals and contribute to team tasks. This work provides an initial approach to enabling AAM operations through appropriate trust within HAT. The main contributions of this approach resides in connecting the construct of trust to mental models. Using the outlined mental model approach, we propose novel HAT strategies, such as Adaptive Trust Calibration, and preview planned research activities derived from this approach. Additionally, we propose several practical applications that can currently be employed by AAM development communities.

Eric T Chancey↗

Thinking About Taking The Leap? Hear From Those Who Did So...and Survived A Case Study: NASA Stennis Space Center Electronic Records Management

Increased visibility into records management: a) Partnered with NARA to provide electronic records management and Emergency Response training; b) Mandate all civil servants and records personnel attend training.Improve Disaster Recovery: a) TechDoc considered a vital system; b) All electronic documentation and records managed by our system available offsite.

Albasini, Colby V.↗

Exploring HPCS Languages in Scientific Computing

As computers scale up dramatically to tens and hundreds of thousands of cores, develop deeper computational and memory hierarchies, and increased heterogeneity, developers of scientific software are increasingly challenged to express complex parallel simulations effectively and efficiently. In this paper, we explore the three languages developed under the DARPA High-Productivity Computing Systems (HPCS) program to help address these concerns: Chapel, Fortress, and X10. These languages provide a variety of features not found in currently popular HPC programming environments and make it easier to express powerful computational constructs, leading to new ways of thinking about parallel programming. Though the languages and their implementations are not yet mature enough for a comprehensive evaluation, we discuss some of the important features, and provide examples of how they can be used in scientific computing. We believe that these characteristics will be important to the future of high-performance scientific computing, whether the ultimate language of choice is one of the HPCS languages or something else.

parallel computing↗

Ares Project Overview - Quality in Design

This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

Cianciola, Chris↗

Two-level main memory co-design: Multi-threaded algorithmic primitives, analysis, and simulation

A challenge in computer architecture is that processors often cannot be fed data from DRAM as fast as CPUs can consume it. Therefore, many applications are memory-bandwidth bound. With this motivation and the realization that traditional architectures (with all DRAM reachable only via bus) are insufficient to feed groups of modern processing units, vendors have introduced a variety of non-DDR 3D memory technologies (Hybrid Memory Cube (HMC),Wide I/O 2, High Bandwidth Memory (HBM)). These offer higher bandwidth and lower power by stacking DRAM chips on the processor or nearby on a silicon interposer. We will call these solutions “near-memory,” and if user-addressable, “scratchpad.” High-performance systems on the market now offer two levels of main memory: near-memory on package and traditional DRAM further away. In the near term we expect the latencies near-memory and DRAM to be similar. Here, it is natural to think of near-memory as another module on the DRAM level of the memory hierarchy. Vendors are expected to offer modes in which the near memory is used as cache, but we believe that this will be inefficient.

97 MATHEMATICS AND COMPUTING↗

Columbia Accident Investigation Board. Volume One

The Columbia Accident Investigation Board's independent investigation into the February 1, 2003, loss of the Space Shuttle Columbia and its seven-member crew lasted nearly seven months. A staff of more than 120, along with some 400 NASA engineers, supported the Board's 13 members. Investigators examined more than 30,000 documents, conducted more than 200 formal interviews, heard testimony from dozens of expert witnesses, and reviewed more than 3,000 inputs from the general public. In addition, more than 25,000 searchers combed vast stretches of the Western United States to retrieve the spacecraft's debris. In the process, Columbia's tragedy was compounded when two debris searchers with the U.S. Forest Service perished in a helicopter accident. This report concludes with recommendations, some of which are specifically identified and prefaced as 'before return to flight.' These recommendations are largely related to the physical cause of the accident, and include preventing the loss of foam, improved imaging of the Space Shuttle stack from liftoff through separation of the External Tank, and on-orbit inspection and repair of the Thermal Protection System. The remaining recommendations, for the most part, stem from the Board's findings on organizational cause factors. While they are not 'before return to flight' recommendations, they can be viewed as 'continuing to fly' recommendations, as they capture the Board's thinking on what changes are necessary to operate the Shuttle and future spacecraft safely in the mid- to long-term. These recommendations reflect both the Board's strong support for return to flight at the earliest date consistent with the overriding objective of safety, and the Board's conviction that operation of the Space Shuttle, and all human space-flight, is a developmental activity with high inherent risks.

SPACE SHUTTLE COLUMBIA↗

Tools, Techniques, and Applications: Normalizing the VR Paradigm

Oshynee's precision Learning Objective performance factor rubrics with associated behavioral anchors integrates with Thinking Worlds(TradeMark), to provide event data recording and dynamic prescriptive feedback. Thinking Worlds(TradeMark) provides SCORM parametric data for reporting within the game and within overarching curricula or workplace evaluation strategy. - Open-sourced, browser-based digital dashboard reporting tools collect data from TW, LMS, LCMS, HR, and workplace metrics or control systems The games may be delivered across the internet or in a range of networked and stand-alone methods using the delivery model (s) required by the host organization.

Duncan, Gaeme↗

Think small - In large numbers

The development and use of microspacecraft are examined. It is proposed that 10-50 microspacecraft per year can be launched; up to 50 microspacecraft can be dispatched with traditional launchers; and 1-3 experiments can be performed on the spacecraft. Various applications for the microspacecraft are discussed and specific examples of proposed missions are presented. Some systems and instruments designed for the microspacecraft are described.

Jones, Ross M.↗

Shuttle Case Study Collection Website Development

As a continuation from summer 2012, the Shuttle Case Study Collection has been developed using lessons learned documented by NASA engineers, analysts, and contractors. Decades of information related to processing and launching the Space Shuttle is gathered into a single database to provide educators with an alternative means to teach real-world engineering processes. The goal is to provide additional engineering materials that enhance critical thinking, decision making, and problem solving skills. During this second phase of the project, the Shuttle Case Study Collection website was developed. Extensive HTML coding to link downloadable documents, videos, and images was required, as was training to learn NASA's Content Management System (CMS) for website design. As the final stage of the collection development, the website is designed to allow for distribution of information to the public as well as for case study report submissions from other educators online.

Ransom, Khadijah S.↗

Using VE to Strategically Plan Our Future

The Value Engineering (VE) Methodology is an effective tool for business or project strategic planning. In conjunction with the “Balanced Scorecard Approach” (Drs. Robert Kaplan, PhD, and David Norton, PhD, from the Balanced Scorecard Collaborative/Palladium Group), function analysis can be used to develop strategy maps and scorecards. The FAST diagram provides an integrated approach to strategy map development by formulating a cause and effect relationship and establishing the “how” and “why” behind the strategy map. By utilizing the VE Job Plan, one is able to move from strategic thinking all the way through to execution of the strategy.

42 ENGINEERING↗