Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

VIPER Rover: Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

VIPER↗

Viper Rover: Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

VIPER Rover Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

New Antenna Deployment, Pointing and Supporting Mechanism

On ITALSAT Flight 2, the Italian telecommunications satellite, the two L-Ka antennas (Tx and Rx) use two large deployable reflectors (2000-mm diameter), whose deployment and fine pointing functions are accomplished by means of an innovative mechanism concept. The Antenna Deployment & Pointing Mechanism and Supporting Structure (ADPMSS) is based on a new configuration solution, where the reflector and mechanisms are conceived as an integrated, self-contained assembly. This approach is different from the traditional configuration solution. Typically, a rigid arm is used to deploy and then support the reflector in the operating position, and an Antenna Pointing Mechanism (APM) is normally interposed between the reflector and the arm for steering operation. The main characteristics of the ADPMSS are: combined implementation of deployment, pointing, and reflector support; optimum integration of active components and interface matching with the satellite platform; structural link distribution to avoid hyperstatic connections; very light weight and; high performance in terms of deployment torque margin and pointing range/accuracy. After having successfully been subjected to all component-level qualification and system-level acceptance tests, two flight ADPMSS mechanisms (one for each antenna) are now integrated on ITALSAT F2 and are ready for launch. This paper deals with the design concept, development, and testing program performed to qualify the ADPMSS mechanism.

Costabile, V.↗

Annual report to the NASA Administrator by the Aerospace Safety Advisory Panel on the space shuttle program. Part 1: Observations and conclusions

The panel reviewed the following areas of major significance for the Approach and Landing Test program: mission planning and crew training, flight-readiness of the Carrier Aircraft and the Orbiter, including its flight control and avionics system, facilities, and communications and ground support equipment. The management system for risk assessment was investigated. The Orbital Flight Test Program was also reviewed. Observations and recommendations are presented.

Source record↗

KSC ground operations planning for Space Station

At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

Lyon, J. R.↗

NASA Commercial Crew Program Crew Transportation System Certificate of Flight Readiness Plan

NASA Commercial Crew Program (CCP) Crew Transportation System (CTS) Certification of Flight Readiness (CoFR) is the authorization granted by the Agency that certifies the flight readiness of a Commercial Provider’s CTS to conduct a flight test or mission to transport NASA Crew to and from the ISS. The Commercial Provider is responsible for developing and executing its plan for certifying the flight readiness of its CTS. The CCP with the International Space Station (ISS) Program must substantiate the Commercial Provider’s CoFR assertion to ensure compliance with NASA requirements and NASA Crew safety. NASA CCP CTS CoFR is the approval of the Commercial Provider’s evidence that: • The physical as-built CTS was produced, assembled, integrated, and tested within the approved production and operational constraints. • The mission specific requirements are enveloped within the certified CTS capabilities. • The CTS personnel are trained and certified to support the mission. • All aspects of the CTS are ready for the mission.

Certification of Flight Readiness↗

NSTAR Extended Life Test Discharge Chamber Flake Analysis

The Extended Life Test (ELT) of the NASA Solar Electric Propulsion Technology Readiness (NSTAR) ion thruster was concluded after 30,352 hours of operation. The ELT was conducted using the Deep Space 1 (DS1) back-up flight engine, a 30 cm diameter xenon ion thruster. Post-test inspection of the ELT engine revealed numerous contaminant flakes distributed over the bottom of the cylindrical section of the anode within the discharge chamber (DC). Extensive analyses were conducted to determine the source of the particles, which is critical to the understanding of degradation mechanisms of long life ion thruster operation. Analyses included: optical microscopy (OM) and particle length histograms, field emission scanning electron microscopy (FESEM) combined with energy dispersive spectroscopy (EDS), and atomic oxygen plasma exposure tests. Analyses of the particles indicate that the majority of the DC flakes consist of a layered structure, typically with either two or three layers. The flakes comprising two layers were typically found to have a molybdenum-rich (Mo-rich) layer on one side and a carbon-rich (C-rich) layer on the other side. The flakes comprising three layers were found to be sandwich-like structures with Mo-rich exterior layers and a C-rich interior layer. The presence of the C-rich layers indicates that these particles were produced by sputter deposition build-up on a surface external to the discharge chamber from ion sputter erosion of the graphite target in the test chamber. This contaminant layer became thick enough that particles spalled off, and then were electro-statically attracted into the ion thruster interior, where they were coated with Mo from internal sputter erosion of the screen grid and cathode components. Atomic oxygen tests provided evidence that the DC chamber flakes are composed of a significant fraction of carbon. Particle size histograms further indicated that the source of the particles was spalling of carbon flakes from downstream surfaces. Analyses of flakes taken from the downstream surface of the accelerator grid provided additional supportive information. The production of the downstream carbon flakes, and hence the potential problems associated with the flake particles in the ELT ion thruster engine is a facility induced effect and would not occur in the space environment.

deGroh, Kim K.↗

Large Liquid Rocket Testing: Strategies and Challenges

Rocket propulsion development is enabled by rigorous ground testing in order to mitigate the propulsion systems risks that are inherent in space flight. This is true for virtually all propulsive devices of a space vehicle including liquid and solid rocket propulsion, chemical and non-chemical propulsion, boost stage and in-space propulsion and so forth. In particular, large liquid rocket propulsion development and testing over the past five decades of human and robotic space flight has involved a combination of component-level testing and engine-level testing to first demonstrate that the propulsion devices were designed to meet the specified requirements for the Earth to Orbit launchers that they powered. This was followed by a vigorous test campaign to demonstrate the designed propulsion articles over the required operational envelope, and over robust margins, such that a sufficiently reliable propulsion system is delivered prior to first flight. It is possible that hundreds of tests, and on the order of a hundred thousand test seconds, are needed to achieve a high-reliability, flight-ready, liquid rocket engine system. This paper overviews aspects of earlier and recent experience of liquid rocket propulsion testing at NASA Stennis Space Center, where full scale flight engines and flight stages, as well as a significant amount of development testing has taken place in the past decade. The liquid rocket testing experience discussed includes testing of engine components (gas generators, preburners, thrust chambers, pumps, powerheads), as well as engine systems and complete stages. The number of tests, accumulated test seconds, and years of test stand occupancy needed to meet varying test objectives, will be selectively discussed and compared for the wide variety of ground test work that has been conducted at Stennis for subscale and full scale liquid rocket devices. Since rocket propulsion is a crucial long-lead element of any space system acquisition or development, the appropriate plan and strategy must be put in place at the outset of the development effort. A deferment of this test planning, or inattention to strategy, will compromise the ability of the development program to achieve its systems reliability requirements and/or its development milestones. It is important for the government leadership and support team, as well as the vehicle and propulsion development team, to give early consideration to this aspect of space propulsion and space transportation work.

Rahman, Shamim A.↗

Quiet Spike(TradeMark) Build-up Ground Vibration Testing Approach

Flight tests of Gulfstream Aerospace Corporation s Quiet Spike(TradeMark) hardware were recently completed on the NASA Dryden Flight Research Center F-15B airplane. NASA Dryden uses a modified F-15B airplane as a testbed aircraft to cost-effectively fly flight research experiments that are typically mounted underneath the F-15B airplane, along the fuselage centerline. For the Quiet Spike(TradeMark) experiment, however, instead of a centerline mounting, a relatively long forward-pointing boom was attached to the radar bulkhead of the F-15B airplane. The Quiet Spike(TradeMark) experiment is a stepping-stone to airframe structural morphing technologies designed to mitigate the sonic-boom strength of business jets over land. The Quiet Spike(TradeMark) boom is a concept in which an aircraft s noseboom would be extended prior to supersonic acceleration. This morphing effectively lengthens the aircraft, thus reducing the peak sonic-boom amplitude, but is also expected to partition the otherwise strong bow shock into a series of reduced-strength, noncoalescing shocklets. Prior to flying the Quiet Spike(TradeMark) experiment on the F-15B airplane several ground vibration tests were required to understand the Quiet Spike(TradeMark) modal characteristics and coupling effects with the F-15B airplane. However, due to the flight hardware availability and compressed schedule requirements, a "traditional" ground vibration test of the mated F-15B Quiet Spike(TradeMark) ready-for- flight configuration did not leave sufficient time available for the finite element model update and flutter analyses before flight testing. Therefore, a "nontraditional" ground vibration testing approach was taken. This paper provides an overview of each phase of the "nontraditional" ground vibration testing completed for the Quiet Spike(TradeMark) project which includes the test setup details, instrumentation layout, and modal results obtained in support of the structural dynamic modeling and flutter analyses.

Spivey, Natalie D.↗

Metals for Cryotank Structures. Present and Future: MSFC Perspective

The Cryogenic Tank Technology Program (CTTP) program has been a cooperative effort between NASA LARC, NASA MSFC, NASA Headquarters, and industry (Lockheed Martin Aeronautics, Lockheed Martin Manned Space Systems, Wyman Gordon, and Ladish). The scope of the CTTP is to develop state-of-the-art, flight-size, flight-quality, low cost hardware, and use this hardware to design, fabricate and test an all aluminum-lithium, all near net shape-component 14' diameter cryogenic tank with a unique low profile bulkhead design. The logical conclusion to the CTTP is to validate these various technologies to a Technology Readiness Level (TRL) of 6 through the proposed structural test program. The CTTP supports the advancement of key enabling technologies required for aluminum lithium cryogenic tanks. The technologies are focused towards innovative and low cost manufacturing processes such as near net shape technologies: one piece spun formed domes, extruded barrel panels, and one piece roll forged ring frames. Other innovative technologies include the friction stir weld process and weight-efficient low profile bulkhead designs. All of these technologies are of primary importance for NASA's mission plan for reusable and expendable launch vehicles. This program fills the niche for an all 2195 aluminum lithium alloy cryogenic tank which is not being covered by existing NASA technology work.

Vaughn, Timothy P.↗

Aerospace Regenerative Fuel Cell Fluidic Component Design Challenges

A discrete regenerative fuel cell (RFC) system is currently under development at the NASA Glenn Research Center and Johnson Space Center. The objective of this activity is to produce an energy storage system with a higher specific energy (W·hr/kg) than the state-of-the-art battery technologies then test that system within an environment simulating the temperatures and pressures expected over a full lunar day cycle on the lunar surface. The system is designed to be as flight-like as possible given resource and commercially available technology limitations. The RFC system is comprised of a fuel cell power system, a high pressure electrolysis system, fluidic and electronic balance of plant systems, avionics, power management and distribution system, and software. This technical memorandum discusses components and subsystems that present challenges in developing flight ready RFCs. To remedy identified issues, functional application test plans are presented for components and subsystems primarily constructed with commercially available options due to the budget and schedule constraints of this ground technology demonstration project.

fuel cell↗

Quiet Spike(TradeMark) Build-up Ground Vibration Testing Approach

Flight tests of the Gulfstream Aerospace Corporation s Quiet Spike(TradeMark) hardware were recently completed on the National Aeronautics and Space Administration Dryden Flight Research Center F-15B airplane. NASA Dryden uses a modified F-15B (836) airplane as a testbed aircraft to cost-effectively fly flight research experiments that are typically mounted underneath the airplane, along the fuselage centerline. For the Quiet Spike(TradeMark) experiment, instead of a centerline mounting, a forward-pointing boom was attached to the radar bulkhead of the airplane. The Quiet Spike(TradeMark) experiment is a stepping-stone to airframe structural morphing technologies designed to mitigate the sonic-boom strength of business jets flying over land. Prior to flying the Quiet Spike(TradeMark) experiment on the F-15B airplane several ground vibration tests were required to understand the Quiet Spike(TradeMark) modal characteristics and coupling effects with the F-15B airplane. Because of flight hardware availability and compressed schedule requirements, a "traditional" ground vibration test of the mated F-15B Quiet Spike(TradeMark) ready-for-flight configuration did not leave sufficient time available for the finite element model update and flutter analyses before flight-testing. Therefore, a "nontraditional" ground vibration testing approach was taken. This report provides an overview of each phase of the "nontraditional" ground vibration testing completed for the Quiet Spike(TradeMark) project.

Spivey, Natalie D.↗

Estimating the Relative Water Content of Leaves in a Cotton Canopy

Remotely sensing plant canopy water status remains a long-term goal of remote sensing research. Established approaches to estimating canopy water status the Crop Water Stress Index, the Water Deficit Index and the Equivalent Water Thickness involve measurements in the thermal or reflective infrared. Here we report plant water status estimates based upon analysis of polarized visible imagery of a cotton canopy measured by ground Multi-Spectral Polarization Imager (MSPI). Such estimators potentially provide access to the plant hydrological photochemistry that manifests scattering and absorption effects in the visible spectral region.Twice during one day, +- 3 hours from solar noon, we collected polarized imagery and relative water content data on a cotton test plot located at the Arid Land Agricultural Research Center, United States Department of Agriculture, Maricopa, AZ. The test plot, a small portion of a large cotton field, contained stressed plants ready for irrigation. The evening prior to data collection we irrigated several rows of plants within the test plot. Thus, ground MSPI imagery from both morning and afternoon included cotton plants with a range of water statuses. Data analysis includes classifying the polarized imagery into sunlit reflecting, sunlit transmitting, shaded foliage and bare soil. We estimate the leaf surface reflection and interior reflection based upon the per pixel polarization and sunview directions. We compare our cotton results with our prior polarization results for corn and soybean leaves measured in the lab and corn leaves measured in the field.

Cotton Canopy↗

XSP Methane Sensors Test and Evaluation Project “M-Step”

Methane sensor technology is employed in industry sectors from oil and gas to agriculture, landfills, and monitoring of natural emissions. The US oil and gas sector is extensive in scale, critical to fulfilling US energy needs, and deals with commodities presenting enormous challenges for personnel safety and the environment. Thus, it is imperative that they have accurate and responsive sensors to detect hazardous gases such as methane. US space launch systems will increasingly also use liquefied methane and liquefied natural gas (LNG), which is mostly methane, in quantities large and small, as main and auxiliary propulsion and power. Some of these systems will be reusable, which adds the unique challenge of processing a vehicle that has residual commodities and has returned to its launch site to be readied for its next launch. The methane sensors test and evaluation project (M-STEP) began within the context of a reusable launch system, the Defense Advanced Research Projects Agency (DARPA) Experimental Spaceplane (XSP) program, which would have employed a high-pressure gaseous methane and gaseous oxygen reaction control system. Although the XSP partnership between Boeing and DARPA was terminated by Boeing in early 2020, DARPA and KSC have continued to collaborate in the area of gas sensors with the hydrogen sensor test and evaluation project (H-STEP) and with M-STEP. The NASA Launch Services program (LSP) invested in M-STEP in FY 2021 “to evaluate and understand the state-of-the-art in methane gas sensors”. M-STEP and the LSP effort was complementary, pushing in the same direction to understand US launch system stakeholder needs and approaches, requirements internal (NASA) and external, and commercially available or forthcoming methane sensing technologies, practices, and approaches. In addition, M-STEP (as with H-STEP) enhances KSC capabilities and understanding of these technologies, informing agency investments and further research in these areas.

Tracy L. Gibson↗

Embracing Safe Ground Test Facility Operations and Maintenance

Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

Dunn, Steven C.↗

Irradiation Testing of Sensors - ASI Program Review 2022

This is a powerpoint presentation for the annual Advanced Sensors and Instrumentation (ASI) program webinar. The following is a summary of the presentation. Advanced instrumentation enables testing of nuclear fuels and materials in support of the US advanced nuclear technology industry. A number of promising sensor technologies are in the pipeline. The early part of sensor development can be done outside of the reactor environment, but full technical readiness requires experience gained from in-core performance testing. Customers usually have only one shot to conduct their irradiation experiments. Because of the high costs test sponsors are frequently reluctant to incorporate unproven technologies in reactor experiments. Therefore, it is vital to demonstrate newly-developed sensors in operational conditions, prior to incorporating them into long-term high-value experiments. Successful completion of these activities will create new monitoring capabilities in high-power test reactors (such as ATR) as well as specialty reactors such as TREAT.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

Mason, Lee↗