Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Evolving the Technical Infrastructure of the Planetary Data System for the 21st Century

The Planetary Data System (PDS) was established in 1989 as a distributed system to assure scientific oversight. Initially the PDS followed guidelines recommended by the National Academies Committee on Data Management and Computation (CODMAC, 1982) and placed emphasis on archiving validated datasets. But overtime user demands, supported by increased computing capabilities and communication methods, have placed increasing demands on the PDS. The PDS must add additional services to better enable scientific analysis within distributed environments and to ensure that those services integrate with existing systems and data. To face these challenges the Planetary Data System (PDS) must modernize its architecture and technical implementation. The PDS 2010 project addresses these challenges. As part of this project, the PDS has three fundamental project goals that include: (1) Providing more efficient client delivery of data by data providers to the PDS (2) Enabling a stable, long-term usable planetary science data archive (3) Enabling services for the data consumer to find, access and use the data they require in contemporary data formats. In order to achieve these goals, the PDS 2010 project is upgrading both the technical infrastructure and the data standards to support increased efficiency in data delivery as well as usability of the PDS. Efforts are underway to interface with missions as early as possible and to streamline the preparation and delivery of data to the PDS. Likewise, the PDS is working to define and plan for data services that will help researchers to perform analysis in cost-constrained environments. This presentation will cover the PDS 2010 project including the goals, data standards and technical implementation plans that are underway within the Planetary Data System. It will discuss the plans for moving from the current system, version PDS 3, to version PDS 4.

Beebe, Reta F.↗

Structural dynamics division research and technology accomplishments for FY 1988 and plans for FY 1989

The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for FY 1988 and research plans for FY 1989. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and plans for the current year as they relate to five-year plans for each area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

Gardner, James E.↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Smart, Connected Manufactured Housing Solutions through High-Performance Design. Final CRADA report

This report focuses on HVAC, domestic hot water, and miscellaneous electric loads via voluntary opportunities that may arise from partnerships with utilities, as well as future US Environmental Protection Agency ENERGY STAR and DOE Zero Energy Ready Manufactured Home programs. Phase I of this project has begun the technical dialogue toward developing an implementation plan among DOE’s Oak Ridge National Laboratory, Clayton Manufactured Homes, and US Department of Housing and Urban Development Code manufactured housing stakeholders. These activities have focused on delivering high-performance design through integration of technology. Project tasks include the following: Identifying baseline energy analysis resources opportunities from a variety of DOE and utility stakeholders; Developing a smart home and business solution by leveraging existing utility programs working with Smart Homes Partners resources such as ACE IoT Solutions, Google Nest, and Ecobee; Developing improved smarter ventilation systems with industry ventilation partners such as the Madison Group; Developing improved building science QA/QC testing equipment with manufacturers such as The Energy Conservatory, and supporting other feasible concepts vetted under DOE’s Advanced Buildings Collaborative with Slipstream, reinventing HVAC in manufactured housing; and, Developing smart home short- and long-term viable technical solutions in coordination with Clayton Manufactured Homes in new and/or revitalized community scales for future Phase II prototype demonstrations, which may include design (and perhaps construction) of single-section homes targeting rental property developers and multi-section homes targeting low- to middle-income affordable housing community developers Given the ongoing US Department of Energy (DOE) rulemaking activities, baseline energy analysis assessments of envelope prescriptive and Uo (i.e., the overall thermal energy efficiency of the home in British thermal units per square foot of exterior heat loss/gain surfaces) measures were removed from the scope of Phase I of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

Proceedings of the Conference on the Design of Leak-tight Fluid Connectors

These technical papers were prepared for presentation at the Conference on Design of Leak-tight Fluid Connectors sponsored by the Society of Automotive Engineers and NASA/George C. Marshall Space Flight Center. This conference was planned to promote the direct exchange of technical information concerning separable, semipermanent and permanent leak-tight fluid connectors for space vehicle use. A conference emphasizing design of separable connectors was previously held on March 24 and 25, 1964. The papers represent a cross section of significant topics on design, testing and instrumentation. This exchange of technical information between government agencies and private industry is certain to benefit the nation's space effort and other fields of technology. The sponsors of the conference extend their thanks to all companies and individuals who have contributed toward this meeting.

Connector↗

Qualification plan for the ultraviolet spectrometer experiment (S-169), revision A

The qualification methods used to verify that the UVS hardware meets the technical requirements of the contract are defined. Included in this plan are test location, the qualification UVS to be tested, test objectives, and all tests required to verify that the UVS meets all performance and environmental requirements of the CEI specification. Additionally, environmental test conditions, testing time or cycles, allowable maintenance, logging requirements, manner of analysis, and utilization of test results, disposition of test specimens, failure criteria, retest requirements, facilities and support requirements, and the time phasing of the tests are presented.

Eckard, L. D., Jr.↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

Sustainable urban transformations based on integrated microgrid designs

The impacts of natural hazards on infrastructure, enhanced by climate change, are increasingly more severe emphasizing the necessity of resilient energy grids. Microgrids, tailored energy systems for specific neighbourhoods and districts, play a pivotal role in sustaining energy supply during main grid outages. These solutions not only mitigate economic losses and well-being disruptions against escalating hazards but also enhance city resilience in alignment with Sustainable Development Goal (SDG) 11. However, disregarding socioeconomic factors in defining microgrid boundaries risks perpetuating inequalities and impeding progress towards other SDG 11 targets, including fair democratic participation. Our approach integrates social and technical indicators to bolster urban microgrid planning. Through a case study in a US county, we illustrate how integrated microgrid planning effectively intertwines urban resilience, well-being and equity while promoting sustainable development. This study underscores the importance of integrated microgrid planning for sustainable and resilient urban transformation amid environmental and societal challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Complex Brownfields Case Study—The Former Bannister Federal Complex, Kansas City, Missouri

Abstract In November 2017, 225 acres (91 ha) of the former Bannister Federal Complex (BFC) in Kansas City, Missouri were transferred from the Federal Government to Bannister Transformation & Development, LLC (BTD), for demolition; environmental corrective measures; and preparation of the site for redevelopment. This presented a once‐in‐a‐lifetime opportunity to reconfigure groundwater remedies and address long‐standing soil contamination issues. The property included more than 40 previously‐identified Solid Waste Management Units, 3.9 million square feet (362,000 m 2 ) of buildings, subsurface utilities dating back to the 1940s, and an active groundwater containment system. Demolition of buildings and installation of an interim groundwater containment system began almost immediately after property transfer. In 2018, BTD substantially modified its project schedule to incorporate the construction of the first new buildings while demolition and remedial activities were ongoing. By October 2020, construction of the first new warehouse commenced while excavation and capping of contaminated soils, installation of a groundwater containment treatment systems, and abandonment of legacy utilities were still underway. Completion of this work, within the originally planned timeframe, was made possible by factors including up‐front multi‐year funding, early and ongoing engagement of regulators, an extended 3‐year due diligence program and planning stage, and establishment of well‐defined environmental targets. Both the soil and groundwater remedies were also designed with the flexibility needed to accommodate unknown conditions, changing schedules, and revisions to the regrading and redevelopment plans. This case study highlights key technical and management factors that led to the successful completion of this complex brownfields remediation project.

Water Resources↗

Least-cost Optimal Distribution Grid Expansion (LODGE) v1

LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate new loads and behind-the-meter DERs in combination with advanced non-wire alternative (NWA) planning solutions, such as utility-owned storage and distributed PV. Working with a set of least-cost solutions per feeder/substation allows us to benchmark and compare techno-economic performance of different traditional and NWA planning solutions. An important aspect of the LODGE model is that it includes power flow operation constraints. This means that the least-cost planning solutions delivered by LODGE are technically feasible. Available projects in LODGE portfolio include: 1) feeder reconductoring; 2) transformers upgrades; 3) non-wire alternatives, such as strategic siting and sizing of storage and distributed PV; 4) voltage regulators.

Heleno, Miguel↗

Building an EPA Class VI Permit Application

Summary To accelerate the commercialization of carbon capture and storage (CCS), the US Department of Energy (US DOE) is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Technology Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30-year period. The program, which was enacted before the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are to discuss (a) the injection permitting requirements of the CarbonSAFE projects; (b) information gathering in support of the permit; (c) the timelines of field development and permit-related activities; (d) the major technical components of the field development plan; and (e) early feedback from the regulators toward acceptance of the permit. In Mississippi, more than 30,000 acres have been characterized by six deep characterization wells, a deep groundwater well, and 92 line miles of 2D seismic as part of the CarbonSAFE Project ECO2S. During the acquisition of seismic data, all receiver lines were live, which resulted in the generation of a pseudo-3D seismic design. The incorporation of a 3D seismic survey was not included as part of this project due to logistical difficulties presented by the undulating, wooded surface terrain. A suite of openhole geophysical logs was taken from each well, allowing for a detailed interpretation of prospective storage reservoirs and confining intervals to complement the analysis carried out on the 290 ft of a whole core that was cut through the prospective confining zone and storage reservoir. The detailed geologic and reservoir data were assembled and entered into a 3D model to assess the injection capacity and the area of review (AoR). This information fed into the detailed corrective action, monitoring, testing, and postinjection site care (PISC) modeling. The results have been exceptional. The geologic assessment has revealed three primary storage targets, ranging in depth from 3,500 ft to 6,000 ft. These storage reservoirs net 1,300 ft of sandstone, with mean porosity and permeability of 29% and 3.6 darcies, respectively. Together, these reservoirs have storage capacities that may exceed 20 million tonnes per square mile, making this a gigatonne prospect. Forward modeling of the project resulted in an AoR of 16 sq miles, injecting about 8000 t/d, for 30 years, via two deep injection wells. The excellent confining characteristics of the caprock, relatively simple geologic structure, and lack of historical well drilling activity in this area provide excellent containment of the injected CO2. Based on this work, the project has proposed 20 years of PISC. To date, only two US CO2 injection permits have been granted. These projects relied on a singular capture point feeding a singular sequestration point (source to sink), and considerations have not been made to garner CO2 emissions from other industrial sources. The Kemper County Storage Complex is a first-of-its-kind storage hub concept that looks to develop an area capable of storing significant quantities of CO2 from the region. Also, this work will show how characterization efforts, geological and numerical modeling efforts, and plan development were constructed in support of permit and incentives acceptance.

Energy & Fuels↗

Updating Fission Yield Data for Applications (Summary Report)

The First Research Coordination Meeting of the CRP on “Updating Fission Yield Data for Applications” was held by video conference from 31 August to 4 September 2020 with more than 50 international experts from 16 countries attending the meeting. The CRP is devoted to evaluation efforts of cumulative and independent fission yields for incident energies from the thermal point up to 14 MeV on actinide targets. Produced fission yield evaluations should include full uncertainty quantification and are expected to combine available experimental data and state-of-art model information. Four working groups were created within the collaboration: 1) Availability of experimental fission product yield data for evaluations; 2) New fission product yield experimental data; 3) Fission product yield evaluation; and 4) Fission product yield validation. Technical discussions and the resulting work plan of the Coordinated Research Programme are summarized in this report.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Summary Report of the 1st RCM of the CRP on the Updating Fission Yield Data for Applications

The First Research Coordination Meeting of the CRP on “Updating Fission Yield Data for Applications” was held by video conference from 31 August to 4 September 2020 with more than 50 international experts from 16 countries attending the meeting. The CRP is devoted to evaluation efforts of cumulative and independent fission yields for incident energies from the thermal point up to 14 MeV on actinide targets. Produced fission yield evaluations should include full uncertainty quantification and are expected to combine available experimental data and state-of-art model information. Four working groups were created within the collaboration: 1) Availability of experimental fission product yield data for evaluations; 2) New fission product yield experimental data; 3) Fission product yield evaluation; and 4) Fission product yield validation. Technical discussions and the resulting work plan of the Coordinated Research Programme are summarized in this report.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Tug fleet and ground operations schedules and controls. Volume 2: part 1

This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

Source record↗

Development of advanced acreage estimation methods

The development of an accurate and efficient algorithm for analyzing the structure of MSS data, the application of the Akaiki information criterion to mixture models, and a research plan to delineate some of the technical issues and associated tasks in the area of rice scene radiation characterization are discussed. The AMOEBA clustering algorithm is refined and documented.

Guseman, L. F., Jr.↗

NAVEX: A space shuttle experiment with atomic clocks

A navigation and time transfer experiment (NAVEX) to be flown within the payload of the first German Spacelab mission D-1 is discussed. The objectives of the experiment are to synchronize distant ground stations with an accuracy of better than 10 nsec and to demonstrate one way ranging with an accuracy of better than 30 m. Spread spectrum signals are used and the related technique is tested. On board a Cs and a Rb clock is used. The relativistic effect of these clocks is about -25 microsec per day. On the ground at least two receiving stations and one transmitting-receiving station will be installed. The synchronization of the ground clocks by shuttle signals is compared to those achieved with clock transportations and with GPS measurements. A system description of this experiment is given containing details on the technical concept, the hardware and the planned data evaluation. The present state of the preparatory work is briefly reviewed.

Starker, S.↗