Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Aircraft System Noise of the NASA D8 Subsonic Transport Concept

A vehicle-level noise assessment has been performed for the NASA D8 (ND8) concept aircraft in the NASA Advanced Air Transport Technology Project portfolio. The NASA research-level Aircraft Noise Prediction Program was used to predict the noise from each source component on the ND8 to build up a noise estimate for the full aircraft. The propulsion airframe aeroacoustic effects of the ND8 (namely, boundary-layer ingestion, with its influence on fan noise; and the noise shielding, reflection, and diffraction mechanisms of the unconventional airframe) were empirically modeled using experimental data. Far-term noise reduction technology concepts were modeled and added to the noise prediction to evaluate the low-noise potential of the ND8 in the far-term timeframe. Results indicate that the increase in fan noise due to boundary-layer ingestion, as well as the lack of aft shielding, prevents the aircraft from approaching NASA’s noise goals for either the midterm or far term. The aircraft achieves margins to Stage 4 of only 9.4 and 17.3 effective perceived noise in decibels (EPNdB) in the midterm and far-term configurations, respectively, compared with goals of 32–42 EPNdB in the midterm and 42-52 EPNdB in the far term.

aircraft system noise↗

MarCO: Interplanetary Mission Development on a CubeSat Scale

Shortly after JPL’s Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) mission launches, separates, and commences its cruise phase, two CubeSats will deploy from the launch vehicle’s upper stage and begin independent flight to Mars (Fig. 1). During InSight’s entry, descent, and landing (EDL) sequence, these twin Mars Cube One (MarCO) spacecraft will fly 3,500 km above the Martian surface, recording and relaying InSight UHF radio data to the Deep Space Network (DSN) on Earth1. MarCO is a twin CubeSat mission developed by the NASA Jet Propulsion Laboratory (JPL) to accompany the InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) Mars mission lander. MarCO's primary mission objective is to launch with InSight and independently fly to Mars to serve as a communications relay during InSight's entry, descent, and landing (EDL) phase. MarCO represents a new type of deep space mission: CubeSats at Mars. Building on the development of JPL's first interplanetary CubeSat project, the Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment (INSPIRE), MarCO further refined the approach to hardware, software, and ground architecture development to solve the challenges of quickly building low-budget spacecraft to fly to Mars. The greatest constraint, beyond others typical of CubeSat missions, was time. The duration between MarCO's conception to completion of spacecraft assembly was less than two years - an unprecedented schedule for any planetary mission to date. Through necessity, MarCO has built on previous experience, procedures, systems, and development methodologies, defining a new niche for supporting larger primary missions. The MarCO spacecraft are poised to write a new chapter in deep space exploration. Originally slated to launch and reach Mars in 2016, the InSight mission schedule subsequently slipped to 2018. During the original landing of InSight, Earth would not be in view, and no orbiter around Mars would have been in position to both receive UHF EDL data and simultaneously relay it back to Earth. It was from this obstacle that MarCO was conceived. Regardless of any changes to InSight’s 2018 EDL configuration geometry, MarCO is still expected to fly and serve in the same capacity as originally designed: the first CubeSat mission to Mars. CubeSats have historically been firmly in the domain of universities and small companies. As first conceived, they served as a platform upon which to teach all aspects of the space mission lifecycle. JPL took on this mission type with Interplanetary Nano-Spacecraft Pathfinder in Relevant Environment2 (INSPIRE), moving the concept into a new domain: deep space. Building from the INSPIRE platform and lessons learned, MarCO addressed new challenges in the domain of planetary missions: independent interplanetary flight and navigation, integration with a large-scale mission, long-distance and long-delay communication, short development time, and a small development team. Of these, the greatest constraint was schedule: only 18 months passed from conception of mission concept until delivery of fully assembled and tested flight hardware. Careful selection of mission team, along with extensive use of off-the-shelf equipment, and streamlining automated processes, was essential. This achievement represents the next step in the evolution of CubeSats beyond low-Earth orbit.

Werne, Thomas↗

The role of scientists in developing Hubble Space Telescope

The objective of the Hubble Space Telescope Program is to build and operate a high-performance, fully-instrumented and long-lived optical observatory in earth orbit. Key Program elements are (1) a logistic strategy of Shuttle launch/maintenance and TDRSS communications, (2) overall responsibility at the MSFC Project for developing both the flight and ground systems, and (3) scientific participation in ST development and responsibility after launch for conducting the observing program. The ST Project is a management structure with a budget and schedule for delivering an ST system capable of achieving its established scientific objectives. The Project distributes through contracts the responsibility for supplying particular components, but retains the responsibility for system-level integrity. Scientists have set the performance objectives and now support the Project during the development stage by providing (1) PI management of the five Science Instruments, (2) continuing translations of scientific requirements into engineering specifications, (3) oversight of designs and performance tests, and (4) specific expertise on technical concerns.

Brown, R. A.↗

Ice Shelves and Landfast Ice on the Antarctic Perimeter: Revised Scope of Work

Ice shelves respond quickly and profoundly to a warming climate. Within a decade after mean summertime temperature reaches approx. O C and persistent melt pending is observed, a rapid retreat and disintegration occurs. This link was documented for ice shelves in the Antarctic Peninsula region (the Larsen 'A', 'B' and Wilkins Ice shelves) by the results of a previous grant under ADRO-1. Modeling of ice flow and the effects of meltwater indicated that melt pending accelerates shelf breakup by increasing fracture penetration. SAR data supplemented an AVHRR- and SSM/I-based image analysis of extent and surface characteristic changes. This funded grant is a revised, scaled-down version of an earlier proposal under the ADRO-2 NRA. The overall objective remains the same: we propose to build on the previous study by examining other ice shelves of the Antarctic and incorporate an examination of the climate-related characteristics of landfast ice. The study now considers just a few shelf and fast ice areas for study, and is funded for two years. The study regions are the northeastern Ross Ice Shelf, the Larsen 'B' and 'C' shelves, fast ice and floating shelf ice in the Pine Island Glacier area, and fast ice along the Wilkes Land coast. Further, rather than investigating a host of shelf and fast ice processes, we will home in on developing a series of characteristics associated with climate change over shelf and fast ice areas. Melt pending and break-up are the end stages of a response to a warming climate that may begin with increased melt event frequency (which changes both albedo and emissivity temporarily), changing firn backscatter (due to percolation features), and possibly increased rifting of the shelf surface. Fast ice may show some of these same processes on a seasonal timescale, providing insight into shelf evolution.

Scambos, Ted↗

The Building Blocks of Materials: Gathering Knowledge at the Molecular Level

Two start-up positions were created within SD46 to pursue developments in the rapidly expanding areas of biomineralization and nano-technology. As envisioned by Dr. Sandor Lehoczy, the new laboratories to be developed must have the capacity to investigate not only processes associated with the self-assembly of molecules but also the examination of self-assembled structures. For these purposes, laboratories capable of performing the intended function, particularly light scattering spectroscopy and atomic force microscopy were created. What follows then are recent advances arising from the development of these new laboratories. With the implementation of the Atomic Force Microscopy Facility, examples of investigations that determine a correlation between the molecular structure of materials and their macroscopic physical properties are provided. In addition, examples of investigations with particular emphasis on the physical properties of protein crystals, at the molecular level, and subsequent macroscopic characteristics are as provided. Finally, progress in fabrication of technology at the nano-scale levels at the developmental stage is also presented.

Source record↗

Application of Single Crystal Failure Criteria: Theory and Turbine Blade Case Study

The orientation of the single crystal material within a structural component is known to affect the strength and life of the part. The first stage blade of the High Pressure Fuel Turbopump (HPFTP)/ Alternative Turbopump Development (ATD), of the Space Shuttle Main Engine (SSME) was used to study the effects of secondary axis'orientation angles on the failure rate of the blade. A new failure criterion was developed based on normal and shear strains on the primary crystallographic planes. The criterion was verified using low cycle fatigue (LCF) specimen data and a finite element model of the test specimens. The criterion was then used to study ATD/HPFTP first stage blade failure events. A detailed ANSYS finite element model of the blade was used to calculate the failure parameter for the different crystallographic orientations. A total of 297 cases were run to cover a wide range of acceptable orientations within the blade. Those orientations are related to the base crystallographic coordinate system that was created in the ANSYS finite element model. Contour plots of the criterion as a function of orientation for the blade tip and attachment were obtained. Results of the analysis revealed a 40% increase in the failure parameter due to changing of the primary and secondary axes of material orientations. A comparison between failure criterion predictions and actual engine test data was then conducted. The engine test data comes from two ATD/HPFTP builds (units F3- 4B and F6-5D), which were ground tested on the SSME at the Stennis Space Center in Mississippi. Both units experienced cracking of the airfoil tips in multiple blades, but only a few cracks grew all the way across the wall of the hollow core airfoil.

Sayyah, Tarek↗

Chandra X-Ray Observatory Pointing Control System Performance During Transfer Orbit and Initial On-Orbit Operations

The Chandra X-ray Observatory (CXO, formerly AXAF) is the third of the four NASA great observatories. It was launched from Kennedy Space Flight Center on 23 July 1999 aboard the Space Shuttle Columbia and was successfully inserted in a 330 x 72,000 km orbit by the Inertial Upper Stage (IUS). Through a series of five Integral Propulsion System burns, CXO was placed in a 10,000 x 139,000 km orbit. After initial on-orbit checkout, Chandra's first light images were unveiled to the public on 26 August, 1999. The CXO Pointing Control and Aspect Determination (PCAD) subsystem is designed to perform attitude control and determination functions in support of transfer orbit operations and on-orbit science mission. After a brief description of the PCAD subsystem, the paper highlights the PCAD activities during the transfer orbit and initial on-orbit operations. These activities include: CXO/IUS separation, attitude and gyro bias estimation with earth sensor and sun sensor, attitude control and disturbance torque estimation for delta-v burns, momentum build-up due to gravity gradient and solar pressure, momentum unloading with thrusters, attitude initialization with star measurements, gyro alignment calibration, maneuvering and transition to normal pointing, and PCAD pointing and stability performance.

Quast, Peter↗

Electrochemical incineration of wastes

The disposal of domestic organic waste in its raw state is a matter of increasing public concern. Earlier, it was regarded as permissible to reject wastes into the apparently infinite sink of the sea but, during the last 20 years, it has become clear that this is environmentally unacceptable. On the other hand, sewage farms and drainage systems for cities and for new housing developments are cumbersome and expensive to build and operate. New technology whereby waste is converted to acceptable chemicals and pollution-free gases at site is desirable. The problems posed by wastes are particularly demanding in space vehicles where it is desirable to utilize treatments that will convert wastes into chemicals that can be recycled. In this situation, the combustion of waste is undesirable due to the inevitable presence of oxides of nitrogen and carbon monoxide in the effluent gases. Here, in particular, electrochemical techniques offer several advantages including the low temperatures which may be used and the absence of any NO and CO in the evolved gases. Work done in this area was restricted to technological papers, and the present report is an attempt to give a more fundamental basis to the early stages of a potentially valuable technology.

Kaba, L.↗

Space Launch System Booster Separation Supersonic Powered Testing with Surface and Off-Body Measurements

A wind tunnel test was run in the NASA Langley Unitary Plan Wind Tunnel simulating the separation of the two solid rocket boosters (SRB) from the core stage of the NASA Space Launch System (SLS). The test was run on a 0.9% scale model of the SLS Block 1B Cargo (27005) configuration and the SLS Block 1B Crew (28005) configuration at a Mach of 4.0. High pressure air was used to simulate plumes from the booster separation motors located at the nose and aft skirt of the two boosters. Force and moment data were taken on both SRBs and on the core stage. Schlieren still photos and video were recorded throughout testing. A set of points were acquired using Cross-correlation Doppler Global Velocimetry (CCDGV) readings to get 3 component velocity measurements between the core and the left-hand SRB. The CCDGV laser was utilized to record flow visualization in the same location, between the core and the left-hand SRB. Pressure Sensitive Paint data were taken on a separate set of runs. Computational Fluid Dynamics (CFD) runs were computed on a subset of the wind tunnel data points for comparison. A combination of the force/moment, CCDGV and Pressure Sensitive Paint (PSP) data (as well as schlieren images) at the CFD-specified test conditions will be used te the CFD simulations that will be used to build an SLS booster separation database flight conditions.

Winski, Courtney S.↗

Space Launch System Booster Separation Supersonic Powered Testing with Surface and Off-body Measurements

A wind tunnel test was run in the NASA Langley Unitary Plan Wind Tunnel simulating the separation of the two solid rocket boosters (SRB) from the core stage of the NASA Space LaunchSystem (SLS). The test was run on a 0.9% scale model of the SLS Block 1B Cargo (27005) configuration and the SLS Block 1B Crew (28005) configuration at a Mach of 4.0. The SRBs weremounted separately from the core, and could be pitched, yawed, and translated in the X, Y, andZ directions relative to the core. High pressure air was used to simulate plumes from the booster separation motors located at the nose and aft skirt of the two boosters. Force and moment data were taken on both SRBs and on the core stage. Schlieren still photos and video were recorded throughout testing. A set of points were acquired using Cross-correlation Doppler Global Velocimetry (CCDGV) readings to get 3 component velocity measurements between the core and the left-hand SRB. The CCDGV laser was utilized to record flow visualization in the same location, between the core and the left-hand SRB. Pressure Sensitive Paint (PSP) data were taken on a separate set of runs. Computational Fluid Dynamics (CFD) runs were computed on a subset of the wind tunnel data points for comparison. A combinationof the force and moment, CCDGV, and PSP data (as well as schlieren images) at the CFD-specified test conditions will be used to validate the CFD simulations that will be used to build an SLS booster separation database at flight conditions.

SLS↗

Large Payload Transportation and Test Considerations

Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure - roads, bridges, airframes, and buildings - necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider how large spacecraft are designed, and where they are manufactured, tested, or launched, could result in unforeseen cost to modify/develop infrastructure, or incur additional risk due to increased handling or elimination of key verifications. During test and verification planning for the Altair project, a number of transportation and test issues related to the large payload diameter were identified. Although the entire Constellation Program - including Altair - was canceled in the 2011 NASA budget, issues identified by the Altair project serve as important lessons learned for future payloads that may be developed to support national "heavy lift" strategies. A feasibility study performed by the Constellation Ground Operations (CxGO) project found that neither the Altair Ascent nor Descent Stage would fit inside available transportation aircraft. Ground transportation of a payload this large over extended distances is generally not permitted by most states, so overland transportation alone would not have been an option. Limited ground transportation to the nearest waterway may be permitted, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing (which includes hypergolic fuels, pyrotechnic devices, and high pressure gasses).

Rucker, Michelle A.↗

Refining the W1 and SE1 Facilities

The Engine Research Building (ERB) houses more than 60 test rigs that study all aspects of engine development. By working with Mary Gibson in the SE1 and W1A Turbine Facilities, I became aware of her responsibilities and better acquainted with the inner workings of the ERB. The SE1 Supersonic/Subsonic Wind Tunnel Facility contains 2 small wind tunnels. The first tunnel uses an atmospheric inlet, while the second uses treated 40-psig air. Both of the tunnels are capable of subsonic and supersonic operation. An auxiliary air supply and exhaust piping providing both test sections with suction, blowing, and crossfire capabilities. The current configuration of SE1 consists of a curved diffuser that studies the blockage along the endwalls. The W1A Low Speed Compressor Facility provides insight for the complex flow phenomena within its 4-stage axial compressor, sand the data obtained from W 1A is used to develop advanced models for fluid dynamic assessment. W1A is based off of a low speed research compressor developed by GE in the 1950's. This compressor has a removable casing treatment under rotor 1, which allows for various tip treatment studies. The increased size and low speed allows instrumentation to be located in the compressor s complex flow paths. Air enters the facility through a filtered roof vent, conditioned for temperature and turbulence, and then passed through the compressor W1A is described as a dynamic facility with many projects taking place simultaneously. This current environment makes it challenging to follow the various affairs that are taking place within the area. During my first 4 weeks at the NASA Glenn Research Center, I have assisted Mary Gibson in multiple tasks such as facility documents, record keeping, maintenance and upgrades. The facility has lube systems for its gearbox and compressor. These systems are critical in the successful operation of the facility. I was assigned the task of creating a facility estimate list, which included the filters and strainers required for the compressor. For my remaining time spent here, we expect to complete a facility parts listing and a virtual project summary so that W1A and SE1 will become ergonomic facilities that will make it easier for people to observe the capabilities and history of the area and the employees that operate. Bolstering our efforts in achieving these goal are the online technical tutorials, software such as Microsoft Excel. Macromedia Flash MX Macromedia Dreamweaver MX, Photoshop 6.0 and the assistance of several NASA employees.

Chambers, Rodney D.↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As NASA turns 60 and plans to transition the International Space Station (ISS) and other low-Earth orbit (LEO) activities to commercial enterprises, the Agency's human exploration program turns its focus to deep space. With missions planned to send astronauts back to the Moon and to construct a lunar orbiting Gateway for surface access as well as science experiments and technology demonstrations, NASA requires a vehicle with capabilities for launching more mass and volume than is currently commercially available. To that end, NASA and its private sector partners are building the Space Launch System (SLS) super heavy-lift launch vehicle, which will send the new Orion crew capsule, eventually with a complement of four astronauts, to cislunar space for the first time since the Apollo Program in the 1960s and 1970s. NASA Kennedy Space Center's (KSC's) Exploration Ground Systems (EGS) Program has upgraded and refurbished ground and launch facilities to process, assemble and launch NASA's new deep space exploration system, which is managed by the Exploration Systems Development (ESD) organization in the Human Exploration and Operations Mission Directorate (HEOMD). Offering an unmatched combination of power, payload capacity and departure energy, the evolvable SLS features the world's most proven propulsion system: solid rocket boosters and RS-25 main engines with a modified Delta Cryogenic Second Stage (DCSS) cryogenic upper stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) to trans-lunar injection (TLI). The second variant, Block 1B, will deliver at least 34 t to TLI in its crew configuration and at least 40 t to TLI in its cargo configuration. The Block 1 cargo vehicle will fly with an industry-standard 5 m fairing while the Block 1B cargo configuration will accommodate 8 m-diameter fairings in varying lengths. The Block 2 vehicle will incorporate upgraded boosters and possibly larger fairings for launching Mars-class payloads to deep space. Although designed to enable human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with access to deep space. Three flights of the Block 1 vehicle are now planned; the first vehicle, being built for a test flight known as Exploration Mission-1 (EM-1), is nearing completion at NASA and contractor sites across the United States. In fact, hardware for the second mission has also been built. This paper will provide an overview of the SLS vehicle, with a focus on its payload accommodations and the missions enabled by the unprecedented payload volume and departure energy of SLS. This paper also describes the status of the manufacturing and integration for first flight and beyond.

Exploration Mission-1↗

The end of the iron-core age.

The terrestrial planets aggregated essentially from small particles, to begin as solid cool bodies with the same general compositions, and there is no possibility of an iron-core developing within any of them at any stage. Their differing internal and surface properties receive ready explanation from their different masses which determine whether the pressures within are sufficient to bring about phase-changes. The claim that the terrestrial core can be identified by means of shock-wave data as nickel-iron is based on theoretical misconception, whereas the actual seismic data establish an uncompressed-density value much lower than any such mixture could have. The onset of the Ramsey phase-change in the earth takes the form of a rapid initial collapse to produce a large core in metallic state which thereafter continues to grow secularly as a result of radioactive heating and leads to reduction of surface-area at long last adequate to account for folded and thrusted mountain-building.

Lyttleton, R. A.↗

High-Resolution Mid-Infrared Molecular Line Survey of the Orion Hot Core

The basic building blocks of life are synthesized in space as part of the natural stellar evolutionary cycle, whereby elements ejected into the interstellar medium by dying stars are incorporated back into the dense clouds, which form the next generation of stars and planets. The formation of stars and planets are fundamental to the evolution of matter in the Universe as complex molecules are created and destroyed during this step. Understanding these processes will allow us to answer “What is the relation between the molecules we see in the ISM and the molecular inventory of Earth and the terrestrial planets in the Solar System?” Measuring and cataloging the inventory of organic molecules and understanding their evolution requires observations over a broad wavelength range (IR, MIR, FIR, (sub)mm, and radio) to cover all stages of this evolutionary cycle needed to link interstellar material to that delivered to planets. High-resolution molecular line surveys provide chemical inventories for star forming regions and are essential for studying their chemistry, kinematics and physical conditions. Previous high spectral resolution surveys have been limited to radio, sub-mm and FIR wavelengths; however, Mid-infrared observations are the only way to study symmetric molecules that have no dipole moment and thus cannot be detected in the (sub)mm line surveys from ALMA. Past midinfrared missions such as ISO and Spitzer had low to moderate resolving power that were only able to link broad features with particular molecular bands and could not resolve the individual rovibrational transitions. JWST will provide exceptional sensitivity in the MIR, but will also not have sufficient spectral resolution, which can lead to confusion in identifying the contribution from strong to moderate strength molecular species. We present new results from an on-going high resolution (R ~ 60,000) line survey of the Orion hot core between 12.5 - 28.3 μm and 7 - 8 μm, using the EXES instrument on the SOFIA airborne observatory. SOFIA's higher-resolution and smaller beam compared to ISO allows us to spatially and spectrally isolate the emission towards the hot core. This survey will provide the best infrared measurements (to date) of molecular column densities and physical conditions, providing strong constraints on the current chemical network models for star forming regions. This survey will greatly enhance the inventory of resolved line features in the MIR, making it an invaluable reference to be used by the JWST and ALMA scientific communities.

Rangwala, Naseem↗

MarCO: CubeSats to Mars in 2016

In March of 2016, the InSight lander will launch from Vandenberg Air Force Base to begin a 6.5 month cruise to Mars. Soon after InSight separates from the upper stage of the launch vehicle, the two MarCO CubeSats will deploy and independently fly to Mars to support telecommunications relay for InSight’s entry, descent, and landing sequence. These craft will have onboard capability for deep space trajectory correction maneuvers; high-speed direct-to-Earth & DSN-compatible communications; an advanced navigation transponder; a large deployable reflectarray high gain antenna; and a robust software suite. This paper will present preliminary information on the MarCO project, including a concept of operations and details of the CubeSats and subsystem design. MarCO will open the door for NanoSpacecraft to serve in support roles for much larger primary missions – in this case, providing a real-time relay of for the InSight project. It will also be the first CubeSats to reach deep space, building upon the lessons learned from the INSPIRE project. At only a 6U in size, these craft well illustrate the tremendous capability available in a small package.

Krajewski, Joel↗

NASA’s Space Launch System: Launch Capability for Lunar Exploration and Transformative Science

Excitement is building for the first launch of NASA’s Space Launch System (SLS), a unique exploration asset for the agency’s Artemis lunar program as well as for a new generation of science missions. SLS is designed for an array of missions beyond Earth’s orbit. The flexible system, which can be configured for Orion, cargo or Orion with co-manifested payload missions, offers high escape velocities to send more mass to deep space destinations. When configured with an 8.4 m-diameter fairing, SLS offers unmatched payload volume for human exploration and science missions. The initial Block 1 variant will insert at least 26 metric tons (t) to trans-lunar injection (TLI) and the more powerful Block 1B vehicle will launch 34-37 t to TLI using a new-development upper stage. Much of the initial SLS Block 1 vehicle is complete, including the upper stage and payload section, the core stage, engines and the solid rocket boosters. The first mission, Artemis I, launching from modernized and upgraded facilities at Kennedy Space Center (KSC), will be an uncrewed test flight of SLS, Orion and ground processing, with a primary objective of testing Orion’s heat shield at lunar re-entry velocity. Artemis I will have accommodations for 13 6U CubeSat payloads. These CubeSat missions will be deployed along the upper stage disposal trajectory after Orion separates from the vehicle. A rare opportunity for CubeSats to be deployed beyond low Earth orbit (LEO), Artemis I CubeSat missions range from searching for hydrogen and other volatiles on the lunar South Pole to studying the acceleration mechanisms of solar and interplanetary particles from a heliocentric trajectory. With manufacturing of the initial vehicle complete, fabrication and procurement is progressing for the second flight of SLS and Orion, Artemis II. Also an SLS Block 1 and Orion flight launching from KSC, Artemis II will mark the return of American astronauts to deep space with a lunar flyby-free return trajectory mission. With the Artemis III flight, NASA has the goal to land the first woman and the next man on the Moon. Infrastructure beyond SLS will be required for this effort, including elements of the lunar Gateway as well as lunar rovers, landers and additional commercially supplied launch services. SLS, as the only vehicle with the capability to lift 26 t of mass to TLI in its initial Block 1 variant, will remain a key component of this new-era exploration program. Future variants – Block 1B and Block 2 –will lift 34-45 t to TLI. This paper will discuss the status of testing and integration for the Artemis I vehicle, manufacturing progress for the second vehicle and the manifest outlook for primary, co-manifested and secondary payloads in the current deep space exploration environment.

Creech, Stephen D.↗

Effect of chemical heat release in a temporally evolving mixing layer

Two-dimensional numerical simulations of a temporally evolving mixing layer with an exothermic infinitely fast diffusion flame between two unmixed reactants have been carried out in the limit of zero Mach number to study the effect of the heat release on the early stages of the evolution of the flow. Attention has been directed to relatively large values of the oxidizer-to-fuel mass stoichiometric ratio typical of hydrocarbon flames, and initial vorticity distributions thicker than the temperature and species distributions have been chosen to mimic the situation at the outlet of a jet. The results show that, during the stages of the evolution covered by the present simulations, enhancement of combustion occurs by local stretching of the flame without much augmentation of its area. The rate of product generation depends strongly on the initial conditions, which suggests the possibility of controlling the combustion by acting on the flow. Rollup and vortex amalgamation still occur in these reacting flows but are very much affected by the production of new vorticity by baroclinic torques. These torques lead to counter rotating vortex pairs around the flame and, more importantly, in thin layers of light fluid that leave the vicinity of the flame when the Kelvin-Helmholtz instability begins to develop. Propelled by the vortex pairs, these layers wind around, split on reaching high pressure regions, and originate new vortex pairs in a process that ends up building large-scale vortices with a vorticity distribution more complex than for a constant density fluid.

Higuera, F. J.↗