Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Spacecraft Telemetry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Autonomous Satellite Command and Control through the World Wide Web: Phase 3

NASA's New Millenium Program (NMP) has identified a variety of revolutionary technologies that will support orders of magnitude improvements in the capabilities of spacecraft missions. This program's Autonomy team has focused on science and engineering automation technologies. In doing so, it has established a clear development roadmap specifying the experiments and demonstrations required to mature these technologies. The primary developmental thrusts of this roadmap are in the areas of remote agents, PI/operator interface, planning/scheduling fault management, and smart execution architectures. Phases 1 and 2 of the ASSET Project (previously known as the WebSat project) have focused on establishing World Wide Web-based commanding and telemetry services as an advanced means of interfacing a spacecraft system with the PI and operators. Current automated capabilities include Web-based command submission, limited contact scheduling, command list generation and transfer to the ground station, spacecraft support for demonstrations experiments, data transfer from the ground station back to the ASSET system, data archiving, and Web-based telemetry distribution. Phase 2 was finished in December 1996. During January-December 1997 work was commenced on Phase 3 of the ASSET Project. Phase 3 is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer; (2) Support prioritized handling of multiple PIs as well as associated payload experimenters; (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft; (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware; (5) Implement a beacon monitoring test; (6) Implement an experimental blackboard controller for space system management; (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals is examined in the next section. Significant sections of this report were also published as a conference paper.

Cantwell, Brian↗

Checking the parameters of AFS in spacecraft in flight

The use of elements for remote testing of matching of on-board spacecraft antennas, required by the need to receive timely telemetry information on the quality of operation of antenna-feeder systems (AFS) during long flights, is discussed. Information on the traveling wave ratio deficiency to the AFS allowed improvement of quality and reliability of communications with spacecraft and developed telemetric information on the matching of on-board antennas, the efficiency of the feeder system and power of transmitters during long flights.

Vlasov, Y. A.↗

Thermal Analysis and Correlation of the Mars Odyssey Spacecraft's Solar Array During Aerobraking Operations

The Mars Odyssey spacecraft made use of multipass aerobraking to gradually reduce its orbit period from a highly elliptical insertion orbit to its final science orbit. Aerobraking operations provided an opportunity to apply advanced thermal analysis techniques to predict the temperature of the spacecraft's solar array for each drag pass. Odyssey telemetry data was used to correlate the thermal model. The thermal analysis was tightly coupled to the flight mechanics, aerodynamics, and atmospheric modeling efforts being performed during operations. Specifically, the thermal analysis predictions required a calculation of the spacecraft's velocity relative to the atmosphere, a prediction of the atmospheric density, and a prediction of the heat transfer coefficients due to aerodynamic heating. Temperature correlations were performed by comparing predicted temperatures of the thermocouples to the actual thermocouple readings from the spacecraft. Time histories of the spacecraft relative velocity, atmospheric density, and heat transfer coefficients, calculated using flight accelerometer and quaternion data, were used to calculate the aerodynamic heating. During aerobraking operations, the correlations were used to continually update the thermal model, thus increasing confidence in the predictions. This paper describes the thermal analysis that was performed and presents the correlations to the flight data.

Dec, John A.↗

Command and data handling for Atmosphere Explorer satellite

The command and data-handling subsystem of the Atmosphere Explorer satellite provides the necessary controls for the instrumentation and telemetry, and also controls the satellite attitude and trajectory. The subsystem executes all command information within the spacecraft, either in real time (as received over the S-band command transmission link) or remote from the command site (as required by the orbit operations schedule). Power consumption in the spacecraft is optimized by suitable application and removal of power to various instruments; additional functions include control of magnetic torquers and of the orbit-adjust propulsion subsystem. Telemetry data from instruments and the spacecraft equipment are formatted into a single serial bit stream. Attention is given to command types, command formats, decoder operation, and command processing functions.

Fuldner, W. V.↗

Thermal Response of the Mars Science Laboratory Spacecraft During Entry, Descent and Landing

NASA’s Mars Science Laboratory (MSL) spacecraft successfully performed its Entry, Descent & Landing (EDL) phase on August 6, 2012. This paper presents the thermal response of the MSL spacecraft from EDL Initialization (5 days prior to Entry) to Rover touchdown on the surface of Mars. Temperature telemetry recorded during EDL is used to reconstruct the thermal response of the spacecraft to each EDL event. Temperature profiles for the Descent Stage and Rover hardware are presented and explained in the context of the changing EDL environments (aerothermal heating and convective cooling) and power states.

Novak, Keith S.↗

Realtime Knowledge Management (RKM): From an International Space Station (ISS) Point of View

We are developing automated methods to provide realtime access to spacecraft domain knowledge relevant a spacecraft's current operational state. The method is based upon analyzing state-transition signatures in the telemetry stream. A key insight is that documentation relevant to a specific failure mode or operational state is related to the structure and function of spacecraft systems. This means that diagnostic dependency and state models can provide a roadmap for effective documentation navigation and presentation. Diagnostic models consume the telemetry and derive a high-level state description of the spacecraft. Each potential spacecraft state description is matched against the predictions of models that were developed from information found in the pages and sections in the relevant International Space Station (ISS) documentation and reference materials. By annotating each model fragment with the domain knowledge sources from which it was derived we can develop a system that automatically selects those documents representing the domain knowledge encapsulated by the models that compute the current spacecraft state. In this manner, when the spacecraft state changes, the relevant documentation context and presentation will also change.

Robinson, Peter I.↗

The 1973 Mariner mission to Venus and Mercury. II

The heart of the spacecraft downlink is the flight data subsystem (FDS). The FDS combines the functions of science and engineering measurement control. The FDS can generate six principal telemetry formats, each of which may be transmitted directly to earth. Spacecraft engineering subsystems are considered, giving attention to the power subsystem, the attitude control subsystem, the propulsion subsystem, devices for temperature control, and the tracking subsystem. The mission operations system is also discussed together with the flight plan.

Hooke, A. J.↗

Viking mission support

The relatively quiet Viking On Board Science & Telemetry period from November 15, 1976, through December 31, 1976, is discussed, when Mars and the Viking spacecraft were in the Solar conjunction period. The period therefore presented the Viking Radio Science Team with a unique opportunity to utilize the DSN and Viking spacecraft to exercise their experiments with nonstandard station configurations, without the usual command and telemetry constraints.

Johnston, D. W. H.↗

The proposed coding standard at GSFC

As part of the continuing effort to introduce standardization of spacecraft and ground equipment in satellite systems, NASA's Goddard Space Flight Center and other NASA facilities have supported the development of a set of standards for the use of error control coding in telemetry subsystems. These standards are intended to ensure compatibility between spacecraft and ground encoding equipment, while allowing sufficient flexibility to meet all anticipated mission requirements. The standards which have been developed to date cover the application of block codes in error detection and error correction modes, as well as short and long constraint length convolutional codes decoded via the Viterbi and sequential decoding algorithms, respectively. Included are detailed specifications of the codes, and their implementation. Current effort is directed toward the development of standards covering channels with burst noise characteristics, channels with feedback, and code concatenation.

Morakis, J. C.↗

Evolution of the satellite telemetry data processing facility at the Goddard Space Flight Center.

Data from scientific and application satellites managed by the NASA Goddard Space Flight Center are acquired through the world-wide Spacecraft Tracking and Data Network (STDN). These data are forwarded to a central telemetry data processing facility whose primary objective is the timely provision of the data to users in a form suitable for their analysis. In a successful evolution, a satellite data processing facility must adapt to changing support requirements while operationally supporting active spacecraft. Advances in the technology of data transmission, data storage systems, and file management make it feasible to implement a third-generation system which will be able to satisfy experimenter requirements for the next ten years.

Keipert, F. A.↗

Mission operations technology

Developments in the area of spacecraft operations are examined that can be utilized in mission and spacecraft designs to enhance the efficiency of planetary and other mission operations. The technology enhancements described address four major systems: the spacecraft, the tracking and data system, the spaceflight operations center, and the flight projects. Specific technological advances are detailed in the areas of telemetry monitoring and fault analysis, scheduling systems, and scientific data analysis. The Spacecraft Health Automated Reasoning Prototype and the Engineering Analysis Subsystem Environment can provide real-time monitoring and analysis with limited workforce resources. The Multimission Automation for Real-time Verification of Spacecraft Engineering Link, the Operation Mission Planner, and the Sky Image Classification and Archiving Tool are other examples of systems developed by NASA that enhance operations technology by reducing the need for human input.

Varsi, Giulio↗

ESSOPE: Towards S/C operations with reactive schedule planning

The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

Wheadon, J.↗

The impact of robots on planetary mission operations

Unmanned roving vehicles sent to explore remote planetary surfaces must carry out some of their tasks without step-by-step human control. To realize the benefits that accrue from such semiautonomous machines, current planning (and carrying out) of mission profiles will be subject to some changes. Specifically, it is shown that mission profiles will have to be based on tasks or functions rather than sequences of timed events, while scientists will have to center their attention on instrument control. Present ideas concerning spacecraft safety, testing (and simulation) of vehicle performance, telemetry design, and ground station equipment must be reexamined.

Hooke, A. A.↗

ATS-6 - Spacecraft Attitude Precision Pointing and Slewing Adaptive Control Experiment

The primary objective of the Spacecraft Attitude Precision Pointing and Slewing Adaptive Control (SAPPSAC) experiment is to establish feasibility and evaluate capabilities of a ground-based spacecraft attitude control system, wherein RF command and telemetry links, together with a ground station on-line minicomputer, perform closed loop attitude control of the Applications Technology Satellite-6 (ATS-6). The ground processor is described, including operational characteristics and the controller software. Attitude maneuvers include precision pointing to fixed targets, slewing between targets, and generation of prescribed ground tracks. Test results show high performance and reliability for over 30 hours of on-line control with no serious anomalies. Attitude stabilization relative to a prescribed target has been achieved to better than 0.007 deg in pitch and roll and 0.02 deg in yaw for a period of 43 min. Ground tracks were generated which had maximum latitude/longitude deviations less than 0.15 deg from reference.

Isley, W. C.↗