Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Solution verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

406 records · Page 23

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗

Dissertation Proposal: Innovations in Pulsed Power and Plasma Science Theory Simulation and Experiment

Pulsed power and plasma physics are topics of great study at both Sandia National Laboratories (SNL or Sandia) and the University of New Mexico (UNM). The goal of this research is to further knowledge and understanding of these fields using the resources of both SNL and UNM in three ways. The first way is through the comprehension, application, and testing of theory. Reading and analytically deriving theoretical solutions of problems both real-world and simplified will allow for a fresh perspective and the furthering of the theory. One such theory is Ottinger's generalized theory for voltage measurement in magnetically insulated transmission lines (MITLs). By working through the math, a deeper understanding of the theory is gained from which one may add more physically accurate and/or more detailed physics into the theory. Additionally, understanding the theory lays a good foundation from which one can analyze, test, and compare results to the theory in the following two ways that will advance the fields of pulsed power and plasma physics. The second way is through the modeling and simulation of real-world and simplified problems that utilize and test the afore mentioned theories. Theory can be applied to a simulation domain by using the unstructured time-domain electromagnetic (UTDEM) codes EMPHASIS and EMPIRE as well as the physical modeling software CUBIT, all of which were developed at SNL. Problems such as the modeling and design of the extended MITL on HERMES III, the understanding of space-charge-limited emission from vacuum cathodes, and the interaction between a relativistic electron beam and an ideal gas can all be modeled, simulated, and analyzed with this set of codes. Here the advantage is three-fold. Firstly, theory that describes our understanding of these problems can be put to the test and advanced through iterative simulation and analysis. Secondly, the understanding of these problems will have a positive impact on national security through the advancement of the technological capability of the United States of America. Thirdly, and not unrelated to the prior advantage, is the validation and verification of EMPIRE and EMPHASIS. This segues into the third way, which is through experiment and the comparison of experiment to simulated and theoretical results. Performing experimental comparisons completes the scientific method and grounds all of the work in reality. Being able to physically test theory and simulation is necessary for any real conclusions to be drawn. Another advantage for carrying out experimental work is to advance the physical testing capabilities of SNL. Several systems will be developed and tested through the course of this work that positively impact technological advancement of Sandia National Labs. Lastly, all of the above work will converge to yield a well-rounded perspective that ties the three categories of research together.

42 ENGINEERING↗

Development, Implementation, and Verification of Partially-Ionized Collisional Multifluid Plasma Models in Drekar

We consider the development of multifluid models for partially ionized multispecies plasmas. The models are composed of a standard set of five-moment fluid equations for each species plus a description of electromagnetics. The most general model considered utilizes a full set of fluid equations for each charge state of each atomic species, plus a set of fluid equations for electrons. The fluid equations are coupled through source terms describing electromagnetic coupling, ionization, recombination, charge exchange, and elastic scattering collisions in the low-density coronal limit. The form of each of these source terms is described in detail, and references for required rate coefficients are identified for a diverse range of atomic species. Initial efforts have been made to extend these models to incorporate some higher-density collisional effects, including ionization potential depression and three- body recombination. Some reductions of the general multifluid model are considered. First, a reduced multifluid model is derived which averages over all of the charge states (including neutrals) of each atomic species in the general multifluid model. The resulting model maintains full consistency with the general multifluid model from which it is derived by leveraging a quasi-steady-state collisional ionization equilibrium assumption to recover the ionization fractions required to make use of the general collision models. Further reductions are briefly considered to derive certain components of a single-fluid magnetohydrodynamics (MHD) model. In this case, a generalized Ohm's law is obtained, and the standard MHD resistivity is expressed in terms of the collisional models used in the general multifluid model. A number of numerical considerations required to obtain robust implementations of these multifluid models are discussed. First, an algebraic flux correction (AFC) stabilization approach for a continuous Galerkin finite element discretization of the multifluid system is described in which the characteristic speeds used in the stabilization of the fluid systems are synchronized across all species in the model. It is demonstrated that this synchronization is crucial in order to obtain a robust discretization of the multifluid system. Additionally, several different formulations are considered for describing the electromagnetics portion of the multifluid system using nodal continuous Galerkin finite element discretizations. The formulations considered include a parabolic divergence cleaning method and an implicit projection method for the traditional curl formulation of Maxwell's equations, a purely- hyperbolic potential-based formulation of Maxwell's equations, and a mixed hyperbolic-elliptic potential-based formulation of Maxwell's equations. Some advantages and disadvantages of each formulation are explored to compare solution robustness and the ease of use of each formulation. Numerical results are presented to demonstrate the accuracy and robustness of various components of our implementation. Analytic solutions for a spatially homogeneous damped plasma oscillation are derived in order to verify the implementation of the source terms for electromagnetic coupling and elastic collisions between fluid species. Ionization balance as a function of electron temperature is evaluated for several atomic species of interest by comparing to steady-state calculations using various sets of ionization and recombination rate coefficients. Several test problems in one and two spatial dimensions are used to demonstrate the accuracy and robustness of the discretization and stabilization approach for the fluid components of the multifluid system. This includes standard test problems for electrostatic and electromagnetic shock tubes in the two-fluid and ideal shock-MHD limits, a cylindrical diocotron instability, and the GEM challenge magnetic reconnection problem. A one-dimensional simplified prototype of an argon gas puff configuration as deployed on Sandia's Z-machine is used as a demonstration to exercise the full range of capabilities associated with the general multifluid model.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MOOSE Framework Meshing Enhancements to Support Reactor Analysis

MOOSE-based physics codes require an input finite element mesh on which the physics solution is calculated, reported, and transferred to other physics codes. The use of difficult-touse, external licensed software is often required to generate high quality meshes for reactor geometries. High-fidelity geometry modeling also requires elaborate tracking of groups of elements for material property assignment and output reporting which can be considerably complex for the user to identify and maintain. Under the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, several meshingrelated enhancements have been developed for the MOOSE framework to address user challenges in creating finite element meshes for advanced reactor geometries. MOOSE mesh generators have been developed to mesh hexagonal geometries (pins, ducted assemblies, and cores) commonly found in liquid-metal cooled fast reactor concepts. The mesh generator used for hexagonal pin cells is generic for regular polygons and therefore may also be used for Cartesian pin cells. Hexagonal pin cells can be stitched into ducted assemblies, and assemblies can be stitched together into a core. The user may specify region ids, region names, and other preferences on the mesh. This control is useful for later material mapping in the MOOSE-based physics codes input. A capability was also developed for meshing rotating control drums including determination of material volume fractions in each mesh element as a function of time. Control drum meshes may be stitched to other hexagonal assemblies to create a core configuration. Additional mesh generators were developed that wrap around the hexagonal meshing capabilities and utilize “extra element integer” ID values on each element. In regular Cartesian or hexagonal assemblies or cores, the bookkeeping of element groups for both material assignment and output reporting can now be automated through assignment of pin, assembly, core, axial and depletion id values stored as extra element integers. The extra element tags on the mesh greatly speed the reactor analyst’s efforts to map materials to meshes, track depletion zones, and parse output such as axial pin power distributions. At the highest level, pin, assembly, and core mesh generators (with this reactor terminology) have also been developed to easily generate regular Cartesian and hexagonal cores, including axial extrusion. These reactor geometry builders call upon the previously mentioned capabilities to produce analysis-ready 3D meshes including material assignments. Open source mesh triangulation capabilities were also investigated for integration into the MOOSE framework to address the need for meshing the core periphery region which extends from the irregular outer assembly border to a cylindrical boundary. Options are limited due to licensing constraints, and the recommendation is pursue building a native MOOSE Delaunay triangulator routine with full functionality. Finally, a series of verification problems were performed with NEAMS physics tools. All developed capabilities will be available in the new open-source “Reactor” module of the MOOSE framework, which is accessible to any MOOSE-based NEAMS physics tool.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Gas-Gap Calorimeter Sizing and Rating Tools for Heat Pipe Experimentation

Effective gas-gap calorimeter sizing and rating tools are required to design calorimeters that enable well-defined operating conditions, high cooling powers, and accurate calorimetry. The present report describes two tools utilizing Microsoft Excel and MathWorks MATLAB that enable the sizing and rating of gas-gap calorimeters with a He-Ar binary gas mixture in the gap. The Excel tools are two easy-to-use spreadsheets for calculating heat pipe operating temperature or He-Ar mole fractions given the required inputs. The MATLAB tool includes similar models with more robust solution algorithms along with sub-options for full-vacuum, static gas-gap, and forced circulation in the gas-gap. The accuracy of the developed tools were demonstrated by comparing with existing work in literature. The MATLAB tool was used for a parametric study to determine the gas-gap thickness, coolant gap thickness, coolant flow rate, and coolant inlet temperatures for the testing of a 3/4 in outer diameter heat pipe up to powers of 10 kW and temperatures of 1,000°C. The effects of heat pipe and calorimeter inner shell surface emissivities were investigated, considering the inability to control or accurately measure surface emissivities in most applications. It was found that controlling the He-Ar mole fractions provides a wide operating range for gas-gap thicknesses around ~ 0.042--0.090 in (~ 1.07--2.29 mm) for a surface emissivity range of 0.4--0.8, since conduction heat transfer is a significant fraction of the heat transfer across the gas-gap. In addition, it was found that turbulent flow in the coolant gap is needed at high input powers to prevent shell temperatures from approaching the boiling temperature of the water coolant. The parametric study resulted in choosing stainless steel tubes with an outer diameter and thickness of 1 x 0.065 in as the inner shell, and a 1-1/2 x 0.156 in as the outer shell of the calorimeter. Overall, this report presents the necessary information for the sizing and rating of gas-gap calorimeters with He-Ar mixtures for the testing of high-temperature heat pipes (~ 500--1,000°C).

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Case Study: Field Evaluation of a Low-Cost Circuit-Level Electrical Submetering System

Circuit-level metering technologies provide the ability to monitor individual circuits within an electrical panel in a building, providing detailed power and energy consumption data at a much more granular level than was previously achievable in a cost-effective manner. While the fundamental hardware components of circuit-level—split-core current transformers (CTs) and power monitoring meters—have existed for some time, the new offerings in the market have tightly integrated these components, lower costs, and have streamlined data organization, transport, and access via software solutions accessible through web and application programming interfaces (API). NREL evaluated Meazon’s single-circuit metering system. The evaluation of the equipment under test (EUT) focused on three aspects: (1) accuracy of the data provided by the system, (2) ease of installation of this technology and ease of data integration into existing U.S. General Services Administration (GSA) analytics platforms, and (3) total cost of ownership and cost-effectiveness of the technology. The metering technology was tested in a field deployment where it was installed in low and high-voltage commercial electrical panels in the César E. Chávez Memorial Building in Denver, Colorado. The goals were to assess the metering accuracy, the ease of installation and data retrieval, and the total cost of ownership and cost-effectiveness. This technology proved easy to install by a certified electrician who completed the install of 6 meters in 2 separate panels (120/208 V and 277/480 V) and 2 circuit disconnects (along with associated commissioning) at the César E. Chávez Memorial Building in less than one day. The technology was installed in high- and low-voltage panels and with limited space in the electrical room, demonstrating the applicability of this technology to almost all commercial buildings in the GSA portfolio. Primary considerations for this technology include appropriate sizing of CTs for each circuit, selection of loads/circuits/panels that are of high value for detailed submetering (e.g., tailored for high-load devices), and how GSA would like to integrate these data with its existing energy management infrastructure. Through the field evaluation, we demonstrated data integration from the vendor system into the primary software component on the GSA enterprise-level energy management and information system, GSA Link. Data from the circuit-level metering were integrated into this platform and used to perform FDD. This demonstrated the ability of the EUT to augment existing energy management and information systems in buildings where GSA Link is deployed and provides a pathway for delivering FDD at other buildings throughout the portfolio.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗