Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Rapid Start-up and Loading of an Attached Growth, Simultaneous Nitrification/Denitrification Membrane Aerated Bioreactor

Membrane aerated bioreactors (MABR) are attached-growth biological systems used for simultaneous nitrification and denitrification to reclaim water from waste. This design is an innovative approach to common terrestrial wastewater treatments for nitrogen and carbon removal and implementing a biologically-based water treatment system for long-duration human exploration is an attractive, low energy alternative to physiochemical processes. Two obstacles to implementing such a system are (1) the "start-up" duration from inoculation to steady-state operations and (2) the amount of surface area needed for the biological activity to occur. The Advanced Water Recovery Systems (AWRS) team at JSC explored these two issues through two tests; a rapid inoculation study and a wastewater loading study. Results from these tests demonstrate that the duration from inoculation to steady state can be reduced to under two weeks, and that despite low ammonium removal rates, the MABRs are oversized.

Meyer, Caitlin E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

International Space Station Lithium-Ion Battery Start-Up

International Space Station Lithium-Ion Battery Start-Up.The International Space Station (ISS) primary Electric Power System (EPS) was originally designed to use Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the space station is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries are designed to operate at a 35 depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. As the oldest of the 48 Ni-H2 battery Orbital Replacement Units (ORUs) has been cycling since September 2006, these batteries are now approaching their end of useful life. In 2010, the ISS Program began the development of Lithium-Ion (Li-ion) batteries to replace the Ni-H2 batteries and concurrently funded a Li-Ion ORU and cell life testing project. The first set of 6 Li-ion battery replacements were launched in December 2016 and deployed in January 2017. This paper will discuss the Li-ion battery on-orbit start-up and the status of the Li-Ion cell and ORU life cycle testing.

Lithium-Ion↗

Vector Radiative Transfer Code SORD: Performance Analysis and Quick Start Guide

We present a new open source polarized radiative transfer code SORD written in Fortran 9095. SORD numerically simulates propagation of monochromatic solar radiation in a plane-parallel atmosphere over a reflecting surface using the method of successive orders of scattering (hence the name). Thermal emission is ignored. We did not improve the method in any way, but report the accuracy and runtime in 52 benchmark scenarios. This paper also serves as a quick start users guide for the code available from ftp:maiac.gsfc.nasa.govpubskorkin, from the JQSRT website, or from the corresponding (first) author.

polarized radiative transfer↗

Method and apparatus for starting supersonic compressors

A supersonic gas compressor with bleed gas collectors, and a method of starting the compressor. The compressor includes aerodynamic duct(s) situated for rotary movement in a casing. The aerodynamic duct(s) generate a plurality of oblique shock waves for efficiently compressing a gas at supersonic conditions. A convergent inlet is provided adjacent to a bleed gas collector, and during startup of the compressor, bypass gas is removed from the convergent inlet via the bleed gas collector, to enable supersonic shock stabilization. Once the oblique shocks are stabilized at a selected inlet relative Mach number and pressure ratio, the bleed of bypass gas from the convergent inlet via the bypass gas collectors is effectively eliminated.

42 ENGINEERING↗

Method for controlling start-up and steady state performance of a closed split flow recompression brayton cycle

A method of resolving a balanced condition that generates control parameters for start-up and steady state operating points and various component and cycle performances for a closed split flow recompression cycle system. The method provides for improved control of a Brayton cycle thermal to electrical power conversion system. The method may also be used for system design, operational simulation and/or parameter prediction.

42 ENGINEERING↗

Pulsed start-up system for electrostatic generators

A new rotor start-up system is provided for application to rotating systems such as stationary or vehicular electromechanical battery systems. An embodiment of the system consists of a "locator" that includes a stationary permanent-magnet pole above which is a circular ferromagnetic (e.g., iron) strip embedded in the lower, inner edge of the flywheel rotor. The lower edge of this strip is wave-like so that the magnet can pull the rotor around to a position where the position relative to the minimum capacity between the rotor and stator electrodes is such as to launch the rotor in a chosen direction, i.e., either clock-wise or counter-clockwise. Startup from rest is then accomplished by applying a short high-voltage ac or dc pulse to the EMB capacitor.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Pulsed start-up system for electrostatic generators

A new rotor start-up system is provided for application to rotating systems such as stationary or vehicular electromechanical battery systems. An embodiment of the system consists of a “locator” that includes a stationary permanent-magnet pole above which is a circular ferromagnetic (e.g., iron) strip embedded in the lower, inner edge of the flywheel rotor. The lower edge of this strip is wave-like so that the magnet can pull the rotor around to a position where the position relative to the minimum capacity between the rotor and stator electrodes is such as to launch the rotor in a chosen direction, i.e., either clock-wise or counter-clockwise. Startup from rest is then accomplished by applying a short high-voltage ac or dc pulse to the EMB capacitor.

42 ENGINEERING↗

Cold start strategy and system for gasoline direct injection compression ignition engine

A method for starting a compression ignition engine having at least one cylinder with a reciprocating piston located therein, an intake valve configured to control the intake of air to an intake port of the cylinder and an exhaust valve configured to control the expulsion of gas from an exhaust port of the cylinder. The method includes the steps of: cranking the engine, conditioning intake air at the intake port of the cylinder to raise the temperature of air in the cylinder, controlling a valve timing the intake valve and/or the exhaust valve to allow the piston to compress the air within the cylinder, thereby increasing the temperature of the air within the cylinder, and injecting fuel into the cylinder when the air within the cylinder has been heated to a temperature sufficient to support compression ignition of a gasoline and air mixture within the cylinder.

Sellnau, Mark C.↗

Semiconductor topologies and devices for soft starting and active fault protection of power converters

Various examples are provided related to semiconductor topologies and devices that can be used for soft starting and active fault protection of power converters. In one example, an active switch device includes an active switch having a gating control input; and a thyristor having a gating control input. The thyristor is coupled in parallel with the active switch. The active switch can be an IGBT, MOSFET, or other appropriate device. In another example, a power converter can include the active switch devices and switching control circuitry coupled to gating control inputs of the active switch devices.

Beddingfield, Richard B.↗

Slag Degassing for Electroslag Remelting Using Cold Start

The effect of slag degassing prior to cold start electroslag remelting (ESR) was investigated using various heat treatments of a commercial 40CaF2 – 30CaO – 30Al2O3 slag. The slag was either degassed in a vacuum heat treatment furnace or in a box furnace in air. Vacuum heat treatment included partial pressure of Ar gas. Several temperatures, ramp rates and/or holding times were investigated for each condition and the pressure was monitored for the heat treatment in the furnace with controlled atmosphere. A research scale 200 kg capacity ESR furnace was used for the experiments along with 1018 steel and 316 stainless steel electrodes. Significant differences in ingot quality were related to the sidewall and the presence of pores which were primarily located near the bottom of the ingot. Adjustments in the heat treatment temperature for heat treatment in air eventually led to an ingot quality near that obtained using slag degassed under vacuum and/or in a controlled atmosphere.

Detrois, Martin↗

PHIL Validation of Ultracapacitor Storage for Black Start Application

A deck of slides that present the modeling, and calibration to conduct PHIL test of ultracapacitor energy storage system. The PHIL test has been done while preparing for the black start field demonstration with Idaho Falls Power. Presentation is invited to the 6th International Workshop on Grid Simulator Testing of Wind Turbine Power Trains and Other Renewable Technologies.

13 HYDRO ENERGY↗

Beyond New START: Two Forecasts for Future Russian-US Arms Control

A world without the New START Treaty (NST) or treaty-based strategic arms control cannot simply be categorised as ‘unacceptable’.1 That world is possible. It has been increasing in likelihood for some time and thus it must be both understood and anticipated. Furthermore, the NST will expire on 5 February 2026 and it could disappear much sooner, depending on the actions of either Russia or the United States. No amount of positive thinking on the value of strategic arms control or talking points about the importance of the treaty can change its status as a hostage in the broader bilateral relationship.

Political science↗

Black start demonstrations of small hydropower plants with energy storage

The U.S. has at least 500 municipal, electric co-operative, and publicly owned utilities with hydropower plants. These are mostly grid-connected to support the national grid. However, due to small size (at most 10 MW) and low ramping capacity, many of these hydropower plants lack the capability to form local grids to provide backup power to critical loads (during grid outage) and rural areas. Energy storage, such as Li-Ion batteries or ultracapacitors, can be used to enable these capabilities. Because this technology is relatively new, proof-of-concept demonstrations are needed to de-risk the approach before it can be deployed at scale. Two field demonstrations have been performed to validate this approach, namely, a 375 kVA / 1.24 kWh ultracapacitor with Idaho Falls Power’s 3.6 MW Old Lower (OL), 8.9 MW Lower Bulb (LB), and 8.9 MW City Bulb (CB) hydropower plants; and a 250 kVA / 320 kWh Li-Ion battery with Fall River Electric Cooperative’s 5.5 MW Felt hydropower plant. The Idaho Falls Power demonstration showed the resilience benefits of hybridization, and the Fall River Electric demonstration showed what the minimal requirements are to retrofit a hydropower plant for black start. These demonstrations are funded by the U.S. Department of Energy Water Power Technologies Office HydroWIRES Initiative.

13 HYDRO ENERGY↗

Zircaloy Cladding as Starting Precursor for Ceramic Waste-Forms - 15562

Zircaloy cladding of spent fuel is regular waste-stream related to the process of reprocessing. It remains in the apparatus after spent fuel dissolution. The most common technique of zircaloy cladding treatment is cementation and disposal in metallic containers. In view of the high cost of the cladding material (mainly zirconium), there have been a number of proposals for this material to be recovered and re-used. However, the residual contamination of the claddings following the dissolution of the fuel and the chemical stability of the zirconium militate against any proposal for a recycling process that might be economically reasonable. At the same time there is a lot of information available about synthesis of mineral-like materials based on zirconium for immobilization of long-lived radionuclides. The object of this work was to study experimentally electrochemical dissolution of fuel rod cladding for further obtaining starting precursor for the synthesis of ceramic-waste forms. The results of experiments on electrochemical dissolution of zirconium and zirconium alloy (fuel rod cladding) in nitric acid solutions are presented. The peak dissolution rate of specimens is shown to be observed in dilute nitric acid at elevated temperatures. The rate of dissolution rises with temperature, reaching ∼40-70 mg/cm{sup 2}.h at 90 deg. C. The current yield at this point is 0.6-0.7 g/A.h. The results of analysis of the surface oxide film on specimens and residues formed during dissolution are also presented. An electrochemical dissolution of zircaloy claddings is the common technique for preparation of zirconium solutions to be used for ceramic waste form synthesis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Fuel Reprocessing Development and Usage of Fission Products as Starting Precursor for Ceramic Waste-Forms - 16498

The principal purpose of spent fuel reprocessing consists in the recovery of the uranium and plutonium and the separation of fission products so as to allow re-use of fissile isotopes and waste preparing for disposal. Reprocessing is a series of chemical operations that separates plutonium and uranium from other constituents in nuclear waste. Indeed, the plutonium separated can be used to fuel reactors, but also to make nuclear weapons. Since reprocessing operations are far more expensive than using uranium fuel and disposing of the spent fuel directly, this process is not readily considered. Without doubts the reprocessing price of $1000 per kilogram of heavy metal (kgHM), like uranium must be less by at least 2-3 times compared to directly deposing the spent fuel. And some more simple technology (in comparison with PUREX process) must be developed, for example, technology based on precipitation processes. One of the options to change reprocessing technology is the idea to use certain fission products occurring in spent fuel in considerable amount and capable to form insoluble substances as suitable materials for long-term storage or final disposal of radioactive wastes. The development of new materials for HLW immobilization are intended to reduce disposal cost. The present work was aimed at the search for the simple engineering decisions that would provide opportunity of fission products usage as starting precursor for ceramic waste-forms. The results of experiments on synthesis of Pd-based metallo-ceramic compositions are presented in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗