Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SRS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Facility Deactivation and Decommissioning at the Savannah River Site

In February 2002, the U.S. Department of Energy initiated actions to expedite Cleanup, focus on significant and early risk reduction, and reduce costs at the Savannah River Site (SRS). In response SRS started on a project focused on completing the decommissioning of inactive facilities in T, D, and M Areas, areas that are on the perimeter of the Site, by the end of 2006. In June 2003, the Department of Energy Savannah River Operations Office (DOE-SR), the South Carolina Department of Health and Environmental Control (SCDHEC), and the Environmental Protection Agency, Region 4 (EPA-4) endorsed a Memorandum of Agreement (MOA) concerning cleanup at the Savannah River Site (SRS). The vision of the Agreement is that SRS will reduce its operations footprint to establish a buffer zone at the perimeter of the Site, while the central core area of the Site will be reserved for continuing or future long-term operations. DOE-SR, EPA-4, and SCDHEC agreed that establishing this buffer zone and appropriately sequencing environmental restoration and decommissioning activities can lead to greater efficiency and accelerate completion of entire site areas. This vision is embodied in the concept of Area Completion - which integrated operations, deactivation and decommissioning (D and D), and soils and groundwater cleanup into a time-phased approach to completing all the work necessary to address the Cold War legacy. D and D addresses the 'footprint' of the building or structure, while the soils and groundwater project addresses any environmental remediation that may be required in the underlying and surrounding soils and groundwater. Since then, {approx}250 facilities have been decommissioned at the SRS, ranging from guard stations to nuclear fuel production facilities. The efforts made up front to develop the MOA and maintain open and active involvement with the EPA and SCDHEC was instrumental to the success of the SRS D and D Project. Accelerated D and D requires innovative regulatory approaches so that time and resources are spent commensurate with the hazards of the facilities being decommissioned. The graded approach developed at SRS accomplished a balance between building hazards and the amount of regulatory and public involvement.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

In Situ Decommissioning (ISD) Concepts and Approaches for Excess Nuclear Facilities Decommissioning End State - 13367

The United States Department of Energy (DOE) currently has numerous radiologically contaminated excess nuclear facilities waiting decommissioning throughout the Complex. The traditional decommissioning end state is complete removal. This commonly involves demolishing the facility, often segregating various components and building materials and disposing of the highly contaminated, massive structures containing tons of highly contaminated equipment and piping in a (controlled and approved) landfill, at times hundreds of miles from the facility location. Traditional demolition is costly, and results in significant risks to workers, as well as risks and costs associated with transporting the materials to a disposal site. In situ decommissioning (ISD or entombment) is a viable alternative to demolition, offering comparable and potentially more protective protection of human health and the environment, but at a significantly reduced cost and worker risk. The Savannah River Site (SRS) has completed the initial ISD deployment for radiologically contaminated facilities. Two reactor (P and R Reactors) facilities were decommissioned in 2011 using the ISD approach through the American Recovery and Reinvestment Act. The SRS ISD approach resolved programmatic, regulatory and technical/engineering issues associated with avoiding the potential hazards and cost associated with generating and disposing of an estimated 124,300 metric tons (153,000 m{sup 3}) of contaminated debris per reactor. The DOE Environmental Management Office of Deactivation and Decommissioning and Facility Engineering, through the Savannah River National Laboratory, is currently investigating potential monitoring techniques and strategies to assess ISD effectiveness. As part of SRS's strategic planning, the site is seeking to leverage in situ decommissioning concepts, approaches and facilities to conduct research, design end states, and assist in regulatory interactions in broad national and international government and private industry decommissioning applications. SRS offers critical services based upon the SRS experience in decommissioning and reactor entombment technology (e.g., grout formulations for varying conditions, structural and material sciences). The SRS ISD approach follows a systems engineering framework to achieve a regulatory acceptable end state based on established protocols, attains the final end state with minimal long stewardship requirements, protects industrial workers, and protects groundwater and the environment. The ISD systems engineering framework addresses key areas of the remedial process planning, technology development and deployment, and assessment to attain the ultimate goal of natural resource stewardship and protecting the public. The development and deployment of the SRS ISD approach has established a path for ISD of other large nuclear facilities in the United States and around the globe as an acceptable remedial alternative for decommissioning nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iron Behavior in Microcosms Simulating Bioreduction in Savannah River Site Sediments - 17389

An estimated 1.8 billion gallons of acidic low-activity waste solutions originating from the processing of uranium slugs and irradiated fuel at separation facilities at the Savannah River Site (SRS) were discharged to the unlined seepage basins located in the F/H-area. The acidic solutions of the basin influent (pH from 3.2 to 5.5) contaminated with a variety of radionuclides and dissolved metals caused groundwater contamination. In 2010, DOE funded a demonstration of the Enhanced Anaerobic Reductive Precipitation (EARP) process at the SRS F-Area that consisted of in-situ injections of a carbohydrate substrate to establish anaerobic reactive zones for metal and radionuclide remediation. The addition of the molasses substrate solution to groundwater was done to produce anaerobic conditions conducive to uranium reduction and then precipitation as uranium (IV). The SRS soil is highly weathered and features very low natural alkalinity. A microcosm study, prepared with sieved SRS sediments and augmented with a solution mixture containing molasses and sulfate, was designed to provide evidence of the capabilities of this remediation technology under SRS environmental conditions. The objective of these microcosm experiments was to replicate the anaerobic conditions created as a result of injections of molasses combined with sulfate ions, similar to the EARP process that was performed at SRS, and investigate if any mineralogical changes could occur in the soil due to the addition of molasses. Specifically, the study aimed to determine if solid phases of reduced iron such as siderite and pyrite would be formed, as this would indicate the potential to form a long-lasting bioreductive zone. An understanding of this technology will be useful in determining if it is a viable option for remediation. In the experiments, the media solution was amended with molasses and sulfate to stimulate sulfate-reducing bacteria. Sulfate reduction occurs extensively under the redox conditions occurring after iron reduction and before methanogenic conditions. These conditions are considered the second most reducing condition in natural groundwater systems. Microcosm tubes prepared in triplicate were kept inside an anaerobic glove box, which was continuously monitored to ensure that conditions remained anaerobic. The initial X-ray diffraction (XRD) analyses on the background sediment samples indicated the presence of quartz, kaolinite, montmorillonite, and goethite. In the molasses-treated samples there were no visible peaks for reduced forms of iron such as siderite and pyrite. The pH measurements suggest that all samples in either batch, including those that were brought to a neutral pH before the addition of the sediments, have followed a similar trend with a decline in the pH value to between 4 and 4.7. This can be attributed to the fermentation of molasses and the natural acidity of the SRS sediments used for the microcosm study. In the acidic iron-rich sediment, the microbial reduction of Fe (III) was the predominant electron-accepting process for oxidation of the organic substrate. The maximum iron concentration detected during the experiments was 13 mg/L. Analytical results showed that there was no sulfate reduction in any of the samples augmented with sulfate and the concentration remained level at 500 ppm as originally added to the initial solutions (518 - 542 mg/L). This is consistent with the absence of any indication of iron sulfide formation. Under the experimental conditions in these microcosms, the abundance of biologically available Fe (III) allows Fe (III)-reducers to out-compete sulfate-reducing bacteria using molasses as an electron donor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mega salt-stone Disposal Units at the Savannah River site - 15322

The Liquid Waste (LW) System at Savannah River Site (SRS) is a highly integrated operation involving safely storing radioactive liquid waste in underground storage tanks; vitrifying the higher activity waste; and storing the vitrified waste in stainless steel canisters until permanent disposition is provided; and removing, treating, and dispositioning the low-level waste (LLW) fraction in concrete with final disposition being the salt-stone Disposal Units (SDUs) at the SRS salt-stone Disposal Facility (SDF). Treatment and disposition of salt waste is the critical path to completion of the SRS Liquid Waste (LW) Disposition Program. Successful and timely salt waste removal and disposal is integral to efforts by SRS to proceed with all aspects of tank cleanup and removal from service. The construction and implementation of the first-of-a-kind Mega SDU (MSDU) is underway to provide the most environmentally safe and cost-effective solution for salt processing and long term storage of the LLW at SRS. The MSDU design is a duplicate of the Water Treatment Tanks located in Syracuse, New York. This commercial design, developed by an affiliate of Savannah River Remediation LLC (SRR), was slightly modified to meet the requirements of the nuclear industry. The MSDU is a critical link in salt disposition. In comparison to the current SDU design, approximately 46 meters (150 feet) in diameter and 7 meters (22 feet) tall with a capacity of approximately 11,000 m{sup 3} (3.0 million gallons), the MSDU is 114 meters (375 feet) in diameter and 13 meters (43 feet) tall which will provide a capacity of approximately 121,000 m{sup 3} (32.0 million gallons) to receive the LLW fraction embedded in a grout-like form. The MSDU will provide the taxpayers an estimated $300 M in life cycle savings at SRS by reducing the number of SDUs from the estimated 72 smaller vessels to 7 of the new larger vessels. Additionally, based on the reduced number of SDUs, the environmental footprint is significantly reduced as well. Due to the similarities between the existing SDU design and the MSDU design, efforts to integrate the MSDU into the LW system are minimal. Required infrastructure modifications will consist of tying into the existing grout and drain lines, as well as the installation of new electrical and instrumentation services for the MSDU. Grout flow testing has been successfully completed, with results showing the MSDU will be a safe and cost-effective replacement for the existing SDUs. The MSDU design is complete, Critical Decision (CD)-3 was approved on June 17, 2014, and the first MSDU, salt-stone Disposal Unit n.6 (SDU 6), is being constructed in the existing LW SDF operated by SRR as a Capital Line Item project. As an added benefit, once constructed, lessons learned will be available for future MSDUs at SRS and throughout the complex as necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 34: US DOE Featured Site: Savannah River Operations Office: 70 Years of Service

The Savannah River Site celebrates its 70. anniversary on November 28, 2020. On this date in 1950, President Harry S. Truman requested the Dupont Company to design, build and operate what was then known as the Savannah River Plant in response to the Soviet Union's detonation of its first atomic weapon, which set the Cold War into motion. During the 1950's, six South Carolina towns were relocated for the construction of SRS and by 1953, the 310 square mile site was complete. Nearly 40,000 workers were employed t build five nuclear reactors and support facilities, two chemical separations plants, heavy water extraction plant, nuclear fuel and target fabrication facility tritium extraction facility and waste management facilities. SRS played a key role in winning the Cold War and for seven decades, SRS has been a leader within the DOE complex. Today, the site supports environmental stewardship and maintains the nation's nuclear deterrent while ensuring the safekeeping and disposal of domestic and international nuclear materials. The site continues to support the nation's nuclear defense as it explores new potential NNSA missions. SRS has a proud 70- year history and looks forward to a future of service as a national asset and strong community partner. The session was kicked off with a video message from Secretary of Energy, Dan Brouillette, who thanked employees past and current for their efforts. The video also provided an overview of the history and future of the Site. This panel provided an overview of the Savannah River Site's 70 years of service (history, challenges, opportunities, and future) presented by the SRS's Senior leadership and the local Aiken, South Carolina Mayor. Panelists with presentations: US DOE Secretary Dan Brouillette's Overview of DOE and SRS - A Legacy of 70 Years of Service (Amy Boyette); 70 Years of Service (Michael Budney); 70 Years of Service (Stuart MacVean); SRS Liquid Waste (Thomas Foster); National Nuclear Security Administration (Nicole Nelson-Jean)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A STUDY ON LEGIONELLA PNEUMOPHILA, WATER CHEMISTRY, AND ATMOSPHERIC CONDITIONS IN COOLING TOWERS AT THE SAVANNAH RIVER SITE

Legionnaires disease is a pneumonia caused by the inhalation of the bacterium Legionella pneumophila. The majority of illnesses have been associated with cooling towers since these devices can harbor and disseminate the bacterium in the aerosolized mist generated by these systems. Historically, Savannah River Site (SRS) cooling towers have had occurrences of elevated levels of Legionella in all seasons of the year and in patterns that are difficult to predict. Since elevated Legionella in cooling tower water are a potential health concern a question has been raised as to the best control methodology. In this work we analyze available chemical, biological, and atmospheric data to determine the best method or key parameter for control. The SRS 4Q Industrial Hygiene Manual, 4Q-1203, 1 - G Cooling Tower Operation and the SRNL Legionella Sampling Program, states that 'Participation in the SRNL Legionella Sampling Program is MANDATORY for all operating cooling towers'. The resulting reports include L. pneumophila concentration information in cells/L. L. pneumophila concentrations >10{sup 7} cells/L are considered elevated and unsafe so action must be taken to reduce these densities. These remedial actions typically include increase biocide addition or 'shocking'. Sometimes additional actions are required if the problem persists including increase tower maintenance (e.g. cleaning). Evaluation of 14 SRS cooling towers, seven water quality parameters, and five Legionella serogroups over a three-plus year time frame demonstrated that cooling tower water Legionella densities varied widely though out this time period. In fact there was no one common consistent significant variable across all towers. The significant factors that did show up most frequently were related to suspended particulates, conductivity, pH, and dissolved oxygen, not chlorine or bromine as might be expected. Analyses of atmospheric data showed that there were more frequent significant elevated Legionella concentrations when the dew point temperature was high--a summertime occurrence. However, analysis of the three years of Legionella monitoring data of the 14 different SRS Cooling Towers demonstrated that elevated concentrations are observed at all temperatures and seasons. The objective of this study is to evaluate the ecology of L. pneumophila including serogroups and population densities, chemical, and atmospheric data, on cooling towers at SRS to determine whether relationships exist among water chemistry, and atmospheric conditions. The goal is to more fully understand the conditions which inhibit or encourage L. pneumophila growth and supply this data and associated recommendations to SRS Cooling Tower personnel for improved management of operation. Hopefully this information could then be used to help control L. pneumophila growth more effectively in SRS cooling tower water.

54 ENVIRONMENTAL SCIENCES↗

SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Deskbook. The TRA consists of three parts: (1) Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. (2) Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. (3) Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adjuvant Stereotactic Radiosurgery After Resection of Intracranial Hemangiopericytomas

Purpose: To evaluate adjuvant stereotactic radiosurgery (SRS) in the management of recurrent or residual intracranial hemangiopericytomas (HPCs), we assessed tumor control, survival, and complications in patients who had undergone gamma knife SRS as part of multimodal therapy. Methods and Materials: We retrospectively reviewed the records of consecutive 20 HPC patients who had undergone SRS for 29 tumors. The median patient age was 51.5 years (range, 8.9-80.2). All patients had undergone previous surgical resection of their tumors. In addition, 12 patients underwent fractionated radiotherapy before SRS. Of the 20 patients, 16 patients had low-grade HPCs (20 tumors) and 4 had high-grade anaplastic HPCs (9 tumors). The median radiosurgery target volume was 4.5 cm{sup 3} (range, 0.07-34.3), and the median marginal dose was 15.0 Gy (range, 10-20). Results: At an average of 48.2 months (range, 7.2-124.1), 5 patients had died of metastases and 3 patients had died of disease progression. The overall survival after radiosurgery was 100%, 85.9%, and 13.8% at 1, 5, and 10 years, respectively. The follow-up imaging studies demonstrated tumor control in 21 (72.4%) of 29 tumors. The progression-free survival rate after SRS at 1, 3, and 5 years was 89.1% for low-grade HPCs and 88.9%, 66.7%, and 0%, respectively, for high-grade HPCs. The factors associated with improved progression-free survival included lower grade and higher marginal dose. Eight patients had intracranial or extracranial metastasis after the initial diagnosis, which correlated with the shorter survival. Conclusion: The results of our study have shown that adjuvant SRS after tumor resection is an important management option for patients with residual or recurrent HPCs and is particularly effective for less-aggressive tumors.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Radiosurgery for Craniopharyngioma

Purpose: To analyze the outcomes of gamma knife stereotactic radiosurgery (SRS) for residual or recurrent craniopharyngiomas and evaluate the factors that optimized the tumor control rates. Methods and Materials: A total of 46 patients with craniopharyngiomas underwent 51 SRS procedures at University of Pittsburgh between 1988 and 2007. The median tumor volume was 1.0 cm{sup 3} (range, 0.07-8.0). The median prescription dose delivered to the tumor margin was 13.0 Gy (range, 9-20). The median maximal dose was 26.0 Gy (range, 20-50). The mean follow-up time was 62.2 months (range, 12-232). Results: The overall survival rate after SRS was 97.1% at 5 years. The 3- and 5-year progression-free survival rates (solid tumor control) were both 91.6%. The overall local control rate (for both solid tumor and cyst control) was 91%, 81%, and 68% at 1, 3, and 5 years, respectively. No patients with normal pituitary function developed hypopopituitarism after SRS. Two patients developed homonymous hemianopsia owing to tumor progression after SRS. Among the factors examined, complete radiosurgical coverage was a significant favorable prognostic factor. Conclusion: SRS is a safe and effective minimally invasive option for the management of residual or recurrent craniopharyngiomas. Complete radiosurgical coverage of the tumor was associated with better tumor control.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Long-Term Outcomes of Stereotactic Radiosurgery for Treatment of Cavernous Sinus Meningiomas

Purpose: Patients with cavernous sinus meningiomas (CSM) have an elevated risk of surgical morbidity and mortality. Recurrence is often observed after partial resection. Stereotactic radiosurgery (SRS), either alone or combined with surgery, represents an important advance in CSM management, but long-term results are lacking. Methods and Materials: A total of 88 CSM patients, treated from January 1991 to December 2005, were retrospectively reviewed. The mean follow-up was 86.8 months (range, 17.1-179.4 months). Among the patients, 22 were followed for more than 10 years. There was a female predominance (84.1%). The age varied from 16 to 90 years (mean, 51.6). In all, 47 patients (53.4%) received SRS alone, and 41 patients (46.6%) had undergone surgery before SRS. A dose of 14 Gy was prescribed to isodose curves from 50% to 90%. In 25 patients (28.4%), as a result of the proximity to organs at risk, the prescribed dose did not completely cover the target. Results: After SRS, 65 (73.8%) patients presented with tumor volume reduction; 14 (15.9%) remained stable, and 9 (10.2%) had tumor progression. The progression-free survival was 92.5% at 5 years, and 82.5% at 10 years. Age, sex, maximal diameter of the treated tumor, previous surgery, and complete target coverage did not show significant associations with prognosis. Among the 88 treated patients, 17 experienced morbidity that was related to SRS, and 6 of these patients spontaneously recovered. Conclusions: SRS is an effective and safe treatment for CSM, feasible either in the primary or the postsurgical setting. Incomplete coverage of the target did not worsen outcomes. More than 80% of the patients remained free of disease progression during long-term follow-up.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Volume Changes After Stereotactic LINAC Radiotherapy in Vestibular Schwannoma: Control Rate and Growth Patterns

Purpose: The purpose of this study was to evaluate the control rate of vestibular schwannomas (VS) after treatment with linear accelerator (LINAC)-based stereotactic radiosurgery (SRS) or radiotherapy (SRT) by using a validated volumetric measuring tool. Volume-based studies on prognosis after LINAC-based SRS or SRT for VS are reported scarcely. In addition, growth patterns and risk factors predicting treatment failure were analyzed. Materials and Methods: Retrospectively, 37 VS patients treated with LINAC based SRS or SRT were analyzed. Baseline and follow-up magnetic resonance imaging scans were analyzed with volume measurements on contrast enhanced T1-weighted magnetic resonance imaging. Absence of intervention after radiotherapy was defined as 'no additional intervention group, ' absence of radiological growth was defined as 'radiological control group. ' Significant growth was defined as a volume change of 19.7% or more, as calculated in a previous study. Results: The cumulative 4-year probability of no additional intervention was 96.4% {+-} 0.03; the 4-year radiological control probability was 85.4% {+-} 0.1). The median follow-up was 40 months. Overall, shrinkage was seen in 65%, stable VS in 22%, and growth in 13%. In 54% of all patients, transient swelling was observed. No prognostic factors were found regarding VS growth. Previous treatment and SRS were associated with transient swelling significantly. Conclusions: Good control rates are reported for LINAC based SRS or SRT in VS, in which the lower rate of radiological growth control is attributed to the use of the more sensitive volume measurements. Transient swelling after radiosurgery is a common phenomenon and should not be mistaken for treatment failure. Previous treatment and SRS were significantly associated with transient swelling.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Concurrent Stereotactic Radiosurgery and Bevacizumab in Recurrent Malignant Gliomas: A Prospective Trial

Purpose: Virtually all patients with malignant glioma (MG) eventually recur. This study evaluates the safety of concurrent stereotactic radiosurgery (SRS) and bevacizumab (BVZ), an antiangiogenic agent, in treatment of recurrent MG. Methods and Materials: Fifteen patients with recurrent MG, treated at initial diagnosis with surgery and adjuvant radiation therapy/temozolomide and then at least 1 salvage chemotherapy regimen, were enrolled in this prospective trial. Lesions <3 cm in diameter were treated in a single fraction, whereas those 3 to 5 cm in diameter received 5 5-Gy fractions. BVZ was administered immediately before SRS and 2 weeks later. Neurocognitive testing (Mini-Mental Status Exam, Trail Making Test A/B), Functional Assessment of Cancer Therapy-Brain (FACT-Br) quality-of-life assessment, physical exam, and dynamic contrast-enhanced magnetic resonance imaging (DCE-MRI) were performed immediately before SRS and 1 week and 2 months following completion of SRS. The primary endpoint was central nervous system (CNS) toxicity. Secondary endpoints included survival, quality of life, microvascular properties as measured by DCE-MRI, steroid usage, and performance status. Results: One grade 3 (severe headache) and 2 grade 2 CNS toxicities were observed. No patients experienced grade 4 to 5 toxicity or intracranial hemorrhage. Neurocognition, quality of life, and Karnofsky performance status did not change significantly with treatment. DCE-MRI results suggest a significant decline in tumor perfusion and permeability 1 week after SRS and further decline by 2 months. Conclusions: Treatment of recurrent MG with concurrent SRS and BVZ was not associated with excessive toxicity in this prospective trial. A randomized trial of concurrent SRS/BVZ versus conventional salvage therapy is needed to establish the efficacy of this approach.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A Phase 2 Trial of Stereotactic Radiosurgery Boost After Surgical Resection for Brain Metastases

Purpose: To evaluate local control after surgical resection and postoperative stereotactic radiosurgery (SRS) for brain metastases. Methods and Materials: A total of 49 patients (50 lesions) were enrolled and available for analysis. Eligibility criteria included histologically confirmed malignancy with 1 or 2 intraparenchymal brain metastases, age ≥18 years, and Karnofsky performance status (KPS) ≥70. A Cox proportional hazard regression model was used to test for significant associations between clinical factors and overall survival (OS). Competing risks regression models, as well as cumulative incidence functions, were fit using the method of Fine and Gray to assess the association between clinical factors and both local failure (LF; recurrence within surgical cavity or SRS target), and regional failure (RF; intracranial metastasis outside of treated volume). Results: The median follow-up was 12.0 months (range, 1.0-94.1 months). After surgical resection, 39 patients with 40 lesions were treated a median of 31 days (range, 7-56 days) later with SRS to the surgical bed to a median dose of 1800 cGy (range, 1500-2200 cGy). Of the 50 lesions, 15 (30%) demonstrated LF after surgery. The cumulative LF and RF rates were 22% and 44% at 12 months. Patients who went on to receive SRS had a significantly lower incidence of LF (P=.008). Other factors associated with improved local control include non-small cell lung cancer histology (P=.048), tumor diameter <3 cm (P=.010), and deep parenchymal tumors (P=.036). Large tumors (≥3 cm) with superficial dural/pial involvement showed the highest risk for LF (53.3% at 12 months). Large superficial lesions treated with SRS had a 54.5% LF. Infratentorial lesions were associated with a higher risk of developing RF compared to supratentorial lesions (P<.001). Conclusions: Postoperative SRS is associated with high rates of local control, especially for deep brain metastases <3 cm. Tumors ≥3 cm with superficial dural/pial involvement demonstrate the highest risk of LF.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Phase 3 Trials of Stereotactic Radiosurgery With or Without Whole-Brain Radiation Therapy for 1 to 4 Brain Metastases: Individual Patient Data Meta-Analysis

Purpose: To perform an individual patient data (IPD) meta-analysis of randomized controlled trials evaluating stereotactic radiosurgery (SRS) with or without whole-brain radiation therapy (WBRT) for patients presenting with 1 to 4 brain metastases. Method and Materials: Three trials were identified through a literature search, and IPD were obtained. Outcomes of interest were survival, local failure, and distant brain failure. The treatment effect was estimated after adjustments for age, recursive partitioning analysis (RPA) score, number of brain metastases, and treatment arm. Results: A total of 364 of the pooled 389 patients met eligibility criteria, of whom 51% were treated with SRS alone and 49% were treated with SRS plus WBRT. For survival, age was a significant effect modifier (P=.04) favoring SRS alone in patients ≤50 years of age, and no significant differences were observed in older patients. Hazard ratios (HRs) for patients 35, 40, 45, and 50 years of age were 0.46 (95% confidence interval [CI] = 0.24-0.90), 0.52 (95% CI = 0.29-0.92), 0.58 (95% CI = 0.35-0.95), and 0.64 (95% CI = 0.42-0.99), respectively. Patients with a single metastasis had significantly better survival than those who had 2 to 4 metastases. For distant brain failure, age was a significant effect modifier (P=.043), with similar rates in the 2 arms for patients ≤50 of age; otherwise, the risk was reduced with WBRT for patients >50 years of age. Patients with a single metastasis also had a significantly lower risk of distant brain failure than patients who had 2 to 4 metastases. Local control significantly favored additional WBRT in all age groups. Conclusions: For patients ≤50 years of age, SRS alone favored survival, in addition, the initial omission of WBRT did not impact distant brain relapse rates. SRS alone may be the preferred treatment for this age group.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Interval From Imaging to Treatment Delivery in the Radiation Surgery Age: How Long Is Too Long?

Purpose: The purpose of this study was to evaluate workflow and patient outcomes related to frameless stereotactic radiation surgery (SRS) for brain metastases. Methods and Materials: We reviewed all treatment demographics, clinical outcomes, and workflow timing, including time from magnetic resonance imaging (MRI), computed tomography (CT) simulation, insurance authorization, and consultation to the start of SRS for brain metastases. Results: A total of 82 patients with 151 brain metastases treated with SRS were evaluated. The median times from consultation, insurance authorization, CT simulation, and MRI for treatment planning were 15, 7, 6, and 11 days to SRS. Local freedom from progression (LFFP) was lower in metastases with MRI ≥14 days before treatment (P=.0003, log rank). The 6- and 12-month LFFP rate were 95% and 75% for metastasis with interval of <14 days from MRI to treatment compared to 56% and 34% for metastases with MRI ≥14 days before treatment. On multivariate analysis, LFFP remained significantly lower for lesions with MRI ≥14 days at SRS (P=.002, Cox proportional hazards; hazard ratio: 3.4, 95% confidence interval: 1.6-7.3). Conclusions: Delay from MRI to SRS treatment delivery for brain metastases appears to reduce local control. Future studies should monitor the timing from imaging acquisition to treatment delivery. Our experience suggests that the time from MRI to treatment should be <14 days.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Brain Metastasis Velocity: A Novel Prognostic Metric Predictive of Overall Survival and Freedom From Whole-Brain Radiation Therapy After Distant Brain Failure Following Upfront Radiosurgery Alone

Purpose: Prior statistical models attempted to identify risk factors for time to distant brain failure (DBF) or time to salvage whole-brain radiation therapy (WBRT) to predict the benefit of early WBRT versus stereotactic radiosurgery (SRS) alone. We introduce a novel clinical metric, brain metastasis velocity (BMV), for predicting clinical outcomes after initial DBF following upfront SRS alone. Methods and Materials: BMV was defined as the cumulative number of new brain metastases that developed over time since first SRS in years. Patients were classified by BMV into low-, intermediate-, and high-risk groups, consisting of <4, 4 to 13, and >13 new metastases per year, respectively. Histology, number of metastases at the time of first SRS, and systemic disease status were assessed for effect on BMV. Results: Of 737 patients treated at our institution with upfront SRS without WBRT, 286 had ≥1 DBF event. A lower BMV predicted for improved overall survival (OS) following initial DBF (log-rank P<.0001). Median OS for the low, intermediate, and high BMV groups was 12.4 months (95% confidence interval [CI], 10.4-16.9 months), 8.2 months (95% CI, 5.0-9.7 months), and 4.3 months (95% CI, 2.6-6.7 months), respectively. Multivariate analysis showed that BMV remained the dominant predictor of OS, with a hazard ratio of 2.75 for the high BMV group (95% CI, 1.94-3.89; P<.0001) and a hazard ratio of 1.65 for the intermediate BMV group (95% CI, 1.18-2.30; P<.004). A lower BMV was associated with decreased rates of salvage WBRT (P=.02) and neurologic death (P=.008). Factors predictive for a higher BMV included ≥2 initial brain metastases (P=.004) and melanoma histology (P=.008). Conclusions: BMV is a novel metric associated with OS, neurologic death, and need for salvage WBRT after initial DBF following upfront SRS alone.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Vorinostat and Concurrent Stereotactic Radiosurgery for Non-Small Cell Lung Cancer Brain Metastases: A Phase 1 Dose Escalation Trial

Purpose: To determine the maximum tolerated dose (MTD) of vorinostat, a histone deacetylase inhibitor, given concurrently with stereotactic radiosurgery (SRS) to treat non-small cell lung cancer (NSCLC) brain metastases. Secondary objectives were to determine toxicity, local failure, distant intracranial failure, and overall survival rates. Materials and Methods: In this multicenter study, patients with 1 to 4 NSCLC brain metastases, each ≤2 cm, were enrolled in a phase 1, 3 + 3 dose escalation trial. Vorinostat dose levels were 200, 300, and 400 mg orally once daily for 14 days. Single-fraction SRS was delivered on day 3. A dose-limiting toxicity (DLT) was defined as any Common Terminology Criteria for Adverse Events version 3.0 grade 3 to 5 acute nonhematologic adverse event related to vorinostat or SRS occurring within 30 days. Results: From 2009 to 2014, 17 patients were enrolled and 12 patients completed study treatment. Because no DLTs were observed, the MTD was established as 400 mg. Acute adverse events were reported by 10 patients (59%). Five patients discontinued vorinostat early and withdrew from the study. The most common reasons for withdrawal were dyspnea (n=2), nausea (n=1), and fatigue (n=2). With a median follow-up of 12 months (range, 1-64 months), Kaplan-Meier overall survival was 13 months. There were no local failures. One patient (8%) at the 400-mg dose level with a 2.0-cm metastasis developed histologically confirmed grade 4 radiation necrosis 2 months after SRS. Conclusions: The MTD of vorinostat with concurrent SRS was established as 400 mg. Although no DLTs were observed, 5 patients withdrew before completing the treatment course, a result that emphasizes the need for supportive care during vorinostat administration. There were no local failures. A larger, randomized trial may evaluate both the tolerability and potential local control benefit of vorinostat concurrent with SRS for brain metastases.

62 RADIOLOGY AND NUCLEAR MEDICINE↗