Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N, and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.

100 Area↗

National Solar Jobs Accelerator (Final Technical Report (FTR))

The aptitudes and experiences gained through military service—such as dynamic leadership, teamwork and critical thinking skills, technical specialization, and a mission-completion work ethic—make veterans exceptional candidates for a wide range of solar energy careers. The solar industry offers a highly collaborative and purpose-driven work environment that resonates with service members and veterans looking to rise to their next challenge, and solar employers are eager to tap into this valuable talent pool. From October 2019 - February 2023, The National Solar Jobs Accelerator (publicly the Solar Ready Vets Network TM (SRV Network; SRVN)) enhanced and streamlined options for military service members and veterans to pursue solar training, certification, and employment, while advancing solar employers’ efforts and capacity to invest in military talent as part of a long-term workforce development strategy. The SRVN was led by the Interstate Renewable Energy Council (IREC) in partnership with the Solar Energy Industries Association (SEIA), the US Chamber of Commerce Foundation’s Hiring Our Heroes program (HOH) and the North American Board of Certified Energy Practitioners (NABCEP). Through several direct-impact and indirect, high-impact capacity building initiatives aligned with six key objectives, the SRV Network strengthened solar career pathways, and promoted increased representation of military talent across all levels and sectors of the solar workforce. A work-based learning Corporate Fellowship model connected transitioning service members with on-the-job experience in leadership roles with solar employers nationwide. The project advanced broader veteran recruitment and talent development by expanding GI Bill eligibility and streamlining veterans’ pathways for solar training and credentialing, supported direct connections to jobs with top solar employers, and led coordination among key education and industry partners to advance registered apprenticeships aligned with solar career pathways. To ensure that the project best served the needs of all stakeholders, an Advisory Committee of military-connected solar professionals, solar employers, and training providers met biannually to guide project activities and sustainability plans. The project team engaged the broader “SRV Network” (comprised of over 2,000 veterans, employers and training organizations) through regular newsletters and targeted outreach to share resources, hiring fairs, webinars, and other opportunities for engagement. The work done under this award builds on the previous iterations of the Department of Energy’s Solar Ready Vets ® program. As the solar industry continues to grow rapidly over the next decade, the military community will continue to be a highly valuable source of talent. The relationships established and work accomplished through this project will have an enduring positive impact well beyond the funding period.

14 SOLAR ENERGY↗

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

54 ENVIRONMENTAL SCIENCES↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning

This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DE-FE0023919 Phase 5 Scientific/Technical Report

Phase 5 of the Deepwater Methane Hydrate Characterization and Scientific Assessment research project (DOE Award No. DE-FE0023919) occurred from Oct. 1, 2020 to Nov. 15, 2023. Throughout Phase 5, UT performed all aspects of project management and planning according to the award, project management plan, and statement of project objectives (Task 1). UT maintained and augmented the capability to transport, store, manipulate and analyze pressure cores (Task 13). UT’s hydrate core effective stress chamber can now run tests at effective stresses up to 20 MPa. A benchmark study was conducted and confirmed that the K0 permeameter accurately estimates geomechanical and petrophysical properties of geomaterials under uniaxial strain conditions. UT continued to analyze remaining UT-GOM2-1 pressure cores from GC955 (Task 10).

03 NATURAL GAS↗

Calibration Plan

PhD project update presentation to be given to Texas Tech University advisor.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Natura 2000 appropriate assessment: Shortcomings and improvements in Finnish practice

The EU Habitats Directive 92/43/EEC requires impact assessments called Appropriate Assessments (AA) for plans and projects probably having adverse effects on the sites of European ecological importance, Natura 2000 sites. Seventy-three Appropriate Assessment reports and seventy official opinions given on them by regional environmental authorities from 1997 to 2005 were reviewed. The findings of the study demonstrate typical shortcomings of ecological impact assessment: a weak information basis for assessment outcomes and lack of proper cumulative impact assessment with respect to ecological structures and processes. The quality of reporting has improved over time with respect to direct impacts on individual habitat types and species and detailed mitigation measures. Regional environment centres considered one fifth of the AA reports to be inadequate because of lacking data. In most cases the regional environment centres demanded a change of plan or project, added mitigation measures, choice of only one alternative for further planning or a new completed assessment with additional information in order to be able to evaluate the significance of the effects. The study underlines the need for iterative planning practices in which the preparation of a plan or project with alternative options goes hand in hand with the impact assessment equipped with sufficient data.

54 ENVIRONMENTAL SCIENCES↗

Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

IDC Re-Engineering Phase 3 Development Plan.

Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Risk Analysis Application to Project Management

Oak Ridge National Laboratory staff are performing risk assessments for the Department of Energy Office of Nuclear Materials Integration for use in project management. The goal was to provide tools to help manage Department of Energy projects that require cross-functional teams to implement a project with a variety of drivers or constraints. The methodology is flexible and can be adapted for the level of rigor needed for the project. This paper focuses on risk assessments and risk mitigation planning for projects in their early stage of development when only preliminary project information is likely to be available. The methodology has been successfully used during the planning phases of projects to guide selection of tasks to be performed to reduce risk, lower costs, and improve chances of success.

Robinson, Sharon↗

Implementation of Lessons Learned - 17406

Following a negative occurrence or event, putting corrective actions into place to address an organisation's systemic and administrative weaknesses is paramount to that organisation's future success. At Los Alamos National Laboratory (LANL, or the Laboratory), recent experiences emphasize this critical point. On February 14, 2014, transuranic (TRU) waste management at DOE facilities changed significantly when a drum of mixed hazardous and TRU (MTRU) waste from LANL breached after its disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Shortly following the LANL-WIPP event, several internal and external investigations and analyses were conducted by LANL, the U.S. Department of Energy (DOE) and others, including the DOE Inspector General and an Office of Environmental Management Accident Investigation Board (AIB), to determine the cause of the LANL drum breach at WIPP. Internal investigations led LANL to self-disclose non-compliancies including treatment without a permit and improper waste characterization to the New Mexico Environment Department (NMED), leading to a Settlement Agreement in January 2016. The Settlement Agreement, together with the other investigations, led LANL to identify and implement many corrective actions related to its waste management practices. The Laboratory recognized the need to revisit implementation of some fundamental concepts, and noted the following 'Lessons Learned': - Communicating requirements more clearly, - Using technical expertise more effectively, and - Improving implementation of policies and procedures. This paper presents the actions LANL has taken to prevent recurrence and demonstrate the Laboratory's commitment to compliant waste management requirements. They have focused on promoting a better understanding of the regulatory requirements in order to address the key root causes and the resulting Lessons Learned, as follows: - Ensure that all levels of a Project Team understand the regulatory requirements related to performing the work;- Engage RCRA subject matter experts in planning (for both initial project plans and subsequent modifications to plans); - Validate that Project Teams' plans and procedures will be effective in meeting regulatory requirements; and - Verify implementation. We believe the corrective actions taken since the drum event at WIPP will fundamentally improve our way of doing business throughout the Laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Facilities Master Plan and Laboratory Renovation Project

Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Airborne Projection of Burning Embers – Planning and Controls for Los Alamos National Laboratory Facilities

As a result of the Las Conchas Fire, the Department of Energy in correspondence SO:32CK 372899 (DOE 2011) requested that LANS take the following action: Evaluate the Las Conchas fire experience and other data on airborne projection of burning embers and the appropriate planning and controls for Los Alamos National Laboratory (LANL) facilities, including nuclear and high hazard facilities. This paper addresses the DOE action by evaluating 1) the meteorology at the time of the accident and implications for new wild land fires; 2) the ability of LANL facilities to withstand fires as a result of burning embers, and 3) LANL programs in place to mitigate the effects of wild land fires. The spread of fire as a result of burning embers is a known and important mechanism. Both empirical and computational studies have been performed, and it is recognized that these studies should continue (Kim 2009, Koo 2010, Sardoy 2007). Due to the locale and environs of LANL, burning brands or embers from forest fires are a credible risk at LANL. With the exception of the Area G TRU Waste Facility, LANL nuclear facilities have fire resistant exteriors with UL Class A roofs. Waste at Area G is stored in fire resistant containers. The laboratory has comprehensive Emergency Operations and Fire Protection Programs, which includes assessing wildland fire risk and mitigating the spread of fires, for example, by maintaining fire breaks and additional defensible buffer areas free of combustibles around LANL facilities and limits on combustible loading. Vegetation is cut-back to at least national consensus standards on a regular basis around nuclear facilities. Fire Department services are provided by Los Alamos County through an agreement with the Department of Energy. The interface between the Fire Department and LANL during emergencies is the Emergency Operations Division. The ability of LANL facilities to withstand a wildland fire was tested by both the Cerro Grande fire in 2000 as well as the Las Conchas fire. No nuclear or high-hazard facilities were damaged even though the Cerro Grande fire burned around a number of the facilities. Since then, the laboratory has strengthened programs to protect against wildland fires.

99 GENERAL AND MISCELLANEOUS↗

Design of 650 MHz Tuner for PIP-II Project

The Proton Improvement Plan (PIP) II project at Fermilab is a proton driver linac which will use of five different cavity geometries including a 650 MHz 5-cell elliptical cavities that will operate in RF-pulse mode. Detuning of these cavities by Lorentz Forces will be large and strongly depend of the stiffness of the cavity's tuner. First prototype tuner built and tested warm [1,2]. Measured stiffness of the prototype tuner was below 30kN/mm instead of expected from simulation 70kN/mm [2]. Significant effort has been invested into understanding discrepancy between simulation and experimental data that led to newest tuner design. Updated 'dressed cavity-helium vessel-tuner' model provided consistent results between ANSYS simulations and experiment results. Modified tuner design and analysis in limitations for overall 'cavity/tuner system' stiffness will be presented.

43 PARTICLE ACCELERATORS↗

Grimsel Test Site - A Successful International Underground Research Laboratory for Many Decades - 20429

For more than 35 years, Nagra and its partners from around the world have been conducting underground research projects at the Grimsel Test Site (GTS, www.grimsel.com) to contribute to the development and confirmation of safe geological disposal concepts and for the characterization of suitable host rock formations. Over the years, the results of this internationally recognized research program have been, and continue to be, incorporated directly into exploration programs, modelling, safety, and engineering feasibility studies on options for deep geological repositories. Each project of the GTS program involves field-testing, laboratory studies, design and modelling tasks, and integrates all scientific and technical aspects. Each project phase is planned with a duration of three to five years to facilitate practical and administrative aspects and allow flexibility for updating the overall project plans with the latest findings. Scientific and engineering interaction among the different projects is ensured via an international steering committee meeting. Hosting an IAEA level C radiation- controlled zone, which allows use of radionuclides, including actinides such as thorium, uranium, neptunium, plutonium and americium, in in-situ experiments is one of the reasons why GTS also developed as a center of excellence for work with radioactive tracers under realistic in-situ boundary conditions. Last year, a new five-year program (2019 to 2023) started which includes projects with a planning horizon of decades. The new five-year program includes a new phase of in-situ experiments using radionuclides such as migration experiments in the Colloid Formation and Migration project (CFM), the Long-Term Diffusion experiment (LTD) and the newly established C-14 and I-129 Migration in cement project (CIM). The 'High Temperature effects on Bentonite' (HotBENT) project is starting in the current phase and is studying the effects of elevated temperatures (>175 deg. C) on bentonite materials. As a generic underground research laboratory (URL) it is expected that the GTS will provide in the coming years a platform for international collaboration, knowledge development and knowledge transfer for the next generation of scientists and engineers in the area of radioactive waste disposal and geosciences. A key role regarding knowledge transfer and training is provided by the well-established Grimsel Training Center (GTC), which (beside many URL related issues) also covers many general aspects of radioactive waste management. In this paper we provide an overview of the current program at the GTS, focusing on the experiments that study the migration of radionuclides through engineered barrier materials and the geosphere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PROTOPLASMA - Proton-driven plasma-wakefield experiment at Fermilab: Stages and approach

Generation of TeV-scale electron beams using conventional RF technology appears expensive for building the next generation of colliders. Proton-driven plasma-wakefield acceleration of electrons promises an alternative route to generate TeV-scale electron beams using existing proton machines. PROTOPLASMA is the proposed R and D project at Fermilab that plans to use a proton beam driven plasma-wakefield to accelerate electrons. The project is planned in stages with the project's path guided by simulations. First, a 60-120 GeV proton beam will be injected into 1-2 meters of plasma to observe selfmodulation instability in the proton beam. Next, an injected 5 MeV electron beam will be accelerated by the plasma. In this paper, we report on the basic project plan and outline our staged approach. We report on first simulation results that show self-modulation of a proton bunch and discuss beam optics requirements and other limits.

43 PARTICLE ACCELERATORS↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗