Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Applications and Performance of a Lightning Risk Assessment using Geostationary Lightning Mapper (GLM) Data

Lightning is a hazard globally, particularly in lesser-developed countries. Cloud-to-ground lightning strikes are a threat to human safety, motivating a desire to monitor location-based lightning risk to mitigate harm. A lightning risk assessment for human safety was created that uses a combination of probabilistic risk calculation and spatial lightning mapping data to produce a risk magnitude. This risk magnitude evolves with time and changing conditions and is compared to tolerability thresholds in order to evaluate safety. The risk assessment using lightning mapping array (LMA) flash extent density (FED) data was found to perform comparatively (with respect to issuing lightning warnings) to a more standard method of monitoring lightning safety where National Lightning Detection Network (NLDN) flashes were monitored within a 5 nautical mile radius of a location of interest. This research investigates the replacement of LMA FED with FED from the Geostationary Lightning Mapper (GLM) within the risk assessment framework. Using GLM FED would allow for risk to be calculated outside of LMA domains and anywhere within the GLM field of view, including areas outside of the United States (US). A few applications of the risk method with GLM FED are shown and discussed for locations both in and outside of the US. Additionally, the performance of the risk method is compared based on the type of lightning input source (LMA vs GLM). The end goal of this work is to provide forecasters and end users with a tool to help monitor lightning risk in decision support scenarios.

Kelley Murphy↗

Exploration of High-Dimensional Scalar Function for Nuclear Reactor Safety Analysis and Visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user’s guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving dataset from a nuclear reactor safety simulation.

97 MATHEMATICS AND COMPUTING↗

Risk-informed Physical Security Using Dynamic Force-on-Force Modelling Tools (ABSTRACT)

Physical security requirement of nuclear power plants (NPPs) in the US is regulated in a mainly prescriptive manner. This “one size fits all” approach may consequently overlook plant-specific characteristics which are beneficial for the inherent safety and security of the plant. Although a performance-based security measure has been promulgated in 10 CFR 73.55(r), current evaluation methods generally emphasize static and conservative assumptions on physical security uncertainties. This conservatism contributes to the overall operational and maintenance costs, which account to 70% of total operating expenditures for an NPP. This paper describes an ongoing work at the Idaho National Laboratory within the Light Water Reactor Sustainability pathway, which aims to optimize physical protection system with regards to system effectiveness and dollar costs. To achieve this goal, a risk-informed approach to physical security is proposed. This approach leverages the Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool to model facility infiltration and Force-on-Force (FoF) engagement in a dynamic manner. The dynamic FoF analysis was conducted by coupling human performance uncertainties modeled in EMRALD to existing commercial 3-dimensional FoF software, i.e. SCRIBE3D, AVERT and Simajin. Meanwhile, risk analysis was accomplished by coupling the attack outcomes to existing plant Probabilistic Risk Assessment (PRA) model with FLEX strategy. This approach reduces the conservatisms in security modeling and further acknowledges the possibility for plant operators to mitigate the attack outcomes. A sabotage attack on a hypothetical NPP facility was devised to demonstrate the proposed methodology. Dynamic FoF rules were implemented in EMRALD coupled to SCRIBE3D. This dynamic evaluation revealed an additional 21% system effectiveness in protecting the target set relative to the static modelling approach. Furthermore, the conditional core damage probability could be reduced by up to 46% by crediting operator actions in mitigating the sabotage outcomes. We evaluated the relative importance of each component of the physical security posture included in the model and assessed tradeoffs between components to identify potential opportunities for cost reduction while maintaining a specific level of system effectiveness. Results of the cost analysis will be presented in the conference. This study is expected to help NPP operators in allocating resources optimally to satisfy the security requirements.

97 MATHEMATICS AND COMPUTING↗

Identification of Significant NPP Cyber-Attack Scenarios based on Risk Information

For the last decades, analog instrumentation and control (I and C) systems have been replaced with digital systems in nuclear power plants (NPPs). While there are various advantages of the digital technology for the plant safety, new threats have been introduced such as cyber security. In fact, there have been cyber-attacks on nuclear facilities adopting digital systems. The cyber-attack on the Iran nuclear facility is a typical example which shows the possibility of a cyber-attack on safety critical infrastructures with intra-network. Cyber security has been introduced as one of the significant issues for NPP safety and recently its importance has been more highlighted, but the research in this field is not mature yet. Moreover, there is not much information about cyber security of NPPs. In this work, as a fundamental research for risk evaluation of cyber-attacks, a method to identify significant cyber-attack scenarios on NPPs was proposed based on the probabilistic risk assessment (PRA) method which is widely used for evaluating the safety of NPPs. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Rich-Text based PSA Model Transformation and Verification in RiskA

Nuclear Energy is one of the most possible alternative to fossil energy in large-scale. Nuclear safety is the lifeline of nuclear energy development, and has been an important part of national security, especially after the accident of Fukushima. On the basis of computer codes, reliability engineering and Probabilistic Risk Assessment (PSA) is effective methods to improve the safety of nuclear power plants. After many years of development, the methodologies, applications and relevant soft programs have been quite sufficient in the area of nuclear safety. However, it is still difficult for the current PSA technologies and software to meet the needs of dealing with the problems of quantitatively public risk assessment in the digital society. Especially, there are so many software that adopted different modeling and analyzing methods, which brings difficulties to the comparison, evaluation or verification for different software and models. By using its own academic advantages, the advanced nuclear energy research team, i.e., FDS Team has invested a few hundreds person-years of independent research and development of a reliability and probabilistic safety assessment software system RiskA. The system consists of three main functions: device reliability optimization management, probabilistic safety assessment and instantaneous risk monitoring, and the comprehensive public risk assessment in digital society. RiskA establishes an integrated risk evaluation system for the device reliability, nuclear power plant (NPP) risk monitoring and public risk assessment. Currently, RiskA has successfully been applied in more than 600 organizations and institutes from a variety of fields in 39 countries, involving nuclear, aerospace, defense and so on. For example, RiskA has been used in the safety analysis of International Thermonuclear Experimental Reactor (ITER), FDS series fusion reactor, and the Strategic Priority Research Program of Chinese Academy of Sciences 'the Future Advanced Nuclear Fission Energy - Accelerator Driven Sub-critical (ADS) transmutation system'. Also, RiskA has been used in public risk communication and risk assessment. Among them, Third Qinshan nuclear power plant Risk Monitor (TQRM), which is the China's first domestic nuclear safety analysis software used in the actual online operation, has been highly apprised by renowned experts in the field. Meanwhile, it has been identified as the first domestic nuclear power plant risk monitoring system with completely independent intellectual property rights, and has reached the international advanced level. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparison of Health and Performance Risk for Accelerated Mars Mission Scenarios

This document details the results for a quantitative estimate of the difference in human health and performance risk that crews would face for two hypothetical variations on Mars mission scenarios: an Accelerated Mars Mission (AMM) and a Standard Mars Mission(SMM).NASA goals for Mars mission concepts, duration, and tasks have varied over the years. While neither of the cases considered here are likely to accurately represent the initial mission to Mars, the exercise of evaluating significant differences in mission duration from an astronaut health perspective can provide bounding insight to the level of risk that is likely to be encountered in an eventual Mars mission. Medical Probabilistic Risk Assessment using the Integrated Medical Model (IMM)(1–3)and the NASA Space Radiation Cancer Risk Model (NSCR)(4,5) are used here to help mission planners gain the best insight currently available into the expected magnitude of impacts to astronaut health when undertaking a Mars mission. These impacts occur both in-mission as well as in the long-term health of the astronauts post-mission. These evaluations are currently the best available modeling estimates to characterize and bound the health risks in a proposed mission domain where humans have no experience.

Erik Antonsen↗

Report on Internship Project: Risk-Informed Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plants (NPPs) in USA are facing premature closures due to financial difficulties. A significant contributing factor in the NPP electricity generation cost is Operational and Maintenance (O&M) cost. This research aims to reduce O&M cost by developing a framework which creates flexibility in NPP maintenance program. This framework relies on FLEX portable equipment to reduce NPP risk and to substitute and/or backup fixed equipment in different NPP operation modes. Probabilistic Risk Assessment (PRA) methodology is used to quantify the change of plant risk to justify the framework's applicability. The framework enables plant managers to shift maintenance workload from refueling outage period into online maintenance programs. As a result, it is expected to increase NPP capacity factor while also reducing the risk of unexpected outage. These results are expected to increase NPP electricity generation revenue and decrease O&M costs while complying to existing nuclear safety regulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Grizzly: A Multi-scale and Multi-Physics Tool to Model Aging of Nuclear Power Plant Components

Grizzly is a multi-scale multi-physics tool being developed at Idaho National Laboratory (INL) as part of the US Department of Energy's Light Water Reactor Sustainability program to provide improved safety assessments of systems, components, and structures in nuclear power plants subjected to age-related degradation. Its goal is to provide an improved scientific basis for decisions surrounding license renewal, which would permit operation of commercial nuclear power plants beyond 60 years. Grizzly is based on INL's MOOSE framework, which enables multi-physics simulations in a massively parallel computing environment. The reactor pressure vessel (RPV) has been chosen as the initial application for Grizzly. The primary concern for the RPV is that it becomes increasingly susceptible to fracture initiation at the sites of pre-existing flaws over time. This is because exposure to irradiation and high temperatures embrittles the steel. Assessing the safety of an RPV under transient conditions involves simulations at multiple scales. At the engineering scale, strongly coupled equations of heat conduction and solid mechanics are solved to simulate the global response of the RPV to accident conditions. Sub-models are used to represent regions with pre-existing flaws and the stress intensity factors are evaluated from the domain integrals. Crack propagation is then determined using a model that provides the temperature and neutron fluence dependent fracture toughness of the RPV steel. The ability of Grizzly to provide accurate engineering scale estimates of RPV safety beyond 60 years of operation strongly relies on the predictability of the embrittlement model. Multiple models for embrittlement have been proposed, and the physically based empirical model is implemented in Grizzly. However, the formation of late blooming phases greatly reduces the confidence on the extrapolated values obtained from embrittlement model, which is further exacerbated by the absence of real field data for validation. Experimentally validated lower length scale models can significantly improve the predictability of the embrittlement model beyond the calibrated range and the development of such models is another ongoing effort in Grizzly. The modeling activity in Grizzly spans across different length scales, and can be divided into: (i) Irradiation induced microstructure evolution at the atomistic and single crystal length scale using molecular dynamics, atomistic kinetic Monte-Carlo, phase-field and rate theory; (ii) Effect of the irradiation induced defects on the flow stress and fracture processes at the polycrystalline scale using crystal plasticity. Subsequently, the prediction from these models can be used to obtain irradiation induced ductile-to-brittle transition temperature (DBTT) shifts from specimen-scale simulations; (iii) Global thermo-mechanical response of the RPV under normal and accident scenarios, and probabilistic risk analyses at the engineering scale using the DBTT shifts obtained from the lower length scale models. The item (i) has been discussed in a previous report. In this extended abstract an overview of items (ii) and (iii) is provided. The extended abstract summarizes the current status of the modeling effort under Grizzly. At the engineering scale, reduced order model development is underway using the statistical tool RAVEN. This will allow probabilistic analysis considering a wide range of flaw topologies in a computationally efficient manner. Coupling the irradiation induced defect growth predictions to crystal plasticity is also in progress. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Simplified Multi-Path Event Tree for the Integral, Inherently-Safe Light Water Reactor (I{sup 2}S-LWR)

The Integral, Inherently-Safe Light Water Reactor (I{sup 2}S-LWR) concept aims to raise the bar for nuclear power plant safety while maintaining the economic advantages of large, gigawatt-scale plants.1 To obtain this goal, the project safety team seeks to eliminate initiating events where possible, maximize passivity of safety systems, and optimize a balance of redundancy, diversity, and simplicity of safety systems.2 Achievement of these objectives, particularly the last set, requires detailed, quantitative risk information from the earliest stages of development. Therefore, despite limited design information, we have constructed a preliminary probabilistic risk assessment (PRA) for I{sup 2}S-LWR. Safety implementation for I{sup 2}S-LWR, then, requires an iterative process involving system design, thermal-hydraulic (T/H) and neutronic deterministic analyses, and risk-informing PRA studies. Due to this parallelism, it is vital those team members without PRA expertise quickly and correctly understand preliminary PRA results. To this end, we have developed a method to condense the entire PRA into a single, multi-path event tree (MPET). (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Methods and Techniques for Risk Prediction of Space Shuttle Upgrades

Since the Space Shuttle Accident in 1986, NASA has been trying to incorporate probabilistic risk assessment (PRA) in decisions concerning the Space Shuttle and other NASA projects. One major study NASA is currently conducting is in the PRA area in establishing an overall risk model for the Space Shuttle System. The model is intended to provide a tool to predict the Shuttle risk and to perform sensitivity analyses and trade studies including evaluation of upgrades. Marshall Space Flight Center (MSFC) and its prime contractors including Pratt and Whitney (P&W) are part of the NASA team conducting the PRA study. MSFC responsibility involves modeling the External Tank (ET), the Solid Rocket Booster (SRB), the Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME). A major challenge that faced the PRA team is modeling the shuttle upgrades. This mainly includes the P&W High Pressure Fuel Turbopump (HPFTP) and the High Pressure Oxidizer Turbopump (HPOTP). The purpose of this paper is to discuss the various methods and techniques used for predicting the risk of the P&W redesigned HPFTP and HPOTP.

Hoffman, Chad R.↗

Medical Updates Number 5 to the International Space Station Probability Risk Assessment (PRA) Model Using the Integrated Medical Model

The Integrated Medical Model (IMM) Project has been developing a probabilistic risk assessment tool, the IMM, to help evaluate in-flight crew health needs and impacts to the mission due to medical events. This package is a follow-up to a data package provided in June 2009. The IMM currently represents 83 medical conditions and associated ISS resources required to mitigate medical events. IMM end state forecasts relevant to the ISS PRA model include evacuation (EVAC) and loss of crew life (LOCL). The current version of the IMM provides the basis for the operational version of IMM expected in the January 2011 timeframe. The objectives of this data package are: 1. To provide a preliminary understanding of medical risk data used to update the ISS PRA Model. The IMM has had limited validation and an initial characterization of maturity has been completed using NASA STD 7009 Standard for Models and Simulation. The IMM has been internally validated by IMM personnel but has not been validated by an independent body external to the IMM Project. 2. To support a continued dialogue between the ISS PRA and IMM teams. To ensure accurate data interpretation, and that IMM output format and content meets the needs of the ISS Risk Management Office and ISS PRA Model, periodic discussions are anticipated between the risk teams. 3. To help assess the differences between the current ISS PRA and IMM medical risk forecasts of EVAC and LOCL. Follow-on activities are anticipated based on the differences between the current ISS PRA medical risk data and the latest medical risk data produced by IMM.

Butler, Doug↗

Improving the Fidelity of Capability & Resource Weighting in A Probalistic Risk Assessment Model for Spaceflight

INTRODUCTION NASA’s Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) tool uses Probabilistic Risk Assessment (PRA) to provide an evidence-based, data-driven estimate of how medical system capabilities affect mission outcomes. IMPACT maps condition incidence to available resources thereby facilitating the calculation of outcome metrics that allow the estimation of mission medical risk. Conditions can be nominally categorized as either treated or untreated depending on the availability of necessary diagnostic and therapeutic capabilities. This categorization enables IMPACT to estimate the effect of various medical system configurations on mission outcomes such as crew mortality, disability, crew member down-time, return to duty/recovery, and need for evacuation. IMPACT currently employs an equal weighting, “partial credit” approach to define treatment in which each of the capabilities associated with a given condition contributes an equal amount to management of the condition. This feature enables IMPACT to report values in between “fully untreated” and “fully treated” based on the proportion of capabilities available within the model. However, as is normal in medical/clinical practice, not all individual capabilities contribute equally to medical care. For example, the ability to provide intramuscular epinephrine during an anaphylactic episode contributes more likelihood of overall management success than does the administration of oral diphenhydramine. We hypothesize that weighting the relative contribution of each capability to each specific condition will improve outcome prediction and therefore will better provide mission planners with more nuanced and accurate options when designing space medical systems. METHODS Using a five-point Fibonacci scaling sequence (1, 2, 3, 5, 8) subject matter experts from NASA’s Exploration Medical Capabilities (ExMC) element assigned relative contribution weighting values to each identified capability within IMPACT. Since the relative importance of each capability varies depending on the specific condition, the resulting “partial” weighting was completed for more than 1,600 individual weighting assignments for 666 capabilities across 121 conditions. Each assignment required three-physician concurrence based on the overall importance of the capability to the diagnosis and management of the condition being considered and the difficulty with which it could be improvised by the crew. Once complete, 100,000 IMPACT simulations were run for a 6-month Lunar mission with a 30-day surface stay to evaluate the effect of this modification of the model. RESULTS Partial weighting significantly decreased predicted task time loss (TTL), evacuation, and loss of crew life without causing significant changes to the recommended medical system design. CONCLUSIONS The paucity of real-world referent data to support long-duration space missions of this type limits the ability to judge one predictive analytics method as superior to another. However, since the proposed method significantly reduces and optimizes outcome risks—without changing the medical system design—incorporating a partial weighting methodology is likely to provide a more accurate and operationally-relevant representation of medical risk without compromising IMPACTs ability to inform overarching medical system requirements.

Steller JG↗

Quantitative Risk Analysis Support to Decision-Making for New Systems

Nowadays, it is widely accepted that scenario-based probabilistic risk assessment (PRA) is needed to support key decisions about new space flight systems. However, taking a risk estimate at face value and comparing it with a management “threshold” to determine whether a system is safe enough is too simplistic. This paper discusses considerations that need to accompany PRA results in particular decision contexts. The present point is not to criticize PRA itself; others have eloquently stressed the point that, for complex, high-stakes systems, whatever PRA’s imperfections, doing PRA is better than not doing it. But while all analysis results are hostage to underlying assumptions, this is especially true for PRA, and over the years, PRA results have occasionally been overinterpreted or otherwise misused. In short, there are more enlightened and less enlightened ways to understand and use PRA results. This paper discusses several issues relating to these concerns, and suggests ways of dealing with them.

99 GENERAL AND MISCELLANEOUS↗

How Many Performance Shaping Factors are Necessary for Human Reliability Analysis?

It has been argued that human reliability analysis (HRA) has expended considerable energy on creating detailed representations of human performance through an increasingly long list of performance shaping factors (PSFs). It is not clear, however, to what extent this refinement and expansion of PSFs has enhanced the quality of HRA. Indeed, there is considerable range in the number of PSFs provided by individual HRA methods, ranging from single factor models such as time-reliability curves, up to 50 or more PSFs in some current HRA models. The US Nuclear Regulatory Commission advocates 15 PSFs in its HRA Good Practices (NUREG-1792), while its SPAR-H method (NUREG/CR-6883) espouses the use of eight PSFs and its ATHEANA method (NUREG-1624) features an open-ended number of PSFs. The apparent differences in the optimal number of PSFs can be explained in terms of the diverse functions of PSFs in HRA. The purpose of this paper is to explore the role of PSFs across different stages of HRA, including identification of potential human errors, modeling of these errors into an overall probabilistic risk assessment, quantifying errors, and preventing errors.

99 GENERAL AND MISCELLANEOUS↗

Robustness of RISMC Insights under Alternative Aleatory/Epistemic Uncertainty Classifications: Draft Report under the Risk-Informed Safety Margin Characterization (RISMC) Pathway of the DOE Light Water Reactor Sustainability Program

The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A technical challenge at the core of this effort is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, would be founded on probabilistic characterizations of uncertainty in SSC performance. In the context of probabilistic risk assessment (PRA) technology, there has arisen a general consensus about the distinctive roles of two types of uncertainty: aleatory and epistemic, where the former represents irreducible, random variability inherent in a system, whereas the latter represents a state of knowledge uncertainty on the part of the analyst about the system which is, in principle, reducible through further research. While there is often some ambiguity about how any one contributing uncertainty in an analysis should be classified, there has nevertheless emerged a broad consensus on the meanings of these uncertainty types in the PRA setting. However, while RISMC methodology shares some features with conventional PRA, it will nevertheless be a distinctive methodology set. Therefore, the paradigms for classification of uncertainty in the PRA setting may not fully port to the RISMC environment. Yet the notion of risk-informed margin is based on the characterization of uncertainty, and it is therefore critical to establish a common understanding of uncertainty in the RISMC setting.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving Quantification of Medical Evacuation Risk for Human Spaceflight in the IMPACT Model

Traditionally, mission planners have used a heuristic and qualitative approach to design medical systems based on prior experience however this approach may result in high variability and implicit bias to design and could put missions and crewmembers at risk. The Informing Mission Planning through Analysis of Complex Tradespaces (IMPACT) tool is a probabilistic risk assessment tool designed by NASA to model medical risk in long duration missions outside of low earth orbit (LEO). This tool can quantify risk metrics such as risk of crewmember death, loss of crew task time, and the need for medical evacuation to better inform and augment the more traditional approach to medical system design. The risk metric of Return to Definitive Care (RTDC) represents the likelihood of requiring medical evacuation and has been difficult to quantify in a reliable and standardized manner. Initial development of the RTDC metric was constrained due to the complexity of a medical evacuation decision and the lack of prior spaceflight data and this presentation will discuss the review and improvement process used to increase model accuracy and fidelity.

Prashant Parmar↗

Automatic Selection of High-Fidelity Models and Surrogates for Uncertainty Analysis

Surrogate models (SMs) with distinct features developed in the last decade provide an efficient substitute to the high-fidelity physical simulations. However, it is generally challenging to quantify the accuracy of surrogate models in a region of interest and examine reliability in the overall domain without additional system evaluations. This paper introduces a new scheme, automated adaptive model selection, to adaptively construct and quantify a set of surrogate models and automatically switch between the surrogates and a high-fidelity code. Cross-validation approaches, such as KFold, Leave One Out (LOO) and Leave P Out (LPO), are employed to assess the global accuracy of the surrogates. The switching strategy is based on local validation metrics, crowding distance, that are able to provide an assessment on the goodness of the prediction made by the surrogates. This decision metric decides whether the surrogates are good enough for a certain realization or whether the high-fidelity code needs to be executed. This new scheme has been implemented in Risk Analysis in Virtual ENvironment (RAVEN) software, which can be employed to accelerate the Probabilistic Risk Assessment (PRA) and Uncertainty Quantification (UQ) processes.

97 MATHEMATICS AND COMPUTING↗