Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Planning software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Handling Emergency Management in [an] Object Oriented Modeling Environment

It has been understood that protection of a nation from extreme disasters is a challenging task. Impacts of extreme disasters on a nation's critical infrastructures, economy and society could be devastating. A protection plan itself would not be sufficient when a disaster strikes. Hence, there is a need for a holistic approach to establish more resilient infrastructures to withstand extreme disasters. A resilient infrastructure can be defined as a system or facility that is able to withstand damage, but if affected, can be readily and cost-effectively restored. The key issue to establish resilient infrastructures is to incorporate existing protection plans with comprehensive preparedness actions to respond, recover and restore as quickly as possible, and to minimize extreme disaster impacts. Although national organizations will respond to a disaster, extreme disasters need to be handled mostly by local emergency management departments. Since emergency management departments have to deal with complex systems, they have to have a manageable plan and efficient organizational structures to coordinate all these systems. A strong organizational structure is the key in responding fast before and during disasters, and recovering quickly after disasters. In this study, the entire emergency management is viewed as an enterprise and modelled through enterprise management approach. Managing an enterprise or a large complex system is a very challenging task. It is critical for an enterprise to respond to challenges in a timely manner with quick decision making. This study addresses the problem of handling emergency management at regional level in an object oriented modelling environment developed by use of TopEase software. Emergency Operation Plan of the City of Hampton, Virginia, has been incorporated into TopEase for analysis. The methodology used in this study has been supported by a case study on critical infrastructure resiliency in Hampton Roads.

Tokgoz, Berna Eren↗

The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

Stetson, Howard↗

Flight software requirements and design support system

The desirability and feasibility of computer-augmented support for the pre-implementation activities occurring during the development of flight control software was investigated. The specific topics to be investigated were the capabilities to be included in a pre-implementation support system for flight control software system development, and the specification of a preliminary design for such a system. Further, the pre-implementation support system was to be characterized and specified under the constraints that it: (1) support both description and assessment of flight control software requirements definitions and design specification; (2) account for known software description and assessment techniques; (3) be compatible with existing and planned NASA flight control software development support system; and (4) does not impose, but may encourage, specific development technologies. An overview of the results is given.

Riddle, W. E.↗

Multi-crop area estimation and mapping on a microprocessor/mainframe network

The data processing system is outlined for a 1985 test aimed at determining the performance characteristics of area estimation and mapping procedures connected with the California Cooperative Remote Sensing Project. The project is a joint effort of the USDA Statistical Reporting Service-Remote Sensing Branch, the California Department of Water Resources, NASA-Ames Research Center, and the University of California Remote Sensing Research Program. One objective of the program was to study performance when data processing is done on a microprocessor/mainframe network under operational conditions. The 1985 test covered the hardware, software, and network specifications and the integration of these three components. Plans for the year - including planned completion of PEDITOR software, testing of software on MIDAS, and accomplishment of data processing on the MIDAS-VAX-CRAY network - are discussed briefly.

Sheffner, E.↗

Lessons learned applying CASE methods/tools to Ada software development projects

This paper describes the lessons learned from introducing CASE methods/tools into organizations and applying them to actual Ada software development projects. This paper will be useful to any organization planning to introduce a software engineering environment (SEE) or evolving an existing one. It contains management level lessons learned, as well as lessons learned in using specific SEE tools/methods. The experiences presented are from Alpha Test projects established under the STARS (Software Technology for Adaptable and Reliable Systems) project. They reflect the front end efforts by those projects to understand the tools/methods, initial experiences in their introduction and use, and later experiences in the use of specific tools/methods and the introduction of new ones.

Blumberg, Maurice H.↗

Sandia National Laboratories Advanced Simulation and Computing (ASC) Appraisal Method for the Implementation of the ASC Software Quality Engineering Practices (V.2.0)

This document provides a guide to the process of conducting software appraisals under the Sandia National Laboratories (SNL) ASC Program. The goal of this document is to describe a common methodology for planning, conducting, and reporting results of software appraisals thereby enabling: 1) Identification of improvements in implementation of the software quality engineering (SQE) practices identified in the ASC Software Quality Plan across the ASC Program against objective baselines. 2) Feedback from project teams on SQE opportunities for improvement. 3) Identification of strengths and opportunities for improvement for individual project teams. 4) Guidance to the ASC Program on the focus of future SQE activities. Document contents include process descriptions, templates to promote consistent conduct of appraisals, and an explanation of the relationship of this procedure to the SNL ASC software program. The activities described by this document are under the oversight of SNL ASC Program Director and SNL ASC Program Manager.

42 ENGINEERING↗

NASA Tech Briefs, January 2014

Topics include: Multi-Source Autonomous Response for Targeting and Monitoring of Volcanic Activity; Software Suite to Support In-Flight Characterization of Remote Sensing Systems; Visual Image Sensor Organ Replacement; Ultra-Wideband, Dual-Polarized, Beam-Steering P-Band Array Antenna; Centering a DDR Strobe in the Middle of a Data Packet; Using a Commercial Ethernet PHY Device in a Radiation Environment; Submerged AUV Charging Station; Habitat Demonstration Unit (HDU) Vertical Cylinder Habitat; Origami-Inspired Folding of Thick, Rigid Panels; A Novel Protocol for Decoating and Permeabilizing Bacterial Spores for Epifluorescent Microscopy; Method and Apparatus for Automated Isolation of Nucleic Acids from Small Cell Samples; Enabling Microliquid Chromatography by Microbead Packing of Microchannels; On-Command Force and Torque Impeding Devices (OC-FTID) Using ERF; Deployable Fresnel Rings; Transition-Edge Hot-Electron Microbolometers for Millimeter and Submillimeter Astrophysics; Spacecraft Trajectory Analysis and Mission Planning Simulation (STAMPS) Software; Cross Support Transfer Service (CSTS) Framework Library; Arbitrary Shape Deformation in CFD Design; Range Safety Flight Elevation Limit Calculation Software; Frequency-Modulated, Continuous-Wave Laser Ranging Using Photon-Counting Detectors; Calculation of Operations Efficiency Factors for Mars Surface Missions; GPU Lossless Hyperspectral Data Compression System; Robust, Optimal Subsonic Airfoil Shapes; Protograph-Based Raptor-Like Codes; Fuzzy Neuron: Method and Hardware Realization; Kalman Filter Input Processor for Boresight Calibration; Organizing Compression of Hyperspectral Imagery to Allow Efficient Parallel Decompression; and Temperature Dependences of Mechanisms Responsible for the Water-Vapor Continuum Absorption.

Source record↗

SU-E-J-166: Sensitivity of Clinically Relevant Dosimetric Parameters to Contouring Uncertainty During Post Implant Dosimetry of Prostate Permanent Seed Implants

Purpose: There is a strong evidence relating post-implant dosimetry for permanent seed prostate brachytherpy to local control rates. The delineation of the prostate on CT images, however, represents a challenge as it is difficult to confidently identify the prostate borders from soft tissue surrounding it. This study aims at quantifying the sensitivity of clinically relevant dosimetric parameters to prostate contouring uncertainty. Methods: The post-implant CT images and plans for a cohort of 43 patients, who have received I–125 permanent prostate seed implant in our centre, were exported to MIM Symphony LDR brachytherapy treatment planning system (MIM Software Inc., Cleveland, OH). The prostate contours in post-implant CT images were expanded/contracted uniformly for margins of ±1.00mm, ±2.00mm, ±3.00mm, ±4.00mm and ±5.00mm (±0.01mm). The values for V100 and D90 were extracted from Dose Volume Histograms for each contour and compared. Results: The mean value of V100 and D90 was obtained as 92.3±8.4% and 108.4±12.3% respectively (Rx=145Gy). V100 was reduced by −3.2±1.5%, −7.2±3.0%, −12.8±4.0%, −19.0±4.8%, − 25.5±5.4% for expanded contours of prostate with margins of +1mm, +2mm, +3mm, +4mm, and +5mm, respectively, while it was increased by 1.6±1.2%, 2.4±2.4%, 2.7±3.2%, 2.9±4.2%, 2.9±5.1% for the contracted contours. D90 was reduced by −6.9±3.5%, −14.5±6.1%, −23.8±7.1%, − 33.6±8.5%, −40.6±8.7% and increased by 4.1±2.6%, 6.1±5.0%, 7.2±5.7%, 8.1±7.3% and 8.1±7.3% for the same set of contours. Conclusion: Systematic expansion errors of more than 1mm may likely render a plan sub-optimal. Conversely contraction errors may Result in labeling a plan likely as optimal. The use of MRI images to contour the prostate should results in better delineation of prostate organ which increases the predictive value of post-op plans. Since observers tend to overestimate the prostate volume on CT, compared with MRI, the impact of the contouring uncertainty on V100 and D90 fortunately, has a conservative effect of underestimating the prostate coverage.

60 APPLIED LIFE SCIENCES↗

Knowledge-based control of an adaptive interface

The analysis, development strategy, and preliminary design for an intelligent, adaptive interface is reported. The design philosophy couples knowledge-based system technology with standard human factors approaches to interface development for computer workstations. An expert system has been designed to drive the interface for application software. The intelligent interface will be linked to application packages, one at a time, that are planned for multiple-application workstations aboard Space Station Freedom. Current requirements call for most Space Station activities to be conducted at the workstation consoles. One set of activities will consist of standard data management services (DMS). DMS software includes text processing, spreadsheets, data base management, etc. Text processing was selected for the first intelligent interface prototype because text-processing software can be developed initially as fully functional but limited with a small set of commands. The program's complexity then can be increased incrementally. The intelligent interface includes the operator's behavior and three types of instructions to the underlying application software are included in the rule base. A conventional expert-system inference engine searches the data base for antecedents to rules and sends the consequents of fired rules as commands to the underlying software. Plans for putting the expert system on top of a second application, a database management system, will be carried out following behavioral research on the first application. The intelligent interface design is suitable for use with ground-based workstations now common in government, industrial, and educational organizations.

Lachman, Roy↗

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STK Integrated Message Production List Editor (SIMPLE) for CEO Operations

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade and replace its mission planning and mission operations software systems, which were developed in the Space Shuttle era of the 1980s and 1990s. The impetuses for this change were the planned transition of all workstations to the Windows 7 64-bit operating system and the desire for more efficient and effective use of Satellite Tool Kit (STK) software required for reliable International Space Station (ISS) Earth location tracking. An additional requirement of this new system was the use of the same SQL database of CEO science sites from the SMMS, which was also being developed. STK Integrated Message Production List Editor (SIMPLE) is the essential, all-in-one tool now used by CEO staff to perform daily ISS mission planning to meet its requirement to acquire astronaut photography of specific sites on Earth. The sites are part of a managed, long-term database that has been defined and developed for scientific, educational, and public interest. SIMPLE's end product is a set of basic time and location data computed for an operator-selected set of targets that the ISS crew will be asked to photograph (photography is typically planned 12 to 36 hours out). The CEO operator uses SIMPLE to (a) specify a payload operations planning period; (b) acquire and validate the best available ephemeris data (vectors) for the ISS during the planning period; (c) ingest and display mission-specific site information from the CEO database; (d) identify and display potential current dynamic event targets as map features; (e) compute and display time and location information for each target; (f) screen and select targets based on known crew availability constraints, obliquity constraints, and real-time evaluated constraints to target visibility due to illumination (sun elevation) and atmospheric conditions (weather); and finally (g) incorporate basic, computed time and location information for each selected target into the daily CEO Target List product (message) for submission to ISS payload planning and integration teams for their review and approval prior to uplink. SIMPLE requires and uses the following resources: an ISS mission planning period Greenwich Mean Time start date/time and end date/time), the best available ISS mission ephemeris data (vectors) for that planning period, the STK software package configured for the ISS, and an ISS mission-specific subset of the CEO sites database. The primary advantages realized by the development and implementation of SIMPLE into the CEO payload operations support activity are a smooth transition to the Windows 7 operating system upon scheduled workstation refresh; streamlining of the input and verification of the current ISS ephemeris (vector data); seamless incorporation of selected contents of the SQL database of science sites; the ability to tag and display potential dynamic event opportunities on orbit track maps; simplification of the display and selection of encountered sites based on crew availability, illumination, obliquity, and weather constraints; the incorporation of high-quality mapping of the Earth with various satellite-based datasets for use in describing targets; and the ability to encapsulate and export the essential selected target elements in XML format for use by onboard Earth-location systems, such as Worldmap. SIMPLE is a carefully designed and crafted in-house software package that includes detailed help files for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in May 2012.

Trenchard, Mike↗

SU-F-T-231: Improving the Efficiency of a Radiotherapy Peer-Review System for Quality Assurance

Purpose: To improve the efficiency of a radiotherapy peer-review system using a commercially available software application for plan quality evaluation and documentation. Methods: A commercial application, FullAccess (Radialogica LLC, Version 1.4.4), was implemented in a Citrix platform for peer-review process and patient documentation. This application can display images, isodose lines, and dose-volume histograms and create plan reports for peer-review process. Dose metrics in the report can also be benchmarked for plan quality evaluation. Site-specific templates were generated based on departmental treatment planning policies and procedures for each disease site, which generally follow RTOG protocols as well as published prospective clinical trial data, including both conventional fractionation and hypo-fractionation schema. Once a plan is ready for review, the planner exports the plan to FullAccess, applies the site-specific template, and presents the report for plan review. The plan is still reviewed in the treatment planning system, as that is the legal record. Upon physician’s approval of a plan, the plan is packaged for peer review with the plan report and dose metrics are saved to the database. Results: The reports show dose metrics of PTVs and critical organs for the plans and also indicate whether or not the metrics are within tolerance. Graphical results with green, yellow, and red lights are displayed of whether planning objectives have been met. In addition, benchmarking statistics are collected to see where the current plan falls compared to all historical plans on each metric. All physicians in peer review can easily verify constraints by these reports. Conclusion: We have demonstrated the improvement in a radiotherapy peer-review system, which allows physicians to easily verify planning constraints for different disease sites and fractionation schema, allows for standardization in the clinic to ensure that departmental policies are maintained, and builds a comprehensive database for potential clinical outcome evaluation.

60 APPLIED LIFE SCIENCES↗

Distribution Substation Planning Toolkit (dsp-toolkit) v1.0

The Distribution Substation Planning Toolkit (DSP Toolkit) is a software suite designed to streamline the planning and optimization of distribution substations. This toolkit offers a comprehensive set of tools and APIs for data curation, short-term electric load forecasting, and weather-sensitive load adjustment, making it an essential resource for utility companies, engineers, and researchers. Features • Data Preprocessing and Curation: Efficiently manage and preprocess large datasets to ensure high-quality input for analysis. • Short-Term Load Forecasting: Utilize data-driven models to predict short-term electric loads accurately. • Weather-Sensitive Modeling: Automatically adjust load forecasts based on weather data to predict future peak demands more precisely. Uses The DSP Toolkit is ideal for planning and optimizing distribution substations, providing a user-friendly interface and comprehensive documentation. It is suitable for both novice and experienced users, facilitating efficient and accurate planning processes. Advantages • Efficiency: Automates complex planning tasks, reducing manual effort and minimizing errors. • Scalability: Handles large datasets and complex models, making it suitable for large-scale projects. • Community and Support: Open-source with active community contributions, ensuring continuous improvement and support. • Extensibility: Easily extendable with custom modules and plugins, allowing users to tailor the toolkit to their specific needs. The DSP Toolkit stands out by offering a robust, flexible, and user-friendly solution for distribution substation planning. Public Abstract

Li, Han [Lawrence Berkeley National Laboratory (LB↗

Waste Compliance and Tracking System (WCATS) Version 3 Requirements Document

This document describes the end-user requirements for the Waste Compliance and Tracking System (WCATS) project in accordance with the WCATS Software Quality Management Plan, EPC-WMP-WCATSPLAN-001. The WCATS application shall support the generation, characterization, processing, and shipment of LANL radioactive, hazardous, and industrial waste. Regulatory drivers include RCRA hazardous waste, DOT shipping, NNSA nuclear material control and accountability, DOE nuclear safety, TSDF permit, and transuranic waste certification requirements. The system will utilize a task-based architecture that supports the spectrum of treatment, storage, disposal, administrative, and characterization based unit operations necessary to manage waste from cradle to grave. The application design shall readily accommodate new facilities, processes, workflow, signature requirements, and so forth, via end-user established metadata. WCATS will provide support for representing waste storage and disposal facilities, buildings, rooms, and grid layouts (x, y, z) to support waste and radioactive material inventory management. Nuclear material at risk (MAR), DOE hazard rating (e.g., Category II facility) compliance per DOE-STD-1027, and permit inventory requirements will be configurable for any storage or disposal facility, or waste operation, and the system will automatically evaluate and enforce those requirements. In addition, the application will support the characterization and management of the entire range of hazardous and radioactive wastes (TRU, MTRU, LLW, MLLW, hazardous waste, etc.) that might be colocated or processed at a permitted facility. Some capabilities not found in traditional systems include user-defined tank systems for liquid waste, user-defined work paths (i.e., sequence of operations), and an equipment subsystem for tracking the calibration, maintenance, and inspection of tools used to process waste, such as torque wrenches, scales, pH probes, etc. The application incorporates a desktop and mobile user interface as shown in Figure 1. The mobile interface supports field operations, such as waste item characterization, intra-facility transfers, internal and external audits, and shipment preparation and receipt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FAST-1.0 Software Release Document

The purpose of this document is to detail the release of FAST-1.0 and the documents that accompany the development and testing of FAST-1.0. Design requirements were for FAST-1.0 developed in the NRC Statement of Work (SOW) for NRC Agreement Number NRC-HQ-25-14-D-001 and are transcribed to this document as part of the Software Quality Assurance Plan for the FAST Code System, PNNL-28767. FAST 1.0 represents the merger of the FRAPCON and FRAPTRAN codes and as such FAST-1.0 performs steady state and transient fuel performance calculations described below. FAST-1.0 calculates the steady state response of light-water reactor fuel rods during long-term burnup. The code calculates temperature, pressure, and deformation of a fuel rod as functions of time-dependent fuel rod power and coolant boundary conditions. The phenomena modeled by the code include: 1) heat conduction through fuel and cladding to the coolant; 2) cladding elastic and plastic deformation; 3) fuel-cladding mechanical interaction; 4) fission gas release from the fuel and rod internal pressure; and 5) cladding oxidation. FAST is used to perform independent calculations for regulatory evaluations of fuel performance under normal operation and anticipated operational occurrences (AOOs).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Progress Towards NQA-1 for Cardinal in FY25

Cardinal is a wrapping of the GPU-oriented spectral element Computational Fluid Dynamics (CFD) code NekRS and the Monte Carlo particle transport code OpenMC within the Multiphysics Object-Oriented Simulation Environment (MOOSE). Cardinal provides high-resolution thermal-hydraulics and/or radiation transport feedback to MOOSE multiphysics simulations. Multiphysics feedback is implemented in a geometry-agnostic manner which eliminates the need for rigid one-to-one mappings. A generic data transfer implementation also allows NekRS and OpenMC to couple to any MOOSE application, enabling a broad set of multiphysics capabilities. Cardinal simulations can also leverage combinations of MPI, OpenMP, and GPU resources. Cardinal continuous development and improvement efforts have led to the software being considered as a high-fidelity design and licensing tool for key areas of nuclear reactor relevant physics, including neutron transport, fluid flow, heat transfer, and mechanical processes. The fast development and expansion of the software from a pure R&D framework towards its application in the nuclear industry and regulation require a focus on developing, enhancing,and maintaining Cardinal’s software quality through strict adherence to a Software Quality Assurance (SQA) framework and SQA program. To facilitate compliance with SQA standards, the Cardinal SQA Program was initiated during Fiscal Year 2023 (FY23). During the development of the Cardinal SQA Program, multiple gaps have been identified. These gaps are primarily related to model verification and code pedigree as they relate to the use of Cardinal as an analysis tool. These gaps were captured in a report published in 2023. A second report highlighted the progress made during Fiscal Year 2024 (FY24) and described Argonne’s effort to document and integrate software verification within Cardinal’s software development process. This report documents the progress made towards NQA-1 for Cardinal in the Fiscal Year 2025 (FY25). All cases in the expanded Continuous Integration (CI) suite of NekRS are included in this report which test the solvers and modules available in NekRS exhaustively. The NekRS tests are integrated with the Cardinal CI suite and made available in publicly accessible Github documentation. Following the CI practice permits integrating of source code changes frequently and ensuring that the integrated codebase clears the verification testing for the software. Also in this report is a brief overview of the development of the Cardinal Software Quality Assurance Plan (SQAP) that was done in FY25, though it should be noted that the rest of the documentation for the SQA program needs to be developed in a future step of this task.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FAST-1.0 Software Acceptance Testing Report

The purpose of this document is to detail the software testing of FAST-1.0 through unit, integration, and assessment tests. More than 400 tests were designed to provide coverage of the requirements for FAST-1.0. These requirements were developed in the NRC Statement of Work (SOW) for NRC Agreement Number NRC-HQ-25-14-D-001 and are transcribed to this document as part of the Software Quality Assurance Plan for the FAST Code System, PNNL-28767. FAST 1.0 represents the merger of the FRAPCON and FRAPTRAN codes and as such FAST-1.0 performs steady state and transient fuel performance calculations described below. FAST-1.0 calculates the steady state response of light-water reactor fuel rods during long-term burnup. The code calculates temperature, pressure, and deformation of a fuel rod as functions of time-dependent fuel rod power and coolant boundary conditions. The phenomena modeled by the code include: 1) heat conduction through fuel and cladding to the coolant; 2) cladding elastic and plastic deformation; 3) fuel-cladding mechanical interaction; 4) fission gas release from the fuel and rod internal pressure; and 5) cladding oxidation. FAST is used to perform independent calculations for regulatory evaluations of fuel performance under normal operation and anticipated operational occurrences (AOOs). FAST calculates the temperature and deformation history of a fuel rod as a function of time-dependent fuel rod power and coolant boundary conditions. The phenomena modeled by FAST include: 1) heat conduction; 2) heat transfer from cladding to coolant; 3) elastic-plastic fuel and cladding deformation; 4) cladding oxidation; 5) fission gas release; and 6) fuel rod gas pressure. FAST code assessment, development and maintenance drive a significant portion of the NRC fuel research activities and the tools are used in a substantial number of regulatory products. Given the centrality of the FAST code to the effectiveness of fuel research, it is critical to assess, develop and maintain this tool.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗