Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Pilot scale testing of an advanced solvent in a 0.7 MWe post-combustion CO 2 capture unit

An advanced Amine Promoted Buffer Solution (APBS), APBS-CDRMax® (CDRMax), developed by Carbon Clean Solutions Limited (CCSL), was tested at the 0.7 MWe CO 2 capture facility at Kentucky Utilities E.W. Brown Generation Station using a heat-integrated two-staged stripping CO 2 capture process. The performance of the solvent was evaluated to determine operating conditions that maximized the cyclic capacity of the solvent and results in energy savings. The regeneration energy ranged from 2.9 to 3.3 GJ/ton CO 2 with 14 vol % (dry) CO 2 inlet and approximately 90 % capture. The difference in the reboiler specific heat duty at stripper pressures of 1.7 and 2.1 bar was minimal as similar amounts of water vapor were observed in the CO 2 product stream at stripper outlet. Recycling of product CO 2 increased the inlet CO 2 concentration to the absorber from 14 to 16 vol% which enhanced mass transfer from the gas to the solvent resulting in about 5 % reduction in the energy of regeneration at the lower stripper pressure. The solvent circulation rate was reduced by about 30 % relative to previous 30 wt% MEA campaign for the CO 2 target capture of 90 %. Finally, the reduced solvent make-up rate of CDRMax shows promise for capital and operating cost savings for post-combustion CO 2 capture.

42 ENGINEERING↗

SunDial – An Integrated SHINES System to Enable High-penetration Feeder-level PV

The Project Team of Fraunhofer USA, National Grid, and IPKeys developed and conducted a pilot deployment of the SunDial system, a virtual power plant platform that enables high-penetrations of solar PV to be integrated into the distribution grid. The pilot was conducted over a 15-month period from August 2018 through October 2019 on a National Grid distribution feeder in Shirley, MA. A vendor-agnostic control platform (the “Global Scheduler”) optimally shaped the net load for a virtual portfolio of non-co-located DERs based on user-defined policy objectives. The goal of the SunDial project was to simplify and reduce the risk associated with the deployment of solar in high-penetration environments by: (1) Developing an open-source, vendor-agnostic dispatch platform that can be readily adapted to optimize control of DERs over a variety of use cases; (2) Developing auto-calibrating load and solar prediction methodologies that can be readily implemented and scaled to new deployments; (3) Developing a methodology to use demand-side management with traditional electrochemical energy storage to provide “load shaping” services in high solar penetration environments; (4) Using grid-scale storage to minimize short-term intermittency association with PV production; and (5) Deploying on the National Grid distribution system to gain experience on the potential for (and limits of) integrated storage with demand-side management.

14 SOLAR ENERGY↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Slipstream Testing of Amine-Based Solvents at a Low-Rank Coal-Fired Power Plant

Conference presentation for 38th Annual International Pittsburgh Coal Conference, Virtual, September 20–23, 2021. To better assess mitigation strategies for aerosol reduction to extend solvent life, the University of North Dakota Energy & Environmental Research Center (EERC) installed a pilot-scale CO 2 absorption system at a lignite-fired plant in central North Dakota. The pilot-scale system was operated using both commercial KS-1™ solvent and advanced KS-21™ solvent provided by Mitsubishi Heavy Industries (MHI). MHI’s proprietary amine emission reduction unit (AERU™) technology was installed downstream of the absorber columns to reduce solvent losses by recovering amines at the system outlet. Fine particulate loading was measured throughout the capture system with and without a WESP operating and using both solvents. Captured particulate was brought back to the EERC to be analyzed for chemical composition and to be examined by scanning electron microscopy for particulate structure. These variables were then correlated to performance of particulate control devices in reducing aerosol formation and solvent losses.

01 COAL, LIGNITE, AND PEAT↗

Wastewater Recycling Using a Hygroscopic Cooling System

This project by the Energy & Environmental Research Center (EERC), Baltimore Aircoil Company (BAC), and Great River Energy (GRE) evaluated the concept of recycling wastewater at a coal-fired power plant using a hygroscopic cooling system, which is an evaporative cooling technology analogous to conventional cooling towers, except that sparingly soluble dissolved solids are precipitated and removed as waste solids instead of purging them with a liquid blowdown stream. This technology can maximize the use of plant makeup water by obtaining useful evaporative cooling from wastewater while minimizing the volume of wastes needing disposal. Experimental activities were conducted in two phases, a laboratory-based evaluation of the properties of wastewater from the host site, GRE’s Coal Creek Station near Underwood, North Dakota, and a field test of a small pilot hygroscopic cooling system at the host site power plant. Findings from the laboratory study informed the design of the pilot system and the system’s field test performance served as the basis for a techno-economic analysis (TEA) of the hygroscopic recycling concept. At the preferred operating conditions identified during the TEA, the wet-bulb approach temperature of the tower was 7.3°C (13°F) and the volume of blowdown produced by the plant was reduced to 5.4% of its incoming volume. Waste solids produced during field testing were classified as nonhazardous waste based on the measured hazardous element content and evaluation of their leaching potential. However, to qualify as a solid for landfill disposal i.e., as determined by the U.S. Environmental Protection Agency’s paint filter test, it appears that a dewatering step beyond hydrocyclone separation is needed. The baseline levelized cost of wastewater disposal (LCWD) for hygroscopic wastewater recycling was estimated to be $\$ $3.69–$\$ $3.72 per m3 of plant blowdown. Capital cost was estimated to contribute over 54% to the LCWD, and parameters that impact capital cost such as the heat exchange coil material of construction and the tower’s wet-bulb approach temperature were identified as having the greatest impact on overall LCWD. A LCWD estimate prepared for the same application but using thermomechanical brine evaporation was almost 40% higher than that calculated for hygroscopic cooling, despite recovering distilled-quality water for reuse, while the LCWD for disposal-only, deep well injection was estimated to be 30% lower compared to hygroscopic wastewater recycling.

01 COAL, LIGNITE, AND PEAT↗

Scale-up Testing of Advanced Polaris Membrane in CO2 Capture Technology

This final technical report describes work conducted by Membrane Technology and Research, Inc. (MTR) for the U.S. Department of Energy (DOE), National Energy Technology Lab (NETL) on the scale-up and testing of advanced Polaris™ membrane CO2 capture technology at the Technology Centre Mongstad (TCM) under award number DE-FE0031591. The work was performed from August 1, 2018 through January 31, 2023. The overall goal of this project was to design, build and operate an advanced Polaris membrane CO2 capture system at TCM. MTR was assisted in this project by Trimeric Corporation (Trimeric), an engineering design services company, the Carbon Capture Simulation for Industry Impact (CCSI2), a partnership among national laboratories, industry, and academic institutions, and the Technology Centre Mongstad (TCM), who provided the host site for the slipstream field test. This report details the work conducted to scale-up MTR’s second-generation (Gen-2) Polaris membrane and advanced planar membrane modules to a final form factor optimized for commercial use; validate their performance in an engineering-scale field test at TCM; and to show the potential of the MTR process to meet DOE CO2 capture targets from large source point emitters. Work for this project included membrane optimization and scale-up, advanced planar module design and fabrication, design and fabrication of an engineering-scale field test membrane skid, operation of the field test skid processing Residue Fluid Catalytic Cracker (RFCC) industrial flue gas at TCM, and a detailed techno-economic analysis (TEA) of the MTR membrane post-combustion process for CO2 capture. This project validated recent membrane technology advancements at the engineering-scale, moves the MTR advanced post-combustion capture technology to TRL-6, and mitigates risk in future Large Pilot or Demonstration scale-up activities.

20 FOSSIL-FUELED POWER PLANTS↗

Application of a Heat Integrated Post-combustion CO 2 Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant (Final Technical Report)

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0007395. In accordance with the Project Management Plan (PMP), Revision F dated 5/10/2019, and Statement of Project Objectives (SOPO) within, the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) has successfully demonstrated a unique, versatile CO 2 capture system (CCS) using a heat integrated process combined with two-stage stripping for process intensification, heat recovery and demineralized (DM) water generation. This project involved the design, fabrication, installation, testing of and data analysis from the UK CAER 0.7 MWe small pilot scale CO2 capture process installed at Kentucky Utilities (KU) E.W. Brown Generating Station in Harrodsburg, KY. During each of the four project Budget Periods (BPs), UK CAER met all project deliverables, all project milestones, with National Energy Technology Laboratory (NETL) approved adjustments made to the campaign long-term hours during BP4. The CCS was constructed in modular skids. Two solvent campaigns were initially conducted; the first with a 30 wt% monoethanolamine (MEA) as a baseline, and the second with the Hitachi H3-1 advanced solvent. Additional tests were performed with two advanced solvents including CAER and Proprietary Solvent C. Short-period testing with a higher concentration of 40 wt% MEA was conducted to evaluate the potential saving with high alkalinity. From the various solvent campaigns, unique aspects of the UK CAER CCS technology, as well as its flexibility and versatility were experimentally validated and demonstrated. With respect to solvent evaluation efforts in identifying candidates with significant operational and capital cost savings potential, performance of solvents were evaluated to determine the energy requirements for regeneration; environmental impacts from secondary emissions and degradation products; degradation rates, solvent make-up rates and stability. The assessments were done from parametric tests that determined optimum operating conditions for the individual solvents to maximize process efficiency and minimize the parasitic load of the power plant, and from long term campaigns (1000 hours for 30 wt% MEA and 1000 hours for H3-1) which collectively informed the techno-economic analyses (TEA) of the process. The long term campaigns included corrosion studies which used three types of metal coupons in different sections of the process: (absorber, primary stripper, lean carbon-loaded and rich carbon loaded flow streams in process) to mimic heat and flow dynamics process equipment were exposed to. The estimated corrosion rates were used to elucidate corrosion mechanisms and to further guide process material selection for potential capital cost savings.

gas separation↗

Advanced Physics-Based Fluid System Performance Monitoring to Support Nuclear Power Plant Operations. Final CRADA report

This project targeted performance monitoring requirements for nuclear power plants with the goal of improving plant economics. We introduced a new and innovative technology to the industry that can reduce operations staffing levels by automating surveillance and can reduce maintenance staffing levels by providing early detection of degrading equipment. A beta-stage release of the PRO-AID power plant equipment fault diagnostic software ready for deployment in nuclear power plants will be delivered and demonstrated in a utility pilot project. To provide for efficient use of DOE funds the aim is to generate a minimum viable product for which we can prove the value of the product. The end state product will be serviceable for use in either a simulator environment or plant environment. The former provides a means for demonstration of the diagnostic capability for faults unlikely to be encountered in day-to-day operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Development and Testing of an Integrated Acid Mine Drainage (AMD) Treatment and Rare Earth/Critical Mineral Plant

The overall objective of this project was to design, construct, and test a pilot-scale continuous process for efficiently treating acid mine drainage (AMD) while producing rare earth element/critical mineral (REE/CM) concentrates. The process technology evaluated in this project included two distinct operations: 1. an upstream pre-concentration unit that treats raw AMD to environmentally compliant discharge standards while capturing an REE/CM preconcentrate, and 2. a downstream REE purification process that further enriches the pre-concentrate while producing mixed or partially separated rare earth oxides (REOs). The project team members successfully completed all of the proposed goals of the project and advanced the technology readiness levels (TRL) of the constituent operations to TRL 7 for the upstream concentration unit (full-scale system demonstration) and TRL 6 for the downstream purification process (pilot-scale demonstration).

01 COAL, LIGNITE, AND PEAT↗

Engineering-Scale Test of a Water-Lean Solvent for Post-Combustion Capture

EPRI, Pacific Northwest National Laboratory, RTI International, and their project collaborators developed an engineering-scale test of a new water-lean solvent, N-(2-ethoxyethyl)-3-morpholinopropan-1-amine (EEMPA or 2-EEMPA) as a post-combustion CO 2 capture solvent for power plant applications. This test was conducted using the Pilot Solvent Test Unit at the National Carbon Capture Center. The primary objective of this test was to collect long-term data operating EEMPA with both coal- and natural gas-representative flue gases at the approximately 0.5 MW e -equivalent scale (5–10 metric tons CO 2 /day captured). This report details the activities preparing for that test, data collected during the test campaign, and analyses and interpretations of that data.

20 FOSSIL-FUELED POWER PLANTS↗

Technoeconomic Analysis of Novel PV Plant Designs for Extreme Cost Reductions

This project sought to gain a deeper understanding of the cost and performance of future solar photovoltaic (PV) plant components, including bifacial PV modules, tandem PV modules, increased plant voltage architectures, and module-level power electronics, and how they may be integrated into new PV plant designs to significantly reduce the levelized cost of electricity (LCOE) of PV. This was done through extensive modeling of current PV plants and future technologies in three different locations, informed by a comprehensive literature review and informational interviews to develop performance and cost assumptions for these technologies. Sensitivities were conducted to understand tradeoffs between different design options, such as the added energy from increasing row spacing versus additional land costs. An optimization tool was then created utilizing an evolutionary algorithm to determine an optimal PV plant configuration for a given set of technologies that resulted in minimized plant LCOE based upon typical performance and cost inputs.

14 SOLAR ENERGY↗