Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Treatability Study of Pentaborane(9)

Procedures for the safe destruction of liquid pentaborane(9), B5H9, by solvolysis were investigated. The objective of the study was to establish the optimum conditions for a pilot plant operation that would use water, or alcohol, or water-alcohol mixtures as the solvolysis reagent Small amounts of B5H9 sprayed from a syringe will not necessarily enflame, nor will a small pool on a spot plate. Therefore, a procedure was developed to reproducibly demonstrate the flammability of B5H9 In these tests every sample of neat B5H9 ignited and burned with a very sooty flame till the sample was consumed. The spontaneous self-ignition of B5H9 was quenched by the addition of small concentrations of the ethers THF (tetrahydrofuran) or DME (1,2-dimethoxy ethane). It was found that 10% (volume) of either provided total quenching with a large margin of safety. When these stabilized solutions were exposed to air, they decomposed and evaporated leaving a residue that was identified by NMR analysis as boric acid. Most of the laboratory solvolysis experiments used the 90% B5H9, 10% THF solution. This mixture was safer to handle and its solvolysis reactivity was virtually identical to that of 100% B5H9. Reaction rates were analyzed by measurement of hydrogen evolved during the solvolysis reactions. In terms of the minimum overall complete reaction time, the data indicate that 50150 alcohol/water is the optimum solvolysis reagent. This reaction produced a mixture of boric acid, B(OH)3, and triethoxyborane, B(OEt)3 [Et = C2H5], and mixed exchange derivatives thereof.

McDonald, Joseph K.↗

Characterization of a New Hypergolic Fuel Candidate

2-(Dimethylamino)ethylazide was identified by Darren Thompson of the US Army Aviation Missile Command (AMCOM) as a promising candidate to replace hydrazine derivatives in certain hypergolic fuel applications, and as a monopropellant using a heated catalyst bed. The preparation of the material has been scaled up to the pilot plant level, and evaluations of its relevant properties have indicated that it may have broader application than was originally foreseen. Physical, chemical, and hazards properties are reported in this paper

Manzara, Tony↗

A 100 kW-Class Technology Demonstrator for Space Solar Power

A first step in the development of solar power from space is the flight demonstration of critical technologies. These fundamental technologies include efficient solar power collection and generation, power management and distribution, and thermal management. In addition, the integration and utilization of these technologies into a viable satellite bus could provide an energy-rich platform for a portfolio of payload experiments such as wireless power transmission (WPT). This paper presents the preliminary design of a concept for a 100 kW-class free-flying platform suitable for flight demonstration of technology experiments. Recent space solar power (SSP) studies by NASA have taken a stepping stones approach that lead to the gigawatt systems necessary to cost-effectively deliver power from space. These steps start with a 100 kW-class satellite, leading to a 500 kW and then a 1 MW-class platform. Later steps develop a 100 MW bus that could eventually lead to a 1-2 GW pilot plant for SSP. Our studies have shown that a modular approach is cost effective. Modular designs include individual laser-power-beaming satellites that fly in constellations or that are autonomously assembled into larger structures at geosynchronous orbit (GEO). Microwave power-beamed approaches are also modularized into large numbers of identical units of solar arrays, power converters, or supporting structures for arrays and microwave transmitting antennas. A cost-effective approach to launching these modular units is to use existing Earth-to-orbit (ETO) launch systems, in which the modules are dropped into low Earth orbit (LEO) and then the modules perform their own orbit transfer to GEO using expendable solar arrays to power solar electric thrusters. At GEO, the modules either rendezvous and are assembled robotically into larger platforms, or are deployed into constellations of identical laser power-beaming satellites. Since solar electric propulsion by the modules is cost-effective for both self-transport of the modules from LEO to GEO, and for on-orbit stationkeeping and repositioning capability during the satellite’s lifetime, this technology is also critical in technology development for SSP. The 100 kW-class technology demonstrator will utilize advanced solar power collection and generation technologies, power management and distribution, advanced thermal management, and solar electric propulsion. State-of-the-art solar concentrators, highly efficient multi-junction solar cells, integrated thermal management on the arrays, and innovative deployable structure design and packaging make the 100 kW satellite feasible for launch on one existing launch vehicle. Early SSP studies showed that a major percentage of the on-orbit mass for power-beaming satellites was from massive power converters at the solar arrays, at the bus, at the power transmitter, or at combinations of these locations. Higher voltage mays and power management and distribution (PMAD) systems reduce or eliminate the need for many of these massive power converters, and could enable direct-drive of high-voltage solar electric thrusters. Lightweight, highly efficient thermal management systems are a critical technology that must be developed and flown for SSP feasibility. Large amounts of power on satellites imply that large amounts of waste heat will need to be managed. In addition, several of the more innovative lightweight configurations proposed for SSP satellites take advantage of solar concentrators that are intractable without advanced thermal management technologies for the solar arrays. These thermal management systems include efficient interfaces with the WPT systems or other high-power technology experiments, lightweight deployable radiators that can be easily integrated into satellite buses, and efficient reliable thermal distribution systems that can pipe heat from the technology experiments to the radiators. In addition to demonstrating the integration and use of these mission-critical technologies, the 100 kw-class satellite will provide a large experiment deck for a portfolio of technology experiments. Current plans for this technology demonstrator allow 2000 kg of payload capability and up to 100 kW of power. The technology experiments could include one or more wireless power transmission demonstrations, either to the Earth’s surface or to a suitable space-based receiver. Technology experiments to quantify the on-orbit performance of critical technologies for SSP or space exploration are welcomed. In addition, the technology experiments provide an opportunity for international cooperation, to advance technology readiness levels of SSP technologies that require flight demonstration. This paper will present the preliminary design for a 100 kW solar-powered satellite and a variety of technology experiments that may be suitable for flight demonstration. In addition, a space-to-Earth-surface WPT experiment will be discussed.

Connie Carrington↗

Current NASA In-Situ Resource Utilization (ISRU) Strategic Vision

Perform development to TRL 5/6 through ground demonstration in relevant environment. Perform component/subscale subsystem flight demonstrations on small/mid-size landers. Assess and characterize water in volatiles in lunar polar shadowed regions and craters. Reduce risk of ISRU for mission critical consumables through Integrated End-to-End Flight Demonstrations (pilot scale). Establish initial Human Mission Scale production capability to promote sustainable operations and as anchor for commercial involvement. Identify and characterize polar region environment and resources/volatiles for Science and future Exploration/Commercial applications. Provide ground-truth physical, mineral, and water/volatile resource characteristic information at multiple locations to provide geological context for science-focused theories of volatile placement and initial mining assessments.Test technologies and processes to reduce risk of future extraction/mining systems. Quantify concentration and lateral/vertical distribution of resources/volatiles. Utilize ISRU capabilities to Extend and Enhance Human Lunar Exploration Missions. Provide oxygen (and fuel) to enable reusable human lunar lander (10+ MT/yr O2)Process carbon-based crew waste/trash into gases and propellants; can reduce logistics while minimizing public perception issues (alternative is conversion to radiation shielding). Scavenge unused propellants and hardware from spent landers. Metal extraction from regolith as feedstock for in situ and in space manufacturing demonstrations. Civil engineering and construction aimed at future outpost/infrastructure build-up. Develop and Demonstrate ISRU for Human Mars Missions. ISRU for propellant production (10-15 MT/yr); Liquefy, store, transfer, and refuel ascent vehicle. Use Moon for operational experience and mission validation for Mars: Pre-deployment & remote activation and operation without crew. Storing and transferring mission consumables Landing crew with empty tanks with ISRU propellants already made and waiting. Support/Promote Commercialization of Space. Large scale polar ice mining (100+ MT/yr water)O2/H2 propulsion for landers/cis-lunar transportation with surface and in space depots. In situ construction and energy expansion at mining and human outpost site(s). ISRU Ground Development. Develop and advance ISRU technologies to enable acquisition of resources and processing into mission consumables. Utilize Multi-center collaboration with a portfolio that includes internal NASA work, external contracts, and collaborative agreements/partnerships. Where appropriate, develop lunar ISRU components and subsystems with a Mars-forward application. Engage industry through public-private partnerships to lay the foundation for long-term lunar and space economic development. Spin-in/spin-out technologies for terrestrial applications and industry (mining, oil & gas, alternative energy, construction). Flight Demonstration Path to Operational ISRU. Utilize small demonstrations with near off-the-shelf hardware to obtain critical information quickly on lunar resources and operations. Demonstrate critical technologies and processes that interact with lunar materials and environments. Perform 'pilot plant' demonstrations at architecture relevant scales and durations to reduce the risk for ISRU-provided products for critical human mission applications.

In-situ Resource Utilization↗

Long -Term Architecture Development For The Moon And M

Developing an enterprise-level architecture encompassing future human-robotic science and exploration at the Moon and Mars requires a visionary approach that ensures NASA is responsive to national priorities and global science and technology advancement objectives. While the initial capabilities needed to return humans to the Moon may be well understood, NASA is still formulating a long-term infrastructure at the Moon and working to narrow the trade space for the first human missions to Mars. This paper will focus on the formulation and current status of engineering and design applications for a long-term and robust lunar architecture that will implement the Artemis Base Camp concept, including pre-formulation activities and elements currently in formulation. Authors will demonstrate how the Moon-to-Mars campaign approach fosters commonality of requirements and standards across individual mission elements, as well as multi-destination systems and operations, to reduce risk and encourage healthy competition in the growing space market. Among the Artemis Base Camp elements discussed will be multiple surface mobility elements, a fixed, anchoring surface habitat, fission surface power, and an in-situ resource development pilot plant. The narrative will clearly illustrate the direct evolution of the base camp elements to a minimal Mars architecture concept, and also outline unique development efforts that will be required in the next decade to make it possible to send humans to the Red Planet as early as the 2030s.

Greg Chavers↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Overview of NASA ISRU Plans, Priorites, and Activities

Introduction:The National Aeronautics andSpace Administration (NASA) of the United States ofAmerica (US) has initiated the Artemis Moon to Marsprogram to send astronauts (the first woman andperson of color) back to the lunar surface, create asustainable human lunar exploration program, andlead the first human exploration mission to the Marssurface in the 2030’s [1]. A major objective of thisprogram is to characterize the resources that exist onthe Moon and Mars, and learn how to utilize them forsustained and affordable exploration. Commonlyknown as In Situ Resource Utilization (ISRU), thesearch for, acquisition, and processing of resources inspace has the potential to greatly reduce thedependency on transporting mission consumables andinfrastructure from Earth, thereby reducing missioncosts, risks, and dependency on Earth.ISRU is Enabling: Through the extraction andprocessing of resources into mission commoditiessuch as rocket propellants, life support consumables,and fuel cell reactants, ISRU enhances and evolvesthe cis-lunar, lander, and surface transportationsystems required for human exploration; expandingand enhancing HOW humans can explore and returnfrom the Moon. Through the extraction andprocessing of resources into metals, silicon, and othermanufacturing and construction feedstock, ISRUenhances and allows for the expansion of criticalinfrastructure using in situ manufacturing andconstruction capabilities that influence WHAT humanscan do on the Moon and in cis-lunar space. Becauseof this, ISRU supports and enables commercialinvolvement beyond NASA and governmentalagencies by both lowering the cost of sustainedtransportation to/from/on the Moon as well assupporting the market required for needing thesetransportation systems. Strategic Framework:To achieve this vision,NASA’s Space Technology Mission Directorate(STMD) ensures the coordinated development ofISRU and other critical space and surfaceinfrastructure elements such as propulsion, power,manufacturing, construction, and robotics through theStrategic Technology Architecture Roundtable(STAR) process. Through STAR, an integratedframework and process has been created allowing forcapabilities and technologies to be linked andassessed, gaps to be identified, specifications andmetrics to be established, and provide a means toprioritize and implement technology development andmissions. A critical part of the STAR effort has beenthe establishment of the Strategic Framework thatorganizes all work under four major Thrusts (Go,Land, Live, and Explore) and identifies the drivingOutcomes for each of these Thrusts. From the Thrustsand Outcomes, all work can be categorized and linkedbetween Capability Areas, and Technology Gaps canbe identified and addressed (Figure 1.)Figure 1. Strategic Framework and STAR FrameworkISRU Envisioned Future: To drive thedevelopment of technologies and capabilities, theSTAR process starts with establishing a ‘grand vision’of where each Outcome and Capability is aiming tobe considered complete. For ISRU, the EnvisionedFuture is “Scalable ISRU production/utilizationcapabilities including sustainable commodities on thelunar and Mars Surface”. This involves starting with10’s of metric tons of products, but evolves into 100’sto 1000’s of metric tons of water, oxygen, propellants,construction and manufacturing feedstock, andcommodities for habitat and food production andoperations. For ISRU, the ‘Prospect to Product’philosophy starts with Destination Reconnaissance &Resource Assessment, followed by ResourceAcquisition, Isolation, and Preparation, leading intoResource Processing (which is further subdivided intomission consumables and feedstocks for constructionand manufacturing). The ISRU Envisioned Futurealso considers what resources are available andattempts to address what and when these resourceswill be evaluated and harnessed, as well asconsidering which products/commodities can beobtained for early use and which ones require moretime and/or users of refined products.It Takes an Architecture: ISRU does not existon its own. By definition, it requires customers/users SHORT TITLE HERE: A. B. Author and C. D. Authorto use the products/commodities produced by ISRUsystems. Also, for an ISRU capability to exist, itmust obtain products and services from other systemsand infrastructure. An important aspect of the STARprocess and the ISRU Envisioned Futures Prioritiesstrategy is to identify and link all of these systems andcapabilities to achieve the desired end state (Figure2).Figure 2. ISRU as Part of a Larger ArchitectureISRU Capability Drivers: The guidingprinciples for NASA’s Space TechnologyDevelopment for Artemis are to develop criticaltechnologies and capabilities that enable (i) asustainable Lunar surface presence, (ii) the future goalof sending humans to Mars, and (iii) promotingcritical technologies to enable future science andcommercial missions. It is a major goal of theArtemis campaign to establish some sort of base campat the lunar South Pole by approximately the end ofthe decade. The ISRU Envisioned Futures Prioritiesstrategy is aligned with the Artemis campaign todevelop and demonstrate ISRU capabilities in thistimeframe that could lead to sustained surfaceoperations, infrastructure growth, and commercialoperations in the next decade (Figure 3).Figure 3. ISRU Dual Path to Full Implementation and CommercializationState of the Art and Gaps: To achieve theenvisioned future, an extensive effort was performedto understand the State of the Art (SOA) for ISRUgoing back decades, and to assess the SOA against thenear and long-term goals and objectives of the ISRUStrategic Outcome objectives. While the releasedISRU Envisioned Futures Priorities only includes atop-level definition of both the SOA and Gaps, furtherinformation on these for ISRU can be found in theISRU Gap Assessment Study performed for theInternational Space Exploration Coordination Group(ISECG) [2]. To provide further guidance to industryand academia, a top level assessment was performedand provide that divides critical areas of ISRUcapabilities and technologies into 3 categories:Significant Funding, Partially Covered/MoreRequired, and Limited/No Funded Activities.Envisioned Future Priorities- Next Steps forISRU: While a significant amount of work over abroad range of technology areas has been performedover the last several years for lunar ISRU, to reach theenvisioned future for ISRU, a lot more work isrequired at the technology level leading to bothsystems and technology demonstrations in the nearfuture. To guide investments within NASA, industry,and academia, 5 specific areas of high priority wereidentified. These are:1.Complete development of the Water and Oxygen Mining Paths and close technology gaps, with emphasis on oxygen extraction from Highland regolith and parallel paths for polar water mining.2.Expand development of metal extraction and feedstock for manufacturing and construction, with emphasis on aluminum and initial/easy to obtain/make construction feedstocks leading to more refined metals and other regolith resources. Also, evaluate biologically inspired/derived technologies in bio-mining, bio-plastic, and other feedstock commodities.3.Ensure the resource assessment needed for future ISRU commercial operations is coordinated with both near/long-term science objectives as well as Artemis mission locations of interest.4.Initiate NASA and industry-led system-level analyses, integration, and testing activities for ISRU capabilities. While significant work has been performed at the technology and subsystemlevel, it is now important to understand how these technology investments can be leveraged and utilized in actual systems and applications5.Initiate lunar ISRU technology flight demonstrations leading to initial ‘Pilot Plant’ end-to-end production capability demonstrations, led by industry

ISRU↗

Characterization of Volatiles from Simulated Lunar Highland Melts Under Vacuum

As part of the Artemis program that returns humans to the Moon for sustained presence, the in-situ resource utilization (ISRU) pilot plant is developing hardware to test systems in relevant lunar environments. As this evolves, the ever-growing field of interest requires in-depth understanding of the environment for operations. Lunar regolith contains compounds that can be harvested as resources such as fuel, or life support and construction feedstocks. Therefore, this necessitates an understanding of its constituents and processed by-products under some of the extreme conditions imposed for resource extraction.

Oxygen Extraction↗

Gaseous By-Product of Thermal Vacuum Processing of Lunar Highland Simulant

Scientists at Kennedy Space Center are advancing technologies to achieve oxygen extraction on the Lunar surface. One such technology is Molten Regolith Electrolysis (MRE) in which regolith simulant is melted under high temperatures to perform oxygen extraction through electrolysis of the melt pool. A study was conducted to understand the molten formation and proper-ties of Lunar Highlands Simulants (LHS-1) under high vacuum environments ranging between 10-6 Torr. These studies include investigating the regolith melt behavior and by-product gas analysis systems to prepare for pilot plant development and operations. The off-gassing rates and pressure build-up, gaseous compounds, and material compatibility may be a risk to MRE systems. The KSC findings are reported here for inclusion into future mis-sion architecture and operational planning. The four stages of the experiment were vacuum, resistive heating, regolith melt and gas detection. The regolith mass of 70 g was melted in a 40 cm tall x 50 cm diameter vacuum chamber at temperature increase rate 47 ℃ /min and ramp rate of 1 ampere/3 min up to an 18-amp maximum. The test is conducted for about 60 minutes and the constituent gases produced during heating of regolith is monitored with a re-sidual gas analyzer. During the molten formation, primary off-gassing volatiles included water vapor (18 amu), a peak at 44 amu (FeO2 – expected), and atomic oxygen (16 amu), among a series of other compounds that could create compatibility issues such as magnesium, chlorine, and silicon oxide. These results add to the knowledge required for successful oxygen extraction on the moon.

Molten Regolith Electrolysis↗

Characterization of Volatiles from Simulated Lunar Highland Melts Under Vacuum

As part of the Artemis program that returns humans to the Moon for sustained presence, the in-situ resource utilization (ISRU) pilot plant is developing hardware to test systems in relevant lunar environments. As this evolves, the ever-growing field of interest requires in-depth understanding of the environment for operations. Lunar regolith contains compounds that can be harvested as resources such as fuel, or life support and construction feedstocks. Therefore, this necessitates an understanding of its constituents and processed by-products under some of the extreme conditions imposed for resource extraction.

Oxygen Extraction↗

Nevada National Security Site V3XA Spherical Explosive Confinement Vessel Awareness Package

This report summarizes the plans and activities that will facilitate shipment of the V3XA experimental spheres (a.k.a., Nevada Spheres) from the Nevada National Security Site (NNSS) to the Idaho National Laboratory’s (INL) Advanced Mixed Waste Treatment Project (AMWTP). The spheres require shipment to INL to be segmented, characterized, and repackaged for ultimate disposal at the Waste Isolation Pilot Plant (WIPP). The NNSS does not currently have the facilities or safety basis to perform these activities. The INL has the facilities, the INL M&O contractor owns an 8-120B cask, and AMWTP has a WIPP Waste Acceptance Criteria approved characterization program. The NNSS has shipped other legacy transuranic waste to INL for WIPP certified characterization in the past.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Conversion of Delignified Biomass into Non-Volatile Products Using Thermophilic Bacteria

Butyric acid (BA) can be used as a platform intermediate for diesel and sustainable aviation fuels (SAFs) as well as a precursor for diverse commodity chemicals for the production of polymers, fibers, solvents, and preservatives. This work presents a co-culture-based bioprocess for the production of BA from corn stover by two thermophilic bacteria, Clostridium thermocellum, a well-known efficient degrader of insoluble and oligomeric cellulosic substrates, and Clostridium thermobutyricum, a highly efficient BA producer from monomeric sugars. First, we tested the capability of C. thermocellum to deconstruct three different biomass streams from the NREL pilot plant pretreatment process -raw, deacetylated, and deacetylated and mechanically refined corn stover (DMR)-, and up to 82% solids deconstruction and 91% carbohydrate utilization were obtained when using DMR solids. Then, the sugar utilization and by-product formation capabilities on various substrates by C. thermobutyricum were compared to evaluate its potential as a co-culture partner for C. thermocellum. Model carbon sources -glucose and xylose- were compared to a mixture of substrates present in soluble DMR hydrolysate streams, and the highest cell density as well as the maximum BA titer (8.3 g/L) were observed on DMR hydrolysate. Finally, clostridial co-cultivations on DMR solids were performed to investigate the inoculation time for both organisms that enhances BA production; while C. thermocellum was always inoculated at the beginning of the cultivation, C. thermobutyricum was inoculated at 0, 36, or 72h. It was found that BA production begins immediately upon inoculation of C. thermobutyricum regardless of the inoculation time. However, higher solids deconstruction and carbohydrate utilization results (83.7 and 95.6%, respectively) were obtained when both organisms were inoculated at the beginning of the fermentation. Under those conditions, up to 2.6 g/L of BA were obtained from DMR solids after 120h of cultivation. This work provides relevant information for the sustainable production of BA using thermophilic bacteria.

bacterial co-culture↗

Modeling and Uncertainty Quantification of CESAR1 Solvent System for Post-Combustion Capture

This presentation is focused on the development of the CESAR1 solvent system model by the CCSI2 team and validation with pilot plant data from Technology Centre Mongstad. It also serves as an update of previous work by incorporating a new thermodynamic model of the system developed by collaborators from Heriot-Watt University through the SCOPE program. Finally, it includes some discussions on future directions of the project including collaboration with SCOPE to add the capability of amine emissions prediction along with some parametric uncertainty quantification work on the submodels.

Morgan, Joshua↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Viability of In-Drum Treatment for Transuranic Wastes Containing Nitrates and Organics - 20406

In February of 2014, a breach in a waste drum stored at the Waste Isolation Pilot Plant resulted in the release of radioactive material into the immediate surroundings and outside of the plant. The waste drum contained a mixture of an organic absorbent and nitrate salts that pressurized the drum, eventually causing the drum lid to fail, leading to the adverse event. Other waste drums with similar contents exist posing both storage and treatment risks. These drums may successfully be treated by an in-drum treatment system. This paper considers the design and operation of an in-drum treatment system and the characteristics of waste containing organics and nitrates to evaluate the viability of treatment. A description of the system, how it is operated, and a summary of previous testing performed is provided. Treatment of both liquids and absorbed liquids comprised of organics and nitrates is addressed. Viability of treatment is demonstrated by presenting operational methods and design strategies to ensure successful treatment of the waste drums. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation and Analysis of Dolomite Dissolution in Variable Strength Systems Relevant to the WIPP

The Waste Isolation Pilot Plant (WIPP) was opened in 1999 as a solution to the long-term disposal of the nation's nuclear defense-generated transuranic (TRU) waste. The salt beds were recommended as the ideal location because they are free from flowing fresh water, easily mined, impermeable, and geologically stable. However, for performance assessment modeling, release scenarios must be considered. The most likely release scenario was determined to be human intrusion leading to direct and/or long-term brine release (US DOE 1995, US DOE 1996, Perkins et al., 1999). The focus of this research is the Rustler formation because it is located above the WIPP and is the most transmissive layer (Perkins et al., 1999). Objective: To determine the effect of chelating ligands ( e.g. EDTA) on dissolution of dolomite in high ionic strength systems. Do brines impact dolomite dissolution and how is it affected by EDTA binding with cations? By varying the ionic strengths, different brine conditions can be simulated similar to those in and around the Culebra member and evaluate trends of dissolved Ca and Mg in the aqueous phase from the quantified data. Conclusions: <2% of dolomite dissolved over one week at pH 8.5. Greater dissolution occurred at higher ionic strength and in the presence of NaCl with approximately 0.4 vs. 0.9% of Mg removed from dolomite in 0.1 and 1.0 M Na. Further, 0.3 vs. 0.9% of Mg was removed from dolomite in 1.0 M IS CaCl{sub 2} versus NaCl. EDTA increased dissolution of dolomite at low ionic strength due to its strong complexation affinity for Ca/Mg with slightly greater removal of Ca than Mg. Significant differences were not observed at high ionic strength due to the presence of large concentrations of competing cations (Na, Ca, Mg). Slightly higher concentrations of Ca were removed from dolomite than Mg after one week, suggesting either incongruent dissolution or release through ion exchange of Ca from trace mineral impurities. Further, when EDTA was present, it may have increased Ca removal due to its greater complexation for Ca than Mg. Environmental Implications: High ionic strength brines and low ionic strength solutions with organic ligands increase dissolution of dolomite. Due to the long half-lives of radionuclides in the TRU waste, it may be important to consider the long term impact of dolomite dissolution for potential release scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) HEPA Filtration System - 20165

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous High Efficiency Particulate Air (HEPA) filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The integrated system design provides for reducing the salt, clay and diesel particulates from the exhaust airflow from the mine, prior to full filtration using Nuclear Safety Significant HEPA filters. The SSCVS design and equipment provides for continuous HEPA filtration over a wide range of operating and environmental conditions. The new exhaust system connects to the existing underground exhaust shaft, and the exhaust air flows from the underground through Salt Reduction Units (SRUs) to protect the final filter banks from excessive moisture and rapid salt/dust buildup. Each of the six (6) SRUs consists of a demister to remove entrained moisture, a dry salt remover unit to filter approximately 90% of the entrained salt/dust, and an automated water treatment system to periodically clean the demisters and to remove salt from the SRU filters. At the maximum expected exhaust flowrate of 540,000 Cubic Feet per Minute (CFM) / 255 Cubic Meters per Second (m{sup 3}/s), five (5) salt removal units will be in operation with one unit in standby or maintenance. An in-line variable frequency drive booster fan will offset pressure losses through each SRU and reduce the relative humidity of the air exiting the SRUs. In the event of a high radiation alarm from the underground Continuous Air Monitors (CAMs), the SRUs will be automatically bypassed, which places the SRS and building outside of the Safety Significant confinement boundary. From the SRUs, the exhaust is directed to the HEPA filter banks located in the New Filter Building. The exhaust system is designed to provide continuous HEPA filtration prior to release to the exhaust stack. There are 22 HEPA filter banks rated at 27,000 CFM / 12.75 m{sup 3}/s each. Each filter bank has two stages of pre-filters and two stages of HEPA filters. The filtered air from each of the 22 filter banks discharges into a common concrete plenum, which is maintained under a negative pressure by the main exhaust fans. Six 1,000 HP variable frequency drive exhaust fans are provided on the south side of the plenum. At the maximum expected exhaust flow of 540,000 CFM, four exhaust fans and twenty filter banks will be in operation. The fans discharge vertically to a separate concrete exhaust plenum. The filtered exhaust is routed from the exhaust plenum to a 125-foot-tall exhaust stack via a 13-foot diameter duct. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Rapid Sequential Separation Method for Determination of Actinides and TENORM in Fracking Wastes - 20223

With recent advances in unconventional drilling technology in the US and around the world, the risks of environmental contamination and exposure due to technologically enhanced naturally occurring radioactive materials (TENORM) from fracking wastes have also surfaced. Although the Permian Basin (southeastern New Mexico, western Texas) has long been a modest producer of oil, the advent of fracking technology a decade ago turned it into hot property for producers. A 2018 assessment of undiscovered, technically recoverable continuous oil and gas resources by the U.S. Geological Survey estimates an average 46.3 billion barrels of oil and 281 trillion cubic feet of gas. This is likely to increase the use of unconventional drilling and TENORM generation. TENORM concentrations in oil and gas exploration and production waste can be several hundred to several thousand times higher than background TENORM concentrations. Both the thorium and uranium decay chains contribute to airborne radionuclides arising from the radon gas escaping the ground and subsequently decaying as airborne particulates. Additionally, radon decay products {sup 210}Pb and {sup 210}Po can build up in scale on the internal surfaces of oil and gas handling pipes and in sludge in refineries, becoming potential inhalation and ingestion hazards for workers. Furthermore, southeastern NM is also home to world's only licensed and operating transuranic nuclear waste repository, the DoE's Waste Isolation Pilot Plant (WIPP). Plutonium isotopes ({sup 239+240}Pu) and {sup 241}Am, are expected to account for more than 99% of the total radioactivity scheduled for disposal in the WIPP repository. Thus, an improved understanding of the environmental fate and transport of TENORM, liberated by unconventional drilling, is essential to assess how best to protect individuals and the environment. In this context, accurate measurement of TENORM and actinides in environmental and biological samples is essential. In this presentation, a new sequential method for the separation and pre-concentration of actinides (Pu, Am, Np) and TENORM (Po, U and Th) derived from oil and gas exploration is proposed. The TEVA method involves a rapid co-precipitation step to remove matrix interferences from the samples, followed by plutonium oxidation state adjustment to Pu (IV) and an incubation period of ∼ 1 hour at 50-60 deg. C to allow the resultant Po (II) to oxidize into Po(IV). The polonium, neptunium, thorium and plutonium are then separated on a TEVA column, while americium and uranium are separated on a TRU column. After separation, the alpha counting source was prepared by micro-precipitation with copper sulfide (CuS) for polonium and neodymium fluoride (NdF{sub 3}) for actinides. The efficiency and reliability of the procedures were tested by analyzing filter, drinking water and frack sand samples. The method is simple, robust and can be performed quickly with excellent removal of interferences, high chemical recovery and very good alpha peak resolution. (authors)

07 ISOTOPE AND RADIATION SOURCES↗