US NDC Modernization Iteration E2 Prototyping Report: OSD & PC Software Infrastructure

During the second iteration of the US NDC Modernization Elaboration phase (E2), the SNL US NDC Modernization project team completed follow-on COTS surveys & exploratory prototyping related to the Object Storage & Distribution (OSD) mechanism, and the processing control software infrastructure. This report summarizes the E2 prototyping work.

97 MATHEMATICS AND COMPUTING↗

Advanced Envelope Research for Factory Built Housing, Phase 3. Whole-House Prototyping

The Advanced Envelope Research effort will provide factory homebuilders with high performance, cost-effective envelope designs that can be effectively integrated into the plant production process while meeting the thermal requirements of the 2012 IECC standards. This work is part of a multiphase effort. Phase 1 identified seven envelope technologies and provided a preliminary assessment of three methods for building high performance walls. Phase 2 focused on developing viable product designs, manufacturing strategies, addressing code and structural issues, and cost analysis of the three selected options. An industry advisory committee helped narrow the research focus to perfecting a stud wall design with exterior continuous insulation (CI). This report describes Phase 3, which was completed in two stages and continued the design development effort, exploring and evaluating a range or methods for applying CI to factory built homes. The scope also included material selection, manufacturing and cost analysis, and prototyping and testing. During this phase, a home was built with CI, evaluated, and placed in service. The experience of building a mock up wall section with CI and then constructing on line a prototype home resolved important concerns about how to integrate the material into the production process. First steps were taken toward finding least expensive approaches for incorporating CI in standard factory building practices and a preliminary assessment suggested that even at this early stage the technology is attractive when viewed from a life cycle cost perspective.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Planning and Prototyping for a Storage Ring Measurement of the Proton Electric Dipole Moment

Electron and proton EDM's can be measured in "frozen spin" (with the beam polarization always parallel to the orbit, for example) storage rings. For electrons the "magic" kinetic energy at which the beam can be frozen is 14.5 MeV. For protons the magic kinetic energy is 230 MeV. The currently measured upper limit for the electron EDM is much smaller than the proton EDM upper limit, which is very poorly known. Nevertheless, because the storage ring will be an order of magnitude cheaper, a sensible plan is to first build an all-electric electron storage ring as a prototype. Such an electron ring was successfully built at Brookhaven, in 1954, as a prototype for their AGS ring. This leaves little uncertainty concerning the cost and performance of such a ring. (This is documentedin one of the Physical Review papers mentioned above.)

43 PARTICLE ACCELERATORS↗

Design and Prototyping of a High Granularity Scintillator Calorimeter

A novel approach for constructing fine-granularity scintillator calorimeters, based on the concept of an Integrated Readout Layer (IRL) was developed. The IRL consists of a printed circuit board inside the detector which supports the directly-coupled scintillator tiles, connects to the surface-mount SiPMs and carries the necessary front-end electronics and signal/bias traces. Prototype IRLs using this concept were designed, prototyped and successfully exposed to test beams. Concepts and implementations of an IRL carried out with funds associated with this contract promise to result in the next generation of scintillator calorimeters.

Direct coupling↗

Gum-compliant uncertainty propagations for Pu and U concentration measurements using the 1st-prototype XOS/LANL hiRX instrument; an SRNL H-Canyon Test Bed performance evaluation project

An SRNL H-Canyon Test Bed performance evaluation project was completed jointly by SRNL and LANL on a prototype monochromatic energy dispersive x-ray fluorescence instrument, the hiRX. A series of uncertainty propagations were generated based upon plutonium and uranium measurements performed using the alpha-prototype hiRX instrument. Data reduction and uncertainty modeling provided in this report were performed by the SRNL authors. Observations and lessons learned from this evaluation were also used to predict the expected uncertainties that should be achievable at multiple plutonium and uranium concentration levels provided instrument hardware and software upgrades being recommended by LANL and SRNL are performed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

97 MATHEMATICS AND COMPUTING↗

Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

97 MATHEMATICS AND COMPUTING↗

Performance testing of a prototype Pd-Ag diffuser

The fusion fuel cycle has gained significant attention over the last decade as interest in fusion programs has increased. One of the critical components of the fusion process is the tritium fuel cycle. The tritium fuel cycle is designed to supply and recycle process tritium at a specific throughput rate. One of the most important processes within the tritium fuel cycle is the clean-up of the of the process tritium. This step will initially separate the hydrogen isotopes (H2, D2, and T2) from the rest of the process gas using Pd-Ag diffusers or permeators. The Pd-Ag diffuser is an integral component for any tritium purification system; whether part of the United States’ defense mission or fusion programs. Domestic manufacturers of Pd-Ag diffusers are extremely limited and only a few manufacturers exist. Johnson-Matthey (JM) Pd-Ag diffusers (permeators) have previously been evaluated for the separation of hydrogen isotopes from non-hydrogen gas species in the process. JM is no longer manufacturing Pd-Ag diffusers and a replacement vendor needs to be identified to support future needs. A prototype Pd-Ag diffuser has been manufactured by Power and Energy, and is considered a potential replacement for the JM diffuser for tritium service. New diffuser designs for a tritium facility for any fusion energy applications must be characterized by evaluating their operating envelope prior to installation in a tritium processing facility. The prototype Pd-Ag diffuser was characterized to determine the overall performance as a function of the permeation of hydrogen through the membrane. The tests described in this report consider the effects of feed gas compositions, feed flow rates, pump configuration and internal tube pressure on the permeation of H2 through the Pd-Ag tubes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Fundamental study of key issues related to advanced sCO 2 Brayton cycle: Prototypic HX development and cavitation

Diffusion bonded heat exchangers are the leading candidates for the sCO 2 Brayton cycles in next generation nuclear power plants. Commercially available diffusion bonded heat exchangers utilize set of continuous semi-circular zigzag micro channels to increase the heat transfer area and enhance heat transfer through increased turbulence production. Such heat exchangers can lead to excessive pressure drop as well as flow maldistribution in the case of poorly designed flow distribution headers. The goal of the current project is to fabricate and test potential discontinuous fin patterns for diffusion bonded heat exchangers; which can achieve desired thermal performance at lower pressure drops. Prototypic discontinuous offset rectangular and Airfoil fin surface geometries were chemically etched on to 316 stainless steel plate and sealed against an un-etched flat pate using O-ring seal emulating diffusion bonded heat exchangers. Thermal-hydraulic performance of these prototypic discontinuous fin geometries was experimentally evaluated and compared to the existing data for the continuous zigzag channels. The data generated from this project will serve as the database for future testing and validation of numerical models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Prototype Stilbene Neutron Collar II

A neutron collar using stilbene organic scintillator cells for fast neutron counting is described for the assay of fresh low enriched uranium (LEU) fuel assemblies. The prototype stilbene collar has a form factor similar to standard He-3 based collars and uses an AmLi interrogation neutron source. This report describes the simulation, using a custom LLNL developed MCNPX, of list mode neutron correlation data on various fuel assemblies. Some of these fuel assemblies have neutron absorbers (burnable Gd poisons) and partial defect s (DU, Fe, Pb pins). Calibration curves (doubles vs 235 U linear mass density) are presented for fast (with Cd lining) mode of operation. The modeling incorporates LLNL developed neutron crosstalk correction algorithms and stilbene light output detector response quench function. Pileup issues are addressed using the LLNL code GamGen / RadSrc to estimate the flux of alpha decay gammas from the fuel assemblies on the stilbene cells with and without Pb shielding. One panel of the prototype collar using 10 high-efficiency 4”x2” stilbene cells from Inrad Optics, using LLNL developed technology, has been constructed and calibrated for optimal PSD and data acquisition electronics. Several sources (AmLi, AmBe, Cf, DD, and DT) have been measured with the single panel and the measured data is consistent with the modeling. A novel part of our work was to determine the light output (LO) quench function for the Inrad 4” x 2” stilbene crystals through a LLNL-MCNPX simulation based optimized fitting of the measured LO data.

42 ENGINEERING↗

ECC Refrigerator: Characterize Performance of a Prototype Electrochemical Compressor

This report documents experimental study to characterize performance of a prototype electrochemical compressor, provided by Xergy INC. It describes the working mechanism and its electrochemical efficiency and isentropic compression efficiency. The experimental results demonstrate that the prototype compressor is able to pump hydrogen flow from 25 psia to 140 psia, and deliver the flow rate as predicted. On the other hand, its efficiency level is low, having the electrochemical efficiency less than 40%, and isentropic efficiency below 47%. Using two identical ECC compressors in parallel will reduce the current density and ohm loss, which can increase the isentropic efficiency up to 67% with increased cost. Further improvements on the compressor are suggested, e.g. using more conductive membrane, etc.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Extension User Manual Contingency: Contractor Optimization Tool - Engineering Prototype (Release 2.3)

This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 User Manual - Contingency Contractor Optimization Tool Prototype - Release 2.2

This User Manual provides step-by-step instructions on the Contingency Contractor Optimization Tool's major features. Activities are organized by user role. The Contingency Contractor Optimization project is intended to address former Secretary Gates' mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Characterization, Polishing & Testing of Stainless Steel Hemofiltration Cartridge Prototypes for Vanderbilt University

Vanderbilt University has developed a stainless steel Hemofiltration Cartridge prototype. It is required that these cartridges be polished to the highest degree possible. Fermilab has expertise in polishing niobium cavities for High Energy Physics applications. This Cooperative Research and Development Agreement will be the first step to determine if the techniques used to polish niobium cavities can be applied to the prototype cartridges.

42 ENGINEERING↗

MPI Sessions: Second Demonstration and Evaluation of MPI Sessions Prototype

MPI Sessions presents a new paradigm for applications to use MPI functionality within an application. This paradigm offers the promise of more flexible ways for applications to express the capabilities they require from MPI at a fine grain level. This report presents a second evaluation of a prototype implementation of the MPI Sessions proposal, including additional development work on the prototype and investigations using Sessions in the DASK data analytics framework.

97 MATHEMATICS AND COMPUTING↗

Analysis of Structural Options for Bench Measurement of AGU Segment Prototype

Refer to Tech Note TN #257 for an introduction to the mechanics and structure for the proposed prototype of a multi-segment Adaptive-Gap Undulator (AGU). Here we investigate various proposed design options for a magnet structure intended to prototype the upper and lower halves of a single segment: A) Assembly SLS-15.55-004, the historic X9 platen (0.6m long, with integral strongback) and single large centric mechanical feed-through post; B) Initial assembly SR-ID-SAGU-4300 with three pairs of feed-throughs spaced along platen length (0.7m); C) That assembly SR-ID-SAGU-4300 with increased base plate thickness. All options have “base plate” affixed to the same actuated gap-drive system with single driven axis as was on NSLS X9 MGU. As shown in Figure 1, design criteria like Gap Tolerance, Taper Error, and the critical Planarity of the pole plane within the gap are used to evaluate performance. The error in planarity to be minimized is the differential in vertical displacement (Y direction) along the Platen length (beam Z direction). Applied loads are magnetic pressure and gravity.

36 MATERIALS SCIENCE↗

Proposal for a Fusion Prototype Neutron Source at the Los Alamos Neutron Science Center

This study evaluates a target station at the Los Alamos Neutron Science Center dedicated to the mission of irradiating structural materials in an environment that is nearly prototypic of the radiation environment experienced by the first wall of a magnetically-confined fusion reactor burning D-T fuel. Such a station could be located in the existing Area A experimental hall and be driven by an 800-MeV, 1-MW proton beam delivered by the LANSCE accelerator. A neutronics assessment of a target concept shows it satisfies all of the key parameter guidelines stated in the Summary Report on the Fusion Prototypic Neutron Source Workshop.