Novel Sorbent Development and Evaluation for the Capture of Krypton and Xenon from Nuclear Fuel Reprocessing Off-Gas Streams

The release of volatile radionuclides generated during Used Nuclear Fuel reprocessing in the US will most certainly need to be controlled to meet US regulatory emission limits. A US DOE sponsored Off-Gas Sigma Team has been tasked with a multi-lab collaborative research and development effort to investigate and evaluate emissions and immobilization control technologies for the volatile radioactive species generated from commercial Used Nuclear Fuel (UNF) Reprocessing. Physical Adsorption technology is a simpler and potential economical alternative to cryogenic distillation processes that can be used for the capture of krypton and xenon and has resulted in a novel composite sorbent development procedure using synthesized mordenite as the active material. Utilizing the sorbent development procedure, INL sigma team members have developed two composite sorbents that have been evaluated for krypton and xenon capacities at ambient and 191 K temperature using numerous test gas compositions. Adsorption isotherms have been generated to predict equilibration and maximum capacities enabling modeling to support process equipment scale-up.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Novel Sorbent Development and Evaluation for the Capture of Krypton and Xenon from Nuclear Fuel Reprocessing Off-Gas Streams

The release of volatile radionuclides generated during Used Nuclear Fuel reprocessing in the US will most certainly need to be controlled to meet US regulatory emission limits. A US DOE sponsored Off-Gas Sigma Team has been tasked with a multi-lab collaborative research and development effort to investigate and evaluate emissions and immobilization control technologies for the volatile radioactive species generated from commercial Used Nuclear Fuel (UNF) Reprocessing. Physical Adsorption technology is a simpler and potential economical alternative to cryogenic distillation processes that can be used for the capture of krypton and xenon and has resulted in a novel composite sorbent development procedure using synthesized mordenite as the active material. Utilizing the sorbent development procedure, INL sigma team members have developed two composite sorbents that have been evaluated for krypton and xenon capacities at ambient and 191 K temperature using numerous test gas compositions. Adsorption isotherms have been generated to predict equilibration and maximum capacities enabling modeling to support process equipment scale-up.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Formulation and Validation of an Efficient Computational Model for a Dilute, Settling Suspension Undergoing Rotational Mixing

Designing processing equipment for the mixing of settling suspensions is a challenging problem. Achieving low-cost mixing is especially difficult for the application of slowly reacting suspended solids because the cost of impeller power consumption becomes quite high due to the long reaction times (batch mode) or due to large-volume reactors (continuous mode). Further, the usual scale-up metrics for mixing, e.g., constant tip speed and constant power per volume, do not apply well for mixing of suspensions. As an alternative, computational fluid dynamics (CFD) can be useful for analyzing mixing at multiple scales and determining appropriate mixer designs and operating parameters. We developed a mixture model to describe the hydrodynamics of a settling cellulose suspension. The suspension motion is represented as a single velocity field in a computationally efficient Eulerian framework. The solids are represented by a scalar volume-fraction field that undergoes transport due to particle diffusion, settling, fluid advection, and shear stress. A settling model and a viscosity model, both functions of volume fraction, were selected to fit experimental settling and viscosity data, respectively. Simulations were performed with the open-source Nek5000 CFD program, which is based on the high-order spectral-finite-element method. Simulations were performed for the cellulose suspension undergoing mixing in a laboratory-scale vane mixer. The settled-bed heights predicted by the simulations were in semi-quantitative agreement with experimental observations. Further, the simulation results were in quantitative agreement with experimentally obtained torque and mixing-rate data, including a characteristic torque bifurcation. In future work, we plan to couple this CFD model with a reaction-kinetics model for the enzymatic digestion of cellulose, allowing us to predict enzymatic digestion performance for various mixing intensities and novel reactor designs.

09 BIOMASS FUELS↗

Recovery of rare earth elements by liquid-liquid extraction from fresh water to hypersaline solutions

The disclosure describes a method of extraction for optimal recovery of rare earth elements (REE). This includes the optimization of a liquid-liquid extraction technique for economic extraction of REE from chemically complex brines. Through the use of a model, operating conditions are altered to increase separation efficiency. The technique achieves >98% recovery of all rare earth elements in one fraction, while using small volumes of sample and reagents. The method of the present invention recovers REE from previously unexploited waste streams, without need for development of new process equipment and while keeping a small footprint because of the volumes involved.

Noack, Clinton W.↗

URANIUM HOLDUP MONITORING WITH COMPTON IMAGING AS FUNCTION OF DEPTH AND MASS

Mass quantification using standoff gamma detection is a logical progression for MC&A applications in uranium processing facilities. While obtaining a ground truth from physical collection and weighing of masses is ideal and routine, it poses a logistical problem from both a standpoint of ALARA programs as well as interruptions to operations. The standard approach is the Generalized Geometry in Holdup (GGH) method that can apply for many cases where geometries of the holdup match simulated models; however, there are many cases where a model may not exist or a feature of the holdup geometry is such that it does not match a model particularly well.1 Gamma imaging at standoff distances and outside process equipment has potential to address these shortcomings and improve mass estimations while reducing personnel exposure; however, algorithms still require a significant degree of benchmarking to build sufficient confidence in algorithms before displacing GGH in some procedures. This paper presents the creation of a set of laboratory standards of depleted U3O8 in fixed size containers covering a range of masses and effective thicknesses up to the infinite thickness for the 185-keV line. These blocks are identically sized aluminum boxes loaded such that a thin, flat face is placed towards the imager, while the back side contains closed cell foam to apply pressure to keep the powder in a fixed position at the front face as the sources are manipulated for measurements. Included is an analysis of the mass estimation using a commercially available Compton imaging instrument where multiple geometries are created showing limitations in current methodologies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Motor technology for mining applications advances

AC motors are steadily replacing DC motors in mining and mineral processing equipment, requiring less maintenance. The permanent magnet rotor, or the synchronous motor, has enabled Blador to introduce a line of cooling tower motors. Synchronous motors are soon likely to take over from the induction motor. 1 photo.

01 COAL, LIGNITE, AND PEAT↗

Drive alignment pays maintenance dividends

Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

01 COAL, LIGNITE, AND PEAT↗

Dismantling of Highly Contaminated Process Installations of the German Reprocessing Facility (WAK) - Status of New Remote Handling Technology - 13287

Decommissioning and dismantling of the former German Pilot Reprocessing Plant Karlsruhe (WAK) including the Vitrification Facility (VEK) is being executed in different Project steps related to the reprocessing, HLLW storage and vitrification complexes /1/. While inside the reprocessing building the total inventory of process equipment has already been dismantled and disposed of, the HLLW storage and vitrification complex has been placed out of operation since vitrification and tank rinsing procedures where finalized in year 2010. This paper describes the progress made in dismantling of the shielded boxes of the highly contaminated laboratory as a precondition to get access to the hot cells of the HLLW storage. The major challenges of the dismantling of this laboratory were the high dose rates up to 700 mSv/h and the locking technology for the removal of the hot cell installations. In parallel extensive prototype testing of different carrier systems and power manipulators to be applied to dismantle the HLLW-tanks and other hot cell equipment is ongoing. First experiences with the new manipulator carrier system and a new master slave manipulator with force reflection will be reported. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel sorbent development and evaluation for the capture of krypton and xenon from nuclear fuel reprocessing off-gas stream

The release of volatile radionuclides generated during Used Nuclear Fuel reprocessing in the US will most certainly need to be controlled to meet US regulatory emission limits. A US DOE sponsored Off-Gas Sigma Team has been tasked with a multi-lab collaborative research and development effort to investigate and evaluate emissions and immobilization control technologies for the volatile radioactive species generated from commercial Used Nuclear Fuel (UNF) Reprocessing. Physical Adsorption technology is a simpler and potential economical alternative to cryogenic distillation processes that can be used for the capture of krypton and xenon and has resulted in a novel composite sorbent development procedure using synthesized mordenite as the active material. Utilizing the sorbent development procedure, Idaho National Laboratory sigma team members have developed two composite sorbents that have been evaluated for krypton and xenon capacities at ambient and 191 K temperature using numerous test gas compositions. Adsorption isotherms have been generated to predict equilibration and maximum capacities enabling modeling to support process equipment scale-up. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Methodology of Qualification of CCIM Vitrification Process Applied to the High- Level Liquid Waste from Reprocessed Oxide Fuels - 12438

The vitrification of high-level liquid waste from reprocessed oxide fuels (UOX fuels) by Cold Crucible Induction Melter is planed by AREVA in 2013 in a production line of the R7 facility at La Hague plant. Therefore, the switch of the vitrification technology from the Joule Heated Metal Melter required a complete process qualification study. It involves three specialties, namely the matrix formulation, the glass long-term behavior and the vitrification process development on full-scale pilot. A new glass frit has been elaborated in order to adapt the redox properties and the thermal conductivity of the glass suitable for being vitrified with the Cold Crucible Induction Melter. The role of cobalt oxide on the long term behavior of the glass has been described in the range of the tested concentrations. Concerning the process qualification, the nominal tests, the sensitivity tests and the study of the transient modes allowed to define the nominal operating conditions. Degraded operating conditions tests allowed to identify means of detecting incidents leading to these conditions and allowed to define the procedures to preserve the process equipments protection and the material quality. Finally, the endurance test validated the nominal operating conditions over an extended time period. This global study allowed to draft the package qualification file. The qualification file of the UOX package is currently under approval by the French Nuclear Safety Authority. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Response Time Analysis and Test of Protection System Instrument Channels for APR1400 and OPR1000

Safety limits are required to maintain the integrity of physical barriers designed to prevent the uncontrolled release of radioactive materials in nuclear power plants. The safety analysis establishes two critical constraints that include an analytical limit in terms of a measured or calculated variable, and a specific time after the analytical limit is reached to begin protective action. Keeping with the nuclear regulations and industry standards, satisfying these two requirements will ensure that the safety limit will not be exceeded during the design basis event, either an anticipated operational occurrence or a postulated accident. Various studies on the setpoint determination methodology for the safety-related instrumentation have been actively performed to ensure that the requirement of the analytical limit is satisfied. In particular, the protection setpoint methodology for the advanced power reactor 1400 (APP1400) and the optimized power reactor 1000 (OPR1000) has been recently developed to cover both the design basis event and the beyond design basis event. The developed setpoint methodology has also been quantitatively validated using specific computer programs and setpoint calculations. However, the safety of nuclear power plants cannot be fully guaranteed by satisfying the requirement of the analytical limit. In spite of the response time verification requirements of nuclear regulations and industry standards, it is hard to find the studies on the systematically integrated methodology regarding the response time evaluation. In cases of APR1400 and OPR1000, the response time analysis for the plant protection system is partially included in the setpoint calculation and the response time test is separately performed via the specific plant procedure. The test technique has a drawback which is the difficulty to demonstrate completeness of timing test. The analysis technique has also a demerit of resulting in extreme times that not actually possible. Thus, the establishment of the systematic response time evaluation methodology is needed to justify the conformance to the response time requirement used in the safety analysis. This paper proposes the response time evaluation methodology for APR1400 and OPR1000 using the combined analysis and test technique to confirm that the plant protection system can meet the analytical response time assumed in the safety analysis. In addition, the results of the quantitative evaluation performed for APR1400 and OPR1000 are presented in this paper. The proposed response time analysis technique consists of defining the response time requirement, determining the critical signal path for the trip parameter, allocating individual response time to each component on the signal path, and analyzing the total response time for the trip parameter, and demonstrates that the total analyzed response time does not exceed the response time requirement. The proposed response time test technique is composed of defining the response time requirement, determining the critical signal path for the trip parameter, determining the test method for each component on the signal path, performing the response time test, and demonstrates that the total test result does not exceed the response time requirement. The total response time should be tested in a single test that covers from the sensor to the final actuation device on the instrument channel. When the total channel is not tested in a single test, separate tests on groups of components or single components including the total instrument channel shall be combined to verify the total channel response. For APR1400 and OPR1000, the ramp test technique is used for the pressure and differential pressure transmitters and the step function testing technique is applied to the signal processing equipment and final actuation device. As a result, it can be demonstrated that the response time requirement is satisfied by the combined analysis and test technique. Therefore, the proposed methodology in this paper plays a crucial role in guaranteeing the safety of the nuclear power plants systematically satisfying one of two critical requirements from the safety analysis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The INFODEM Information Centre at CEA Marcoule: A Unique Information Tool in Europe About Nuclear Decommissioning - 16217

In September 2014, the French Alternative Energies and Atomic Energy Commission (CEA) inaugurated a unique information center focused on decommissioning of its nuclear facilities. This facility, named INFODEM information center, is inside the main building of the G1 nuclear reactor at Marcoule, a nuclear site in the south of France with world-recognized expertise in decommissioning. Constructed in the 1950's, the G1 reactor was the first industrial-scale reactor for plutonium production in France; it was also used to produce electricity. Operations ceased in 1968, and it was progressively dismantled (through removal of fuel and main components) and placed in monitoring status. In the 1980s, mockups of fuel cycle process equipment were built under a temporary mission to support development activities for the La Hague reprocessing plant. When that ended, further dismantling occurred, and during 1996 through 2010, the site established itself as a reference example for worldwide nuclear dismantling activities. In 2012, the project to establish an information center at the reactor began, targeting three main audiences: the public, agency personnel and politicians, and technical professionals. Considerable thought went into the facility design, to address the interests and information needs of these three audiences. The INFODEM concept extended over 800 square meters (about 960 square yards), to host an informative tour addressing several major themes: CEA's D and D strategy, programs, skills, tools and methodologies and 'everyday life' on decommissioning projects. Illustrating its unique value and considerable success, INFODEM received the Public Information Prize from the French Nuclear Energy Society (SFEN) in June 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Protecting the Columbia River through Removal and Packaging of Radioactive Sludge in Hanford's K Area - 16572

The Columbia River once provided power and cooling water to operations on the Hanford Site; today, more than a million people downstream from Hanford rely on the river for agriculture, fishing and recreation. The Department of Energy and contractor CH2M HILL Plateau Remediation Company (CH2M) is making significant progress in protecting that vital resource. Eight of nine reactors along the river have been cocooned and soil and groundwater remediation is successfully reducing the concentration of contaminants in groundwater. The 100-K area is the last area where significant work remains to protect the river. CH2M has accomplished much in the past ten years, including demolishing the K East reactor fuel storage basin in 2009. Prior to demolition of the basin, highly radioactive sludge from that basin was transferred into containers located in the nearby K West reactor fuel storage basin. Today, the K East reactor is in interim surveillance mode, and work is underway in the K West basin to remove the sludge, which is a mixture of tiny fuel corrosion particles, fuel rod and metal fragments and soil and sand less than 1/4-inch in diameter. CH2M has designed a sludge removal system that will safely and efficiently remove the sludge from the K West basin and deposit it into specially designed containers which will be relocated to a storage facility on Hanford's Central Plateau. Procurement, fabrication and delivery of the sludge removal system is underway, with extensive testing and training planned for 2016 and 2017 ahead of the goal of removing sludge from the river by September 30, 2018. This project must account for many technical and safety considerations that render the project very challenging. Several safety measures have been incorporated as a result of safety evaluations. This paper will describe the issues facing the project team in developing the safety basis requirements and incorporating them into the design of the process equipment and construction of the facility to house the repackaging operations. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic Crane System for the Deconstruction of Chernobyl Unit 4 - 18583

The Chernobyl Nuclear Power Plant (ChNPP) Unit 4 accident occurred on April 26, 1986 leaving a severely damaged reactor building and a highly radioactive area. To minimize the long-term radiological impact to personnel and the environment, Unit 4 was immediately enclosed by a structure named the Object Shelter (OS). To transform the OS into an ecologically safe system, the Shelter Implementation Plan (SIP) was developed in 1997. The most significant SIP tasks was the design and construction of the New Safe Confinement (NSC). The NSC is a 36,000 tonne arch enclosure that includes a suite of process equipment to address the ruins of Unit 4 while assuring the safety of workers, public, and the environment. The NSC has a span of 257 meters, length of 164 meters, and height of 110 meters and is designed for a 100 years life. The New Safe Confinement was slid from its erection area to directly over Unit 4 (a distance of 327 meters) in November 2016. One of the major mechanical handling systems installed in the NSC is the Main Cranes System (MCS), designed and fabricated by PaR Systems (USA). The planned deconstruction activities require the handling of shielded waste disposal casks containing fuel as well as transporting extremely large structural elements -remotely controlled using video surveillance equipment. The lifting activities required the cranes to be tele-robotically controlled to prevent inadvertent collisions, expedite repetitive and high accuracy functions, protect the equipment and structures within the NSC as well as increase the overall effectiveness of the MCS. In addition, due to the elevated radiation levels, remote deconstruction activities will need to be performed. The MCS has design provisions included for a tele-robotically controlled manipulator and a suite of tooling to be used for multiple activities including concrete coring, cutting, debris collection and other heavy demolition activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Readiness Process and Transition to Operation for a Remote-Handled Transuranic Packaging Facility at Hanford - 19298

CH2M Hill Plateau Remediation Company manages the Sludge Retrieval Project, which has the mission to develop and deploy technologies to safely retrieve and package remote-handled transuranic sludge that is currently stored in the 105K West Reactor Fuel Storage Basin located in the 100-K Area of the U.S. Department of Energy's Hanford Site near Richland, Washington. In 2017, CH2M Hill Plateau Remediation Company installed and commissioned a process for removal of the sludge. A contractor Operational Readiness Review was completed in March 2018, and a U.S. Department of Energy, Richland Operations Office Operational Readiness Review was completed in May. The first sludge transfer was successfully completed on June 12, 2018, proving that the Engineered Container Retrieval and Transfer System process equipment worked as intended. This paper will describe the issues and successes along the path of readiness and startup, as well as the challenges that remain and CH2M Hill Plateau Remediation Company's plan to overcome them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval and Management of TRU Sludge at Hanford K-Basin - 19641

At the US Department of Energy Hanford site, the K-East and K-West reactor fuel storage basins (KE or KW Basin) were used in the 1970's and 1980's to store more than 100,000 uranium fuel rods and rod fragments that had been irradiated in the Hanford N Reactor. Approximately 2,100 metric tons of spent nuclear fuel that had been stored in the KW Basin were removed in 2004. Over time a mixture of small fuel corrosion particles, fuel rod metal fragments, and other debris accumulated in the KW Basin from the degradation of the spent nuclear fuel during storage. This is the source of the TRU sludge stored in the KW Basin. The corrosion products mixed with windblown sand, concrete dust, and other debris in the basin to form what is known as sludge. In 2006/2007 KE Basin sludge of similar origin as the KW Basin was transferred to KW Basin. Approximately 27 m{sup 3} of highly radioactive sludge was collected and consolidated underwater in six specially designed engineered containers. The mission of the Hanford Sludge Treatment Project (STP) is to develop and deploy technologies to safely retrieve, transport, and interim store the approximately 27 m{sup 3} of remote-handled transuranic (RH-TRU) sludge that is stored in the KW Basin. After extensive technology development, testing (with a bounding range of simulants), design, and procurement a sludge removal and storage system called the Engineered Container Retrieval and Transfer System (ECRTS) completed acceptance testing in 2018. The ECRTS system is designed to remotely retrieve and transport high density, highly erosive, uranium metal pieces as well as small low-density particles. The ECRTS system includes a retrieval tool based on the XAGO{sup tm} design from the United Kingdom, a heavily modified positive displacement pump, a hose-in-hose transfer system, a Sludge Transport and Storage Container (STSC), a settling and decant system, and a shielded transport system. The first sludge transfer was successfully completed on June 12, 2018 proving that the ECRTS process equipment worked as intended on the actual sludge. Three batches (i.e. transfer and decant) were required to obtain a ∼ 100% fill of the first STSC. The STSC was then transported to the on-site storage facility. Over 20 STSCs will be filled with RH-TRU sludge over approximately 16 months. This paper will discuss the issues and successes associated with this project including the operational aspects of this new system. Experience gained from this successful project should assist anyone with the need to retrieve and manage remote handled sludge from fuel storage basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Processing System at Pilgrim Nuclear Station - 19665

Pilgrim Nuclear Power Station (PNPS) has been using reverse osmosis (RO) to process equipment and floor drain water to the condensate storage tank for 23 years. In 1996 a Thermex unit was designed, fabricated and installed by Chem-Nuclear Systems, now EnergySolutions. This unit consisted of a dual pass RO followed by ion exchange for polishing. In April 2017, PNPS and EnergySolutions commissioned a new Thermex unit consisting of a single pass RO followed by electrodeionization (EDI) for polishing. The new Thermex unit provides consistence product water quality meeting specifications for reactor reuse and lowering the amount of ion exchange usage when compared to the previous generation of Thermex. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗