Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry

This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Color Maintenance of LEDs in Laboratory and Field Applications

Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is critical. Example data collected by the GATEWAY program for LED lamps installed in museums shows that many have changed color beyond a reasonable tolerance well before their rated lifetime was reached, necessitating replacement. Similar data collected by the CALiPER program between 2008 and 2010 reveals that many early products shifted beyond acceptable tolerances in as little as a few thousand hours. In contrast, data from the L Prize program illustrates that commercially available LED products can have exemplary color stability that is unmatched by traditional light sources. Beyond presenting data from the aforementioned DOE programs, this report discusses the metrics used for communicating color shift—namely MacAdam ellipses and Δu'v'—as well as providing guidance for end users on how to monitor color shift and what to look for in manufacturer warranties. Also included are descriptions of the physical changes that have been documented as leading to color shift in some example types of LED packages. As with complete products, the data presented herein for LED packages shows that a wide variety of products are available; in order for specifiers and consumers to make educated choices, more detailed and standardized information should be made available.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

17 WIND ENERGY↗

Color Maintenance of LEDs in Laboratory and Field Applications

To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, such as museum lighting, where visual appearance is critical. Field data collected by the U.S. Department of Energy's (DOE) GATEWAY program for LED lamps installed in museums shows that many have changed color beyond a reasonable tolerance well before their rated lifetimes have been reached. Laboratory data collected by DOE's CALiPER program between 2008 and 2010 reveals that many early LED products shifted beyond acceptable tolerances in as little as a few thousand hours. In contrast, data from the L Prize® program illustrates that commercially available LED products can have exemplary color stability that is unmatched by traditional light sources. In addition to presenting data from the aforementioned DOE programs, this report discusses the metrics used for communicating color shift, and provides guidance for end users on how to monitor chromaticity and what to look for in manufacturer warranties. Also covered are the physical changes that have been shown to lead to color shift in some types of LED packages. As with lamps and luminaires, the data presented for LED packages shows that a wide variety of products are available; in order for specifiers and consumers to make educated choices, more detailed and standardized information is necessary.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hot Cell Design and Maintenance

This presentation shows the remote handling systems used at MFC and how to perform maintenance on those systems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis of a Full Scale Blowdown Due to a Mechanical Failure of a Pressure Relief Device in a Natural Gas Vehicle Maintenance Facility

A computational fluid dynamics (CFD) analysis of a natural gas vehicle experiencing a mechanical failure of a pressure relief device on a full CNG cylinder was completed to determine the resulting amount and location of flammable gas. The resulting overpressure if it were to ignite was also calculated. This study completes what is discussed in Ekoto et al. which covers other related leak scenarios. We are not determining whether or not this is a credible release, rather just showing the result of a possible worst case scenario. The Sandia National Laboratories computational tool Netflow was used to calculate the leak velocity and temperature. The in - house CFD code Fuego was used to determine the flow of the leak into the maintenance garage. A maximum flammable mass of 35 kg collected along the roof of the garage. This would result in an overpressure that could do considerable damage if it were to ignite at the time of this maximum volume. It is up to the code committees to decide whet her this would be a credible leak, but if it were, there should be preventions to keep the flammable mass from igniting.

03 NATURAL GAS↗

Model of Operation-and-Maintenance Costs for Photovoltaic Systems

This article presents a method for calculating costs associated with operation and maintenance (O&M) of photovoltaic (PV) systems. It compiles details regarding the cost and frequency of multiple O&M services to estimate annual O&M costs ($\$$/year) for each year of an analysis period, the net present value ($\$$) of life cycle costs accumulated over the analysis period, and the reserve account amount ($\$$). Here we show that this method is an improvement over the previous averaged or levelized per-unit ($\$$/kW/year) valuations for estimating PV O&M costs, because it allows a detailed selection of services to perform based on system size, market served (e.g., residential, commercial, or utility), type and configuration of system components (e.g., micro-, string or central inverter) and site and environmental conditions (e.g., snow, pollen, bird populations). This model also distinguishes costs that vary from year to year and increase at different rates over time because of heuristic failure distributions (e.g. Weibull or Lognormal distribution) based on actuarial data for many of the services. This cost model was created by the PV O&M Working Group of researchers and industry, sponsored by DOE Solar Energy Technologies Office, and has been published in an on-line version hosted by SunSpec Alliance at apsuite.sunspec.org. A spreadsheet version is included with this paper as supplementary material.

14 SOLAR ENERGY↗

Workforce and Economic Development Considerations from the Operations and Maintenance of Wind Power Plants

As wind capacity in the United States grows, economic opportunities also emerge—supported by the development of the wind workforce, specifically in the operation and maintenance (O&M) phase. Moreover, almost all wind turbines in the United States—about 99%—are located in rural areas (American Wind Energy Association 2018). Communities in these rural areas can anticipate some degree of economic impact from the wind industry. However, the various stakeholders within these communities, such as local businesses and government officials, are not always fully informed of the workforce impacts caused by wind power plants during operational years (Stefek et al. 2019). Although several research studies have focused on workforce and economic impacts of land-based wind facilities (e.g., Tegen et al. 2014; Brown et al. 2012; Halvatzis and Keyser 2013), these studies focused on the quantity of workers and not on O&M workforce interactions with local communities, such as worker commuting and spending patterns. This report is intended to provide stakeholders and community decision makers with qualitative and quantitative information to enable informed decisions that support workforce planning around new wind energy deployment.

17 WIND ENERGY↗

Wind Turbine Drivetrain Reliability and Wind Plant Operations and Maintenance Research and Development Opportunities

The Drivetrain Reliability Collaborative holds annual meetings convened by the National Renewable Energy Laboratory, Argonne National Laboratory, and the U.S. Department of Energy to bring researchers and stakeholders throughout the wind turbine drivetrain supply, operations, and sustainment chain together to explore the state of the art in mechanical system reliability and operations and maintenance challenges that if solved could have significant benefits. Identification of these research and development opportunities are a prime focus of the meetings and are summarized in this report.

17 WIND ENERGY↗

PMDT: AI-Enabled Predictive Maintenance Digital Twins for Advanced Nuclear Reactors

Our team made substantial technical progress on various fronts during the course of the program. Multiple milestones were geared towards demonstrating the feasibility of machine learning based predictive maintenance digital twins towards reducing O&M costs, whereas some other milestones actually focused on identifying technical gaps and developing technologies such as humble AI to provide necessary robustness to the ML-based models. We were able to demonstrate in many cases that Machine learning-based methods can be successfully adapted for Nuclear plant environments especially for remote monitoring applications. Detailed analyses were carried out with plant and full scope simulation data along with capabilities of enhanced analytics to assess and set realistic expectations on cost reductions in O&M. These assessments are paving the way for investments towards reactor design improvements as well project planning for SMR projects as they develop and mature in the next few years. Technology developed under this program got direct visibility to GE Hitachi and their utility customers and resulted in positive intents to deploy some of the elements from design phase. The project additionally resulted in several reports, publications, software and data generation that will be useful in deployment and O&M services for BWRX300 fleets.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS

On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

54 ENVIRONMENTAL SCIENCES↗

Authorized Limits for the Release of a 25 Ton Locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly Facility, Nevada Test Site, Nevada

This document contains process knowledge and radiological data and analysis to support approval for release of the 25-ton locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly (EMAD) Facility, located on the Nevada Test Site (NTS). The 25-ton locomotive is a small, one-of-a-kind locomotive used to move railcars in support of the Nuclear Engine for Rocket Vehicle Application project. This locomotive was identified as having significant historical value by the Nevada State Railroad Museum in Boulder City, Nevada, where it will be used as a display piece. A substantial effort to characterize the radiological conditions of the locomotive was undertaken by the NTS Management and Operations Contractor, National Security Technologies, LLC (NSTec). During this characterization process, seven small areas on the locomotive had contamination levels that exceeded the NTS release criteria (limits consistent with U.S. Department of Energy [DOE] Order DOE O 5400.5, “Radiation Protection of the Public and the Environment”). The decision was made to perform radiological decontamination of these known accessible impacted areas to further the release process. On February 9, 2010, NSTec personnel completed decontamination of these seven areas to within the NTS release criteria. Although all accessible areas of the locomotive had been successfully decontaminated to within NTS release criteria, it was plausible that inaccessible areas of the locomotive (i.e., those areas on the locomotive where it was not possible to perform radiological surveys) could potentially have contamination above unrestricted release limits. To access the majority of these inaccessible areas, the locomotive would have to be disassembled. A complete disassembly for a full radiological survey could have permanently destroyed parts and would have ruined the historical value of the locomotive. Complete disassembly would also add an unreasonable financial burden for the contractor. A decision was reached between the NTS regulator and NSTec, opting for alternative authorized limits from DOE Headquarters. In doing so, NSTec personnel performed a dose model using the DOE-approved modeling code RESRAD-BUILD v3.5 to evaluate scenarios. The parameters used in the dose model were conservative. NSTec’s Radiological Engineering Calculation, REC-2010-001, “Public Dose Estimate from the EMAD 25 Ton Locomotive,” concluded that the four scenarios evaluated were below the 25-millirem per year limit, the “likely” dose scenarios met the “few millirem in a year” criteria, and that the EMAD 25-ton locomotive met the radiological requirements to be released with residual radioactivity to the public.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Program of Experimental Diagnostics at the NNSS. An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

43 PARTICLE ACCELERATORS↗