Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Low-Energy Cooling for Electron Ion Collider

Luminosity parameters at the highest hadron energy in the Electron Ion Collider (EIC) require a proton beam with a small vertical emittance. Such a small emittance can be obtained using the technique of electron cooling, by pre-cooling of the proton bunches at an injection energy of 23:8 GeV. After pre-cooling, the proton bunches are accelerated to the maximum energy for collisions. Once at the top energy, such proton bunches can be refilled frequently to maintain a high average luminosity, or, alternatively, cooling at the top energy could be provided with relaxed requirements of just counteracting the emittance growth due to Intra-Beam Scattering (IBS) and thus maintaining the luminosity close to its initial peak value. Presently, several schemes of cooling at the top energy of 275 GeV are being considered with the goal to maintain the initial proton beam parameters, thus relying on pre-cooling at the low energy to obtain such initial parameters of proton bunches. For the lowest proton collision energy of 41 GeV in the EIC, there is a need for an electron cooler which counteracts the beam emittance growth due to IBS. This can be achieved by the same electron cooler which is used for cooling of protons at 23.8 GeV. In this case, we assume the electron cooler rst pre-cools protons at an injection energy of 23.8 GeV and then, after acceleration, cools the 41 GeV protons, counteracting IBS and maintaining the beam emittances. In this report, we summarize a feasibility study of an electron cooler that would be needed to cool protons at 23.8 GeV to obtain a small vertical emittance, as well as to counteract beam growth due to IBS for collisions at 41 GeV. The traditional electron cooling system employed at a typical low-energy cooler is based on an electron beam generated with an electrostatic electron gun in DC operating mode, immersed in a longitudinal magnetic field. To cool protons at 23.8 and 41 GeV, electron beam energies of 13.0 and 22.3MeV, respectively, are required. Due to the technical limitations of static high-voltage acceleration, these beam energies require RF acceleration of a pulsed electron beam. Electron cooling using RF-accelerated electron bunches was recently successfully commissioned in RHIC, allowing us to consider such an approach for EIC low-energy electron cooling.

43 PARTICLE ACCELERATORS↗

Electroanalytical Sensors for Liquid Fueled Fluoride Molten Salt Reactor

ThorCon is developing a thermal thorium / uranium molten salt fueled reactor that uses a fuel salt consisting of NaF - BeF 2 - ThF 4 - UF 4 - UF 3 , which uses 19.75% enriched uranium. It is not a breeder reactor but requires regular additions of fissile material. On-site fuel processing is limited to adding make-up fuel, and adding beryllium to maintain redox balance in the fuel salt. The fluoride salt is an excellent flux that will strip the protective oxygen away from all metal surfaces it contacts. In order to protect the metal surfaces in the primary loop, no free fluorine is allowed. Maintaining a ratio of UF 4 to UF 3 provides a chemical buffer that can absorb any free fluorine released during the fission process before it can harm the structure. Periodic additions of metallic beryllium to the fuel salt will react with UF 4 to form BeF 2 and UF 3 , which will maintain the desired UF 4 /UF 3 ratio. A means to measure the UF 4 /UF 3 ratio is important to maintain the fuel salt in a non-corrosive state and could also provide additional insight into the corrosion behavior and chemical constitution of the system. A promising measurement technique is based on electrochemistry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Micro-Environmental Control System (Final Report)

This project developed an innovative micro-environmental control system (µX) that enables office buildings to reduce energy used for heating and cooling by 15% or more. The µX is a compact, quiet, and ergonomic device that is designed to be installed under an office workstation; it is designed to maintain occupant comfort when room thermostat setpoints are incremented by 4°F or more (warmer in the summer and cooler in the winter) to save energy. When ambient room temperatures are outside of the usual comfort range, the µX maintains occupant comfort by delivering personalized cooling or heating locally to each office worker. The µX provides personalized cooling using a micro vapor compression system that includes a new high-performance micro-scroll compressor and a novel thermal storage unit. The vapor compression system operates at night to freeze a phase-change material (PCM). During the workday, the cooling stored in the PCM is released as a cool breeze of air to make occupants more comfortable. The micro-scroll compressor was developed specifically for this application; it is smaller than any of its type, minimizing the amount of power needed. In heating mode, the µX maintains occupant comfort using a foot heating mat with an infrared reflective box. The µX R&D project was conducted by Syracuse University in collaboration with United Technologies Research Center, Air Innovations, Bush Technical, and Cornell University. Over the course of the initial three-year project, the team developed and evaluated four versions of the unit, advancing the concept to Technology Readiness Level 6. The capabilities of individual proof-of-concept prototypes were verified in tests that were conducted with: 1) units in psychrometric chambers, 2) an instrumented manikin in a laboratory, and 3) human subjects in laboratories that simulate office environments. The tests verified that the µX prototypes met or exceeded all performance targets required to enable office buildings to reduce energy used for heating and cooling by 15% or more by maintaining occupant comfort when thermostat setpoints are incremented by 4°F or more.

25 ENERGY STORAGE↗

Advanced Simulation and Computing: ASC FY24 Implementation Plan

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, security, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including previous nuclear tests, stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent. The ASC program is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification process, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This work requires a balance of resources, including technical staff, hardware, simulation software, and computer science solutions. The ASC program focuses on increasing the predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The Program continues to improve its unique tools for understanding and solving progressively more difficult stockpile problems (sufficient resolution, dimensionality, and scientific details), and quantifying critical margins and uncertainties. Resolving each issue requires increasingly difficult analyses because the aging process has progressively moved the stockpile further from the original test base. While the focus remains on the U.S. nuclear weapons program, where possible, the Program also enables the use of high-performance computing (HPC) and simulation tools to address broader national security needs, such as foreign nuclear weapon assessments and nuclear counterterrorism. The 2022 Nuclear Posture Review (NPR) calls for NNSA to “deliver a modern, adaptive nuclear security enterprise based on an integrated strategy for risk management, production-based resilience, science and technology innovation, and workforce initiatives.” Furthermore, “NNSA will establish a Science and Technology Innovation Initiative to accelerate the integration of science and technology (S&T) throughout its activities.” Executing this strategy necessitates the continued emphasis on developing and sustaining high-quality scientific and engineering staff, as well as supporting computational and experimental capabilities. These components constitute the foundation of the nuclear weapons program. The continued success of the SSP and LEPs is predicated upon the ability to credibly certify the stockpile, without a return to underground nuclear tests (UGTs). Shortly after the nuclear test moratorium entered into force in 1992, the Accelerated Strategic Computing Initiative (ASCI) was established to provide an extensive simulation capability to underpin stockpile certification. While computing and simulation have always been essential to the success of the nuclear weapons program, the program goal of ASCI was to execute NNSA’s vision of using these tools in support of the stockpile stewardship mission. The ASCI program was essential to the successful demonstration of the SSP, providing critical nuclear weapons simulation and modeling capabilities. ASCI officially evolved into the ASC program in fiscal year (FY) 2005, but the mission remains essentially the same: provide the simulation and computational capabilities that underpin the ability to maintain a safe, secure, effective nuclear weapon stockpile, without returning to underground nuclear testing. The capabilities that the ASC program provides at the national laboratories play a vital role in the nuclear security enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Stockpile Management and Production Modernization programs (formerly Directed Stockpile Work) also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these life extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT.

97 MATHEMATICS AND COMPUTING↗

Introduction to Grid Forming Inverters: A Key to Transforming our Power Grid [Slides]

A grid-forming (GFM) inverter-based resource (IBR) controls maintain an internal voltage phasor that is constant or nearly constant in the sub-transient to transient time frame. This definition means that the GFM IBR will nearly immediately respond to changes in the external system and attempt to maintain IBR control during challenging network conditions to maintain grid stability. In GFM IBR, the voltage phasor is controlled to maintain synchronism with other devices in the grid while regulating the active and reactive power appropriately to support the grid. This contrasts with conventional GFL IBR controls wherein immediately after a disturbance (0-5 cycles), within the normal operating range of voltage, the output current phasor magnitude and angle remain unchanged, and the current phasor begins changing only within the transient time frame (tens of cycles) to strictly control the active and reactive power being injected into the network. This presentation gives an introduction to GFM IBR and presents the current state of the art in this area.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LYNM PE1 Shot A Meteorology Team Technical Report

Weather support for Shot A was done by NOAA’s Air Resources Laboratory (ARL) / Special Operations and Research Division (SORD) and Lawrence Livermore National Laboratory (LLNL). Weather support activities included wind and precipitation forecasting, maintaining and monitoring PE1 meteorology towers MT02-11, maintaining and monitoring the ARL/SORD tower on Aqueduct Mesa (A12AI, also called MT01), maintaining and monitoring the Blackbrush energy flux tower, radiosonde preparation and launch, providing weather conditions on shot day for go/no-go criteria, and quality control and submission of the datasets. ARL/SORD additionally maintains and monitors the meteorological tower network (Mesonet) and sodar (at Desert Rock) for NNSS.

54 ENVIRONMENTAL SCIENCES↗

Ash Fouling Free Regenerative Air Preheater for Deep Cyclic Operation

The University of Kentucky (UKy) project titled “Ash Fouling Free Regenerative Air Preheater for Deep Cyclic Operation”, DE-FE0031757, was conducted from 8/15/2019 to 8/14/2024 in two Budget Periods. Other participants included PPL Corporation and Black Dragon Double Boiler. The overall goal was to investigate the proposed self-cleaning technology to achieve ash fouling free air preheater operation in a coal-fired power plant, especially during deep cycling. All project deliverables, milestones, and success criteria were met. UKy obtained the following scientific findings. • Temporary and periodic high temperature of heating elements (450 ~ 500 °F) can prevent ash accumulation and maintain air preheater free of clogging. • The ash samples analysis and unit operation provide solid evidence of ABS formed during low load with SCR ammonia slip being the major cause of ash accumulation, and air preheater clogging can be prevented by raising the heating element temperature up to 450 °F~ 500 °F at which ABS is decomposed. • In-situ self-cleaning can be controlled by monitoring temperature and/or presetting fixed number of cleanings per day. Both approaches in pilot testing show positive results for maintaining an ash free state for the air preheater. • Temperature criteria (cold end or gas outlet temperature) for entering self-cleaning service is critical to balance the number of cleaning cycles with maintaining the ash level. • Temperature criteria (cold end or gas outlet temperature) for exiting self-cleaning service is critical to balance the duration of the cleaning cycles with maintaining the ash level.

01 COAL, LIGNITE, AND PEAT↗

Audit Report on "Protection of the Department of Energy's Unclassified Sensitive Electronic Information"

The Department of Energy and its contractors store and process massive quantities of sensitive information to accomplish national security, energy, science, and environmental missions. Sensitive unclassified data, such as personally identifiable information (PII), official use only, and unclassified controlled nuclear information require special handling and protection to prevent misuse of the information for inappropriate purposes. Industry experts have reported that more than 203 million personal privacy records have been lost or stolen over the past three years, including information maintained by corporations, educational institutions, and Federal agencies. The loss of personal and other sensitive information can result in substantial financial harm, embarrassment, and inconvenience to individuals and organizations. Therefore, strong protective measures, including data encryption, help protect against the unauthorized disclosure of sensitive information. Prior reports involving the loss of sensitive information have highlighted weaknesses in the Department's ability to protect sensitive data. Our report on Security Over Personally Identifiable Information (DOE/IG-0771, July 2007) disclosed that the Department had not fully implemented all measures recommended by the Office of Management and Budget (OMB) and required by the National Institute of Standards and Technology (NIST) to protect PII, including failures to identify and encrypt PII maintained on information systems. Similarly, the Government Accountability Office recently reported that the Department had not yet installed encryption technology to protect sensitive data on the vast majority of laptop computers and handheld devices. Because of the potential for harm, we initiated this audit to determine whether the Department and its contractors adequately safeguarded sensitive electronic information. The Department had taken a number of steps to improve protection of PII. Our review, however, identified opportunities to strengthen the protection of all types of sensitive unclassified electronic information and reduce the risk that such data could fall into the hands of individuals with malicious intent. In particular, for the seven sites we reviewed: (1) Four sites had either not ensured that sensitive information maintained on mobile devices was encrypted. Or, they had improperly permitted sensitive unclassified information to be transmitted unencrypted through email or to offsite backup storage facilities; (2) One site had not ensured that laptops taken on foreign travel, including travel to sensitive countries, were protected against security threats; and, (3) Although required by the OMB since 2003, we learned that programs and sites were still working to complete Privacy Impact Assessments - analyses designed to examine the risks and ramifications of using information systems to collect, maintain, and disseminate personal information. Our testing revealed that the weaknesses identified were attributable, at least in part, to Headquarters programs and field sites that had not implemented existing policies and procedures requiring protection of sensitive electronic information. In addition, a lack of performance monitoring contributed to the inability of the Department and the National Nuclear Security Administration (NNSA) to ensure that measures were in place to fully protect sensitive information. As demonstrated by previous computer intrusion-related data losses throughout the Department, without improvements, the risk or vulnerability for future losses remains unacceptably high. In conducting this audit, we recognized that data encryption and related techniques do not provide absolute assurance that sensitive data is fully protected. For example, encryption will not necessarily protect data in circumstances where organizational access controls are weak or are circumvented through phishing or other malicious techniques. However, as noted by NIST, when used appropriately, encryption is an effective tool that can, as part of an overall risk-management strategy, enhance security over critical personal and other sensitive information. The audit disclosed that Sandia National Laboratories had instituted a comprehensive program to protect laptops taken on foreign travel. In addition, the Department issued policy after our field work was completed that should standardize the Privacy Impact Assessment process, and, in so doing, provide increased accountability. While these actions are positive steps, additional effort is needed to help ensure that the privacy of individuals is adequately protected and that sensitive operational data is not compromised. To that end, our report contains several recommendations to implement a risk-based protection scheme for the protection of sensitive electronic information.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Integrated Forest Products Refinery (IFPR)

Pre-extraction–kraft studies of hardwoods showed that when extracting about 10% of the wood, the final kraft pulp yield and physical properties could only be maintained at a level similar to that of regular kraft pulp when the final extract pH was close to neutral. This so-called “near neutral” pre-extraction condition at a level of 10% wood dissolution was achieved by contacting the wood chips with green liquor (GL) at a charge of about 3% (as Na2O on wood) at 160 °C for almost 2 hours (or an H-factor of about 800 hrs.). During subsequent kraft cooking of the pre-extracted hardwood chips the effective alkali charge could be reduced by about 3% (as Na2O on wood) and the cooking time shortened relative to that during regular kraft cooking, while still producing the same bleachable grade kappa number as the kraft control pulp. For softwood, no extraction conditions were discovered in the present investigation whereby both the final kraft pulp yield and physical properties could be maintained at a level similar to that of regular softwood kraft pulp. Therefore for hardwoods the “near- neutral green liquor pre-extraction conditions do meet the requirements of the IFPR concept, while for softwood, no extraction conditions were discovered which do meet these requirements. Application of simulated industrial GL at an extraction H-factor of about 800 hrs and 3% GL charge in a recirculating digester produced an hardwood extract containing about 4% (on wood) of total anhydro-sugars, 2% of acetic acid, and 1.3% of lignin. Xylan comprised of 80% of the sugars of which about 85% is oligomeric. Since only polymeric hemicelluloses and lignin may be adsorbed on pulp (produced at a yield of about 50% from the original wood), the maximum theoretical yield increase due to adsorption may be estimated as 10% on pulp (or 5% on wood). However, direct application of raw GL hardwood extract for hemicelluloses adsorption onto hardwood kraft pulp led to a yield increase of only about 1% (on pulp). By using the wet-end retention aid guar gum during the adsorption process at a charge of 0.5% on pulp the yield gain may be increased to about 5%. Unfortunately, most of this yield increase is lost during subsequent alkaline treatments in the pulp bleach plant. It was found that by performing the adsorption at alkaline conditions the adsorption loss during alkaline treatment in the bleach plant is mostly avoided. Thus a permanent adsorption yield of about 3 and 1.5% (on pulp) was obtained with addition of guar gum at a charge of 0.5 and 0.1% respectively during adsorption of GL hardwood extract on pre-extracted kraft pulp at optimal conditions of pH 11.5, 90 C for 60 minutes at 5% consistency. The beatability of the adsorbed kraft pulps was improved. Also, significant physical strength improvements were achieved. Further study is needed to determine whether the improvements in pulp yield and paper properties make this an economic IFPR concept. Application of the wood solids of a hot water extract of Acer rubrum wood strands as a substitute for polystyrene used for production of SMC maintained the water adsorption properties of the final product. Further work on the physical properties of the hemicellulose containing SMCs need to be completed to determine the potential of wood extracts for the production of partially renewable SMCs. The discovery of the “near-neutral” green liquor extraction process for hardwood was formed the basis for a commercial Integrated Biorefinery that will extract hemicelluloses from wood chips to make biofuels and other specialty chemicals. The pulp production process will be maintained as is proposed in the present researched IFBR concept. This Integrated Biorefinery will be constructed by Red Shield Acquisition LLC (RSA) at the Old Town kraft pulp mill in Maine. RSA in collaboration with the University of Maine will develop and commercialize the hemicellulose extraction process, the conversion of the hemicellulose sugars into butanol by fermentation, and the separation of specialty chemicals such as acetic acid from the extract. When operating the facility will produce 1.5 million gallons per year of butanol and create 16 new “green collar” jobs. Previously, a spare pulp digester was converted to a new extractor, and in 2009 it was demonstrated that a good hemicellulose extract could be produced, while simultaneously producing market pulp. Since then more than 250 hours of operational experience has been acquired by the mill generating a hemicellulose extract while simultaneously producing market pulp at a scale of 1000 tonnes (OD)/day of mixed northern hardwood chips.

09 BIOMASS FUELS↗

The Role of Light–Dark Regulation of the Chloroplast ATP Synthase

The chloroplast ATP synthase catalyzes the light-driven synthesis of ATP and is activated in the light and inactivated in the dark by redox-modulation through the thioredoxin system. It has been proposed that this down-regulation is important for preventing wasteful hydrolysis of ATP in the dark. To test this proposal, we compared the effects of extended dark exposure in Arabidopsis lines expressing the wild-type and mutant forms of ATP synthase that are redox regulated or constitutively active. In contrast to the predictions of the model, we observed that plants with wild-type redox regulation lost photosynthetic capacity rapidly in darkness, whereas those expressing redox-insensitive form were far more stable. To explain these results, we propose that in wild-type plants, down-regulation of ATP synthase inhibits ATP hydrolysis, leading to dissipation of thylakoid proton motive force (pmf) and subsequent inhibition of protein transport across the thylakoid through the twin arginine transporter (Tat)-dependent and Secdependent import pathways, resulting in the selective loss of specific protein complexes. By contrast, in mutants with a redox-insensitive ATP synthase, pmf is maintained by ATP hydrolysis, thus allowing protein transport to maintain photosynthetic activities for extended periods in the dark. Hence, a basal level of Tat-dependent, as well as, Sec-dependent import activity, in the dark helps replenishes certain components of the photosynthetic complexes and thereby aids in maintaining overall complex activity. But, the influence of a dark pmf on thylakoid protein import, by itself, could not explain all the effects we observed in this study. For example, we also observed in wild type plants a large transient buildup of thylakoid pmf and nonphotochemical exciton quenching upon sudden illumination of dark adapted plants. Thus, we conclude that down-regulation of the ATP synthase is probably not related to preventing loss of ATP per se. Instead, ATP synthase redox regulation may be impacting a number of cellular processes such as (1) the accumulation of chloroplast proteins and/or ions or (2) the responses of photosynthesis to rapid changes in light intensity. A model highlighting the complex interplay between ATP synthase regulation and pmf in maintaining various chloroplast functions in the dark is presented.

59 BASIC BIOLOGICAL SCIENCES↗

Above-cloud concentrations of cloud condensation nuclei help to sustain some Arctic low-level clouds

Abstract. Previous studies have found that low-level Arctic clouds often persist for long periods even in the face of very low surface cloud condensation nuclei (CCN) concentrations. Here, we investigate whether these conditions could occur due to continuous entrainment of aerosol particles from the free troposphere (FT). We use an idealized large eddy simulation (LES) modeling framework, where aerosol concentrations are low in the boundary layer (BL) but increased up to 50× in the free troposphere. We find that the tests with higher tropospheric aerosol concentrations simulated clouds, which persisted for longer and maintained higher liquid water paths (LWPs). This is due to direct entrainment of the tropospheric aerosol into the cloud layer, which results in a precipitation suppression from the increase in cloud droplet number and in stronger cloud-top radiative cooling, which causes stronger circulations maintaining the cloud in the absence of surface forcing. Together, these two responses result in a more well-mixed boundary layer with a top that remains in contact with the tropospheric aerosol reservoir and can maintain entrainment of those aerosol particles. The surface aerosol concentrations, however, remained low in all simulations. The free-tropospheric aerosol concentration necessary to maintain the clouds is consistent with concentrations that are frequently seen in observations.

Environmental Sciences & Ecology↗

Method of fabricating free-form, high-aspect ratio components for high-current, high-speed microelectrics

Microelectronic structures and devices, and method of fabricating a three-dimensional microelectronic structure is provided, comprising passing a first precursor material for a selected three-dimensional microelectronic structure into a reaction chamber at temperatures sufficient to maintain said precursor material in a predominantly gaseous state; maintaining said reaction chamber under sufficient pressures to enhance formation of a first portion of said three-dimensional microelectronic structure; applying an electric field between an electrode and said microelectronic structure at a desired point under conditions whereat said first portion of a selected three-dimensional microelectronic structure is formed from said first precursor material; positionally adjusting either said formed three-dimensional microelectronic structure or said electrode whereby further controlled growth of said three-dimensional microelectronic structure occurs; passing a second precursor material for a selected three-dimensional microelectronic structure into a reaction chamber at temperatures sufficient to maintain said precursor material in a predominantly gaseous state; maintaining said reaction chamber under sufficient pressures whereby a second portion of said three-dimensional microelectronic structure formation is enhanced; applying an electric field between an electrode and said microelectronic structure at a desired point under conditions whereat said second portion of a selected three-dimensional microelectronic structure is formed from said second precursor material; and, positionally adjusting either said formed three-dimensional microelectronic structure or said electrode whereby further controlled growth of said three-dimensional microelectronic structure occurs.

42 ENGINEERING↗

Environmental Requirements Management

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

Cusack, Laura J.↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TOPDAQ Acquisition Utility Beta version 1.0

This TOPDAQ Acquisition Utility uses 5 digital cameras mounted on a vertical pole, maintained in a vertical position using sensors and actuators, to take photographs of an RP-2 or RP-3 module, one camera for each row (4) and one in the center for driving, when the module is at 0 degrees, or facing the eastern horizon. These photographs and other data collected at the same time the pictures are taken are analyzed by the TOPAAP Analysis Utility. The TOPCAT implemented by the TOPDAQ Acquisition Utility and TOPAAP Analysis Utility programs optimizes the alignment of each RP in a module on a parabolic trough solar collector array (SCA) to maximize the amount of solar energy intercepted by the solar receiver. The camera fixture and related hardware are mounted on a pickup truck and driven between rows in a parabolic trough solar power plant. An ultrasonic distance meter is used to maintain the correct distance between the cameras and the RP module. Along with the two leveling actuators, a third actuator is used to maintain a proper relative vertical position between the cameras and the RP module. The TOPDAQ Acquisition Utility facilitates file management by keeping track of which RP module data is being taken and also controls the exposure levels for each camera to maintain a high contract ratio in the photograph even as the available daylight changes throughout the day. The theoretical TOPCAT hardware and software support the current industry standard RP-2 and RP-3 module geometries.

MOreno, Mario↗

Manually operated small envelope scanner system

A scanner system and method for acquisition of position-based ultrasonic inspection data are described. The scanner system includes an inspection probe and a first non-contact linear encoder having a first sensor and a first scale to track inspection probe position. The first sensor is positioned to maintain a continuous non-contact interface between the first sensor and the first scale and to maintain a continuous alignment of the first sensor with the inspection probe. The scanner system may be used to acquire two-dimensional inspection probe position data by including a second non-contact linear encoder having a second sensor and a second scale, the second sensor positioned to maintain a continuous non-contact interface between the second sensor and the second scale and to maintain a continuous alignment of the second sensor with the first sensor.

47 OTHER INSTRUMENTATION↗

National Nuclear Security Administration Strategic Vision Strengthening our Nation through Nuclear Security

The National Nuclear Security Administration’s enduring mission is to protect our nation by maintaining a safe, secure, and effective nuclear weapons stockpile, reducing global nuclear threats, and providing our submarines and aircraft carriers with militarily effective nuclear propulsion. Although we have numerous strategic partners that enable, contribute to, and benefit from our efforts, no other organization, government or civilian, can accomplish our unique mission on behalf of the American people. In this area, we stand alone. This strategic vision pursues urgent change at a significant scale to develop creative approaches, make sustained investments, and be disciplined in our approach to develop a nuclear capability for our time and for the foreseeable future. It is incumbent on us to anticipate our future security challenges and ensure our country is ready to meet them. Not doing so would have far-reaching consequences. Failure to meet our vital mission objectives will erode confidence in the security that the United States strategic deterrent umbrella provides. In assessing the current mission environment in NNSA, we can count on one thing—change: The geopolitical environment for our deterrent is ever-changing Threats from rogue states and terrorists are evolving Our nuclear weapons and the infrastructure that supports them are aging Science and technology continue to move forward at an ever-increasing pace In this dynamic environment, it is not sufficient to remedy today’s situation and meet our current mission requirements. We must lean forward in the development, planning, and execution of programs that address our current challenges while developing the workforce, infrastructure, tools, and governance systems that will enable us to meet our deterrence, non-proliferation, and naval propulsion mission requirements for the next 50 years. We must embrace a next-generation enterprise that is flexible enough to respond to future challenges. With decades of stagnation following the end of the Cold War, we find ourselves in the unenviable position of implementing near-term fixes while using those lessons learned to better prepare for the future. Without sustained and predictable investments to restore and modernize our infrastructure, we will rapidly lose our ability to deliver on our promise of a safe and reliable nuclear weapons stockpile, which will degrade our deterrent capability and render legacy weapon systems irrelevant to the defense of our nation. We must not and will not allow the next generation of our nuclear security enterprise to simply maintain the status quo. We have a storied past that guides us. For 75 years our enterprise has overcome every challenge, led the country in incredible scientific and engineering endeavors and discoveries, and successfully ensured constant vigilance in maintaining an effective deterrent, reducing global nuclear threats, and powering our nuclear navy. Now is the time for us to take decisive action in forging the enterprise of the future. As I have traveled to all of our labs, plants, and sites and met with people across our complex, I have been left with one overwhelming impression: the incredible workforce that makes up our nuclear security enterprise is up to all of the challenges we have before us. Together we can and will ensure that those in the future workforce have the resources and the responsive, agile infrastructure they need to maintain the systems of today and to design and field the systems of tomorrow.

Source record↗

SAFSTOR and License Renewal: Making Them Coexist

The Indian Point Energy Center is located on the eastern shore of the Hudson River in the town of Buchanan, New York. It lies approximately thirty miles north of New York City, and thus, holds the distinction of being the closest nuclear facility to a major metropolitan area. Units 1 and 2 were constructed and operated by Consolidated Edison and Unit 3 was owned and operated by the New York State Power Authority. All three units are now owned and operated by Entergy Nuclear- Northeast. Indian Point Unit 1 was powered by a pressurized water reactor which operated with an authorized maximum steady state power level of 615 thermal megawatts until October 31, 1974. On June 19, 1980, the Commission issued an order revoking authority to operate the facility. Although 244 spent fuel assemblies were successfully shipped offsite to a spent fuel reprocessing facility, 160 assemblies remain in the Unit 1 spent fuel pool awaiting relocation to dry cask storage. Units 2 and 3 are also pressurized water reactors which each produce slightly in excess of 1,000 MWe. Since 1974, Unit 1 has been maintained in a Safe Store Mode (SAFSTOR). For the purposes of this document, the term 'SAFSTOR' is intended to mean 'Custodial SAFSTOR' as described in section 2.4.3 of NUREG 0586 (Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (GEIS) as follows: 'Custodial SAFSTOR requires a minimum cleanup and decontamination effort initially, followed by a period of continuing care with the active protection systems (principally the ventilation system) kept in service throughout the storage period. Full-time onsite surveillance by operating and security forces is required to carry out radiation monitoring, to maintain the equipment, and to prevent accidental or deliberate intrusion into the facility and the subsequent exposure to radiation or the disposal of radioactivity beyond the confines of the facility'. The decision to enter SAFSTOR was based upon the immediate proximity of Unit 1 to the operating units and the fact that a number of Unit 1 systems are shared with Unit 2. Over the past few decades, additional Unit 1 space (primarily within the turbine building) has been cleaned out and is being used to support the operating Units. The original plan to maintain Unit 1 in a SAFSTOR condition until it could be safely dismantled along with Unit 2 at the end of the Unit 2 operating license in 2012, requires some level of re-thinking now that Units 2 and 3 are applying for renewal of their licenses with the desire to continue operation until the 2033 time frame. The remainder of this paper summarizes the inspections and assessments undertaken by Entergy to investigate and document the condition of Indian Point Unit 1 and the resulting steps taken to assure that it would not pose a threat to the license extension efforts being under taken by Units 2 and 3. In conclusion: the Entergy Indian Point management team has systematically undertaken an effort to ensure the Unit 1 SAFSTOR condition and has implemented programs and procedural controls which will assure that it will continue to be safely maintained and will not impact the continued safe operation of Units 2 and 3 during their license renewal period.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗