Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lunar surface”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Electrical Transmission on the Lunar Surface: DC Transmission - Part 1

This report summarizes a portion of the results from a grant at Auburn University to study the electrical and thermal energy management for lunar facilities. Over the past year (June 1989 to May 1990) the following topics have been investigated: June 1989 to November 1989 - Literature survey, assessment of lunar power needs, and overview study of the requirements of a lunar power system; November 1989 to April 1990 - Develop models for the study of dc electrical power transmission lines for the lunar surface; March 1990 to May 1990 - Develop models for the study of ac electrical power transmission lines for the lunar surface. Because of the large amount of information in the model development and application to a wide parameter space this report is being bound separately. This report specifically contains the model development and parameter study for dc electrical power transmission lines. The end of the funding year (May 1990) will conclude with an annual report including the literature survey, the overview of the requirements of a lunar power system, and summaries of the dc and ac models of electrical transmission lines.

Gordon, Lloyd B.↗

Evaluation of Aerobic Standards for Lunar Surface Extravehicular Activities

As NASA prepares to return to the Moon, astronauts will need to be physically primed to successfully execute Extravehicular Activities (EVA) on the Lunar surface. Compared to past Apollo missions, Artemis missions will include EVAs of increased physical demand, frequency, intensity, and duration, thus requiring adequate fitness to successfully and safely complete mission objectives. The physical demand associated with partial gravity (g) EVAs on the Moon is expected to be greater compared to microgravity EVAs based on initial workload estimation. Currently, aerobic fitness standards for partial g EVAs are not well supported by high-fidelity data and require further research for establishing standards to protect crew health and performance during Lunar surface missions. Therefore, the aim of this investigation is to characterize metabolic data from Lunar analog simulations and in-flight crew population aerobic capacity data to validate the current NASA 3001 standard for celestial partial g aerobic fitness (aerobic capacity (VO_2pk) ≥36.5ml/kg/min).

Nicole Strock↗

Meteoroid activity on the lunar surface from the Surveyor 3 sample examination.

The Surveyor 3 television camera shroud and polished aluminum tube, retrieved as a result of the Apollo 12 mission after 2.5 years on the lunar surface, were examined for evidence of meteoroid impact. Resulting estimates of the meteoroid flux in the lunar vicinity are shown to be in good agreement with the Lunar Orbiter penetration rates. In addition, the relationship between a derived lunar-surface meteoroid cumulative-flux model and the comparable near-earth model is discussed in the light of theoretical predictions. It is shown that the effect of the gravitational field of the earth on the near-earth environment was greater than previously predicted.

Cour-Palais, B. G.↗