Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Policy, Regulatory, Legal, and Permitting Case Study Subtask 3.2 – Topical Report

This report summarizes the policy, regulatory, legal, and permitting requirements to-date for the siting of a CO 2 injection and storage project in the CarbonSAFE Illinois East Sub-Basin pre-feasibility study area. Where applicable, the East Sub-Basin case study focuses on a proposed carbon capture and storage (CCS) site location in West Terre Haute, Indiana. Indiana has established the legal mechanisms to obtain rights to the subsurface mineral estate with the expectation to apply to reservoir pore space for CO 2 storage in an analogous manner to storage of natural gas, which is a common practice in Indiana. There is, however, no precedent in Indiana to take liability for stored CO 2 . There are currently no Indiana State incentives for CCS, but at the Federal level, tax credits for carbon capture and storage under 26. U.S. Code § 45Q constitute the greatest incentive targeted at CCS projects. The amendment to these credits put forth in the Bipartisan Budget Act (the FUTURE Act) of 2018 substantially increases the per-ton incentive for CCS—from $22.66 per ton in tax year 2017 up to $50 per ton in tax year 2027, for CO 2 not used as an injectant (i.e. saline storage). Additional economic opportunities may exist for the provision of CO 2 for potential EOR in the Illinois Basin. Policies that may support the development of CO 2 pipelines and/or CCS projects in Indiana include: 1) Title 41 of the FAST Act (2015), which created a new governance structure, procedures, and funding authorities in order to improve and expedite Federal review and authorization of covered infrastructure projects, including pipelines, and 2) the Eminent Domain for Transportation of Carbon Dioxide by Pipeline (IC 14-39, Indiana State, 2011), which declares pipeline transportation of CO 2 exclusively to a carbon management application, including sequestration, enhanced oil recovery, and deep saline injection as a benefit to the welfare of Indiana and the people. The US Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) Program Class VI rule and permit requirements address all components pertaining to CO 2 injection and monitoring for long-term storage, and outline the minimum technical criteria to protect underground sources of drinking water at, and surrounding, injection well sites. The Class VI requirements also address financial responsibility for corrective action, post-injection site care, and site closure. In addition, UIC Program public notice requirements include that the EPA issue notice of the draft permit preparation to key stakeholders, and open a public comment period of not less than 30 days. A public hearing about the permit would also be held, if specifically requested by the public. A potential Class VI CO 2 injection well permit for the East Sub-Basin case study site would be obtained through the US EPA Region 5, because the State of Indiana does not have UIC Class VI primacy. Although no CO 2 injection wells have been permitted in Indiana, the US EPA Region 5 (which covers Illinois and Indiana) and the East Sub-Basin CarbonSAFE team (via the Midwest Geological Sequestration Consortium [MGSC]) have Class VI permitting experience from several projects located in Illinois. Based on our experience, applying for a Class VI permit can be an intensive and iterative process requiring clear communication and numerous interactions with EPA staff. In addition to gathering and preparing the data/models and documentation necessary for a permit application’s initial submittal, the subsequent public comments, EPA response and review, and answering of any follow-up questions/requests by the EPA could significantly increase the timeframe of draft permit issuance. The US EPA offers guidance documents regarding the specific Class VI permit requirements, and shows a general permitting timeline example from the FutureGen Alliance 2.0 covering one-and-a-half years from permit submittal to issuance. However, the overall permitting process to-date has a high degree of variability, and in MGSC’s project experience we observed a more extended timeline to receive Class VI permits for each of two CO 2 injection wells.

01 COAL, LIGNITE, AND PEAT↗

The Chesapeake Lighthouse and Aircraft Measurements for Satellites (CLAMS) Experiment

NASA has developed an Earth Observing System (EOS) consisting of a series of satellites designed to study global change from space. The EOS flagship is the EOS TERRA satellite, launched in December 1999, equipped with five unique sensors to monitor and study the Earth s heat budget and many of the key controlling variables governing the Earth's climate system. CLAMS, the Chesapeake Lighthouse and Aircraft Measurements for Satellites field campaign was conducted from NASA Wallops Flight Facility and successfully executed over the middle Atlantic eastern seaboard from July 10 August 2, 2001. CLAMS is primarily a shortwave closure experiment designed to validate and improve EOS TERRA satellite data products being derived from three sensors: CERES (Clouds and Earth's Radiant Energy System), MISR (Multi-angle Imaging Spectro-Radiometer) and MODIS (MODerate Resolution Imaging Spectroradiometer). CLAMS is jointly sponsored by the CERES, MISR and MODIS instrument teams and the NASA GEWEX Global Aerosol Climatology Project (GACP). CLAMS primary objectives are to validate satellite-based retrievals of aerosol properties and vertical profiles of radiative flux, temperature and water vapor. Central to CLAMS measurement strategy is the Chesapeake Lighthouse, a stable sea platform located in the Atlantic Ocean, 13 miles east of Virginia Beach near the mouth of the Chesapeake Bay and the site of an ongoing CERES Ocean Validation Experiment (COVE). Six research aircraft were deployed to make detailed measurements of the atmosphere and ocean surface in the vicinity of COVE, over the surrounding ocean, over nearby NOAA buoys and over a few land sites. The measurements are used to validate and provide ground truth for simultaneous products being derived from TERRA data, a key step toward an improved understanding and ability to predict changes in the Earth's climate. One of the two CERES instruments on-board TERRA was programmed for Rotating Azimuth Plane Scans (RAPS) during CLAMS, increasing the CERES coverage over COVE by a factor of 10. Nine coordinated aircraft missions and numerous additional sorties were flown under a variety of atmospheric conditions and aerosol loadings. On one golden day, July 17, all six aircraft flew coordinated patterns, vertically stacked between 100 ft and 65,000 ft over the COVE site as the TERRA satellite orbited overhead. A summary of CLAMS measurement campaign and a description of the platforms and measurements is given.

Smith, William L., Jr.↗

Status of the Characterization of DEs from the Full Circumference Examination of the Inner Container Closure Weld Region (FY2020)

One of the main focus areas of the 3013 Surveillance Program is a thorough evaluation of the inner container closure weld region (ICCWR) opened for destructive examination (DE). As part of the protocol to investigate the corrosion in the ICCWR a laser confocal microscope (LCM) is used to perform close visual examination of the surface and measurements of corrosion features on the surface. DE containers from FY13 through FY16 were screened with three candidates selected for full circumference evaluation (FCE) according to the ICCWR examination protocol, During the FCE, FY16 DE05 and FY15 DE07 showed suspect major corrosion events, FY16 DE05 Section C2 shows two crack-like features, identified as Denebola and Draco. Both features are located at the boundary of Zone 2 and Zone 3. Consequently, Section C2 of FY16 DE05 was selected for examination by serial metallography at Savannah River National Laboratory (SRNL). For FY15 DE07 the suspect corrosion events were observed on Sections Cl and C2. Section Cl shows one crack-like feature, identified as Acrux. Section C2 shows three crack-like features, identified as Bellatrix, Cursa Minor and Cursa Major. Unlike Acrux and Bellatrix, which are located at the boundary of Zone 2 and Zone 3, Cursa Minor and Cursa Major are located in Zone 2. Sections Cl and C2 of FY15 DE07 were sent to Los Alamos National Laboratory (LANE) for characterization by X-Ray Tomography (XRT).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement (Rev. 6)

This Compliance Monitoring Implementation Plan outlines monitoring activities conducted by the U.S. Department of Energy (DOE) at the Waste Isolation Pilot Plant (WIPP) to demonstrate compliance with the U.S. Environmental Protection Agency (EPA) disposal regulations at Title 40 Code of Federal Regulations (CFR) Part 191, "Environmental Protection Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes," Subparts B and C; and the EPA criteria for certifying compliance at 40 CFR Part 194, "Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the Disposal Regulations," Certification Decision, Final Rule. This plan does not address | monitoring activities intended to demonstrate compliance with 40 CFR Part 191 Subpart A. WIPP is a mined repository designed for the permanent disposal of defense-related transuranic (TRU)waste located in the Chihuahuan Desert, 26 miles east of Carlsbad, New Mexico. The suitability of the WIPP site for TRU waste disposal is supported by more than three decades of environmental studies. Monitoring the WIPP facility is one of the DOE's top priorities. Monitoring activities are implemented in compliance with various federal and state of New Mexico regulatory and operational safety requirements. These activities are conducted to ensure environmental protection, public and worker health and safety, and proper characterization of the disposal system. Monitoring activities will continue at WIPP through the operational period and until well after closure of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulating the Clamped Tapered Beam Specimen Under Quasi-Static and Fatigue Loading Using Floating Node Method

As part of the NASA Advanced Composites Project (ACP), a sub-element has been designed to provide validation data for progressive damage analysis models. The clamped tapered beam is a cross-ply laminated composite specimen designed to validate the simulation of the onset of matrix cracks and their interaction with delaminations, including delamination migration. A tapered geometry was used to localize the first damage occurrence in the tapered region, without prescribing an initial crack. The boundary and loading conditions were chosen to favor delamination growth and subsequent migration after the first damage occurrence. The typical sequence of events consists of a matrix crack located at the tapered region, leading to delamination onset, followed by delamination growth and subsequent delamination migration to a different interface via a dominant matrix crack. The Clamped Tapered Beam (CTB) was tested in both quasi-static and fatigue regimes. The results obtained are used in this study to assess and validate a methodology based on the Floating Node Method (FNM) implemented as an Extended Interface Element. In this methodology, quasi-static and fatigue damage formation and development are modeled by combining FNM to represent crack networks, with Directional Cohesive Zone Elements (DCZE) and Virtual Crack Closure Technique (VCCT), respectively. Qualitatively, the methodology is capable of predicting the sequence of events and overall failure morphology. Quantitatively, the simulation results generally bound the experimental data, based on the range of the characterization data used. In this paper, the results from quasi static and fatigue simulations are compared and correlated with experimental data.

Seshadri, B. R.↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada National Security Site, Nevada, Revision 0 with ROTC 1

This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗

Safety Basis Development for the Tank Closure Cesium Removal (TCCR) Demonstration - 19596

The Tank Closure Cesium Removal (TCCR) system has been installed at Savannah River Site (SRS) to supplement the existing salt waste treatment facilities. The TCCR system is intended to demonstrate the capability of ion exchange (IX) technology to remove Cs-137 from high level liquid waste. Separation is performed by Crystalline Silicotitanate (CST) IX media. The media is stored in shielded columns within a small enclosure. Following processing in the TCCR system, decontaminated waste can receive further treatment and be dispositioned at other SRS facilities. The Cesium-laden columns will instead be removed from the enclosure and transported to another location on site for interim storage. Developing the safety basis for the TCCR system and integrating it into the documented safety analysis for existing facilities presented a unique challenge. Most notably, utilizing new methodologies to analyze new hazards resulted in unexpectedly high consequences. The TCCR system therefore required more rigorous controls than had initially been anticipated. However, the integrated control set developed for the TCCR system should have little impact on its operating capabilities and will allow it to begin operating in 2019. This may lay the foundations for future utilization of similar systems at SRS and across the Department of Energy complex. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Robotics in Liquid Waste System - {sup 3}H Evaporator, Tank Closure and Defense Waste Processing Facility - 18525

The Savannah River Site (SRS) Liquid Waste System (LWS) safely stores and treats high-level radioactive waste. The LWS consists of 51 waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities such as the Defense Waste Processing Facility (DWPF) and Salt-stone Production Facility (SPF). At Savannah River Remediation (SRR), the liquid waste contractor, robotic technologies are needed to enter areas and spaces that are otherwise inaccessible or prohibit direct access by workers due to unsafe, unstable, or unknown physical or structural conditions; or configurations that are hard to reach or beyond reach without taking extraordinary mechanical measures. As discussed below, SRR uses robotic technologies at various LWS facilities to reduce dose to the workers as well as provide access to unreachable locations due to the presence of radiological or chemical hazards. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in extending high poloidal beta scenarios on DIII-D towards a steady-state fusion reactor and impact of energetic particles

To prepare for steady-state operation of future fusion reactors (e.g. the International Thermonuclear Experimental Reactor and China Fusion Engineering Test Reactor (CFETR)), experiments on DIII-D have extended the high poloidal beta ( β P ) scenario to reactor-relevant edge safety factor q 95 ~ 6.0, while maintaining a large-radius internal transport barrier (ITB) using negative magnetic shear. Excellent energy confinement quality ( H 98y2 > 1.5) is sustained at high normalized beta ( β N ~ 3.5). This high-performance ITB state with Greenwald density fraction near 100% and q min ≥ 3 is achieved with toroidal plasma rotation V tor ~ 0 at ρ ≥ 0.6. This is a key result for reactors expected to have low V tor . At high β P (≥1.9), large Shafranov shift can stabilize turbulence leading to a high confinement state with a low pedestal and an ITB. At lower β P (<1.9), negative magnetic shear in the plasma core contributes to turbulence suppression and can compensate for reduced Shafranov shift to continue to access a large-radius ITB and excellent confinement with low V tor , consistent with the results of gyrofluid transport simulations. These high- β P cases are characterized by weak/no Alfvén eigenmodes (a.e.) and classical fast-ion transport. At high density, the fast-ion deceleration time decreases and Δ β fast is lower; these reduce a.e. drive. The reverse-shear Alfvén eigenmodes are weaker or stable because the negative magnetic shear region is located at higher radius, away from the peaked fast-ion profile. Resistive wall modes can be a limitation at simultaneous high β N , low internal inductance, and low rotation. Analysis suggests that additional off-axis external current drive could provide a more stable path at reduced q 95 . Based on a DIII-D high- β P plasma with large-radius ITB, two scenarios are proposed for CFETR Q = 5 steady-state operation with ~1 GW fusion power: a lower-$l_i$($l_i$ ~ 0.66) and a higher-$l_i$($l_i$ ~ 0.75) case. Using a Landau closure model, multiple energetic particle (EP) effects on the a.e. stability are analyzed modifying the growth rate of the a.e.s triggered by the neutral-beam-injection EPs and alpha particles, although the stabilizing/destabilizing effect is weak for the cases analyzed. The stabilizing effects of the combined EP species β , energy, and density profile in CFETR need further investigation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Shale disposal of U.S. high-level radioactive waste.

This report evaluates the feasibility of high-level radioactive waste disposal in shale within the United States. The U.S. has many possible clay/shale/argillite basins with positive attributes for permanent disposal. Similar geologic formations have been extensively studied by international programs with largely positive results, over significant ranges of the most important material characteristics including permeability, rheology, and sorptive potential. This report is enabled by the advanced work of the international community to establish functional and operational requirements for disposal of a range of waste forms in shale media. We develop scoping performance analyses, based on the applicable features, events, and processes identified by international investigators, to support a generic conclusion regarding post-closure safety. Requisite assumptions for these analyses include waste characteristics, disposal concepts, and important properties of the geologic formation. We then apply lessons learned from Sandia experience on the Waste Isolation Pilot Project and the Yucca Mountain Project to develop a disposal strategy should a shale repository be considered as an alternative disposal pathway in the U.S. Disposal of high-level radioactive waste in suitable shale formations is attractive because the material is essentially impermeable and self-sealing, conditions are chemically reducing, and sorption tends to prevent radionuclide transport. Vertically and laterally extensive shale and clay formations exist in multiple locations in the contiguous 48 states. Thermal-hydrologic-mechanical calculations indicate that temperatures near emplaced waste packages can be maintained below boiling and will decay to within a few degrees of the ambient temperature within a few decades (or longer depending on the waste form). Construction effects, ventilation, and the thermal pulse will lead to clay dehydration and deformation, confined to an excavation disturbed zone within a few meters of the repository, that can be reasonably characterized. Within a few centuries after waste emplacement, overburden pressures will seal fractures, resaturate the dehydrated zones, and provide a repository setting that strongly limits radionuclide movement to diffusive transport. Coupled hydrogeochemical transport calculations indicate maximum extents of radionuclide transport on the order of tens to hundreds of meters, or less, in a million years. Under the conditions modeled, a shale repository could achieve total containment, with no releases to the environment in undisturbed scenarios. The performance analyses described here are based on the assumption that long-term standards for disposal in clay/shale would be identical in the key aspects, to those prescribed for existing repository programs such as Yucca Mountain. This generic repository evaluation for shale is the first developed in the United States. Previous repository considerations have emphasized salt formations and volcanic rock formations. Much of the experience gained from U.S. repository development, such as seal system design, coupled process simulation, and application of performance assessment methodology, is applied here to scoping analyses for a shale repository. A contemporary understanding of clay mineralogy and attendant chemical environments has allowed identification of the appropriate features, events, and processes to be incorporated into the analysis. Advanced multi-physics modeling provides key support for understanding the effects from coupled processes. The results of the assessment show that shale formations provide a technically advanced, scientifically sound disposal option for the U.S.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental and numerical investigation of proppant embedment and conductivity reduction within a fracture in the Caney Shale, Southern Oklahoma, USA

The current worldwide energy supply is insufficient to meet the rising demand. As a result, the energy prices are expected to keep soaring despite the recent increases in a variety of renewable energy resources. Although not renewable, shale oil and gas — “unconventional” hydrocarbon resources are relatively clean forms of energy resources, which still hold a vast share of the energy market. For many oil and gas companies, meeting profitable production goals from shale reservoirs is sometimes challenging, due to the loss of fracture conductivity and premature declines in the production. In this paper we investigate the stress-dependent changes in the hydraulic conductivity of proppant-filled fractures and mechanical fracture–proppant interactions in Caney Shale, a calcareous, organic-rich mudrock, through laboratory experiments and numerical modeling. American Petroleum Institute (API) fracture conductivity tests were conducted using 2% KCl on five locations within the Caney Shale that consisted of selecting three brittle (reservoir) zones and two ductile zones. Confining pressures ranged from 1,000 psi to 12,000 psi at 210 °F. Conductivity, permeability as well as embedment were measured during the test. Also, an additional, laboratory in-situ visualization test was conducted to examine the detailed proppant-shale matrix interaction under elevated stress (3,920 psi effective stress) and temperature (252 °F), with a synthetic reservoir fluid. Our experimental results have confirmed that improved fracture conductivity is attributed to proppant size, and that the increase in porosity of the proppant pack, closure pressure changes and the reduction in fracture conductivity are a function of many factors such as fracture closure stress.

04 OIL SHALES AND TAR SANDS↗

RANS Simulation VBM of Array of Three Coaxial Lab Scaled DOE RM1 MHK Turbine with 5D Spacing

Attached are the .cas and .dat files along with the required User Defined Functions (UDFs) and look-up table of lift and drag coefficients for the Reynolds Averaged Navier-Stokes (RANS) simulation of three coaxially located lab-scaled DOE RM1 turbine implemented in ANSYS FLUENT CFD-package. The lab-scaled DOE RM1 is a re-design geometry, based of the full scale DOE RM1 design, producing same power output as the full scale model, while operating at matched Tip Speed Ratio values at reachable laboratory Reynolds number (see attached paper). In this case study the flow field around and in the wake of the lab-scaled DOE RM1 turbines in a coaxial array is simulated using Blade Element Model (a.k.a Virtual Blade Model [VBM]) by solving RANS equations coupled with k-\omega turbulence closure model. It should be highlighted that in this simulation the actual geometry of the rotor blade is not modeled. The effect of turbine rotating blades are modeled using the Blade Element Theory. This simulation provides an accurate estimate for the performance of each device and structure of their turbulent far wake. The results of these simulations were validated against the developed in-house experimental data. Simulations for other turbine configurations are available upon request.

16 TIDAL AND WAVE POWER↗

Adaptive mass expulsion attitude control system

An attitude control system and method operative with a thruster controls the attitude of a vehicle carrying the thruster, wherein the thruster has a valve enabling the formation of pulses of expelled gas from a source of compressed gas. Data of the attitude of the vehicle is gathered, wherein the vehicle is located within a force field tending to orient the vehicle in a first attitude different from a desired attitude. The attitude data is evaluated to determine a pattern of values of attitude of the vehicle in response to the gas pulses of the thruster and in response to the force field. The system and the method maintain the attitude within a predetermined band of values of attitude which includes the desired attitude. Computation circuitry establishes an optimal duration of each of the gas pulses based on the pattern of values of attitude, the optimal duration providing for a minimal number of opening and closure operations of the valve. The thruster is operated to provide gas pulses having the optimal duration.

Rodden, John J.↗

Knowledge based ranking algorithm for comparative assessment of post-closure care needs of closed landfills

Post-closure care (PCC) activities at landfills include cap maintenance; water quality monitoring; maintenance and monitoring of the gas collection/control system, leachate collection system, groundwater monitoring wells, and surface water management system; and general site maintenance. The objective of this study was to develop an integrated data and knowledge based decision making tool for preliminary estimation of PCC needs at closed landfills. To develop the decision making tool, 11 categories of parameters were identified as critical areas which could affect future PCC needs. Each category was further analyzed by detailed questions which could be answered with limited data and knowledge about the site, its history, location, and site specific characteristics. Depending on the existing knowledge base, a score was assigned to each question (on a scale 1-10, as 1 being the best and 10 being the worst). Each category was also assigned a weight based on its relative importance on the site conditions and PCC needs. The overall landfill score was obtained from the total weighted sum attained. Based on the overall score, landfill conditions could be categorized as critical, acceptable, or good. Critical condition indicates that the landfill may be a threat to the human health and the environment and necessary steps should be taken. Acceptable condition indicates that the landfill is currently stable and the monitoring should be continued. Good condition indicates that the landfill is stable and the monitoring activities can be reduced in the future. The knowledge base algorithm was applied to two case study landfills for preliminary assessment of PCC performance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final corrective action study for the former CCC/USDA facility in Ramona, Kansas.

Past operations at a grain storage facility formerly leased and operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Ramona, Kansas, resulted in low concentrations of carbon tetrachloride in groundwater that slightly exceed the regulatory standard in only one location. As requested by the Kansas Department of Health and Environment, the CCC/USDA has prepared a Corrective Action Study (CAS) for the facility. The CAS examines corrective actions to address groundwater impacted by the former CCC/USDA facility but not releases caused by other potential groundwater contamination sources in Ramona. Four remedial alternatives were considered in the CAS. The recommended remedial alternative in the CAS consists of Environmental Use Control to prevent the inadvertent use of groundwater as a water supply source, coupled with groundwater monitoring to verify the continued natural improvement in groundwater quality. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) has directed Argonne National Laboratory to prepare a Corrective Action Study (CAS), consistent with guidance from the Kansas Department of Health and Environment (KDHE 2001a), for the CCC/USDA grain storage facility formerly located in Ramona, Kansas. This effort is pursuant to a KDHE (2007a) request. Although carbon tetrachloride levels at the Ramona site are low, they remain above the Kansas Tier 2 risk-based screening level (RBSL) and the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 5 {micro}g/L (Kansas 2003, 2004). In its request for the CAS, the KDHE (2007a) stated that, because of these levels, risk is associated with potential future exposure to contaminated groundwater. The KDHE therefore determined that additional measures are warranted to limit future use of the property and/or exposure to contaminated media as part of site closure. The KDHE further requested comparison of at least two corrective action alternatives to the 'no-action' alternative, as the basis for the Draft Corrective Action Decision for the site. The history and nature of the contamination and previous investigations are summarized in Section 2. Also included in Section 2 is an evaluation of human and environmental targets and potential exposure pathways. Section 3 describes the corrective action goals and applicable or relevant and appropriate requirements (ARARs). Section 4 describes four alternatives, Section 5 analyzes the alternatives in detail, and Section 6 compares the alternatives. Section 6 also includes a summary and a recommended corrective action.

54 ENVIRONMENTAL SCIENCES↗

Analysis of the MODIS Above-Cloud Aerosol Retrieval Algorithm Using MCARS

The Multi-sensor Cloud and Aerosol Retrieval Simulator (MCARS) presently produces synthetic radiance data from Goddard Earth Observing System version 5 (GEOS-5) model output as if the Moderate Resolution Imaging Spectroradiometer (MODIS) was viewing a combination of atmospheric column inclusive of clouds, aerosols and a variety of gases and land/ocean surface at a specific location. In this paper we use MCARS to study the MODIS Above-Cloud AEROsol retrieval algorithm (MOD06ACAERO). MOD06ACAERO is presently a regional research algorithm able to retrieve aerosol optical thickness over clouds, in particular absorbing biomass burning aerosols overlying marine boundary layer clouds in the Southeastern Atlantic Ocean. The algorithm’s ability to provide aerosol information in cloudy conditions makes it a valuable source of information for modeling and climate studies n an area where current clear sky-only operational MODIS aerosol retrievals effectively have a data gap between the months of June and October. We use MCARS for a verification and closure study of the MOD06ACAERO algorithm. The purpose of this study is to develop a set of constraints a model developer might use during assimilation of MOD06ACAERO data. Our simulations indicate that the MOD06ACAERO algorithm performs well for marine boundary layer clouds in the SE Atlantic provided some specific screening rules are observed. For the present study, a combination of five simulated MODIS data granules was used for a dataset of 13.5 million samples with known input conditions. When pixel retrieval uncertainty was less than 30%, optical thickness of the underlying cloud layer was greater than 4 and scattering angle range within the cloud bow was excluded, MOD06ACAERO retrievals agreed with the underlying ground truth (GEOS-5 cloud and aerosol profiles used to generate the synthetic radiances) with a slope of 0.913, offset of 0.06, and RMSE=0.107. When only near-nadir pixels were considered (view zenith angle within +/-20 degrees) the agreement with source data further improved (0.977, 0.051 and 0.096 respectively). Algorithm closure was examined using a single case out of the five 38 used for verification. For closure, the MOD06ACAERO code was modified to use GEOS-5 temperature and moisture profiles as ancillary. Agreement of MOD06ACAERO retrievals with source data for the closure study had a slope of 0.996 with offset -0.007 and RMSE of 0.097 at pixel uncertainty level of less than 40%, illustrating the benefits of high-quality ancillary atmospheric data for such retrievals.

MODIS↗

Western Sector In-Situ Chemical Oxidation Project: Initial Results Following Injection Activities (U)

The persistence of elevated groundwater concentrations of volatile organic compounds (VOCs) (i.e., trichloroethylene [TCE] and tetrachloroethylene [PCE]) in the Lost Lake Aquifer Zone (LLAZ) requires focused treatment to supplement the removal of these contaminants by the existing corrective action systems. The 2000 Resource Conservation and Recovery Act Part B Permit Renewal Application: M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities (HWMFs) Post Closure (WSRC-IM-98-30, Volume III, Revision 7, March 2014) included the use of four temporary authorization (TA) requests to assess the effectiveness of different corrective action technologies at the field scale in the Western and Southern Sectors of A/M Area. There is indeterminate dense non-aqueous phase liquid (DNAPL) associated with historic migration along geologic strata. The DNAPL source is likely the M-Area Settling Basin; however, the 321-M Solvent Storage Tank Area is another potential source. Both of these source areas have been treated using dynamic underground stripping and soil vapor extraction. Groundwater from both of these potential source locations is currently undergoing groundwater pump and treat.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗