Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration Sites”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Robotics for Systems Integration in Buildings: Pilot Study of Viable Approaches to Install Hygrothermal and Rigid Electrical Systems

The Industrialized Construction Innovation (ICI) team at the National Renewable Energy Laboratory (NREL) has been exploring the use of robotics to integrate hygrothermal, mechanical, electrical, and plumbing systems in prefabricated building assemblies (off-site construction) and 3D-printed buildings (on-site construction). Such multisystem integration tasks often require specialized robots and custom end effectors to handle a range of rigid and nonrigid building components. This paper begins with a brief overview of the current state of robotics in construction, followed by a pilot study exploring the use of robotics to integrate a simple prototype multitrade wall assembly composed of structural studs, hygrothermal layer, wall finishing, and electrical fixtures. The study was funded by the US Department of Energy's (DOE's) Advanced Materials and Manufacturing Technologies Office (AMMTO). Insights about the implementation of design for manufacturing and assembly (DfMA) principles in designing the prototype wall for robotic assembly, and selection of appropriate robotic end-effector hardware to handle these components are included. Detailed comparison of computational toolpath simulations of the robotic assembly process and real-life demonstration of the same are presented. Finally, limitations and lessons learned from this study are included, along with future research recommendations for robotic assembly of more complex multitrade assemblies, including potential scenarios such as robotic outfitting of facilities in extraterrestrial environments.

advanced manufacturing↗

Evaluating Integrated Surface/Subsurface Permafrost Thermal Hydrology Models in ATS (v0.88) Against Observations from a Polygonal Tundra Site: Modeling Archive

This Modeling Archive supports the NGEE Arctic publication "Evaluating integrated surface/subsurface permafrost thermal hydrology models in ATS (v0.88) against observations from a polygonal tundra site" available in the Geoscientific Model Development journal. We evaluated the integrated surface/subsurface permafrost thermal hydrology models in the Advanced Terrestrial Simulator (ATS) against field observations in polygonal tundra at the Barrow Environmental Observatory. We simulated thermal hydrology of three-dimensional ice-wedge polygons with generic but broadly representative surface microtopography. We drove the simulations with meteorological data and observed water table elevations in ice-wedge polygon troughs. With limited calibration of the soil properties and evaporation model parameters, the simulations were found to be consistent with observed water tables, active layer thickness, snowpack depth, evaporation, and observed soil temperatures at several depths in trough, rim, and center. The study builds confidence in the emerging class of integrated surface/subsurface permafrost simulators and provides an optimized set of model parameters for use in projections of permafrost dynamics in a warming climate. This dataset includes python, html, pdf, EXO, H5, xlsx, and csv files. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Central Hanford Ecological Integrity Assessments: Final Report

The Hanford Site is comprised of an expanse of shrub-steppe habitats that provides exceptional ecological value to plants and animals located on the site and in the surrounding greater Columbia Basin. The U.S. Department of Energy, Hanford Field Office (HFO)-managed portion of the Hanford Site, referred to herein as Central Hanford, has been the focus of various ecological monitoring efforts, such as vegetation monitoring. The scope and goals of vegetation surveys have varied greatly since the Hanford Site was established, but studies have documented a rapidly changing landscape, making it clear that routine vegetation monitoring is integral to understanding ecological changes and preserving the ecological value of the Hanford Site. A new vegetation monitoring effort was initiated in calendar year (CY) 2023 and continued through CY 2025 using methods based on ecological integrity assessments (EIA) (NHR-2024-04, Field Manual for Applying Rapid Ecological Integrity Assessments in Upland Plant Communities of Washington State ) developed by the Washington Natural Heritage Program (WNHP), a division of the Department of Natural Resources (DNR), and NatureServe.® The methods were modified and supplemented to meet monitoring goals at the Hanford Site. The EIA monitoring effort consisted of field surveys to evaluate vegetation and soil conditions for upland habitats throughout Central Hanford. Vegetation cover estimates were used to score a variety of metrics for vegetation condition. This report summarizes monitoring methods, monitoring results, and provides management recommendations.

54 ENVIRONMENTAL SCIENCES↗

Casing Annulus Monitoring of CO 2 Injection Using Wireless Autonomous Distributed Sensor Networks

Effective and secure carbon subsurface storage, involving the deep underground injection of CO 2 into geological formations where it is permanently trapped, is paramount to mitigating CO 2 emissions (Figure I). Ensuring the integrity of these storage sites and detecting potential leakage through the casing annulus necessitates robust monitoring. This work provides the first integrated demonstration of a wireless casing-annulus monitoring architecture that can operate in highly attenuating cement-brine environments relevant to CO 2 storage. This project focused on developing and validating a novel sensor system for integration with autonomous monitoring near the cement reservoir interface. The goal was a fully integrated Technology Readiness Level (TRL) 4/5 field validation of a distributed wireless intelligent sensor system providing real-time, direct subsurface formation measurements to enhance fluid movement monitoring in the cemented casing annulus. Achieving this objective required the development and integration of 1) wireless autonomous microsensor technology by California Institute of Technology (Caltech); 2) sensor packaging and emplacement technology by Research Triangle Institute (RTI); and 3) smart well completions using wireless active casing collars and NOV pipe by the Sandia National Lab (SNL). The collaboration with the Caltech team in this project aimed to develop millimeter-scale radio frequency identification (RFID) sensors capable of detecting CO 2 , pH, and/or methane levels. These sensors are engineered to be impervious to fluids, allowing them to be mixed with cement and installed within the casing annulus. They operate using RFID protocols at frequencies of 902–928 MHz for both power and communication. A Sandia National Laboratories’ team engaged their expertise in the development of a Smart Collar system designed for the wireless data collection from these RFID sensors embedded in the cement annulus and transmission of this information to the ground surface via IntelliPipe/IntelliServ NOV drill pipe. This is accomplished through inductive coupling at the collar, which facilitates data transfer through each segment of the pipe. Because the system cannot transmit a direct current signal to power the Smart Collar, both power and communication were implemented using alternating current and electromagnetic signals at varying frequencies. Furthermore, the developed microsensor technology had to be demonstrated and validated in comparison with reference transducer measurements in a field test site at The University of Texas at Austin (UT-Austin). Although the full sensor suite did not reach field-deployment readiness, the system-level integration achieved in this project establishes a validated pathway for future incorporation of advanced microsensors.

47 OTHER INSTRUMENTATION↗

Development of a high efficiency integration system and promoter library for rapid modification of Pseudomonas putida KT2440

Pseudomonas putida strains are highly robust bacteria known for their ability to efficiently utilize a variety of carbon sources, including aliphatic and aromatic hydrocarbons. Recently, P. putida has been engineered to valorize the lignin stream of a lignocellulosic biomass pretreatment process. Nonetheless, when compared to platform organisms such as Escherichia coli, the toolkit for engineering P. putida is underdeveloped. Heterologous gene expression in particular is problematic. Plasmid instability and copy number variance provide challenges for replicative plasmids, while use of homologous recombination for insertion of DNA into the chromosome is slow and laborious. Furthermore, heterologous expression efforts to date typically rely on overexpression of exogenous pathways using a handful of poorly characterized promoters. In order to improve the P. putida toolkit, we developed a rapid genome integration system using the site-specific recombinase from bacteriophage Bxb1 to enable rapid, high efficiency integration of DNA into the P. putida chromosome. We also developed a library of synthetic promoters with various UP elements, -35 sequences, and -10 sequences, as well as different ribosomal binding sites. We tested these promoters using a fluorescent reporter gene, mNeonGreen, to characterize the strength of each promoter, and identified UP-element-promoter-ribosomal binding sites combinations capable of driving a ~150-fold range of protein expression levels. One additional integrating vector was developed that confers more robust kanamycin resistance when integrated at single copy into the chromosome. This genome integration and reporter systems are extensible for testing other genetic parts, such as examining terminator strength, and will allow rapid integration of heterologous pathways for metabolic engineering.

59 BASIC BIOLOGICAL SCIENCES↗

Field-Based Detection and Mnitoring of Uranium in Contaminated Groundwater using two Immunosensors

Field-based monitoring of environmental contaminants has long been a need for environmental scientists. Described herein are two kinetic exclusion-based immunosensors, a field portable sensor (FPS) and an inline senor, that were deployed at the Integrated Field Research Challenge Site of the U.S. Department of Energy in Rifle, CO. Both sensors utilized a monoclonal antibody that binds to a U(VI)-dicarboxyphenanthroline complex (DCP) in a kinetic exclusion immunoassay format. These sensors were able to monitor changes of uranium in groundwater samples from ~1 μM to below the regulated drinking water limit of 126 nM (30 ppb). The FPS is a battery-operated sensor platform that can determine the uranium level in a single sample in 5-10 min, if the instrument has been previously calibrated with standards. The average minimum detection level (MDL) in this assay was 0.33 nM (79 ppt), and the MDL in the sample (based on a 1:200-1:400 dilution) was 66-132 nM (15.7-31.4 ppb). The inline sensor, while requiring a grounded power source, has the ability to autonomously analyze multiple samples in a single experiment. The average MDL in this assay was 0.12 nM (29 ppt), and the MDL in the samples (based on 1:200 or 1:400 dilutions) was 24-48 nM (5.7-11.4 ppb). Both sensor platforms showed an acceptable level of agreement (r 2 = 0.94 and 0.76, for the inline and FPS, respectively) with conventional methods for uranium quantification.

Melton, Scott J↗

Advancing the understanding of coastal disturbances with a network-of-networks approach

Coastal ecosystems are at the nexus of many high priority challenges in environmental sciences, including predicting the influences of compounding disturbances exacerbated by climate change on biogeochemical cycling. Extreme events such as hurricanes, flooding, landslides, and wildfires influence biogeochemical cycling in these systems. However, while research in coastal science is fundamentally transdisciplinary – as drivers of biogeochemical and ecological processes often span scientific and environmental domains – traditional place-based approaches are still often employed to understand coastal ecosystems. In this perspective, we argue that integration among distributed research sites from a macrosystem perspective is crucial to understand how compounding disturbances affect coastal ecosystems. We identify a roadmap for the implementation of an integrated network-of-networks framework that leverages existing research network sites in coastal ecosystems to advance continental-scale process understanding for studying extreme events and global change. We also identify specific ways that existing research efforts can maximize mutual benefit, and where additional infrastructure investments might increase return-on-investment along the coast, using the coastal continental US as a case study.

Myers-Pigg, Allison N. [BATTELLE (PACIFIC NW LAB)]↗

Integrated Salt Waste Processing at the Savannah River Site - 18549

An intricate shoring system to provide protection to the workers and to critical components in the area was designed and installed. Designing and installing shoring systems is commonplace around the world, but installing it adjacent to high-level radioactive waste transfer lines nearly twenty feet in depth with tolerances within one-one thousandths of an inch required a more robust design. Upon completion, approximately 671 square meters (or 7,225 square feet) of sheet piling was installed without issue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Module OT PNM Field Demonstration Test Procedure

This document will detail a field demonstration test procedure for the Module OT device developed for the joint NREL-SNL DOE CEDS project titled "Modular Security Apparatus for Managing Distributed Cryptography for Command & Control Messages on Operational Technology (OT) Networks." The aim of this document is to create the testing and evaluation procedure for field demonstration of the device; this includes primarily functional testing and implementation testing at Public Service Company of New Mexico's (PNM's) Prosperity solar site environment. Specifically, the Module OT devices will be integrated into the Prosperity solar site system; traffic will be encrypted between several points of interest at the site (e.g., inverter micrologger and switch). The tests described in this document will be performed to assess the impact and effectiveness of the encryption capabilities provided by the Module OT device.

97 MATHEMATICS AND COMPUTING↗

Space Station as a Long Duration Exposure Facility

There is need for a space platform for experiments investigating long duration exposure to space. This platform should be maintainable in the event of a malfunction, and experiments should be easily recoverable for analysis on Earth. The International Space Station provides such a platform. The current Space Station configuration has six external experiment attachment sites, providing utilities and data support distributed along the external truss. There are also other sites that could potentially support long duration exposure experiments. This paper describes the resources provided to payloads at these sites, and cites examples of integration of proposed long duration exposure experiments on these sites. The environments to which external attached payloads will be exposed are summarized.

Folley, Adrienne↗

Development of an Integrated Waste Plan for Chalk River Laboratories - 13376

To further its Strategic Planning, the Atomic Energy of Canada Limited (AECL) required an effective approach to developing a fully integrated waste plan for its Chalk River Laboratories (CRL) site. Production of the first Integrated Waste Plan (IWP) for Chalk River was a substantial task involving representatives from each of the major internal stakeholders. Since then, a second revision has been produced and a third is underway. The IWP remains an Interim IWP until all gaps have been resolved and all pathways are at an acceptable level of detail. Full completion will involve a number of iterations, typically annually for up to six years. The end result of completing this process is a comprehensive document and supporting information that includes: - An Integrated Waste Plan document summarizing the entire waste management picture in one place; - Details of all the wastes required to be managed, including volume and timings by waste stream; - Detailed waste stream pathway maps for the whole life-cycle for each waste stream to be managed from pre-generation planning through to final disposition; and - Critical decision points, i.e. decisions that need to be made and timings by when they need to be made. A waste inventory has been constructed that serves as the master reference inventory of all waste that has been or is committed to be managed at CRL. In the past, only the waste that is in storage has been effectively captured, and future predictions of wastes requiring to be managed were not available in one place. The IWP has also provided a detailed baseline plan at the current level of refinement. Waste flow maps for all identified waste streams, for the full waste life cycle complete to disposition have been constructed. The maps identify areas requiring further development, and show the complexities and inter-relationships between waste streams. Knowledge of these inter-dependencies is necessary in order to perform effective options studies for enabling facilities that may be necessary for multiple related waste streams. The next step is to engage external stakeholders in the optioneering work required to provide enhanced confidence that the path forward identified within future iterations of the IWP will be acceptable to all. (authors)

54 ENVIRONMENTAL SCIENCES↗

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

2013↗

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cleaning Genesis Sample Return Canister for Flight: Lessons for Planetary Sample Return

Sample return missions require chemical contamination to be minimized and potential sources of contamination to be documented and preserved for future use. Genesis focused on and successfully accomplished the following: - Early involvement provided input to mission design: a) cleanable materials and cleanable design; b) mission operation parameters to minimize contamination during flight. - Established contamination control authority at a high level and developed knowledge and respect for contamination control across all institutions at the working level. - Provided state-of-the-art spacecraft assembly cleanroom facilities for science canister assembly and function testing. Both particulate and airborne molecular contamination was minimized. - Using ultrapure water, cleaned spacecraft components to a very high level. Stainless steel components were cleaned to carbon monolayer levels (10 (sup 15) carbon atoms per square centimeter). - Established long-term curation facility Lessons learned and areas for improvement, include: - Bare aluminum is not a cleanable surface and should not be used for components requiring extreme levels of cleanliness. The problem is formation of oxides during rigorous cleaning. - Representative coupons of relevant spacecraft components (cut from the same block at the same time with identical surface finish and cleaning history) should be acquired, documented and preserved. Genesis experience suggests that creation of these coupons would be facilitated by specification on the engineering component drawings. - Component handling history is critical for interpretation of analytical results on returned samples. This set of relevant documents is not the same as typical documentation for one-way missions and does include data from several institutions, which need to be unified. Dedicated resources need to be provided for acquiring and archiving appropriate documents in one location with easy access for decades. - Dedicated, knowledgeable contamination control oversight should be provided at sites of fabrication and integration. Numerous excellent Genesis chemists and analytical facilities participated in the contamination oversight; however, additional oversight at fabrication sites would have been helpful.

Allton, J. H.↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Brentwood Lessons Learned Project Report

The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.

30 DIRECT ENERGY CONVERSION↗